1. CAR Section 2 Series E Part I Approval of organizations is issued vide


a) Rule 133 B b) Rule 133 A

c) Rule 155 A d) Rule 134

2. Mark the incorrect sentence, if any.


a) Category A organizations manufacture aircraft/aircraft goods/components
b) For cat A, B, C, D & E organizations separate approval in category ‘F’ is not required
c) The organization which tests the RPM gauge will be approved in D category
d) The approval to organization is based on the concept of delegated system of responsibility
3. A person who has corporate authority for ensuring that all tasks as per the scope of approval can be financed
and carried out as per DGCA standards is
a) QCM b) Nodal Officer

c) Accountable Manager d) Chief QCM

4. Aircraft Goods mean


a) Paints for use in civil aircraft
b) Dopes for use in civil aircraft
c) Fuels lubricants & special petroleum product intended for use in civil aircraft
d) All above and of an approved specification
5. Certificate of approval is issued by
a) QCM in case of scheduled operator
b) Chief engineer in case of unscheduled operator
c) Nodal Officer in case of private of aerial category aircraft operators
d) DGCA in case of all organizations
6. A management system for programming and coordinating the on going efforts in an organization in accordance
with requirements of DGCA is
a) Quality assurance
b) Programme management
c) Quality control
d) Scope of approval
7. An independent body with an overall authority for the supervision of quality standards, enabling the standards
set by the system of quality control to be enforced is known as
a) Quality assurance
b) Directorate of Airworthiness
c) Quality control
d) None of these
8. A document dispatched along with aircraft components certifying that the component has been obtained from
an approved source after overhaul/repair/manufacture is known as
a) Certificate of Maintenance
b) Release note
c) Rejection note
d) Certificate of approval
9. Mark the in correct sentence, if any.
a) An organization will be initially granted part approval and given 3 months time to meet the deficiencies
for final grant of approval
Page

b) Granting approval will be dependent on request of applicant and his capability/capacity to perform
work as required by DGCA
c) Scope of approval for routine maintenance of aircraft shall not be less than 100hrs inspection schedule

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

d) No incorrect statement
10. Organizations located within India will apply for initial issue of approval in
a) CA 182 D b) CA 182 C
2(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

c) CA 182 B d) CA 182 A

11. Indian organizations shall apply to ________ for initial issue of approval
a) DGCA Hqs b) RAWO/sub RAWO

c) Director of Air safely d) None of these

12. Foreign organizations will submit the application for initial approval to
a) DGCA HQs b) RAWO/sub RAWO

c) Director of Air Safety d) Ministry of External Affairs

13. Approval of foreign organization will be affected by


a) RAWO b) Sub RAWO

c) DGCA Hqs d) Ministry of External Affairs

14. Approval of Indian organization will be done by


a) Controller of Airworthiness
b) Officer incharge sub RAWO
c) DAW of RAWO
d) DAW at DGCA Hqs
15. Form CA 182 C is used for
a) Approval of Indian organization
b) Renewal of approval of foreign organization
c) Renewal of approval of Indian organization
d) Approval of foreign organization
16. Mark the incorrect statement, if any.
a) In case Indian Operators desire to carry out maintenance activities including daily inspection of their
fleet out side India, DGCA Hqs will grant such approval
b) For issue of approval a statement signed by accountable manager is mandatory
c) CA 182 D is used for renewal of approval of foreign organizations
d) All above statements are correct

17. Scope of approval of an organization will depend on


a) Qualification of QCM & Dy QCM
b) Capacity of the organization and availability of equipment
c) Both A & B
d) None
18. The nodal officer shall be reporting to
a) The QCM b) Head of organization

c) Accountable manager d) DGCA

19. The function of nodal officer is to


a) Ensure that all personnel are appropriately trained and qualified to accomplish the work
b) Ensure that appropriate instructions are developed, maintained, documented and followed for
Page

compliance, with requirements


c) Provide required spare parts and components from approved sources with appropriate documents
before use on aircraft owned by his organization

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

d) All of the above


20. Undergoing refresher course covering up-to date knowledge of technology, organizational procedure etc. is
necessary for all certifying staff atleast once
a) In two years b) In a year
3(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

c) In five years d) In six months

21. Mark the incorrect statement, if any.


a) Engineering organization manual is not required to be approved by DGCA
b) The QC manual will be approved by RAWO/Hqs
c) All pages of QC manual will be stamped by the DGCA
d) No incorrect statement
22. The engineering organization manual contains
a) Scope of work authorized by DGCA
b) Aims and objectives of the organization
c) The policy for amending QC manual, QA manual, Engg. orgn. manual
d) All above
23. Mark the incorrect statement, if any.
a) The quality assurance personnel will be from QC dept. who should highly experienced and have
rating/approval is their area of work
b) The quality assurance manager gives his report directly to QCM
c) The application for grant of approval of fuel companies shall be submitted at DGCA Hqs
d) All incorrect statements
24. Procedure for duplicate inspection of flight & engine controls is enumerated in
a) Quality control manual
b) Flight manual
c) Maintenance system manual
d) Aircraft maintenance manual
25. A list of maintenance related forms will be available in
a) Maintenance system manual
b) Engineering organization manual
c) Quality control manual, section-II maintenance
d) Quality assurance manual
26. Kingfisher Airlines will start scheduled airlines operation from April 2005 with A-320 aircraft. They have an
approved QCM who has 30 years experience in A-320 aircrafts. Their inspection schedule shall be
a) Approved by the QCM
b) Approved by the Sub RAWO
c) Approved by DGCA Hqs
d) None of these
27. The periodicity of inspection schedules shall be expressed not only in terms of lapsed flying hours but also in
terms of lapsed calendar period to
a) Ensure that all required inspections are performed
b) Ensure continued airworthiness of aircraft in the event of low utilization
c) So that DGCA can monitor the maintenance activities of the operator, with out the knowledge of
operator
d) All the above
28. Mark the correct statement, if any.
a) The inspection schedule of organization approved in cat ‘D’ will be approved by QCM it is has more than
3 years experience
b) Inspection schedule of cat ‘E’ organization will be approved by DGCA Hqs
c) Once approved, no item can be removed from inspection schedules of cat ‘A’ organizations
d) All correct statements
29. A list containing the current life of every major component shall be included in the
a) COSL b) QC manual
Page

c) MEL d) Maintenance system manual

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

30. For an operator who carried out his first in house audit in June, the next audit shall be carried out in
a) Next year July b) November

c) September d) One audit is sufficient is a year


4(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

31. In the event of an organization wishing to increase the scope of its existing approval the approval will be granted
by
a) Sub RAWO
b) QCM for scheduled operators having more than 3 years experience
c) RAWO
d) DGCA Hqs
32. Mark the incorrect statement, if any.
a) The maintenance schedules lower than 100 hrs at a sub base with in the country shall not require fresh
approval
b) The maintenance facilities of a sub base of an approved organization shall be approved by local
airworthiness office where the sub base is located
c) The maintenance activities at a sub base shall be monitored by local airworthiness office where the sub
base is located
d) No incorrect statement
33. Who will ensure that the work done at sub contractors facility meets the manufacturers/DGCA requirements
a) QCM b) Accountable manager

c) Nodal officer
d) Local airworthiness office where operator is based
34. Mark the incorrect statement, it any.
a) Indian organizations shall apply to RAWO for renewal of approval along with internal audit report & a
statement from Accountable manager
b) Foreign organizations shall apply to RAWO for renewal of approval along with internal audit report & a
statement from Accountable manager
c) Inspection schedules of 100 hrs and above at a sub base shall be approved by local airworthiness office
d) All correct statements
35. All the approved organizations shall retain a copy of all inspection records for
a) One year b) Two weeks

c) Ten years d) None of these

36. Whenever an organization to whom approval is granted, changes its name


a) The certificate of approval is not valid
b) The name in the certificate of approval is struck off, new organizations name is entered and officer
incharge RAWO will counter sign it
st
c) The certificate of approval once issued is valid till 31 December of the year. The change of name will
not affect the certificate of approval
d) B & C
37. Mark the correct sentence. If any
a) The third copy of release not will be sent to RAWO
b) The fourth copy of rejection note will be sent to RAWO
c) When a new certificate of approval is issued, previously issued certificate is to be returned to the
RAWO
d) All correct statements’
38. Which of the following changes in AO must be notified to the DGCA at the earliest
a) Change of Accountable Manager
b) Change of QCM
c) Change of location of maintenance facilities
d) All of the above
Page

39. The QC manual Volume I, Section II, Chapter 3 contains


a) Modifications b) Documentations

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

c) Computer maintenance
d) Maintenance programme-Inspection schedule
40. An organization seeking approval in Cat-B shall submit ______ no. of specimens of anodic oxidation process
a) Three specimens
5(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

b) A photograph showing plateau size


c) Twelve specimens
d) No specimen required
41. ‘CAR’ Series E part VII deal with
a) Fuel, lubricants organizations
b) Stores organizations
c) AMO
d) Test laboratories
42. Organizations approved in category D shall issue
a) Certificate of manufacture
b) Release note
c) Certificate of maintenance
d) None of these
43. Organizations seeking approval in cat D shall have to meet the requirements laid down in
a) CAR Series E Part VII
b) CAR Series E Part II
c) CAR Series E Part I
d) CAR Series E Part IV
44. The organization carrying out chemical analysis of aircraft goods will be approved in
a) Category B b) Category G

c) Category A d) None of these

45. Petroleum is bulk means


a) Petroleum contained in a container exceeding 900 ltrs in capacity
b) Petroleum in a receptacle in excess of 1900 ltrs
c) Petroleum is a receptacle exceeding 900 gallons in capacity
d) None of these
46. Which organization needs an approval from chief inspector of explosives, in addition to approvals from DGCA
a) Category A b) Category E

c) Category D
d) No additional approvals. All approvals are granted by DGCA, and is sufficient
47. Organization approved in cat E will issue a voucher to the customer with each consignment of aviation fuel
delivered by it into an aircraft in order to certify
a) The quantity b) The quality

c) The airworthiness requirements d) None of these

48. The procedure for receipt and testing of overseas shipment and the method of acceptance in case of cat ‘E’
organization will be found in
a) QC Manual b) QA Manual

c) Maintenance system Manual


d) Engineering organization Manual
49. Airworthy & Serviceable material, awaiting evidence of having been received from approved sources are called
a) Bonded stores b) Serviceable stores

c) Bulk stores d) None of these


Page

50. Release notes, will be preserved by stores organization for atleast


a) Ten years b) Five years

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

c) Two years d) One year

51. _________ Specifies that applicants who have passed a course from DGCA approved institute will be granted
one year relaxation in total aeronautical experience for grant of AME license
6(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

a) Rule 60 b) Rule 61

c) Rule 62 d) Rule 63

52. A training school shall apply for issue of approval in form


a) CA 2001 b) CA 9 Rev 5

c) CA 182 d) None of these

53. The section III of quality control manual of approved training school contains
a) Training of certifying staff & technicians
b) Distribution of QC manual
c) Records
d) None of the above is applicable to trg school
54. The instructors in a training school shall be approved by
a) Chief instructor
b) Local airworthiness office where school is situated
c) RAWO
d) None of the above
55. The question and answer papers of each semester shall be preserved for a period of
a) Five years b) Four years

c) Three years d) Two years

56. Which of the following information is not part of training manual?


a) Names & experience of all regular instructors
b) Name & address of all students semester wise
c) Details of practical trg to be imparted
d) All above are part of training manual
57. Any station other than the main base which is equipped to undertake lay over checks and rectification of minor
defects is
a) Parent base b) Transit station

c) Night halt station d) Line station

58. Which of the following manuals shall be available for reference at the night halt station?
a) Maintenance manual
b) Quality control manual
c) CAR
d) All the above
59. The transit/line stations shall have
a) Trouble shorting charts
b) Set of schedules including special inspection schedule
c) Both A & B
d) Transit/line stations need not to have any documents. Only qualified AME/authorized person with
adequately skilled staff is required
60. Mark the correct statement, if any.
a) The cat ‘D’ organizations shall preserve their records for five years
b) Cat ‘G’ organizations shall preserve their records for five years
c) Cat ‘F’ organizations shall preserve their records for five years
Page

d) All correct statements


61. Security clearance of foreign AME students should be obtained by
a) DGCA Hqs b) RAWO/Sub RAWO

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

c) QCM d) None of these

47. Separate approval in category “F” is not required for organization approved in any of the categories
7(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

a) A,C.D &E b) A,B,D &E c) A,B,C, & E d) A,B & C

48. Manager who has authority for ensuring that all the tasks of the approved organization can be financed and
carried out to the standard required by DGCA

a) QC Manager b) Accountable Manager

c) Finance Manager d) RAWO

49. A document issued to an organization approved by DGCA and defining the scope of approval granted:

a) Scope of approval b) Terms of approval

c) Certificate of approval d) None

50. Document accompanying the sale of aircraft component certifying that they were obtained from approval
source

a) Certificate of approval b) Release Note

c) Rejection Note d) Certificate of Manufacture

51. The scope of approval for routine maintenance shall not be less than

a) Daily inspection
b) 600 Hrs inspection outside India
c) Daily inspection for Indian organization
d) 100 Hrs inspection with in India
52. NODAL OFFICER is the requirement of the following operator / owner:

a) Who maintain their fleet of aero planes under approved programme


b) Who have contracted maintenance of their aircraft to an a AMO
c) It is applicable to state government a/c only
d) It is applicable to private aircraft only
53. Certifying staff issuing certificate of maintenance shall have

a) Six months of actual a/c maintenance experience


b) Six months of actual a/c maintenance experience in the preceding 12 months
c) Six months of actual a/c maintenance experience in the preceding 15 months
d) Six months of actual a/c maintenance experience in preceding 24 months
54. Quality control manual of Indian Airlines will be approved by:

a) RAWO b) DGCA HQ c) QCM

d) RAWO/Sub RAWO

55. Maintenance systems manual of Cat “C” organization shall be approved by:

a) DGCA b) DGCA in case of Indian Air lines


Page

c) RAWO in consultation with DGCA HQ


d) None
56. Vertical black line along the left hand margin of the text of the manuals is to identify:

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

a) Identifying revisions and amendments


b) Identifying important points
c) Identifying items of inspection as per MPD
d) None
8(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

57. Special inspection checks like hard landing etc. shall be included in

a) QC manual b) Maintenance scheduler

c) Special inspection schedule


d) None
58. Inspection schedule of scheduled operator will be approved by:

a) QCM b) RAWO c) DGCA

d) QCM in case of operator with 3 years experience, others by RAWO

59. Investigation of defects shall be completed;

a) Within 4 months b) Within 3 months

c) Within 6 Months d) Within 15 days

1. Certificate issued to signify that the design of a type of aircraft complies with applicable design standard?

a) Export C of A b) Type Certificate c) Certificate of compliance d) None

2. The approval of the “approval personnel” in Cat ‘A’ organization will be granted by:

a) RAWO b) DGCA c) QCM if delegated by RAWO d) a & c correct

3. Completed items in any category “A” organization shall be identified by:

a) Affixing part serial number


b) As in (a) or any other markings as per approved specification drawing
c) As in (b) and inspection stamps of final inspection shall also be affixed
d) As in (c) where these are not practicable, a tag or label shall be fixed.
4. Mark correct statements

a) Certification records of completed work during manufacture shall be retained for five years
b) Manufacturer shall have obtained approval under Cat `F’ and comply with all requirements
c) Cat-“A” organization shall keep all manuals (QC Manual, MSM & EOM) up-date
d) All the statements are correct
5. Corrective actions, improvement in the product subsequent to receiving defects / in service problems from
operators / AMO shall be notified to:

a) All users of the products b) DGCA

c) As in (a) & (b) and the procedure shall be included in QC Manual

d) As in C and the same may be included in MSM

6. After an aircraft component / item of equipment has been manufactured

a) QCM will issue certificate of manufacture


Page

b) QCM or an authorized person will issue certificate of manufacture


c) QCM or an approved person will issue certificate of manufacture
d) (b) & (c) are in-correct

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

7. Heat treatment applied to airframe or engine parts or accessories is the scope of:

a) Category “F” organization b) Category “C” organization


9(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

c) Category “B” organization d) Category “D” organization

. Mark correct statement

a) All changes / modifications in Category “B” organization will have DGCA concurrence
b) All changes / modifications effecting airworthiness / safety of aircraft shall be implemented after
concurrence by RAWO
c) All changes / modifications in an approved organization shall be promptly notified to RAWO
d) All are in-correct statements
9. Category “B” organization shall have

a) All three manual


b) QC & maintenance system manual
c) EOM & QC manual
d) EOM & MSM
10. Test specimen submitted by the firm for approval of cat B organization should have been

a) Processed in any DGCA approved organization


b) Processed in applicants workshop
c) As in (b) under the supervision of DGCA representative
d) As in (b) under the supervision of RAWO representative
11 Test specimen required to be submitted for approval of cadmium plating

a) Twelve specimen 8”X2”X16 Swg b) Twelve specimen 3”X3/4”X16 Swg

c) Three specimen 8”X2”X16 Swg d) None

12. The firm approved under Category “B” will issue the

a) Certificate of Maintenance b) Certificate of compliance

c) Certificate of inspection d) Test report & Release Note

13. The inspectors of Cat-“C” organization shall be approved by:

a) DGCA b) RAWO c) Local Airworthiness Office

d) QCM

14. Aircraft /Aircraft components released by Cat-“C” organization after the item has been serviced /inspected or
modified shall be accompanied by:

a) Certificate of maintenance b) Release Note c) Both A&B

d) As in C along with Test report

15. Certificate of maintenance by a Category “C” organization shall be signed by:

a) QCM b) Approved signatory c) AME

d) AME/Approved/Authorized person
Page

16. Firm asking for approval of Category “D” shall prepare and submit the following manuals

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

a) EOM b) EOM&QCM c) QCM & MSM

d) QCM & MSM


10(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

17. Test report issued by approved organization shall be signed by

a) Approved signatories b) QCM c) Authorized Person

d) Licensed Engineer

19. Bulk storage / Bulk mobile equipment used by Category E organization shall be approved by

a) DGCA b) RAWO c) Local Airworthiness Office

d) Chief explosive inspection

20. Test laboratories of Category “E” firm will be approved by

a) RAWO b) QCM c) DGCA d) None of the above

21. Format of release note and sale vouchers of Category “E” organization shall be approved by:

a) QCM b) RAWO c) DGCA d) None of the above

22. Release note and sale vouchers issued by Category “E” organization shall be preserved for

a) 5 years b) 10 years c) 2 years d) 1 year

23. Release note signatory is

a) A person approved by QCM to Sign Release Note


b) A person approved by RAWO to Sign Release Note
c) A person approved by the organization to Sign Release Note
d) A person approved by DGCA to issue Release Note
24. Stores where materials received from approved source with proper evidence are stocked:

a) Bonded stores b) Quarantine c) Approved stores

d) Category “F” organization

25. A certificate issued under approval granted by DGCA certifying that the materials / aircraft components have
been received from approved source and they are airworthy:

a) Release Note b) Certificate of maintenance

c) Type certification documents d) None of the above

26. A/c components drawn from bonded store but having been rejected after inspection are returned along with

a) Release Note b) Rejection Note c) Log Card/Log Book

d) Inspection Report

27. Distribution of rejection note is such that


Page

a) Third copy is for record b) First copy is to supplier

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

c) Second copy is to RAWO d) First copy is to RAWO

28. Mark the person responsible to ensure that goods released to customers from cat-F organization have not
11(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

deteriorated during storage

a)QCM b)Accountable Manager c)Release note signatory

d) QCM & Release note signatory

29. In-coming as well as outgoing release note in case of cat-F organ. shall be preserved for:

a) Two years b) Five years c) Ten years d) None

30. Any deviations from approved design document of an a/c component supplied by Cat-F organization will be
mentioned in:

a) In-coming Release Note b) Out-going Release Note

c) In-coming release note or any equivalent document and the same will be mentioned in out going
release note

d) None of the above

31. Mark the correct statement

a) Candidates who have passed AME Course from DGCA approved institute will be given one year
relaxation in the total aeronautical experience required for grant of AME License
b) The training period in AME institute will be counted for computing total aeronautical experience
required to appear in AME license examination

c) Aircraft Rule 61 of 1937 gives the requirements for issue of AME License

d) All the above are correct

32. Chief instructor of Category “G” organization is approved by

a) DGCA b) RAWO c) Local AW Office

d) Examined for approval by a board chairman of which will be an officer not below the rank of controller
of Airworthiness

33. Instructors to teach various subjects in DGCA approved institute are approved by:

a) RAWO b)DGCA c)QCM d)Chief Instructor

34. Overall Ratio of whole time instructors to students shall be

a) About 1:30 b) Not less than 1:30 c) Not more than 1:30 d) About 1:25

35. Security clearance of foreign students is the responsibilities of

a) DGCA b) RAWO c) Min of Civil Aviation d) Chief Instructor

36. No. of students in a batch of AME students shall be


Page

a) Not more than 30 b) Not less than 15 c) Not less than 10

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

d) Not more than 30 & Not less than 10

37. Total period of training in case of AME institute


12(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

a) 2 ½ years b) 3 ½ years c) 3 years d) None

38. Records of examination conducted in DGCA approved institute is required to be preserve for:

a) Six months b) Two years c) One year d)Five years

39. Internal audit for renewal of Cat-“G” organization shall be


st
a) Carried out and submitted to RAWO by 31 Dec
b) Carried out and submitted to Local Airworthiness Office at least two months before expire of approval
c) As in (b) but not earlier than 60 days
d) None of the correct
40. Application for approval of Category “G” organization

a) CA-182A b) CA-182C c) CA182 d) CA-182B

10. Separate approval in Cat-F is not required in case of

a) Category – A, B, D&E b) Category – A,B,C c) Category A,C,D&E

d) Category – A,B,C & E

11. Certificate issued by AME after carrying out some repair on aircraft is:

a) Structural repair scheme b) Certificate of Maintenance

c) Compliance certificate d) Flight Release Note

12. A document certifying that the item mentioned there under were obtained from an approved source
a) Maintenance Certificate b) Release Note c) Rejection Note

d) Certificate of Compliance

13. The scope of approval for routine maintenance shall not be less than

a) 100 Hrs. inspection schedule in case of organization in India


b) Daily inspection in case of organization located outside the India
c) 100 Hrs Inspection schedule for Indian organization and daily inspection in case of foreign organization
d) All are correct
14. CA-182C shall be submitted to:

a) RAWO b) RAWO/Sub-RAWO c) DGCA HQs

d) RAWO/DGCA in case of Indian / Foreign organization

15. Organization shall establish bonded stare to keep:


Page

a) A/c material and equipment


b) Serviceable material and equipment

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

c) All un-serviceable material/equipment


d) None of the above
16. Appointment of NODAL OFFICER is the requirement of
13(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

a) All AMO’s b) All operators c) Owners/operator of General Aviation A/C

d) As in C who contracted maintenance to an AMO

17. Which one of the following is responsible to ensure regular receipt of specific aircraft literature, amendments
etc, and making them available to AMO?

a) QCM b) Accountable Manager c) Nodal Officer d) DGCA/RAWO

18. Certifying staff involved in maintenance of aircraft shall undergo refresher course once in

a) 12 months b) 24 months c) 3years d) As desired by DGCA

19. Internal audit by QA team shall be carried out:

a) Once in every year b) Twice in every year

a) 30 days before renewal of organization


b) 60 days before renewal of organization
20. How many copies of manuals are required to be submitted for approval of a firm?

a) Two b) Three c) Four d) One

21. Any condition classified as major defect observed during maintenance or operation shall be reported to

a) DGCA b) Manufacturer c) DGCA and manufacturer d) None

22. The following shall be reported to DGCA/ RAWO:

a) Major defect b) Any condition classified as major defect

c) Mechanical delay d) All the above

23. Investigation of major defect shall be completed with in:

a) Four months b) Three months c) As early as possible

d) None of the above is correct

80. The form and manner of certificate issued by AO/AMO shall be approved by:

a) DGCA HQs b) RAWO c)


DGCA HQs or RAWO at the time of approval d) QCM/Chief QCM

01. Grant of approval to organizations engaged in ACAS modifications is governed by

a) Rule 133A of 37 b) Rule 133B of 34 c) Rule 133 C of 37 d) Rule 133 B of 37

2. An organization located out side India approval granted by DGCA under


Page

a) CAR&AAC 4 of 1998 b) CAR & ACCC 5 of 1998

c) CAR& AAC 6 of 97 d) CAR &AAC 8 of 1998

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

3. Certificate of maintenance is

a) A certificate issued in respect of aircraft, aircraft component / item equipment


14(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

b) Issued by appropriately licensed AME or approved person or authorized person


c) Issued after carrying out servicing, modifications, repairs and inspection etc.
d) All as above, certifying that work has been performed in accordance with the airworthiness
requirements stipulated by DGCA
4. Release note

a) A document accompanying the sale of aircraft components spares, materials goods


b) Certifying the same were be obtained from an approved source
c) After manufacture / repair/overhaul all relevant airworthiness requirements of the DGCA are satisfied
d) All correct
5. For issue of approval to an organization___ required

a) CA 182 A b) Fees

c) Statement of Accountable Manager d) All of the above

6. Rejection Note means

a) A document issued by an approved organization


b) For the purpose of advising details of the rejection of certified aircraft goods, which fail to meet the
applicable requirements
c) Only A is correct d) Both A and B correct
7. The scope of approval for routine maintenance of aircraft shall

a) Not less than 50 hrs. b) Not less than 100 hrs. c) Not less
than 200 Hr d) All the above

8. Storage and handling procedure for electro static devices are detailed in

a) AAC 5 of 2002 b) AAC 6 of 2000 c) AAC 8 of 2002 d) AAAC 2 of 2004

9. Literature required for aircraft maintenance as per scope of approval

a) Aircraft maintenance manual, component maintenance manual, CAR, advisory circular, airworthiness
directives
b) Structural repair manual, Illustrated parts catalogue, wiring diagrams manual, Component maintenance
manual
c) Service Bulletins (SB’s), service information letters, MMEL
d) All correct
10. Quality control and assurance manuals approved by -->mark incorrect answer

a) Indian airlines - DGCA HQs


b) Deccan Airlines - RAWO
c) Crescent Airways - RAWO southern region
d) Air India - DGCA HQs.
11. Engineering organization manual to be approved by

a) Need not required to be approved by DGCA


b) As at a), but its contents may influence DGCA decision
c) It is to be approved by RAWO
d) None
Page

12. Maintenance system manual to be approved by

a) To be approved by regional airworthiness office

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

b) As a) in consultation with DGCA HQs.


c) As a) in consultation with Civil Aviation Minister
d) None of the above
15(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

13. The periodicity of inspection schedules shall be expressed

a) Lapsed flying hours b) Lapsed calendar period c)


Both A and B correct d) None

14. Validity of approval


st
a) One year b) Six months c) 31 December of the year d) All correct

15. Renewal of approval for Indian airlines

a) CA 182 B b) CA 182A c) CA 182 C d) CA 182 D

16. Approval of below 100 hrs. Inspection at sub base

a) Sub base within the country not required fresh approval


b) Inspection schedules approved at the main base shall be followed at sub base
c) Both A and C correct d) None of the above
17. Preservation of records

a) Approved Organization must retain a copy of all inspection records and data for 2 year
b) Approved organization must retain records and data 180 days
c) Approved organization must retain records and data for 2 weeks
d) All correct
18. Distribution of release note
st rd
a) 1 copy to the consignee b) 3 copy to the organization records
nd
c) 2 copy to RAWO d) All correct

19. Rejection note is to be distributed


st nd
a) 1 copy to the suppliers b) 2 copy to the organization
rd
c) 3 copy to RAWO Office d) All correct

20. Change of name of approved organization

a) Certificate of approval no longer valid


b) On written application by the new organization, DGCA may change the name by striking off old name
c) Previously issued documents will be effective with DAW’s signature
d) Both b) and c) correct
21. Certificate of manufacture means

a) A certificate issued by duly authorized person


b) The aircraft/component mentioned there in has been manufactured by the firm
c) The aircraft has been manufactured according to approved drawings
d) As in a) & b) and has been manufactured as per approved specification and drawings and is airworthy
22. Type certificate means

a) A certificate issued or validated by DGCA


Page

b) Signify that the design type of aircraft, aircraft component or item of equipment is acceptable to DGCA
c) That the design complies with the applicable design standard as specified or approved
d) All correct

DOWNLOAD OUR MOBILE APP FROM PLAY STORE @DGCA QUESTION PAPERS
IF YOU HAVE PREVIOUS SESSION QUESTION PAPERS, SHARE WITH US AT AVIATORSLINKS@GMAIL.COM
WWW.DGCAQUESTIONPAPERS.IN - (PAPER 1SERIES ‘E’ QUESTIONS)

23. All records of inspection and certifications of completed work in an approved manufacturer like HAL shall be
retained
16(www.dgcaquestionpapers.in), Like us on Facebook @ fb/DGCAQuestionPapers (ParT 66 Questions are also available)

a) 5 years b) 3 years c) 5 years from the date of manufacture