You are on page 1of 6

PROJECT: 220KV OHL Works for New Rumaitha and New Dabbiya

CONTRACT No. N-13859


CLIENT: M/S TRANSCO
CONSULTANT: M/S ELECTRICITE DE FRANCE (EDF)
MAIN CONTRACTOR: M/S KALPATARU POWER TRANSMISSION LTD
Tower Type AT0 LE+2
MOMENT CALCULATION
LOAD CASE: COMPRESSION
DATA
PILE DIA D 0.50 m
CONCRETE COVER Ds 75 mm
PILE LENGTH L 8.00 m
AXIAL LOAD P 150 kN
HORIZANTAL LOAD OUT OP PLUMP (P/75) U 2 kN
RESULTATNT HORIZANTAL LOAD H 20 kN
TOTAL HORIZANTAL FORCE Ht 22 kN
CONCRETE STRENGTH fc 35 N/mm²
PILE PROJECTON ABOVE G.L P * 0.075 11.25 m
EXTERNAL MOMENT 32 kN.m
MOMENT ON TOP Mt 43.25 kN.m

CALCULATION
pile Area Ac 0.1963494 m²
Moment of initial Ip 0.00307 m⁴
Modules of elastic(E) Ep 2.70E+04 MN/m²
co-efficient of sub grade modulus variation nh 40 MN/m³
Stiffness Factor (Ep*Ip/nh)^1/5 T 1.157 m
Zmax (L/T) 6.92

Elastic analysis of Laterally-load vertical Piles (Ref.1. M.J. Tomlinson art. 6.3.4)

Bending Moment = MA + MB = Am * Ht * T + Bm * Mt

Z
Depth (x)
(Depth/T) Am Bm Ma

MTS MTS
0.00 0.00 0.00 1.00 0
0.23 0.20 0.25 0.99 6
PROJECT: 220KV OHL Works for New Rumaitha and New Dabbiya
CONTRACT No. N-13859
CLIENT: M/S TRANSCO
CONSULTANT: M/S ELECTRICITE DE FRANCE (EDF)
MAIN CONTRACTOR: M/S KALPATARU POWER TRANSMISSION LTD
Tower Type AT0 LE+2
MOMENT CALCULATION
LOAD CASE: COMPRESSION
0.46 0.40 0.40 0.98 10
0.69 0.60 0.55 0.96 14
0.93 0.80 0.65 0.92 17
1.16 1.00 0.73 0.85 19
1.39 1.20 0.78 0.78 20
1.62 1.40 0.78 0.68 20
1.85 1.60 0.73 0.59 19
2.08 1.80 0.67 0.46 17
2.31 2.00 0.60 0.40 15
2.54 2.20 0.52 0.30 13
2.78 2.40 0.45 0.22 11
3.01 2.60 0.36 0.15 9
3.24 2.80 0.28 0.07 7
3.47 3.00 0.23 0.00 6
3.70 3.20 0.16 0.00 4
3.93 3.40 0.10 0.00 3
4.16 3.60 0.08 0.00 2
4.40 3.80 0.05 0.00 1
4.63 4.00 0.03 0.00 1
4.86 4.20 0.01 0.00 0
5.78 5.00 0.00 0.00 0
6.94 6.00 0.00 0.00 0
8.10 7.00 0.00 0.00 0
9.25 8.00 0.00 0.00 0

AREA OF STEEL REQUIRED (FROM PROKON) Ast = 3817 mm² (0.49 % of Ac)

AREA OF STEEL PROVIDED Ast = 16085 mm² (20 T 32 )


PROJECT: 220KV OHL Works for New Rumaitha and New Dabbiya
CONTRACT No. N-13859
CLIENT: M/S TRANSCO
CONSULTANT: M/S ELECTRICITE DE FRANCE (EDF)
MAIN CONTRACTOR: M/S KALPATARU POWER TRANSMISSION LTD
Tower Type AT0 LE+2
MOMENT CALCULATION
LOAD CASE: COMPRESSION
Depth from G.L. (m))

Moment Diagram for AT0 LE+2


Total Moment (kN-m)
0 250 500 750 1000 1250 1500
0

10

12

14

16

18

20

22
maitha and New Dabbiya

Mb M(a+b)

43 43
43 49
maitha and New Dabbiya

42 53
42 56
40 56
37 55
34 54
29 49
26 44
20 37
17 33
13 26
10 21
6 16
3 10
0 6
0 4
0 3
0 2
0 1
0 1
0 0
0 0
0 0
0 0
0 0

(0.49 % of Ac)
maitha and New Dabbiya

AT0 LE+2
-m)
1250 1500 1750 2000

You might also like