1 Sluice pump 100 200 65 73 76 82 70
2 CCCWP-A 100 200 65 69.4 74 69 78
3 CCCWP-B 100 200 65 75 75 68 73
4 OCC Water A 100 200 65 72.8 79.8 69 77
5 OCC Water B 100 200 65 77 73.3 68 98
6 H2 sampling point 100 200 65 80.3 81.3 69 103
7 N2 filling station 100 200 65 67.5 50 11.11.19 46 13.11.19 53 14.11.19
8 CO2 filling station 100 200 65 43 10.11.19 51 11.11.19 49 13.11.19 63
9 Electric water stainer 100 200 65 77 87 66 83
10 Evaporating cooling unit- A 100 200 65 82 68 72 68
11 Evaporating cooling unit- B 100 200 65 69 74 76 76
12 Vaccum pump-A 100 200 65 64.5 49 11.11.19 48.5 13.11.19 50 14.11.19
13 Vaccum pump-B 100 200 65 67 87 73 75
14 Vaccum pump-C 100 200 65 64.8 45 11.11.19 49 13.11.19 45 14.11.19
15 Hydrogen dryer Unit 100 200 65 80 69 66 87
16 Seal oil system 100 200 65 69 82 68 67
17 Condenser front side 100 200 65 79 76 70 75
18 Condenser back side 100 200 65 68 42.1 11.11.19 51 13.11.19 46 15.11.19
19 Condenser de watering pump A 100 200 65 60 10.11.19 48 11.11.19 50 13.11.19 43 15.11.19
20 Condenser de watering pump B 100 200 65 61.2 10.11.19 48 11.11.19 49 13.11.19 44 15.11.19
21 Rubber ball recirculating pump 100 200 65 62 10.11.19 50 11.11.19 48 13.11.19 45 15.11.19
22 Oil transforemer pump area 100 200 65 77 80 87 87
23 Oil purifying device 100 200 65 82 69 70 79
24 Bypass EH oil device Unit 100 200 65 69 68 78 84
25 Oil cooler Unit 100 200 65 68 69 73 88
26 Jacking Oil Pump Unit 100 200 65 69 88 77 83
27 Turbine MCC front side 100 200 65 68 69 98 68
28 Turbine MCC back side 100 200 65 69 66 86 76
29 Mix bed Unit area 100 200 65 60 41.5 12.11.19 46 13.11.19 43.4 15.11.19
30 fire resistant oil pump 100 200 65 82 68 69 69
31 Stator cooling water Unit 100 200 65 69 75 68 68
32 CPU analizer 100 200 65 68 87 69 69
33 Condenset pump (CEP)-A & B 100 200 65 69 70 68 68
34 TDBFP Booster pump A 100 200 65 68 78 69 69
35 TDBFP Booster pump B 100 200 65 69 73 77 77
36 MDBFP 100 200 65 77 77 72 72
37 LP heater emergency drain valve Unit 100 200 65 72 98 66 66
38 Lubricating cooler of the M-BFP Unit 100 200 65 66 101.2 72 72
39 CPU regeneration system 100 200 65 72 66 76 76
40 CPU control room 100 200 65 76 72 74 74
41 Maintenance Bay of Unit-1 & 2 100 200 65 74 83 85 85
6.9 M
42 Gland steam vent condensor 100 200 65 69 77 69 80
43 Deaerator water level Unit 100 200 65 68 82 68 69
44 Drainage of main steam piping 100 200 65 69 69 69 68
45 MOT 100 200 65 68 68 68 69
46 Governing valve unit 100 200 65 69 46 12.11.19 41.8 14.11.19 48 15.11.19
47 IP HP control valve station 100 200 65 64.2 73 75 69
48 CEP recirculation Unit 100 200 65 77 77 73 66
49 LP heater-7 100 200 65 82 98 69 69
50 LP heater-8 100 200 65 69 88 87 75
51 Exciatation transformer R phase Front 100 200 65 68 40.3 12.11.19 43.2 14.11.19 44 15.11.19
52 Exciatation transformer R phase Back 100 200 65 69 68 69 78
53 Exciatation transformer Y phase Front 100 200 65 61.1 48 12.11.19 44 14.11.19 46 15.11.19
54 Exciatation transformer Y phase Back 100 200 65 69 75 73 77
55 Exciatation transformer B phase Front 100 200 65 67 49.5 12.11.19 44 14.11.19 42 15.11.19
56 Exciatation transformer B phase Back 100 200 65 72 76 87 69
57 Neutral grounding transformer panel 100 200 65 76 69.4 68 68
58 LP heater No.6 100 200 65 74 75 75 69
59 IP feed water piping 1 100 200 65 75 75 87 77
60 IP feed water piping 2 100 200 65 79.4 85 70 72
61 No 5 LP heater 100 200 65 73.8 89.4 78 66
62 Auxillary steam header Unit 100 200 65 63 44.5 12.11.19 43 14.11.19 43.6 16.11.19
63 6th extraction steam pneumatic drain valve 65 77 87 77 76
area 100 200
64 Between butter fly valve A & B 100 200 65 82 72 98 74
13.7 M
65 Generator area 200 200 65 90 68 80 87
66 Turbine area 200 200 65 97 75 69 75
67 4th steam extraction piping 200 200 65 88 87 68 69
68 LP feed water turbine 200 200 65 87 70 69 87
69 seal oil tank smoke extractor fan 200 200 65 92 78 88 77
70 NO 1 HP heater 200 200 65 92 43 12.11.19 44 14.11.19 42 16.11.19
71 NO 2 HP heater 200 200 65 92 44.2 12.11.19 40.5 14.11.19 41.4 16.11.19
72 NO 3 hp heater 200 200 65 87 98 66 75
73 TD FWP-A 200 200 65 69 98 72 86
74 TD FWP-B 200 200 65 82 66 76 75
75 Deaerator floor 200 200 65 76 72 74 41.2 16.11.19
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
ILLUMINATION LEVEL-AHP Area For October -19
Lux Reading
SI. Location/Description Standard as per Standard as per As per Odisha Targate Remarks
No IS 3646 (lux) IFC (lux) Factories Rule Unit Date
(# 1 & # 2)
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
3
400 KV New Control Room LILO-1(Line-11 & 12) 200-300 100 65
Switchyard
Type LILO-3(Line-7 & 8) 100 100 22
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
EL-Switchyard For October-19
ILLUMINATION
LEVEL Targate
Date Remarks
(IN lUX)
80
85.2
92.5
75.8
26.2
66.8
ILLUMINATION LEVEL-CHP Area
For the month : June 2016
As per
Standard as Standard ILLUMINATI
Odisha
SL No Arae Location per IS 3646 as IFC ON LEVEL Remarks
Factories (IN lUX)
(lux) (Lux) Rule
1 Con-0 Mcc panel 200-300 500 65 55
2 0A-Tail End 70-100 100 22 7
3 0B-Tail End 70-100 100 22 13
4 0C-TailEnd 70-100 100 22 23
5 0D-TailEnd 70-100 100 22 5
6 0A-Head End 70-100 100 22 340
7 0A-Middle 70-100 100 22 18
8 0B-Head End 70-100 100 22 342
9 0B-Middle 70-100 100 22 19
10 0C-Head End 70-100 100 22 45
11 0C-Middle 70-100 100 22 13
12 Conveyor-0 0D-Head End 70-100 100 22 43
13 0D-Middle 70-100 100 22 16
14 0A side between 2 lights 70-100 100 22 11
15 0B side between 2 lights 70-100 100 22 12
16 Near Mcc panel board 70-100 100 22 56
17 Near sewage pump-T.E 70-100 100 22 20
18 Near sewage pump-H.E 70-100 100 22 28
19 Emergency exit 70-100 100 22 2
20 Con-0 Chute area 70-100 100 22 130
21 chute area to con-1 staircase 70-100 100 22 44
22 TT-1 70-100 100 22 12
23 Dozer shed 70-100 100 22 24
24 Head end 70-100 100 22 38
25 Tail End 70-100 100 22 37
Track Hopper
26 Middle side 70-100 100 22 34
27 Middle between 2 lights 70-100 100 22 33
28 Con-1 T.E 70-100 100 22 47
29 Con-1A H.E 70-100 100 22 73
30 Con-1B H.E 70-100 100 22 74
31 Con-1A Middle side 70-100 100 22 35
32 Con-1B Middle side 70-100 100 22 37
Conveyor-1 Con-1A&B Middle between 2
33 lights 70-100 100 22 27
34 Con-1A&B Middle side 70-100 100 22 27
35 Con-1A&B T.E side 70-100 100 22 37
36 Con-1A&B H.E side 70-100 100 22 73
37 Near Dust catcher 70-100 100 22 66
38 Con-2 T.E 70-100 100 22 75
39 Con-2A Middle 70-100 100 22 60
40 Coal sampling -1 70-100 100 22 20
41 Con-2A H.E 70-100 100 22 45
42 Con-2B Middle side 70-100 100 22 20
43 Con-2B H.E side 70-100 100 22 76
44 Con-2A&B between 2 lights 70-100 100 22 60
Conveyor-2
45 Con-2A&B T.E side 70-100 100 22 73
46 Con-2A&B H.E side 70-100 100 22 67
47 Con-2A&B Middle side 70-100 100 22 60
48 2A -1 drive 70-100 100 22 83
49 2A-2 drive 70-100 100 22 77
50 2B -1 drive 70-100 100 22 60
51 2B-2 drive 70-100 100 22 56
52 Crusher MCC panel 200-300 500 65 93
53 Screen motor-A 70-100 100 22 44
54 Screen motor-B 70-100 100 22 97
55 Screen motor-C 70-100 100 22 74
56 Screen motor-D 70-100 100 22 84
Middle of Screen motor
57 A,B,C&D 70-100 100 22 43
Crusher house
58 Crusher motor-A 70-100 100 22 35
59 Crusher motor-B 70-100 100 22 68
60 Crusher motor-C 70-100 100 22 8
61 Crusher motor-D 70-100 100 22 35
Middle of Crusher motor
62 A,B,C&D 70-100 100 22 21
63 Mcc panel board 70-100 100 22 53
64 3A&B T.E 70-100 100 22 130
65 Fabrication yard 70-100 100 22 90
66 3A&B T.E sewage motor 70-100 100 22 32
67 3A&B T.E DDs motor 70-100 100 22 20
68 3A T.E 70-100 100 22 128
69 3A H.E 70-100 100 22 62
70 Conveyor-3 3A&B between2 light 70-100 100 22 27
71 3B middle 70-100 100 22 47
72 TT2 70-100 100 22 82
73 3B H.E 70-100 100 22 30
74 3A&B T.E -Middle 70-100 100 22 135
75 3A&B Middle 70-100 100 22 40
76 3A&B H.E 70-100 100 22 47
77 4A&B-T.E 70-100 100 22 52
78 4AMiddle 70-100 100 22 48
79 4A H.E 70-100 100 22 38
80 4B Middle 70-100 100 22 32
81 Conveyor-4 4B H.E 70-100 100 22 33
82 4A&B middle between2 lights 70-100 100 22 13
83 4A&B T.E 70-100 100 22 37
Conveyor-4
Conveyor-8
129 8A&B T.E ,Between 2 lights 70-100 100 22 10
130 8A&B middle 70-100 100 22 2
131 Conveyor-8 8A Middle 70-100 100 22 0
132 8B Middle 70-100 100 22 0
133 8A&B Drive motor,Middle 70-100 100 22 11
8A&B -Drive motor Between 2
134 lights 70-100 100 22 24
135 Con 9A&B inside Mcc Panel 200-300 500 65 8
136 9A&B T.E 70-100 100 22 10
137 9A&B Between Unit-1&2 70-100 100 22 26
138 9A&B Between 2 lights 70-100 100 22 17
Conveyor-9
139 9A&B H.E 70-100 100 22 13
140 9A Middle 70-100 100 22 22
141 9B Middle 70-100 100 22 12
142 9A&B Between 2 lights 70-100 100 22 29
143 Con 10A&B inside Mcc Panel 200-300 500 65 18
144 10A&B T.E 70-100 100 22 11
145 10A&B Between Unit-3&4 70-100 100 22 22
146 10A&B Between 2 lights 70-100 100 22 24
Conveyor-10
147 10A&B H.E 70-100 100 22 13
148 10A Middle 70-100 100 22 27
149 10B Middle 70-100 100 22 10
150 10A&B Between 2 lights 70-100 100 22 24
Note:
Calibration of Lux Meter: PCL/7640/16-17
Serial No: 130925699
Date of Calibration: 22-09-16
Due Date of Calibration: 22-09-17
Note:
Calibration of Lux Meter:
Serial No:
Date of Calibration:
Due Date of Calibration:
ILLUMINATION LEVEL-Boiler Area For OCTOBER-19
As per Unit # 1
Standard Standard Odisha Unit # 2 Unit # 3 Unit # 4
Illumina Target Target Target Target
SN LOCATION AREA as per IS as per IFC Illuminati Illuminati Illuminati Remark
Factories tion (lux) Date Date Date Date
3646 (lux) (lux) on (lux) on (lux) on (lux)
Rule
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020