DOLPHIN GAS FIELD DEVELOPMENT

CONTRACT 303740/01 - L2368

SITE QUERY

REF. No.: SQ/DRG/001 DATE: 04/08/95

SQ TYPE : DRAWINGS URGENT


x x
SPECIFICATIONS ROUTINE

SCOPE OF WORK

SUBJECT:
Spoolpiece at Dolphine A
REFERENCE:
Spoolpiece Details at Dolphin Platform A
Drg No. BG/TRI/D01/PIP/CN/04/02/404 Rev 0
TECHNICAL ISSUE:

The elevation and the Detail 1 of the above referenced drawing show the spoolpiece as
concrete coated up to the tail of the bend, whereas the plan View of the spoolpiece on
the same drawing shows a length of uncoated pipe from the tail of the bend

PROPOSED SOLUTION:

We propose that the spoolpiece be fabricated in accordance with the Plan View, ie with
a length of bare pipe after the bend tail.
Please advise if this is acceptable to Company.

SIGNED: DATE:

COMPANY RESPONSE:

SIGNED: DATE: