You are on page 1of 2

Unilateral Cp(l/u) - Cpk Calculator

Project : Date : Specification


Process / Product : Characteristic : Min Max
Operation : Cpk Criteria : 1.497

Data Std Deviation (s) : 0.001 Short-term Capability (Cpl) : 1.01


Part Actual Mean (m) : 1.499 Short-term Centered Capability - including Global Variation (Cpk) : 1.01
1 1.4980 Lower Control Limit (LCL) : 1.497
2 1.4970
3 1.4990 PROCESS IS CAPABLE
4 1.4990
5 1.4990 1.50
6 1.4990
7 1.50
1.4990
8 1.5000
1.50
9 1.5000
10 1.4990 1.50
11 1.5000
12 1.5000 1.50
13 1.5000
14 1.5000 1.50
15 1.4998
16 1.4999 1.50
17 1.4999
18 1.4998 1.50
19 1.4990
1.50
20 1.5000
21 1.4995 Actual Mean LCL LSL
1.50
22 1.4996
23 1.4998 1.50
24 1.4980 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
25 1.5000

File : 452028110.xls - Unilateral


Form Release : 1.00US
Copyright © 2005-2008 - Lean Flow Consulting - All Rights Reserved
Project : Date : Specification
Process / Product : Characteristic : Min Nominal Max
Operation : Cpk Criteria : 24 25 26

Data Std Deviation (s) : 7.656 Short-term Capability (Cp) : 0.04


Part Actual Mean (m) : 19.880 Short-term Centered Capability - including Global Variation (Cpk) : -0.18
1 25.0 Upper Control Limit (UCL) : 26.000
2 26.0 Lower Control Limit (LCL) : 24.000
3 27.0
4 28.0
5 18.0
40.00
6 14.0
7 17.0
8 12.0 35.00
9 15.0
10 19.0 30.00
11 25.0
12 35.0 25.00
13 25.0
14 25.0
15 25.0 20.00
16 25.0
17 25.0 15.00
18 29.0
19 10.0 10.00
20 5.0
21 8.0 Actual Mean UCL LCL USL LSL
22 5.00
10.0
23 19.0
24 18.0 0.00
25 12.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

File : 452028110.xls - Bilateral


Form Release : 1.00US
Copyright © 2005-2008 - Lean Flow Consulting - All Rights Reserved