SITE QUERY
SCOPE OF WORK
SUBJECT:
Spoolpiece at Dolphine A
REFERENCE:
Spoolpiece Details at Dolphin Platform A
Drg No. BG/TRI/D01/PIP/CN/04/02/404 Rev 0
TECHNICAL ISSUE:
The elevation and the Detail 1 of the above referenced drawing show the spoolpiece as
concrete coated up to the tail of the bend, whereas the plan View of the spoolpiece on
the same drawing shows a length of uncoated pipe from the tail of the bend
PROPOSED SOLUTION:
We propose that the spoolpiece be fabricated in accordance with the Plan View, ie with
a length of bare pipe after the bend tail.
Please advise if this is acceptable to Company.
SIGNED: DATE:
COMPANY RESPONSE:
SIGNED: DATE: