You are on page 1of 1
48195 VEDANTA 4X600 MW IPP, [HARSUGUDA PERMIT NO: 12787 Icheck List For Av W.0. 0 36133 DATE 16-10-2013 [si.No jo pEscRP TION staTus | REMARKS: (Complete cleaning of AVR including indivi fer Work completed ‘All Dian BO Signals fom AVR to DCS,GP Prox. a = Foe cneckea Work completed | 3 [AllAux. transformer tobe checked Work compet Js [control cirewe Tigh ess to he checked werk completed Js [attaux. contactors and Relays tobe checked Work compleved [al the converter bank cooling fans, Flap Limit Switenes Jé—_|ctcaningand working conditiontohechecked and [Work completed replacement as per requirement All the converter bank MPCH,Contactorcleaningand 17 working condition to be checked and replacement as per [Work completed requirement [Converter bank HRC Fuse healthiness tobe checked and |* [replacement itrecessary. eceeeeee > aR Greate estinestebececkntand wacom [Shunt Fase healthiness to be checked and replacement if ho work completed necessary, * [AVR incoming AC busduct cleaning and tightness ae Ht feecking Mork completed [AVR outgoing DC busduct cleaning and tightness 2 work completed checking support insulator cleaning z Tamp load testing of AVR@oltage controling fan supply 13 |ehangeoverfan changeoverslap gate closingchanel [Work completed Working propery changeover) 14 [AVR controling checking during OCC (Voltage oe oe controling checkingchanel changeover checking) | 0" eometed eae 'STEAG ENGINEER, set ‘oPN Sign, sien And sien f Mel Zaigeh — Ava cowl aS Name Sexe Chandon pry : same fink 6 mqoorcsre

You might also like