You are on page 1of 1
AANS4O VEDANTA 4X600 MW IPP, JHARSUGUDA steag PERMIT NO: __ 173008 Check List For GENERATOR 'w.0. No 4454 bare 25-07-2013 S1.NO JOH DESCRIPTION status [REMARKS ‘Carbon Brush Cleaning and replacement if Jcarbon brushes cleaned and lengt arthing Copper Flexible replacement. | CT ratio test, Knee point test, Pal | Test, Resistance measurement. ty Test lk Pr ie value Test, Resistance Value, Ratio Test, [Pre Fase repiocemen if requiced 'Work completeet 'Work completed Work completed [rout satistactory. feonatton af copper tees Values are in test report Values are in test repor e Terminal tightness in terminal box. lwork completed Terminals tightness done by ‘Generator Bus duct Pressure device and © htemperature monitoring device checking Work completed applying washers. Discharge hose was damaged and it was replaced. Phase: 1.18 G ohm(i min) 7 |Generator IR and Pl value measurement | Work completed 4.696 ohm (10 min); PI=1.46 Ly Phase: 560 M olums{1 mint, | | R-R'=1,394 m ohm ; 8 (Generator winding resistance measurement _|Work completed 'y-¥'=1.379 mom: BB 394 mobm 9 [Generator relay testing [work completed Values are in test report Checking , cleaning, tightness & ratio test of 10 |xor | work competed Values are in test report 11 [Generator air leakage test checking ‘Work completed Found no leakage of air any segments of busduct and at the end 12 [Generator SCC and OCC testing ‘Work completed All vollage and current parameters observed found OK STEAG ENGINEER Sign Name Suscesh, Ch. ety . = nye Name ragoos Cert

You might also like