48195
VEDANTA 4X600 MW IPP, [HARSUGUDA
PERMIT NO: 12787
Icheck List For Av W.0. 0 36133
DATE 16-10-2013
[si.No jo pEscRP TION staTus | REMARKS:
(Complete cleaning of AVR including indivi
fer
Work completed
‘All Dian BO Signals fom AVR to DCS,GP Prox. a =
Foe cneckea Work completed |
3 [AllAux. transformer tobe checked Work compet
Js [control cirewe Tigh
ess to he checked werk completed
Js [attaux. contactors and Relays tobe checked Work compleved
[al the converter bank cooling fans, Flap Limit Switenes
Jé—_|ctcaningand working conditiontohechecked and [Work completed
replacement as per requirement
All the converter bank MPCH,Contactorcleaningand
17 working condition to be checked and replacement as per [Work completed
requirement
[Converter bank HRC Fuse healthiness tobe checked and
|* [replacement itrecessary. eceeeeee
> aR Greate estinestebececkntand wacom
[Shunt Fase healthiness to be checked and replacement if
ho work completed
necessary, *
[AVR incoming AC busduct cleaning and tightness ae
Ht feecking Mork completed
[AVR outgoing DC busduct cleaning and tightness
2 work completed
checking support insulator cleaning z
Tamp load testing of AVR@oltage controling fan supply
13 |ehangeoverfan changeoverslap gate closingchanel [Work completed Working propery
changeover)
14 [AVR controling checking during OCC (Voltage oe oe
controling checkingchanel changeover checking) | 0" eometed eae
'STEAG ENGINEER, set ‘oPN
Sign, sien And sien f Mel
Zaigeh — Ava cowl aS
Name Sexe Chandon pry : same fink 6 mqoorcsre