Well pressure control is the most critical consideration in the planning and performing any
well servicing operation.
The awareness of well pressure control in the prevention of injury to personnel, harm to the
environment and potential loss of facilities, must be fully appreciated by planning engineers
and well site personnel. This appreciation must include a sound knowledge of legislative
requirements, completion equipment, pressure control equipment and operating practices
and procedures.
‘Well Intervention’ and ‘Workover’ are commonly used terms to describe servicing operations
on oil and gas wells and which have, in the past, had many different interpretations. However,
in general,‘Workover’ describes well service operations on dead wells in which the formation
pressure is controlled with hydrostatic pressure. Workover operations are carried out by a
drilling rig, workover rig or Hydraulic Workover Unit (HWO) where the Xmas tree is removed
from the wellhead and replaced by blow out preventor (BOP) equipment.‘Well Intervention’
is a term used to describe ‘through-tree’ live well operations during which the well pressure
is contained with pressure control equipment.Well Interventions are generally conducted by
wireline, coiled tubing or snubbing methods. Snubbing operations are now usually conducted
with HWO units.
This ADS course is designed to train personnel in Well Intervention Pressure Control.
Well pressure control equipment used by wireline, coiled tubing and snubbing units is so
termed as it must control well pressure during live well intervention operations. It significantly
differs from BOP systems used on dead well workovers. As most well servicing is now carried
out by these live well intervention methods, it is essential that these are fully addressed during
this course. The term Well Control specifically applicable to drilling or dead well workover
operations are not addressed in this manual. However, it is necessary to review Production
Well Kill Techniques and have a thorough understanding of Pressure Basics to minimise risks
involved when placing fluids in the well, whether it is to provide a barrier or when performing
a well intervention activity.
To have an understanding of well operations conducted by live well intervention methods
and the associated pressure control equipment, it is first necessary to have, or obtain, a basic
knowledge of completion designs, completion equipment, practices, well service methods
and their applications. An overview of these activities is given in the manual with a multitude
of exercises the student can work through to review their knowledge.
Training in well intervention well pressure control is an essential part in ensuring the
competence of personnel involved in the planning and carrying out of live well servicing
operations.The Aberdeen Drilling Schools Ltd. WELL INTERVENTION PRESSURE
CONTROL TRAINING COURSE and course materials intend to provide this essential
knowledge in order to help delegates to obtain an IWCF (International Well Control Forum)
certificate in Well Intervention Pressure Control.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
The overall aim of the course is to provide a delegate with the theoretical skills essential in
applying well pressure control during well intervention and servicing operations with the
objective of improving the individuals knowledge and level of competence.
AIMS
OBJECTIVES
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 1
1. OVERVIEW OF COMPLETIONS
1.1 INTRODUCTION
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 2
2.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 3
3.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 4
4.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 5
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 6
6. PRESSURE BASICS
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 7
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 8
8.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 1
1. OVERVIEW OF COMPLETIONS
1.1 INTRODUCTION
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
1. OVERVIEW OF COMPLETIONS
1.1 INTRODUCTION
In combination with the disciplines of geology, geophysics, and geochemistry, the usual
purpose of drilling a well is to establish the subsurface location of hydrocarbon reservoirs.The
term ‘completion’ is derived from the operation to complete a well for production after it has
been successfully drilled. Dependent upon the reason for a well to be drilled (i.e. wild cat
exploration, appraisal or production) and the results of logging and/or well test results, the
well will then be:
In the early days, if the well was to be ‘completed’ (as in iii) above, the hardware installed, i.e.
packer, tubing, Xmas tree and other accessories, was termed the ‘completion’.The purpose of
completing a well is to produce hydrocarbons to surface production facilities. Commercial
reasons demand that this is achieved in an efficient, cost effective and safe manner throughout
the producing life of the well.
Completing a well consists of a series of operations that are necessary to enable a well to
produce (and to sustain the production of) hydrocarbons following the installation and
cementing of the casing. Well completion operations include:
• Perforating.
• Sand control.
• Production packer installation.
• Tubing (completion) string / tubing hanger installation.
• Downhole safety valve installation.
• Xmas tree installation.
• Bringing the well onto production.
Well servicing methods must be considered as a fundamental element in the planning and
completion design process. For example, early measurement of formation parameters (porosity,
permeability) may indicate the need to stimulate (fracturing, acidising) a well to enhance the
production rate. An appropriate completion design must cater for these and any future possible
well servicing operations, both planned and unplanned. Similarly, subsea completions will
necessitate operations such as flowline and surface safety valve installations. It should be
emphasised here that such completion operations are not independent and the engineer needs
to understand the basics in every area to be most effective in producing a completion design
to cater for all contingencies.
An engineer, when considering completion options, should adopt a realistic approach to the
overall project economics i.e. the cost of the equipment, service life, type of servicing and
respective rig time etc. In general, the ideal completion is the lowest cost completion which
will meet the demands placed on it during its producing life.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
In reality, many unforeseen problems can arise due to the initial available data being deficient
and it is commonly seen that subsequent completion designs on a field are developed as the
data base increases.
Even though different types of wells present distinct design and installation problems for the
engineer, most completion types are simply variations on a few basic designs, therefore the
equipment installed is generally similar. Completions may be classified with respect to the
following.
Reservoir/Wellbore Interface
In the absence of formation damage, this determines the rate at which well fluid is transferred
from the formation to the wellbore.
Mode of Production
This relates to the way well fluid is transferred from the wellbore at the formation depth to
the surface, i.e.:
• Flowing.
• Artificial lift.
This effectively governs the volume of hydrocarbons recoverable from a single bore hole:
• Single.
• Multiple.
Figure 1.1 indicates the types of completions and various methods used to produce well fluid
to surface.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Interval segregation
Multiple Zone
Concentric String
Multiple Strings
Number of Zones
Single Zone
Interval Co-Mingling
Standard
Hydraulic Pump
Production
Mode of
Rod
HighPressure
Temporary, simple, low cost
Tubingless
Perforated Casing
Standard
Wells
Perforated Liner
Wellbore and Reservoir
Interface Between
Uncemented Liner
Slotted Pipe
Open Hole
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
In this type of completion the casing is set in place and cemented above the productive
formation(s). Further drilling extends the wellbore into the reservoir(s) and the extended
hole is not cased; See Figure 1.2.
This completion method is used where it is desirable to expose all zones to the wellbore.
Producing formations must be of firm rock which will remain in place during production.
Open hole completions are also referred to as ‘barefoot’ completions.
Cement
Cement
Production Casing
Formation Formation
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
• Unsuitable to produce pay zones with incompatible fluid properties and pressures.
• Mainly limited to Limestone formations.
In some formations hydrocarbons exist in regions where the rock particles are not bonded
together and sand will move towards the wellbore as well fluids are produced, this formation
is usually referred to as being ‘Unconsolidated’. The use of uncemented liners (slotted or
screened) act as a strainer stopping the flow of sand. Liners are hung off from the foot of the
production casing and usually sealed off within it to direct any well flow through the liner
bore.
Various examples of uncemented liner operations implementing sand control are as follows:
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Various examples of uncemented liner operations implementing sand control are as follows:
a) Slotted Liner
Slot widths depend on the size of the sand grains in the formation and are typically 0.01 ins.
- 0.04 ins. (0.254 - 1.016 mm) wide; See Figure 1.3a
Liner is drilled with 3/8 ins - 1/2 ins. (9.53 - 12.7 mm) holes along its length and then lightly
wrapped with a special V-shaped wire; See Figure 1.3b
• Sand movement into the wellbore causes permeability (flow rate) impairment.
• Screen erosion can occur at high production rates.
These problems may be overcome by filling the annulus between the open hole and screen
with graded coarse sand, i.e. gravel packing, which acts to support the open hole section as
well as prevent formation sand movement.
The open hole is enlarged to about twice its diameter and a liner is run. Correctly sized gravel
is placed between the outside of the screen and the formation by using special gravel pack
running equipment; See Figure 1.3c
d) Pre-packed Screen
A Pre-packed screen is constructed of an outer and inner wrapped screens with resin coated
gravel placed between the screens. This gives a performance better than a wire wrapped
screen but less that an open gravel pack.
These are used when there may be difficulty in installing a gravel pack.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Cement
Slotted Liner
a) Slotted Pipe
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
In perforated cemented liner completions, the casing is set above the producing zone(s) and
the pay section(s) drilled. Liner casing is then cemented in place which is subsequently punctured
(perforated) by bullet-shaped explosive charges.
These perforations are designed to penetrate any impaired regions around the original wellbore
to provide an unobstructed channel to the undamaged formation. By using various depth
measuring devices (i.e. casing collar locator, CCL) various sections of pay zone can be perforated
accurately (excluding unproductive regions), avoiding the production of undesirable fluids
(gas or water), or production from unconsolidated sections that might produce sand.
The various methods of completing a well using perforated cemented liner operations are:
Cement
Production Casing
Liner Liner Hanger
Cement
Perforations
Formation Formation
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
This is where the production casing is cemented. Perforation of the producing interval(s) is
then performed and the perforations cleaned out. A screen is run and gravel is pumped into
the casing/screen annulus and the perforation tunnels; See Figure 1.5b.
NOTE: Cased and perforated completions are the most common types of
completions performed today since they offer selective pay zone (or pay
section) perforating and enable selective stimulation.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Cement
Liner Hanger
Perforations Production Casing
Screened Liner
Graded Gravel
Formation Formation
Formation
Formation Formation
When the hydrocarbon reservoir can sustain flow due to its natural pressure, flow may be up
the production casing string, up the tubing string, or both.
Tubingless Completions
Casing flow completions are a particularly low-cost method in marginal flow conditions such
as low rate gas wells; See Figure 1.6a.
NOTE: Casing flow completions are not normally used by most operators, primarily
because the production casing is exposed to well pressure and/or corrosive fluids.
Tubingless completions are potentially hazardous especially in offshore
installations. As there is an increased risk of collision damage offshore and
there is no facility to install downhole safety valves. The use of casing flow
production methods are discouraged both offshore and onshore.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Tubing flow completions utilise the tubing to convey well fluids to surface. Flow rate potential
is much lower in tubing flow than in unrestricted casing flow completions. As well as for
production, the tubing string can be utilised as a kill string or for the injection of chemicals.
Tubing strings may also accommodate gas lift valves which essentially ‘gas assist’ well liquids to
surface; these valves would be installed if formation pressure diminished considerably and
natural drive ceased.
By far the most common methods of completing a well is to use a single tubing string/packer
system where the packer is installed in the production casing to offer casing protection, sub-
surface well control, and an anchor for the tubing. Examples of such completions methods
are:
Other equipment commonly installed in the tubing string to facilitate a safer production
system may be:
A polished bore receptacle (PBR) in a liner hanger is often used in place of a packer, e.g. in a
high rate liner or monobore completion; See Figure 1.6d.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
These are utilised in deep wells where tubing/casing clearances are small and for high
productivity wells where the use of a packer would restrict the flow of well fluids; See Figure
1.6d.
In general, tubing and packer installations depend on the completion requirements and
economic considerations.The completion engineer should consider the following factors for
tubing/packer type completion installations:
• Simplification of the completion for future well servicing operations (i.e. wireline, coiled
tubing, snubbing etc.).
• Optimum tubing size for maximum long term flow rate.
• Future artificial lift needs.
• Bottom hole pressure and temperature gauge survey hang off system.
• Seal movement device to accommodate tubing elongation or contraction.
• Availability of downhole circulating device.
• Requirements for downhole corrosion inhibitor injection.
• Requirements for downhole hydrate inhibitors.
• Tubing-conveyed perforating (TCP) guns and/or through tubing guns for underbalanced
perforating.
• Fluids to be used i.e. drilling muds, completion fluid, wellbore fluid.
• Well killing.
The monobore completion was developed primarily for the North Sea area by operators to
reduce the high cost of well servicing operations.The monobore, termed from the production
liner and tubing having the same or similar size bores, allows much improved servicing capability
by the use of ‘through tubing’ tools and services to conduct many operations which had
previously required the tubing to be pulled from the well.
A liner packer and PBR is used in place of the conventional type packer to maintain the
fullest bore size. Some versions are ‘full bore’ completions to retain maximum bore size which
are serviced with retrievable through tubing bridge plugs or nippleless wireline locks (such as
the Halliburton Monolock system) that can be set in the tubing or liner bore.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Formation
Chemical
Injection Valve
Polished Large Diameter
Permanent Packer
Bore Tubing
Sliding Sleeve Receptacle
Millout Extension Sliding Sleeve
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Artificial Lift
These pumps consist of a cylinder and piston with an intake and discharge valve. Vertical
reciprocation of the rod will displace well fluid into the tubing; See Figure 1.7a. These are
utilised in low to moderate wells which deliver less than 2,000 BPD (318 m3/day).
Hydraulic pump lift is utilised in crooked holes, for heavy oils and variable production conditions
that cause problems for conventional rod pumping. Three types of hydraulic pump exist to
lift liquid:
Piston Consists of a set of coupled pistons, one driven by a power fluid and the
other pumping the well fluid; systems exist for production up the annulus,
See Figure 1.7b, or up the tubing.
Jet Converts power fluid to a high velocity jet which pulls the well fluid up
into the flow stream.
Turbine Power fluid rotates a shaft on which a centrifugal or axial pump is mounted;
See Figure 1.7c.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
c) Plunger Lift
The plunger lift system, See Figure 1.7d, is a low rate lift system in which annulus gas energy
is used to drive a plunger carrying a small slug of liquid up the tubing when the well is
opened at surface. Subsequent closing of the well allows the plunger to fall back to bottom.
Plunger lift is useful for de-watering low rate gas wells.
An ESP is used for moving large liquid volumes of low gas/liquid ratio from reservoirs with
temperatures below 250˚F, e.g. water supply wells, high water cut producers and high
deliverability undersaturated oil wells; See Figure 1.7e.
• The annulus is open to atmosphere for gas venting (but not offshore).
• A special wellhead is required for cable sealing.
• Some cable protection is needed.
• Motor cooling must be adequate.
• The tubing size must be adequate to handle large volumes with minimum back pressure
on the pump.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Rod
Tubing
Plunger
Housing
Travelling Valve
Standing
Fluid Level Valve Pump Seat
Standing Valve
Nipple
Turbine
Electric
Liquid Load Cable
Pump
Standing Valve
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
e) Gas Lift
Gas lift supplements the flow process by the addition of compressed gas which lightens the
liquid head, reduces the liquid viscosity, reduces friction and supplies potential energy in the
form of gas expansion; See Figure 1.8.
Continuous gas lift is used to lift liquid from reservoirs that have a high productivity index
(PI) and a high bottom hole pressure BHP. Intermittent lift is used in reservoirs that exhibit
low PI/low BHP, low PI/high BHP, or high PI/low BHP.
Liquid production can range from 300 - 4,000 bbls/day (48 - 636 m3/day) through normal
size tubing strings. Casing flow can lift up to 25,000 bbls/day (3,975 m3/day).
• Tubing size.
• The need for a packer.
• Setting depths for gas-lift valves.
Gas In
Gas Lift
Valves
Packer
b) Piston Pump
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Flowing wells that are equipped with a single tubing string are usually completed with a
packer. Single zone completions include the downhole co-mingling of production from
several intervals within a pay zone. Examples of single zone completions are shown in Figure
1.9, i.e.:
a) Standard
b) Interval Co-mingling
At the design stage, the following options should be considered and possibly built into the
completion:
• The optimum tubing size for maximum long term flow rate.
• Future artificial lift needs.
• Future well servicing operations.
Tubing
Packer
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
When a well encounters multiple pay zones a decision must be made either to:
• Produce the zones individually, one after the other, through a single tubing string and the
annulus.
• Complete the well with multiple tubing strings and produce several zones simultaneously.
• Produce only one zone from that well and drill additional wells to produce from the other
pay zones.
This is the most basic dual completion where production of the lower zone is up the tubing
and production of the upper zone is up the casing/tubing annulus; See Figure 1.10a.
Separate flow from each zone is maintained by the use of two tubing strings and two packers;
See Figure 1.10b.
NOTE: With the installation of gas lift valves in the two tubing strings,
artificial lift can be initiated at a later date.
Separate flow from each zone can be maintained by the use of three tubing strings and three
packers; See Figure 1.10c.
Such completions provide a method of individual zone production and can improve some
field economics. However, in general, such completions are difficult to install and are usually
too restrictive in regard to total well production, due to the small tubing sizes, to be economically
attractive in most cases. Furthermore, the difficulty of carrying out future remedial well
operations of such wells prevent their widespread use.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Concentric strings require less clearance and can often achieve a higher overall flow capability;
See Figure 1.10d
.
The advantages of Multiple Zone Completions:
e) Annulus Configurations
An active annulus refers to any annulus being used for circulation purposes. An inactive
annulus refers a non-circulatable annulus e.g. any annulus formed between two strings of
cemented casings.
In the case of a well having an extra annulus between the production casing and the tubing,
this annulus is identified separately e.g. a well on artificial lift using hydraulic pumping will
have a ‘drive’ annulus.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Dual
Packer
Packer
Concentric
Tubing
Strings
Triple Packer
Single
Packers
Blast Joint
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
In a vertical wellbore, the state of technology is such that it can be successfully cased, cemented,
completed, producing zone or zones perforated and cleaned up, produced and, if the level of
production is not economical, various means of stimulation (hydraulic fracturing, acidisation)
used on the formation to increase productivity. By contrast, the drilling of horizontal wells
and their subsequent study has indicated substantial increases in production rates as compared
to unfractured vertical wells. As a result, there is now great incentive to investigate the technology
required to drill, complete, test, stimulate and properly produce horizontal wells which, due
to increased production, can lead to significant improvements in field economics.
From the drilling point of view, horizontal wells are classified as having ultra-short, short,
medium or long turning radii into a horizontal plane.The geometrical characteristics of such
horizontal wells are given in Table 1.1.
Figure 1.12 shows some of the methods used to complete horizontal wells. A classification of
completions for horizontal wells is shown in Figure 1.13.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Oil Accumulations
Wellbore
Open Hole
This is the most economical type of completion where removal of mud and debris from the
horizontal section is the primary stimulation performed. If additional stimulation is required,
tubing or coiled tubing can be run to TD, stimulation fluid spotted into the horizontal
section and then pumped into the formation; See Figure 1.12a.
Slotted Liner
This type of completion is used in the possible event of hole collapse. It is used in reservoirs
that will flow naturally and where no stimulation treatments are necessary; See Figure 1.12b.
These are used for control of a single interval in the whole horizontal section of a reservoir
that has different zones producing hydrocarbons. They also control water production from
selective zones. External casing packers and closeable ported subs are useful in controlling
unwanted production from formations along the horizontal section; See Figure 1.12c.
Packers of this type are commonly used to separate productive zones, either with or without
cement. Similarly, because of the difficulty in cementing horizontal liners, many horizontal
production strings are run without cementing.
For uncemented liner completions, the application of rotation can be utilised to deflate the
packer for retrieval.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Fracture Stimulation
In this type of completion production casing or liner is cemented into the horizontal section.
After perforating, controlled stimulation treatments (matrix and fracture) can be performed
efficiently; See Figure 1.12d.
In a horizontal hole, the completion problems are more complex than in vertical wells. For
example, any debris in the horizontal well bore will remain in situ and create an obstacle for
moving tools or instruments. Similarly, gravity will have a profound effect on various tools in
the horizontal section of the wellbore and effective centralisation and friction reduction is
necessary by using roller stem.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Interface Between
Wellbore and Reservoir
l - long
m - medium
s - short
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Offshore fields are increasingly being developed with subsea wells. In the early
days subsea wells were extensively used as satellite wells only, usually located a
distance away from the main production platform outside the normal reach
limitations for deviated wells. Today entire fields can be produced through subsea
wells to floating production systems or to nearby platforms on other fields. Subsea
well top hole locations are generally clustered together (sometimes in a subsea
manifold) to share production and control line facilities although single satellites
are still occasionally used.
Developing an offshore field with subsea wells is a very economic method but has
a drawback from the completions point of view in that vertical access
requirements for well servicing intervention will inevitably be high with the need to
use a MODU (Mobile Offshore Drilling Unit) or other type of well servicing vessel.
Some wells have been clustered under the floating production facilities to allow
vertical re-entry from the vessel, thereby reducing servicing costs. Nowadays, the
availability of long-service life tubing retrievable sub-surface safety valves (TRSVs)
with all metal-to-metal technology minimise the need for mechanical servicing.
'Through flowline' (TFL) servicing (see Figures 1.14 &1.15) also reduces servicing
costs and is especially useful on highly deviated wells. However, no matter the
attractiveness of utilising TFL systems in completion design the operational
complexity, rate restriction and cost, should not be underestimated and through
experience most users of TFL have now abandoned it's use due to its associated
problems.
In a completed subsea well, high pressure losses can occur in the flowlines
connected to surface production facilities and it is common to minimise this by
incorporating gas lift valves or hydraulic pumping equipment in the completion.
Subsea flowlines are also subject to substantial cooling which may result in poor
oil flow properties and the requirement to install methanol injection systems in
subsea components to minimise the risk of hydrate formation .
Figure 1.16 shows a typical subsea wellhead arrangement.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
12 Corrosion Cap
Running Tool
128.4" P.No. 541081-A
(3.3m)
10 114.3" 3
(2.9m)
4
Injection Tree Assy 1
P.No. 541010-A
1. 2. 3.
I.L.M.
2
0 Feet Datum
0 Meter Datum
Top Of Wellhead
-2
-1
Permanent Guide Base
-4 P.No. 540869
-6
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Subsea wells can be serviced by means of subsea workover systems. There are two
systems in current use, one for conventional subsea trees (Figure 1.17) and the
other for the newer generation of spool trees (horizontal tree, Figure 1.18). Each of
these is described below :
Pressure control is provided at surface by a Xmas tree fitted with a lift frame
which accommodates the pressure control equipment installed on the top of the
tree. Other than this, pressure control is exactly the same as that described in the
previous sections except that vessel movement gives additional rigging up and
operational problems. However, the workover riser system must also have subsea
pressure control capabilities in the event of a emergency disconnection or a riser
failure. Subsea pressure control is provided by a subsea lower riser assembly
(LRA) and an emergency disconnect package (EDP) which can safely close in the
well and disconnect the riser, with or without wireline or coiled tubing through the
subsea tree, in the event of an emergency.
These systems maintain the well in a safe condition until the problems arisen are
overcome and the riser can be re-attached. Operations can then be recommenced
and fishing operations initiated, if required.
Due to the capital costs of conventional workover riser systems, and the
incompatibility between the various manufacturer's designs, this drove the
industry to develop the spool tree and associated intervention systems utilising
standard drilling rig subsea BOP riser systems.
The subsea BOPs were utilised for connection to the tree and to provide pressure
control in conjunction with a subsea test tree which latches onto the spool tree
tubing hanger. Pressure is contained within the subsea tree and it's riser to the
surface which is terminated with a surface test tree in the conventional well test
fashion. The BOP rams are closed on the subsea test tree slick joint to provide a
barrier to any well pressure below the BOPs. In the event of an emergency, the
subsea tree can be closed, the subsea riser disconnected before the BOP shear/
blind rams are closed above the tree valve section and the drilling riser
disconnected.
The main problem thrown up by this method of well intervention was the lack of
bore size in standard subsea test tree riser systems initially available which has
driven the design of systems with bores sizes now up to 7 inches in diameter.
Subsea test tree systems must have a cutting capability to sever any wireline or
coiled tubing run through the BOPs.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
DEBRIS CAP
WIRELINE PLUGS
WORKOVER
VALVE
CROSSOVER
VALVE
PRODUCTION MASTER
VALVE
PRODUCTION
ISOLATION VALVE
ANNULUS ISOLATION
VALVE
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
• Maximises the safe recovery of hydrocarbons from a gas or oil well throughout its
producing life.
• Gives an effective means of pressurising selected zones in water injection wells.
Downhole accessories used should be designed to provide the safe installation and retrieval of
the completion, and flexibility for sub-surface maintenance of the well using wireline, coiled
tubing or other methods.
Even though different types of wells present distinct design and installation problems for
engineers, most completions are just variations on a few basic designs types and, therefore, the
equipment used is fairly standard. An overview of the equipment commonly used in single
and dual string completions is given in the following sections.
The detailed operation of some the items such as sliding side doors (SSDs), side pocket
mandrels (SPMs) and packers will not be covered in this manual. However, the relative location
of these tools in a completion and their functions in intervention work or workovers will be
addressed.
Figure 1.21 shows a schematic drawing illustrating the location of equipment in a typical oil
well completion. Each common item in the completion string is described in the following
sections.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Tubing Hanger
Tubing
SCSSV Control Line
Flow Coupling
Production Casing SCSSV Landing Nipple
Flow Coupling
SPM
SPM
SPM
SPM
Flow Coupling
Flow Coupling
Landing Nipple
Pup Joint
Packer
Cross-Over
Landing Nipple
Perforated Joint
Landing Nipple
Pup Joint
Wireline Re-Entry Guide
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
A wireline entry guide is used for the safe re-entry of wireline tools from the casing or liner
back into the tubing string. It attaches to the end of the production string or packer tailpipe
assembly and has a chamfered lead in with a full inside diameter.
Bell Guide
This guide has a 45 degree lead in taper to allow re-entry into the tubing of wireline tools.
This type of guide, See Figure 1.22a, is used in completions where the end of the tubing does
not need to pass through any casing obstacles such as liner laps.
This type of guide is essentially the same as the Bell Guide but incorporates a large 45 degree
angle cut on one side of the guide; See Figure 1.22b. Should the guide hang up on any casing
item such as a liner lip while being run, rotation of the tubing will cause the 45 degree
shoulder to slide past the liner lip and enter the liner.
45 Chamfer
45 Taper
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
This is a normally a single joint of tubing installed for the particular purpose of providing
protection for wireline installed bottomhole pressure and temperature gauges from buffeting
in the flow stream. This protection joint is installed directly below the gauge hanger landing
nipple in the tailpipe below the packer and must be long enough to accommodate the longest
BHP toolstring which may be run.
Landing nipples, See Figure 1.23, are short profiled tubulars installed in strategic positions in
the tubing string into which various wireline retrievable flow controls can be set and locked.
These can seal within the nipple bore, if required dependent upon the tools function. The
most common tools run are plugs, chokes, and pressure and temperature gauges. The main
features of a landing nipple are:
Landing nipples are supplied in ranges to suit most tubing sizes and weights with API or
premium connections and are available in two basic types:
• No-Go or Non-Selective.
• Selective.
No-Go or Non-Selective
The non-selective nipple receives a locking device which uses a No-Go principle for the
purposes of location.This requires that the OD of the locking device is slightly larger than the
No-Go diameter of the nipple.The No-Go diameter is usually a small shoulder located below
the packing bore (bottom No-Go) but in some designs, the top of the packing bore itself is
used as the No-Go. Only one No-Go landing nipple of a particular size should be used in a
completion string. In most completions other than monobores, it is common practice to use
a bottom No-Go nipple as the last nipple in the packer tailpipe to prevent dropped tools
falling into the sump.
As the No-Go provides a positive location, they are widely used in high angle wells where
wireline tool manipulation is difficult and weight indicator sensitivity reduced.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Selective
In the selective system, the locking devices are designed with the same key profile as the
nipples and the means of nipple selection is determined by operation of the running tool and
the setting procedure. The selective design is full bore and allows the installation of several
nipples of the same size.
Orientation Orientation
Groove Groove
Key Profile Key Profile
Seal Bore
Seal
Bore
Trash Groove
No-Go Shoulder
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
In wells where flowing velocities are high, a restriction in the tubing, such as a gauge hanger,
can cause false pressure and temperature readings.Also, vibrations in the tool can cause extensive
damage to delicate instruments. To provide an alternative flow path, a perforated joint is
installed above the gauge hanger nipple which allows unrestricted flow around the gauge
toolstring eliminating these hazards.The perforated joint is normally a full tubing joint which
is drilled with sufficient holes to provide a flow area greater than that in the tubing above.
1.3.6 Packers
A packer is a device used to provide a seal between the tubing and the casing. With a suitable
completion string, this seal allows the flow of reservoir fluids from the producing formation
to be contained within the tubing up to the surface. This protects the casing from being
exposed to well pressure and to corrosion from well or injection fluids.
• Case hardened slips to bite into the casing wall and hold the packer in position against
pressure and tubing forces.
• Packing elements which seal against the casing.
Figure 1.24 gives examples of typical packer installations and Figure 1.19 shows common
types of packer.
• Retrievable.
• Permanent.
• Permanent/Retrievable.
Packers may be further classified according to the number of bores required for production
i.e.
Single One concentric bore through the packer for use with a single tubing string.
Dual Two parallel bores through the packer for use with two tubing strings.
Triple Three parallel bores through the packer for use with three tubing strings.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
A typical packer description, therefore, might be: 95/8 ins. Dual 31/2 ins. x 31/2 ins. Hydraulic-
set Retrievable Packer.
Retrievable Packers
These are generally run into the wellbore on the production tubing string. As the name
implies, retrievable packers can be recovered from the well after setting by pulling it with the
tubing.
Permanent Packers
These are installed in the wellbore usually independent of the production tubing string. A
permanent packer may be considered as an integral part of the casing. Permanent packers can
only be removed from the well by milling operations.
Permanent/Retrievable Packers
As their name may suggest, these packers have the same characteristics as permanent packers
but can be released and recovered from the well without milling. They will generally have a
smaller bore than a permanent packer to accommodate the addition of some type of releasing
mechanism.
Packers, both retrievable and permanent versions, are installed in the production
casing by one of the following methods:
Hydraulically ; Can be run on a workstring or on the tubing string. When the desired
setting depth is reached the tubing is plugged below the packer with a check valve, standing
valve or a wireline plug and hydraulic pressure applied to the tubing to set the packer. Generally,
a predetermined upward pull on the tubing string will release the seal unit from the packer
with a Hydraulic Permanent packer system.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Casing
Annulus
Production Tubing
Packer
Producing Formation
Upper Formation
Single Packer
Lower Formation
Packer 1
Dual Completion
Zone 1
Packer 2
Zone 2
Packer 3
Zone 3
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Anchor Latch
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Connection
Shear Ring
(Closed Position)
Seal Units
Connection
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Sliding Side Doors (SSDs) or Sliding Sleeves are installed in the tubing during well completion
to provide a means of communication between the tubing and the annulus when opened; See
Figure 1.29.
• Bring a well into production after drilling or workover by circulating the completion
fluid out of the tubing and replacing it with a lighter underbalanced fluid.
• Kill a well prior to pulling the tubing in a workover operation.
• Provide selective zone production in a multiple zone well completion.
SSDs are available in versions which open by shifting an inner sleeve either upwards or
downwards. A number of SSDs can be installed in a completion string and selectively opened
or closed by the use of the appropriate wireline shifting tool.
CAUTION: Tubing and annulus pressures must be equalised before an SSD sleeve
is opened to prevent wireline tools being blown up or down the tubing.
A common fault of sliding sleeves is that the seal failure usually leads to a workover although
a pack-off can be installed as a temporary solution.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Top Sub 1
Female Adapter 5
Packing 6
Closing Sleeve 2
Nipple 3
O-Ring 7 O-Ring 4
Female Adapter 5
Split Ring 8
O-Ring 9 Female Adapter 5
Female Adapter 10 O-Ring 7
Packing 6
O-Ring 4
Bottom Sub 11
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Flow couplings, which are heavy-walled tubulars, are installed above and below any completion
component which may cause flow turbulence such as wireline nipples, SSDs, SCSSV landing
nipples etc., to cater for internal erosion.Although the same amount of erosion is experienced,
the added thickness of the flow coupling provides enough material to prevent weakening
over the projected life of the well. In lower velocity wells, such as low GOR oil wells, a flow
coupling may only be needed to be placed above restrictions.
Side Pocket Mandrels (SPMs) were originally designed for gas lift completions to provide a
means of injecting gas from the casing-tubing annulus to the tubing via a gas lift valve. However
in recent times, they have also been commonly used in place of an SSD as a circulating device
because seal failure can be rectified by pulling the dummy gas lift valve (or kill valve) with
wireline and replacing the seals. SPMs are installed in the completion string to act as receptacles
for the following range of devices:
It is essential to understand the operation of the device installed in an SPM before conducting
any well intervention as it may affect well control. See Figure 1.24 for a typical SPM and
Figure 1.31 for types of valves.
There are many different designs for gas lift valves for various applications. They range from
being simple orifice valves to pressure operated bellows type valves. However, they all contain
check valves to prevent tubing to annulus flow. These check valves may leak after a period of
use and they should never be relied on as barriers in a well control situation.These should be
replaced with dummy valves and the tubing pressure tested to confirm integrity.
Dummy Valves
These are tubing/annulus isolation valves. They are installed in place of the valves in order
that the completion tubing string can be pressure tested from both sides during installation or
when well service operations are required.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
The injection valve is designed to control the flow of chemicals injected into the production
fluid at the depth of the valve. A spring provides the force necessary to maintain the valve in
the fail-safe closed position. Reverse flow check valves, which prevent backflow and circulation
from the tubing to the casing, are included as an integral part of the valve assembly.
Injection chemicals enter the valve from the annulus in an open injection system. (This
requires the annulus to be full of the desired chemical. An alternative method is to run an
injection line from surface to the SPM.) When the hydraulic pressure of the injected chemicals
overcomes the pre-set tension in the valve spring plus the pressure in the tubing, the valve
opens. Chemicals then flow through the crossover seat in the valve and into the tubing.
Circulating Valves
These are recommended to be installed in the SPM whenever any circulating is to carried
out.The circulating valve is designed to enable circulation of fluid through the SPM without
damaging the pocket.The valve allows fluid to be dispersed from both ends allowing circulation
of fluid at a minimal pressure drop. Some valves permit circulation from the casing into the
tubing only and others to circulate fluid from the tubing into the casing only.
If a circulating valve is not used and the pocket is flow cut a workover would be necessary to
replace the SPM.
Differential dump/kill valves are designed to provide a means of communication between the
casing annulus and the tubing when an appropriate differential pressure occurs. Below a pre-
set differential pressure, the valve acts as a dummy valve since it uses a moveable piston to
block off the circulating ports in the valve and the side pocket mandrel.
The differential pressure necessary to open the valve will depend on the type and number of
shear screws installed.The valve will only open when the casing annulus pressure is increased
by the differential (of the shear screw rating) above the tubing pressure. An increase in tubing
pressure above the casing annulus pressure will not open the valve. After opening, the piston is
locked in the up position and fluids can flow freely in either direction.The hydrostatic pressure
from the column of annulus fluid will kill the well and remedial operations can be planned.
Equalising Valves
The equalisation valve is designed to equalise pressure between tubing and casing and/or to
circulate fluid before pulling the valve from the SPM.
The valve has two sets of packing which straddle and pack off the casing ports in the SPM.
The tubing and annulus are isolated from each other until the equalising device is operated by
a pulling tool. Pressures equalise through a port before the valve and latch are retrieved.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
"KBUG"
Orienting Sleeve
Tool Discriminator
Latch Lug
Section A - A
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Running Neck
Pulling Neck
Latch Ring
['RKP' Latch]
Packing Stack
Reverse
Flow Check Spring
Communication
Packing Stack Port
Packing Stack
Shear Screw
Packing Stack
Communication
Port Communication
Piston Port
Reverse
Packing Stack Flow Check Reverse
Packing Stack Flow Check
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
A travel joint is used to compensate for tubing movement due to temperature and/or pressure
changes during treating or production. It is normally used with a seal assembly anchored to a
permanent packer. Figure 1.32 shows a Travel Joint commonly used on the short string in
dual string completions.
NOTE: Alternative names for travel joints are Telescoping or Expansion joints.
Polished Bore Receptacles (PBRs) and Extra Long Tubing Seal Receptacles (ELTSRs) are
other devices commonly installed above a permanent packer to compensate for tubing
movement; Refer to Section 1.3.7.
Packing
Inner Sleeve
Outer Sleeve
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
The modern sub-surface safety valve has been developed from the earliest versions produced
in the 1930’s. The initial demand was for a downhole valve that would permit flow during
normal conditions, but would isolate formation pressure from the wellhead to prevent damage
or destruction. This valve would be installed downhole in the production string.
The valve that was developed was a Sub-Surface Controlled Safety Valve (SSCSV) and was a
poppet type valve with a mushroom shaped valve/seat system. Compared with today’s valves,
this simple poppet type valve had several disadvantages; restricted flow area, tortuous flow
paths, low differential pressure rating and calibration difficulties. Despite these limitations the
valve operated successfully and other versions were developed with less tortuous flow paths
such as the ball and flapper valve.
From this beginning, the Surface Controlled Sub-Surface Safety Valve (SCSSV) was developed
in the late 1950’s.This moved the point of control from downhole to surface; See Figure 1.33.
This design provided large flow areas, remote control of opening and closing, and responsiveness
to a wide variety of abnormal surface conditions (fire, line rupture, etc.). Initial demand for
this valve was slow due to it’s higher cost and the problems associated in successfully installing
the hydraulic control line, hence it’s usage was low until the late 1960’s.
The SCSSV is controlled by hydraulic pressure supplied from a surface control system which
is ideally suited to manual or automatic operation, the latter of which pioneered the sophisticated
emergency shut-down systems required today. The versatility of the valve allows it to be used
in specialised applications as well as in conventional systems.
SCSSVs are available in two variants - Tubing Retrievable Safety Valves (TRSV) and Wireline
Retrievable Safety Valves (WRSV). SCSSVs are available with ball or flapper type closure
mechanisms.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Nipple Adapter
O-Ring
Brass Shear Screws
T-Seals
Housing
Locking Mandrel
Piston
O-Ring
T-Seal
Stainless Steel Set Screws
Intermediate Sub
Stainless Steel Set Screws
O-Ring
Stainless Steel Set Screws
Piston Coupling
C-Ring
Flow Tube
Power Spring
Housing
Spring Stop
O-Ring
Stainless Steel Set Screw
O-Ring
Flapper
Flapper Base
Seat
Resilient Seal
Flapper Pin
Torsion Spring
Flapper
Flapper Housing
O-Ring
Stainless Steel Set Screw
Bottom Sub
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Fail-safe Sub-Surface Safety Valves, whether directly or remotely controlled, are installed to
protect personnel, property and the environment in the event of an uncontrolled well flow
(or blow-out) caused by collision, equipment failure, human error, fire, leakage or sabotage.
Whether safety valves are required in a particular operating area, depends on the location of
the wells and in some cases on company operating policy and/or government legislation.
In general, each application must be considered separately due to varied well conditions,
locations, regulations, depth requirements etc.
General application: where intervention by General application: where larger flow area is
wireline is available desired for the tubing size
High pressure gas wells High volume oil and gas wells
High velocity wells with abrasive Multiple zone completions where several flow
production control devices are set beneath the TRSV
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
These valves are installed in regular wireline type nipples on a lock mandrel.
This type of direct-controlled safety valve is a ‘normally open’ valve that utilises a pressure-
differential to provide the method of valve closure. Normally a spring holds a valve off-seat
until the well flow reaches a pre-determined rate.
This rate can be related to the pressure differential generated across an orifice or flow bean.
When this differential is reached or exceeded, a piston moves upwards against a pre-set spring
force closing the valve.Valves of this type are termed ‘storm chokes’.
There are two closing mechanisms available with these valves, i.e.:
• Ball-type closure.
• Flapper-type closure.
The valve is held open by a spring force which may be increased by adding spacers or changing
the spring. The relationship between flow rate and differential may be adjusted by changing
the bean size. The valve when closed will remain in the this position until pressure is applied
at surface to equalise across it when the spring will return to the open position
.
NOTE: This type of valve should never be attempted to be pulled unless it has been
equalised and is open.
These valves are rarely in use today but a derivative, the Injection Valve, which is normally
closed is widely used in injection wells.This injection valve opens when fluid or gas is injected
and travels to the fully open position when the predetermined minimum injection rate is
reached; See Sub Section c) Injection Valve.
This type of direct-controlled safety valve is a fail safe closed valve which is pre-charged with
a calibrated dome (chamber) pressure prior to running. Ambient controlled valves will open
when the well pressure reaches the set point of the dome calibration. The valve will close
when the flowing pressure of the well, at the point of installation, drops below the pre-
determined dome pressure. Ambient type safety valves are also generally referred to as a ‘storm
chokes’.
This type of valve is usually a ball valve and is not limited by a flow bean which gives it a large
internal diameter and, hence, a large flow area making it suitable for high volume installations
possibly producing abrasive fluids.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Ambient type safety valves are run with an equalising assembly to allow equalisation across
the valve should it close, and a lock mandrel to locate and lock the valve in the landing nipple.
NOTE: Both pressure differential and ambient controlled sub-surface safety valves
close on pre-determined conditions.They do not offer control until these
conditions exist. Also valve settings may change if flow beans become cut.
Surface controlled safety valves should be considered in such cases.
c) Injection Valve
Injection valves are normally closed valves installed in injection wells. They act like check
valves allowing the passage of the injected fluid or gas but close when injection is ceased.
The closure mechanism is either a ball or flapper type which opens when the differential
pressure from the injected medium equalises that below the valve. As the injection rate is
increased to the precalculated rate, the differential acts on a choke bean and overcomes a
spring to move the mechanism to the fully open mode. If the injection rate is insufficient or
fluctuating, the mechanism will be damaged and possibly flow cut
.
The flapper-type valve is the most popular as its operation is less complicated and is also less
prone to damage if the injection rate is not high enough.
Bottom hole regulators are essentially throttling valves installed downhole to enhance the
overall safety in wells where high surface pressures or hydrate formation present problems.
Bottomhole regulators are designed to reduce surface flowline pressures to safe, workable
levels and to keep surface controls from freezing.
In gas wells, the pressure drop across a regulator will occur downhole where the gas and
surrounding well temperature is higher than at surface. The higher gas temperature and
surrounding well temperature tend to prevent hydrate formation when a pressure drop occurs
across the regulator.The cooler gas immediately above the regulator will usually increase due
to the downhole ambient temperature.
In oil wells, the installation of a bottomhole regulator is used to facilitate the liberation of gas
from solution downhole and consequently lighten the oil columns to increase flow velocity
.
The regulator has a stem and seat which are held closed by a spring and at a pre-set differential
pressure the valve opens.
If high reductions in pressure are necessary, more than one regulator can be installed, providing
stepped reductions reducing the risk of hydrate formation and flow cutting.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
NOTE: An equalising sub should be installed between the lock mandrel and the
regulator to facilitate the equalisation of pressure.
The SCSSV is a downhole safety device that can shut in a well in an emergency or provide a
barrier between the reservoir and the surface. As the name suggests, the valve can be controlled
from the surface by hydraulic pressure transmitted from a control panel through stainless steel
tubing to the safety valve; See Figure 1.34
The remote operation of this type of valve from the surface can also be integrated with pilots,
emergency shut down (ESD) systems, and surface safety control manifolds. This flexibility of
the surface controlled safety valve design is its greatest advantage
.
In the simplest system an SCSSV is held open by hydraulic pressure supplied by a manifold at
the surface, the pressure being maintained by hydraulic pumps controlled by a pressure pilot
installed at some strategic point at the wellhead. Damage to the wellhead or flowlines causes
a pressure monitor pilot to exhaust pneumatic pressure from a low pressure line which in turn
causes a relay to block control pressure to a 3-way hydraulic controller resulting in hydraulic
pressure loss in the SCSSV control line.When this pressure is lost, the safety valve automatically
closes, shutting off all flow from the tubing.
Both categories are supplied with or without internal equalising features. This allows the
pressure to equalise across the valve so as it can be re-opened. Valves without this feature need
to be equalised by pressure applied at surface. The former is more prone to failure due to
having more operating parts whereas for the latter equalisation pressure is often difficult to
provide and possibly time consuming.
Wireline retrievable sub-surface safety valves are located and locked, using standard wireline
methods, in a dedicated safety valve landing nipple (SVLN). The SVLN is connected to a
hydraulic control line pressure source at the surface normally by a 1/4 ins. OD stainless steel
tubing.
When the safety valve is set in the nipple, the packing section seals against the bore of the
nipple below the port.The packing section of the lock mandrel forms a seal above the port in
the nipple. Control pressure, introduced through the control line, enters the valve through the
port in the housing and allows pressure to be applied to open the valve. Figure 1.34 shows a
typical surface-controlled, wireline retrievable safety valve.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Piston
Packing Stack
Packing Sack
Safety Valve
Landing Nipple
Spring
Packing Stack
Piston
Power Spring
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Because a wireline retrievable SCSSV seats in a landing nipple installed in the production
string, it offers a much smaller bore than a tubing retrievable SCSSV for the same size of
tubing. Frequently, WRSVs have to be pulled prior to wireline operations being carried out.
Compared to a tubing retrievable SCSSV, the wireline retrievable SCSSV is easy to replace in
the case of failure. Most failures can be prevented by introducing a planned maintenance
schedule in which valves are regularly pulled and serviced. However, during wireline entry
operations there is also a safety risk and care must be maintained at all times.
The components required for the installation of a wireline retrievable SCSSV are:
Tubing retrievable safety valves operate by the same principle as wireline SCSSVs except all
the components are incorporated in one assembly which is installed in the completion string;
See Figure 1.35. Some models have rod pistons instead of the more normal concentric piston
designs.
Should the tubing retrievable valve need to be locked out, a wireline retrievable can be
installed and operated, although with a reduced internal bore.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Hydraulic Port
Tubing Connection
Hydraulic Port
Hydraulic Line
Metal Seat Upper Piston
(Upper Static Seal) Assembly
Rod Piston
(Upper Assembly)
Hydraulic Port
Metal Seal
(Lower Static Seal) Upper Piston Assembly
Power Spring
Flow Tube
Flapper Spring
Flapper
Lower Piston Assembly
Spring Loaded Debris Barrier
Flow Tube
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
A test performed on Sub-Surface Safety Valves immediately after installation, and on a regular
schedule, is the leak test. A typical leak test entails the production, kill and swab valves are
closed on the Xmas tree and control line pressure bled off to close the valve. Tubing pressure
is bled off slowly above the valve to zero for a tubing retrievable valve and in 100 psi. (6.9 bar)
stages for a wireline retrievable valve.
The system is closed in again and tubing pressure monitored. If there is a rapid build up, a
major leak is indicated or improper functioning of the valve; in this case the valve should be
cycled and the test repeated. After a specified shut-in period the tubing head pressure should
be below a maximum allowable pressure as specified by the operator’s leak off criteria although
there is an API standard.
NOTE: It is extremely important that pressure data is fully and accurately recorded.
After initial installation, leak tests should be carried out periodically; this accomplishes three
functions:
NOTE: All the above tests should be conducted on all Sub-Surface Safety Valves by
authorised personnel.
For gas wells, leakage rates can be compiled from a surface pressure build-up from the formula
(low pressure application)
4(∆p)V
Q = –––––
∆t
where:
If the leakage rate is in excess of 900 SCft./hr. (25.5 m3/hr.), the SCSSV should be cycled
opened and re-tested. If the leakage rate is greater than API or Group specifications, which
ever is the most stringent, then corrective action must be taken.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
For oil wells, the pressure depends on the static fluid level and the amount of gas in the oil. If
the liquid level is below the SCSSV, the formula for gas wells can be used. If the liquid level is
above the SCSSV then the leakage rates are determined from the build-up of surface pressure
which is converted to a liquid volume.
If the leakage rate is in excess of 6.3 gal/hr (0.4 m3/min) then the SCSSV should be cycled
and re-tested. If the leakage rate is still in excess of 6.3 gal/hr (0.4 m3/min) then corrective
action should be taken.
The sub-surface safety valves discussed so far, i.e. tubing retrievable and wireline retrievable,
only provide tubing flow control. In these systems, no annular flow control exists.
Annulus safety valve systems are usually associated with completions where artificial lift or
secondary recovery methods are employed e.g. gas venting in electric submersible pump
(ESP), hydraulic pump, and gas lift installations. There application is to remove the potential
hazard of a large gas escape in the event there is an incident where the tubing hanger seal is
breached.
There are a number of designs of such systems on the market and the variety of mode of
operation is too wide to be covered in this document, however the basic concepts are the
same. With any annulus system, there must be a sealing device between the tubing and the
casing through which the flow of gas can be closed off.This is generally a packer but may also
be a casing polished bore nipple in some designs into which a packing mandrel will seal. In
the sealing device there is a valve mechanism operated by hydraulic pressure similarly to an
SCSSV. The valve mechanism opens the communication path from the annulus below to the
annulus above the valve and is fail safe closed.
The closure mechanism may be a sliding sleeve, poppet or flapper device. Figure 1.30 shows
a typical annulus safety valve.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Tubing Hanger
Production Casing
Baker Multi-Purpose
Hydraulic Connection Expansion Joint
Annulus Port
Tubing
Valve
TRSV Hydraulic
Control Line
Flow Coupling
Tubing Retrievable
Power Spring SCSSV
Flow Coupling
Spacer
Baker "AVLDEM"
Annulus Safety Valve
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Surface control manifolds are designed to provide and control the hydraulic pressure required
to hold an SCSSV open. The manifold has one or more air powered hydraulic pumps to
maintain the hydraulic operating pressure for the safety valve.
The hydraulic pressure is through a 3-way control valve which is controlled by remote pressure
pilots and fire sensors. Pilot, sensor or manual activation removes the hydraulic pressure, closing
the safety valve.
NOTE: Activation can occur from the operation of remote-control pressure sensing
pilots, fusible plugs, plastic line, sand probes, level controllers or emergency
shut down (ESD) systems.
Surface control manifolds are generally supplied as complete systems containing a reservoir,
pressure control regulators, relief valves, gauges, and a pump with manual override.
Manifolds, in combination with the various pilot monitors, have many different applications,
e.g. controlling multiple wells using individual control, multiple wells using individual pressures
and any combination of these.
Other additional features have been incorporated into surface control manifolds when the
system is integrated with other pressure operated devices. A control panel, designed to supply
hydraulic pressure to a surface safety valve (SSV) and hydraulic pressure to an SCSSV, contains
a circuit logic for proper sequential opening and closing of the safety valves, i.e.
• Sequential closing:
- SSV first
- SCSSV second.
• Sequential re-opening:
- SCSSV first
- SSV second.
Sequential logic is incorporated to increase the service life of hydraulic master valves and
SCSSVs to prevent SCSSVs becoming flow cut by high velocity wells.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
The conduit which supplies the hydraulic fluid to the SCSSV is the control line. The control
line is normally a 1/4 ins. OD tubing attached to the sub-surface valve (TRSV) or nipple
(WRSV) with a compression fitting, and run up the outside of the tubing to the tubing
hanger. The method of termination at the hanger is dependent on the type wellhead and
hanger system being deployed.
Some control lines on land wells are simply fed out through a packing element in a port
(often a tie-down bolt hole) which is tightened to seal around the tubing. Other systems have
drilled ports in the hanger, into which the control line is fitted again with a compression
fitting, and the spool sealed off from the annulus and the Xmas tree bore by concentric weight
set or pressure energised seals.
Subsea wellheads have different methods of termination so the tree can be installed subsea
without diver assistance.
The control line material is selected to meet the environment into which it is to be installed
and be compatible with both the safety valve and the hanger materials from the point of
corrosion due to being of dissimilar materials.Their is a large choice of control lines materials
from 316 ss for sweet service to Inconel and Elgiloy alloys for more demanding service.They
are also supplied in hard durable plastic coatings for added protection from corrosion and
against crushing damage during installation which at one time was one of the major problems
during completing. Two lines can be encased for dual control line safety valves.
Control lines are held flat to the tubing by control line protectors usually placed across a
coupling or connection and sometimes also in the middle of a joint. The protector has a slot
into which the control line plastic outer coating fits. Simple banding can be used but it is not
strong and is easily ripped off. Protectors are now metal clamp types as earlier rubber versions
were easier detached and caused major problems while retrieving the completion string.
1.3.16 Tubing
The purpose of using tubing in a well is to convey the product from the producing zone to
the surface, or in some cases to convey fluids from the surface to the producing zone. It should
continue to do this effectively, safely and economically for the life of the well, so care must be
taken in its selection, protection and installation.
Tubulars up to and including 41/2 ins. are classified as tubing, over 41/2 ins. is casing. In large
capacity wells, casing size tubulars may be run as the production conduit.
Tubing selection is governed by several factors. Anticipated well peak production rate, depth
of well, casing sizes, well product, use of wireline tools and equipment, pressures, temperatures,
and tubing/annulus differential pressures are among those which must be considered.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
To meet various completion designs, there is a wide range of tubing sizes, wall thickness
(weights) and materials to provide resistance to tubing forces and differing well environments.
The best tubing selection is the cheapest tubing which will meet the external, internal and
longitudinal forces it will be subjected to, and resist all corrosive fluids in the well product.
This is not practical in every instance and often compromises have to be made.
For ease of identification, tubing is colour coded to API specification. Some specialist suppliers
steels are not covered by the code and provide their own codes. Refer to codes to ensure the
tubing is according to requirements.
A Tubing Head/Tubing Hanger combination unit is attached to the uppermost casing head
on the wellhead. The main functions of this unit are to:
Suspension of the tubing is accomplished usually by threads, slips or any other suitable device
i.e.. rams.
The tubing head consists of a spool piece type housing where the internal profile of the top
section is a straight or tapered cylindrical receptacle (bowl) into which the tubing hanger is
landed, suspending the tubing and sealing off the volume between the tubing and the casing.
A tapered type tubing hanger system is shown in Figure 1.37
Top and Bottom The size and pressure ratings of these connections (usually flanged)
Connections must be compatible with the size and pressure rating of the joining
connections.
Upper Bowl Provides the seal area for various tubing hangers and a load shoulder
to support the production tubing.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Set Screws Set screws or hold-down screws are found in most tubing heads and
have two important functions.
• retain the tubing hanger and prevent any upward tubing movement
due to pressure surges.
• activate (energise) the body seals on the tubing hanger.
Outlets These provide access to the annulus (e.g.. for pressure monitoring or
gas lift) during production.
Test Port Permits the pressure testing of the hanger seal assembly, lockdown
screw packing connection between flanges, and the secondary
(isolation) seal.
Landing Threads These are the uppermost threads on the hanger and they must support
the entire weight of the tubing string.
Bottom Threads These must support the entire weight of the tubing string and seal
the producing zone from the annulus.
Sealing Area These provide compression type sealing between the outside diameter
of the hanger body and the inside diameter of the hanger bowl. Sealing
is accomplished by energising elastomer seals or metal-to-metal seals
by the action of tubing weight on various load bearing surfaces.
Tubing hangers are sized according to the upper bowl of the tubing head and the tubing size
the hanger will be supporting. Thus, a 7" x 27/8" tubing hanger means a 27/8" production
string suspended from a tubing head 71/16" top bowl.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
Ram Type Tubing Heads find their application in completions where manipulation of the
tubing is necessary to locate and latch into a packer and to maintain tension in the tubing
when landed.
Figure 1. 38 shows a ram type tubing head which comprises a housing with two side outlets
in which are located retractable rams. These rams, when closed, support the hanger nipple
which is screwed on to the top of the tubing string. The seal between the annulus and the
tubing is provided by a seal assembly which is located around the hanger nipple above the
rams.
With the ram type tubing hanger installed on the wellhead and the packer set, production
tubing is run and spaced out so that the final position of the hanger nipple is that distance
below the tubing head corresponding to the amount of stretch required to give the appropriate
tension. The tubing is latched into the packer and tension applied to the tubing so that the
hanger nipple is just above its final hang off position. The rams are closed, the tubing weight
is set on the rams and the handling string removed. The seal assembly is then installed, bolted
down, and the seal system energised by the injection of plastic packing. Finally, the BOPs are
removed and the Xmas Tree installed.
NOTE: Like mandrel type hangers, landing nipple hangers are provided with a top
thread for the landing joint, an internal left hand thread or wireline profile
for the installation of a back pressure valve, and can be supplied with extended
necks to facilitate secondary sealing.Also, ram type tubing heads are available
with control line outlets to allow an SCSSV to be incorporated in the tubing
string.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
HANGER NIPPLE
HANGER SEALS
RETRACTABLE RAM
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
For multiple string completions two or three segments, one for each production string, are
used to form a hanger assembly which, when installed in the appropriate tubing head, resembles
a mandrel type tubing hanger. Figure 1.39 shows a tubing head/hanger arrangement for use
in a dual completion. An important characteristic of this tubing head is the support wedges
(or in other heads support pins) used to guide and align the two segmented hangers in their
proper positions in the upper bowl. The segmented hangers are locked in place with the tie-
down screws. A disadvantage of this type of hanger is that seals are often damaged while
installing the second segment.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
1.3.18 Wellheads
At the drilling stage, casing is run and cemented in a well to line the well to protect against
collapse of the borehole, to prevent unwanted leakage into or from rock formations and to
provide a concentric bore for future operations.Various strings of casing are run, i.e. conductor,
surface string (which provides a base for the wellhead) followed by one or more intermediate
strings depending on the target depth and expected conditions in the well. At the completion
stage, production tubing is run to act as a flowline between the formation and surface. Unlike
casing, production tubing is not cemented in the hole so the entire tubing weight must be
supported by a suspension system suitably installed in a tubing head. The tubing head is
positioned on top of the uppermost casing head of a well and is used to suspend the production
tubing and to produce an effective seal between tubing and casing.
Tubing heads are composed of a body, a hanger-sealing device (tubing hanger), and a mechanism
which retains the hanger.
The wellhead equipment installed on top of the tubing head serves to control and direct the
flow of well fluids from the production tubing string. Such surface equipment may range
from a simple flow cross with stuffing box to an elaborate Xmas tree. Choice of surface tree
depends on well fluid production method (natural flow or artificial) and the wellhead pressure
encountered. In general, most surface trees are comprised of at least one master valve, at least
two wing or flow valves (one of which may be hydraulically operated), and one swab valve
utilised in wireline operations; See Figure 1.40.
With regard to subsea wellheads, there is no API standard and manufacturers all have their
own specific designs which includes some means of orientation in order to align the subsea
tree inlets and outlets to the flowlines or indeed in a subsea manifolding system.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
LC
ON G
TROL TRAININ
Xmas Trees
An Xmas Tree is an assembly of valves and fittings used to control the flow of tubing fluids at
surface and to provide access to the production tubing and on some subsea completions to
the annulus string. In general, an Xmas Tree is essentially a manifold of valves which is installed
as a unit on top of a tubing head or subsea wellhead.
Similarly to the tubing hanger the range of trees available is wide and are not all addressed in
this manual. However the valving of surface Xmas trees is similar throughout and typically
contains the following valves and tree cap:
The Lower Master Valve is utilised on all Xmas trees to shut in a well. This valve is usually
operated manually. As its name implies, the master is the most important valve on the Xmas
tree. When closed, this valve should keep the well pressure under full control and therefore
should be in optimum condition - it should never be used as a working valve.
In moderate to high pressure wells, Xmas trees are often furnished with a valve actuator
system for automatic or remote controlled operation (i.e. surface safety valve system). This is
often a regulatory requirement in sour gas or high pressure wells.
The Upper Master Valve is used on moderate to high pressure wells as a emergency shut-in
system where the valve should be capable of cutting at least 72/3 ins. braided wireline. This
valve can be actuated pneumatically or hydraulically. The UMG valve is a surface safety valve
and is normally connected to an emergency shut-down (ESD) system.
The Flow Wing Valve permits the passage of well fluids to the choke valve. This valve can be
operated manually or automatically (pneumatic or hydraulic) depending on whether a surface
safety system is to be included in the production wing design.
Choke Valve
The Choke Valve is used to restrict, control or regulate the flow of hydrocarbons to the
production facilities.This valve is operated manually or automatically and may be of the fixed
(positive) or adjustable type. It is the only valve on the Xmas tree that is used to control flow.
NOTE: All other valves used on Xmas trees are invariably of the gate valve type
providing full bore access to the well, that is, such valves must be operated to
the fully open or closed position.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
OVERVIEW OF COMPLETIONS
CE
L
ON G
C
TROL TRAININ
The Kill Wing Valve permits entry of kill fluid into the completion string and also for pressure
equalisation across tree valves e.g. during wireline operations or prior to the removal/opening
of a sub-surface safety valve. This valve is usually manually operated.
Swab Valve
The Swab Valve permits vertical entry into the well for wireline (e.g. running BHP/BHT
gauges, tubing conditioning) or for well interventions such as coiled tubing operations and
logging. This valve is operated manually.
The Xmas Tree Cap provides the appropriate connection for well control equipment when
conducting well interventions and is installed directly above the swab valve.
The Xmas Tree cap normally includes a quick union type connection and should be strong
enough to support the well control equipment.The bore of the cap flange should be compatible
with the tree and permit the running of service tools.
Sometimes the Cap is removed and replaced by tertiary well control equipment.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 2
2.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
LC
ON G
TROL TRAININ
2.1 GENERAL
This section illustrates the various well control methods and practices employed on all the
various well intervention servicing methods and includes a section to explain barrier theory.
The most significance between the various types of well service methods is whether they are
live well or dead well interventions as this impacts specifically on the equipment and methods
of well control employed. Dead well interventions, in terms of the IWCF, are classified as
workovers and well control methods for these are covered in the IWCF drilling test. The
methods are addressed in this course are those used specifically in live well interventions.
There is a distinct difference between the terminology used between well control used in rig
workover operations and that in live well interventions. Workover well control uses a
combination of barriers and procedures in a systematic method to contain pressure downhole
whereas live well interventions use a system of barriers to contain pressure at surface. Barrier
theory and these systems are described in the following sections.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
L
ON G
C
TROL TRAININ
Definition: A Barrier is any device, fluid or substance that prevents the flow of well bore
fluids.
• Mechanical.
• Hydrostatic.
A rule common to well intervention activities worldwide regarding pressure control is that a
minimum of two independent and tested barriers shall be available at all times. In any
circumstance where either of the barriers has failed, or there are indications that it is likely to
fail, immediate action must be taken to re-instate or supplement that barrier and returning
the well to double barrier protection again.
The ‘primary barrier’ is the term used to described the first line system of pressure containment
and ‘secondary barrier’ the next line of defence. Nowadays, it is common, especially of high
pressure wells, to install a third line of defence or a ‘tertiary’ barrier.
The particular status of the well will have different barriers in place for given operations and
well circumstances. For instance, the completion provides barriers in the form of individual
Xmas tree valves and a sub-surface safety valve, however, when running coiled tubing, these
cannot be closed and therefore are not available barriers until the BHA is above them.
The function of well control in well interventions, is the arrangement of the barriers into
groups and their systematic operation to provide competent well control. As stated earlier,
these are conveniently arranged into three main categories of pressure control, namely:
• Primary.
• Secondary.
• Tertiary.
Each of these consist of at least one, or a combination of mechanical barriers described below.
NOTE: These categories may not be the terms used in some areas of the world,
especially where the common language is not English.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
LC
ON G
TROL TRAININ
Mechanical barriers can be either closed barrier systems such as a wireline lubricator system
complete with a stuffing box, i.e. the complete surface pressure envelope or closeable barrier
systems which are held open to allow well entry but available and ready to be closed at any
time on demand.Various types of closed and closeable barriers are listed below.
• BOP rams.
• Xmas tree valves.
• Subsurface safety valves. *
• Shear/seal valves/BOPs.
• Annular preventers.
• Wireline plugs.
• Bridge plugs.
• Cement plugs.
• Ice plugs.
• Overbalance hydrostatic fluid.
* Sub-surface safety valves are acceptable as barriers during normal operations if they are
tested in accordance with the test criteria given below, however, to be used for well
plugging, i.e. for Xmas tree removal before a rig operation, it must be leaktight.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
L
ON G
C
TROL TRAININ
Barrier Integrity
Mechanical barriers must be tested, preferably from the direction of anticipated flow.Tests on
closed type barriers should be leaktight. The leakage rate on closeable barriers such as Xmas
tree valves etc. should be the API leakage criteria: 400 cc/min or 900 scf/hr with the exception
of sub-surface safety valves used in well plugging (refer to note above in list of closeable
barriers). Each operator should develop procedures for testing of Xmas tree and sub-surface
safety valves to meet this criteria. This is problematic in subsea completions where there are
long undulating production flowlines and riser systems which makes it difficult to calculate
leakage rates for various well GORs and downstream volumes; however to help, formulae are
provided in API 14A.
Hydrostatic barriers are provided by liquids. A liquid is only a barrier when the hydrostatic
head of pressure is greater than the formation pore pressure at the top of the producing
interval and when the fluid level and condition (i.e. weight) can be monitored. The specific
gravity of the fluid to be used as a barrier may be difficult to predict without good formation
pressure data.The hydrostatic overbalance provided should be circa 200 psi. but may be adjusted
to counter for high losses in wells which cannot support this differential, especially troublesome
when using solids free brines.
A fluid can only be confirmed as a barrier after diligent monitoring of the well over a specified
period of time, to ensure that any thermal expansion contraction effects have ceased.
• Drilling muds.
• Completion brines.
• Seawater.
• Fresh water.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
LC
ON G
TROL TRAININ
Primary pressure control is the system which provides the first line of defence from an
uncontrolled well flow. In each of the well servicing intervention methods it is provided by
different mechanical systems. On a wireline rig up it is simply the stuffing box and lubricator
envelop, however on a C/T or snubbing rig up, it consists of the riser pressure envelop and
internal workstring check valves.
Secondary pressure control is the system which provides the second line of defence in the
event that primary well control cannot be properly maintained. This is generally provided by
the BOP system .
If pumping facilities are available, although undesirable, a hydostatic fluid barrier can be placed
in the wellbore as a secondary barrier when either the primary or original secondary barrier
has failed and there is no tertiary barrier.
Tertiary pressure control is not always available but may be an additional third and final line of
defence in the event that secondary well control cannot be properly maintained.This is usually
a shear seal valve or BOP system.This may be an integral part of the Xmas tree (e.g. a wireline
or coiled tubing cutting actuator), or installed directly on top of the tree immediately before
operations commence.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
L
ON G
C
TROL TRAININ
The method of pressure control on live wells with wireline, coiled tubing or snubbing services
methods, is provided by primary, secondary and occasionally tertiary barrier systems as outlined
above. In live well interventions, it is not generally necessary to provide kill facilities unless
there is higher risk due extreme high pressure or the presence of high concentrations of H2S.
In many applications, pumping services may be on hand for other operations such as well
clean-outs and stimulations and may double as a kill facility provided there is a suitable supply
of kill fluid and a handling system.
2.3.1 Wireline
Slickline
Wireline relies entirely on the lubricator system to provide primary pressure control. Secondary
pressure control is provided by the wireline BOPs and tertiary well control may be available
in the form of another wireline cutting valve, either contained in the Xmas tree or as a shear/
seal valve or BOP installed on top of the Xmas tree.
Primary
Secondary
• Wireline BOP rams/valve which can close and seal around the wire.
• Xmas tree upper master, if the wire is broken and ejected.
• SCSSV, if wire is above it.
The BOP rams can be used for stripping wire out of a well but only when absolutely necessary.
Stripping through the BOPs is only carried out to find the free end of the wire for wireline
recovery.
Tertiary
In the event of primary and secondary failure with no tertiary barriers available, a Xmas tree
valve can be used to sever the wire, as they can easily cut wireline although the valve seat may
be damaged. The valve used should be the upper master for two reasons:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
LC
ON G
TROL TRAININ
• If the lower master is used and damaged, it requires the well to be plugged before repair.
• If the swab is used and damaged the well cannot be used for production as there is no
longer double barrier protection from the production fluid.
Braided Line
The system for braided line is very similar to slickline. Pressure control is provided by:
Primary
Secondary
Two wireline BOP rams (in conjunction with a grease pump) which can close and seal
around the wire.
Tertiary
In general, tertiary barriers are rarely used unless a heavy duty wireline operation is being
carried out.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
L
ON G
C
TROL TRAININ
Coiled tubing well control equipment is similar to wireline but also includes internal workstring
barrier systems.
Primary
• Stripper.
• Xmas tree valves when installing into,or removing tools from, the riser.
Secondary
• BOPs .
• SCSSV, if the tubing is not straddling it.
Tertiary
Primary
Secondary
• BOPs .
Tertiary
In the North Sea Region, it has almost become obligatory to use shear/seal BOPs due to a
number of instances where the up-to-then commonly used primary and secondary barrier
systems failed to deal with some well control occurrences.
NOTE: Some well interventions are conducted without BHA check valves as it is
necessary to reverse circulate. In these cases the primary inside well control is
the BOP shear rams and a shear/seal BOP becomes the secondary.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL METHODS
CE
LC
ON G
TROL TRAININ
2.3.3 Snubbing
There are two types of snubbing BOP set-ups, one for running upset pipe and one for non-
upset or tapered upset tubing connections (i.e. not square shouldered); Pressure control is
provided by:
Primary
Secondary
Tertiary
• BOP shear and blind rams or a shear/seal valve or BOP mounted directly on top of the
Xmas tree.
Primary
Secondary
• Wireline plug installed by wireline in the BHA or an additional third check valve.
Tertiary
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 3
3.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
LC
ON G
TROL TRAININ
3.1 GENERAL
Many servicing operations can be conducted by rig workovers, however live well intervention
is preferred as killing a well risks fluid invasion of the formation thereby causing potential
formation damage.
The primary objective of well intervention operations is the management of wells to provide
optimum well production. This is achieved by conducting live well remedial operations,
obtaining downhole reservoir data or preparation of the well for a dead well workover (if a
problem cannot be solved by live well servicing). Occasionally, gathering of downhole reservoir
data is a secondary objective only opportunistically taken when a an intervention is planned
for other reasons. This data are usually to provide well information on lateral and vertical
movement, current location of oil, water and gas and identifying the producing the zones.
There are many reasons for remedial live well intervention well operations, most notably to:
• Remove obstructions to flow such as tubing blockage with sand, wax or asphalt.
• Eliminate excessive water or gas production.
• Repair mechanical failure.
• Improve production through well stimulation, re-completions or multiple completions
on low productivity wells.
• Enhance production by conducting well stimulation such as hydraulic fractures on high
productivity wells.
• Increase production by bringing other additional potentially productive zones on stream.
• Maintain control of oil, water and gas in various zones or layers in stratified reservoirs.
• Side-tracking passed severely damaged formations.
• Increase production by drilling laterals.
Before a well is entered, a complete analysis must be made of the current well status, the
reasons for work carefully established, the associated risks identified and appropriate
contingencies measures planned in the event of operational failure.
All oil and gas wells will encounter some impairment to production during it’s producing life
and well service operations will need to be planned to rectify or improve the conditions
within the well. Therefore, common servicing operations such as cleaning out fill, re-
perforating, chemical treating, acidising, fracturing or a combination of these techniques are
routinely carried out to enhance production.
A description of these main well problems are discussed in the following sections.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
L
ON G
C
TROL TRAININ
Tubing blockage is generally caused by sand, wax and asphalt production or scale build up. It
can usually be remedied with a well clean out operation. Some of these can be prevented, or
at least alleviated, by treating the formation with regular chemical inhibition treatments,
pumped into the formation from surface.
With regard to injection wells severe formation scaling can occur if injection water is not
treated so that it is compatible with the formation fluids.
Tubing blockage is one of the most commonly experienced production problems and which
is remedied by clean out operations conducted normally by snubbing or coiled tubing (C/T)
intervention although dead well workover may also be considered.The use of snubbing or C/
T is more desirable as they can be carried out without killing the well. C/T is preferred as it
is relatively low cost, is easily organised and very effective when used in conjunction with
modern jetting or clean-out tools (especially with the larger C/T sizes which allow higher
pump rates). In most circumstances, flowing the well helps with the efficiency of the clean
out.
Wax build-up can be removed by an operation termed ‘Hot Oiling’.This is a simple treatment
consisting of pumping heated oil from surface at a temperature sufficiently high enough to
melt the wax. This can also be done by circulation of the hot oil through C/T which is
preferred as it prevents any fluids being pumped to the formation.Asphalt can also be removed
similarly by pumping solvents rather than hot oil.
Some well clean outs may be accomplished with wireline methods using tools such as gauge
cutters which can remove wax from tubing walls and bailing to remove sand or other blockages,
provided the amount to be removed is relatively small. It is often easier to use wireline, even
if it may be less efficient, as many platforms are already equipped with permanent wireline
units or they can be easily mobilised. C/T takes longer to rig up and deploy which are
considerations which need to be taken into account during the evaluation process. However
in general, most operations can more efficiently be accomplished using C/T and it is sometimes
the only option if the well is high angle or horizontal.The general limit for wireline operations
is circa 70˚ from vertical but this may vary according to well build up angles and the types of
tools to be run.
Snubbing with a Hydraulic Workover unit (HWO) may also be considered but it is generally
not utilised as it is slow and costly in comparison with C/T. However, in some circumstances,
e.g. where there is not enough space for a C/T injector or the reel due to their size, Hydraulic
Workover may be the only alternative.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
LC
ON G
TROL TRAININ
As an oil zone is depleted, the gas/oil or water/oil interfaces will move vertically in the
formation. This may result in increasing undesired water or gas production.
Excessive gas production leads to a premature decrease in reservoir pressure, hence reducing
the energy available to move the oil into the well bore and ultimately reduces the quantity of
gas necessary to lift the oil to surface.
When excessive water is produced, it leads to reduced oil production due to; the increased
hydrostatic head in the tubing acting against the formation pressure, increased risk of corrosion
and production problems handling and disposing of the water. It may also cause sand production
which can lead to erosion of completion and production equipment.
These problems can be controlled by the appropriate well intervention measures, as described
below.
There are different reasons for water problems. Firstly, fingering of water in stratified or
layered reservoirs where the water production is essentially from one zone. Secondly, advancing
water level due to oil depletion.Thirdly; water coning in reservoirs where there is appreciable
vertical permeability; See Figure 3.1, Figure 3.2 and Figure 3.3. Once a rock becomes more
saturated with water, the relatively permeability to water increases in regard to that of the
other fluids. This leads to a self aggravating cycle of increasing water flow and increasing
relative permeability to water.
Prior to running or planning operations for water control, production logs must be run
which will identify the zones from which water is being produced. Once identified, this can
usually be controlled by a number of differing methods depending upon the specific well
design and well conditions:
Sand placement in the sump may solve the problem in circumstances where there is a sufficient
height of sand as the vertical permeability of a column of sand is high and blocks water flow.
Cement squeezes have probably been the commonest means of plugging off water producing
zones in the past utilising workover methods requiring killing of the well, pulling the
completion, cementing and re-completing.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
L
ON G
C
TROL TRAININ
High production liner or monobore type completions have been specifically designed for
through tubing operations enabling water control by simply installing a through tubing bridge
plug by wireline or C/T after which cement can be squeezed, if necessary.
Cement squeezing by C/T below regular packer style completions using modern through
tubing tooling, is now also common practice.
Water blocking by creating a gel in the formation is a much more recent development. This
entails pumping chemicals to the formation which react after a pre-determined period of
time to form a gel. The viscosity of the gel is so high that it will not flow through the
formation pores, blocking the flow of water trapped behind the gel. This method is usually
expensive due to high chemical costs.
Plugging back of water producing zones may on occasions require the well to be re-completed
if the packer has to be moved or if shallower zones need to be perforated and brought on
stream.
Well Bore
Low Permeability
High Permeability
Water
Intermediate Permeability
Low Permeability
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
LC
ON G
TROL TRAININ
Initial Conditions
Producing Oil/Water
Contact Resulting Oil
From Coning
Original
Oil/Water
Contact
Water
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
L
ON G
C
TROL TRAININ
The most common reason for excessive gas production is the growth of the gas cap as oil is
produced; See Figure 3.4.A gas/oil contact will gradually move downwards causing an increase
in the production of gas.
The common method of remedying excessive gas coning is to squeeze the gas producing
zone and deepen the well by re-perforating (converse to water coning). An alternative, is to
conduct a workover where the well is plugged back and side-tracked with the new hole
drilled horizontally through the lower part of the reservoir avoiding the gas cap.
In a layered reservoir, gas producing zones can also usually be effectively squeezed off with
cement.Again, most cement squeezes can be accomplished with C/T methods using through-
tubing tools.
Initial Conditions
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
LC
ON G
TROL TRAININ
Well service operations to repair mechanical completion failures are still relatively common
in old wells, however in new wells less servicing is required due to the increasing reliability of
modern completion equipment.
In the past, one of the most common reasons for working over a well was to replace downhole
safety valves which had failed. For this reason, engineers were inclined to install wireline
retrievable valves as they could easily be replaced using live well interventions by wireline
methods, hence avoiding the need to pull tubing. Nowadays, this is no longer the case as the
reliability of tubing retrievable valves has increased substantially where it is now the most
commonly used valve.
Probably the most common reason for remedial mechanical operations today is tubing failure
due to erosion or corrosion.
Some completion failures can be repaired by wireline or C/T methods but, in some
circumstances, a full workover programme to pull the tubing is necessary. Typical failures are:
A full workover programme usually entails the placement of an overbalance kill fluid against
the formation unless it can be isolated using a plug, e.g. a W/L plug in a permanent packer
tailpipe or setting of a through tubing plug in the casing above the producing zone(s).
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
L
ON G
C
TROL TRAININ
There are many reasons why a well may have low productivity, for instance:
• Formation damage.
• Low permeability.
• Pressure depletion.
• Liquid hold up in a gas well.
• Gas slip in an oil well.
• Excessive water or gas production; Refer to Section 3.3.
• Sand or other fill or debris; Refer to Section 3.2.
• Mechanical failure; Refer to Section 3.4.
• Artificial lift failure.
You will note that some of the above have already been addressed in previous sections. With
regard to the others in the list, there may be a number of possible solutions for each problem.
For instance:
• Reservoir problems such as formation damage and low permeability can sometimes be
improved by stimulation operations such as acidisation or hydraulic fracturing.
• In oil or gas wells where there is liquid hold up or gas slip, this is often countered by
installing smaller diameter tubing strings. These may be reeled tubing strings installed inside
the original completion by large size C/T units.This tubing reaches down into the sump and
provides a smaller flow area to improve liquid lift. These reeled strings are normally 23/8 ins.,
27/8 ins. or 31/2 ins. OD and are run and hung off on a wireline lock or similar device.
• The tubing is snubbed into the well by normal C/T methods from large reels. When the
correct length of tubing is in the well and has been attached to the lock mandrel, it is run to
setting depth and set on regular size C/T.
• The main disadvantage with this solution is the high weight of such large reels which is
often above the lifting capacity of some offshore installations. Smaller, more manageable, reel
sizes entails more undesirable offshore connections to make up the full length of tubing
required. These problems, however, are outweighed when set against the costs of a full
programme to re-complete.
• An artificial lift system is usually required in any low permeability well to give adequate
production rates. A work programme to re-complete this type of well is required once the
well flow has reached the minimum economic acceptable natural flow. If the well has already
been on gas lift and it is no longer efficient, then the design should be reviewed to optimise
the existing gas lift mandrel spacing against re-completing with the optimum mandrel depths.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
REASONS FOR WELL INTERVENTIONS
CE
LC
ON G
TROL TRAININ
Similar to low permeability wells, in a depleted oil reservoir, an effective artificial lift system
can be installed to increase production. If a well was originally planned and designed for gas
lift and completed with gas lift mandrels in the string then the gas lift valves are simply
installed by wireline intervention. However, if a re-completion is needed, a full dead well
workover would necessary. In high angle wells, gas lift valves can be installed with coiled
tubing methods.
Improved recovery by reservoir pressure maintenance is usually the best long term approach
to increased production rates.
There are normally two solutions to control unconsolidated sand and these are; to gravel pack
or; install a pre-packed screen although resins are occasionally used; See Section 1.2.1 d).The
drawback of having to implement such sand control measures is that they reduce productivity
typically by 10% to 15%.
The installation of a gravel pack entails a full workover and re-completion although new
snubbing methods with HWO unit have now been developed.
For a successful gravel pack it is important to ensure that clean fluids (containing little or no
dispersal solids) are used on initial completion or when the gravel pack is installed. A second
requirement is that the gravel is correctly sized in relationship to the formation sand to
prevent further ingress or alternatively cause a blind off. It also is desirable, if completing in a
sand zone that is known to be unconsolidated, that the gravel pack is installed immediately. As
it is more difficult to install at a later stage.
If an open hole (external) gravel pack is required the hole will need to be enlarged to about
twice its size by under-reaming first before the liner/screen is run. Properly sized gravel is
placed outside the screen by reverse circulation techniques. External gravel packs are utilised
when high production rates are required. Internal gravel packs are the norm but do carry a
penalty in reducing production rates.
The use of pre-packed screens has risen in recent years as they can often be installed in an
existing completed well avoiding re-completion, however they are more prone to blinding
off as they do not provide the same effectiveness as a regular gravel pack in controlling the
production of fines.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 4
4.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
4.1 GENERAL
Well interventions in the context of IWCF are servicing operations conducted through the
Xmas tree (through-tree) on live wells. These are carried out by the following methods:
Well service operations or workovers on dead wells where the Xmas tree is replaced by well
control equipment, are carried out by:
• Drilling rigs.
• Workover rigs.
• Hydraulic workover units.
During workovers, it is probable that well interventions with wireline and/or coiled tubing
are required as part of the work programme to prepare the well for tree removal or establish
production post workover.
Many offshore installations have drilling rigs onboard used for the drilling phase of a
development. These units are often retained to conduct well servicing operations on fields
which frequently have wells requiring servicing although it is becoming more common for
the drilling units to be demobilised and dead well servicing to be accomplished by a Hydraulic
Workover Unit.Where a drilling rig is available for well servicing, it is obviously more economic
for it to be used than mobilising an HWO unit.
On installations which have not retained the drilling rig, or on small platforms (drilling
performed with a jack-up rig), the HWO unit is commonly used. This is due to their easy
deployment and their small footprint.
On subsea wells, normally the only means of conducting a well intervention is to use a semi-
submersible vessel (drilling unit, DSV or specialised well servicing unit) from which a workover
riser can be deployed. However, if the work programme can be conducted solely with wireline,
this can be successfully carried out by subsea wireline systems deployed from well servicing
vessels (for example the Stenna Seawell). These vessels also have the capability to carry out
subsea tree change outs once appropriate barriers have been installed by wireline.
Well control equipment used on well interventions in live wells is specific to the particular
service being used for the intervention, albeit BOPs and strippers all operate under the same
principles.The main differences in the systems usually lie in the design of BOP ram elements,
strippers or stuffing boxes, grease heads used in wireline braided line operations and the
configuration of these above the Xmas tree.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
BOPs are usually compact for manipulation into position above the Xmas tree or onto a riser
often used in platforms arrangements. They are fitted with flexible hoses to enable ease of
installation and to reach between the BOP hydraulic control system and the BOPs when in
situation. The connections on the BOP must be compatible with the riser/tree connection
and lubricator or be supplied with appropriate crossovers.
The Snubbing/HWO Unit is a well service unit utilised for both snubbing and dead well
servicing. Snubbing is the process of ‘tripping pipe in a well which has a surface pressure great
enough to eject the pipe if no restraining force is applied’; this is termed the ‘pipe light’ mode.
Stripping is the term for moving pipe through a rubber element to contain pressure whether
it is in the snubbing mode or ‘pipe heavy’ mode (where the pipe is too heavy to be ejected).
In practice, however, snubbing has come to mean all of the operations conducted in a live
well.
The HWO unit is also used in place of a conventional drilling or workover rig on dead well
servicing as it is easily mobilised, has a small footprint and is cost effective in comparison to
mobilising a workover rig. They are also very useful when working in confined spaces and
with small diameter (skinny) pipe where a drilling rig’s instrumentation is generally not sensitive
enough.
An HWO unit would only be used before C/T on a snubbing job where:
The first snubbing units were mechanical units using mechanical advantage in order to force
the pipe in the hole against well pressure. In the development of the hydraulic type unit, the
power to raise and lower the tubing was provided by a set of hydraulic rams through a set of
bi-direction travelling slips or snubbers.The main elements of an HWO unit, See Figure 4.1,
are as follows:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
• Work basket.
• Control panel.
• Hydraulic power pack.
• Hose package.
• BOP system.
• Strippers.
• Circulating system.
HWO units are supplied in a range of lifting capacities (lbs. in thousands), 60K, 90K, 120K,
200K, 250K, 400K and 600K. Snubbing capacity is half of this rating.
When used instead of a conventional drilling or workover rig, the well would be killed and
plugged, the Xmas tree removed and BOPs installed on the casing head. It can also be used for
re-completing wells as it has the capability to run and pull completion strings by running the
downhole safety valve control line through the access window.
As described earlier, the jack assembly consists of one or more hydraulic cylinders that travel
in a vertical direction to move pipe in or out of the hole. For higher snubbing or lifting power,
more cylinders are added into the system which reduces running speed unless larger capacity
pumps are used. The operator controls the hydraulic power to the jack as the weight of pipe
changes or as the weight of pipe overcomes well pressure and changes from snubbing to
lifting and visa versa.
Guide Tube
This is simply a tube which prevents the bucking of the pipe under snubbing forces. It should
be sized to be just larger than the particular tubing to be run or pulled to constrain lateral
movement. It travels up and down with the hydraulic jack.
Splined Tube
Some units have a splined tube which passes rotational torque force generated by the rotary
table through to the bottom plate and hence to the wellhead. If a splined tube is not used, the
forces are transmitted through the hydraulic cylinders possibly reducing the operating life.
Travelling Slips
The travelling slips, or snubbers, are attached to the upper end of the jack and grip the pipe to
push it into or pull it from the hole. There are two sets, one for snubbing and one for lifting.
As a pipe is snubbed into the hole, it comes to a balance point which changes from pushing to
holding back weight, the point the lifting slips take over.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
Stationary Slips
The stationary slips hold the pipe while the travelling slips are released for the next stroke.
Like the travelling slips, there are two sets, one for hold upward force and one for holding
downward weight. In high well pressures, the second set can be used as back-up to the primary
slips. These would be changed at or around the balance point.
Access Window
The access window (work window) is installed at the base of the jack between the stationary
slips and the stripper and is the access for stripper rubber change out or for installing tools in
the string. It must also help guide the pipe like the guide tube.
Power Swivel
The power swivel (or Rotary Head) is used for rotating the pipe for drilling or milling
operations. It, like the other systems, are hydraulically powered and controlled from the control
pane.
Hanger Flange
A hanger flange (also known as a tubing hanger assembly) is a pressure containing component
sometimes used in the blowout preventer stack to hold pipe and toolstring in both the 'light'
and 'heavy' directions. It is usually incorporated near the top of the BOP stack between the
stripper bowl and the upper stripping ram or annular BOP. It is commonly used when
changing the stripper rubber element or adding a tool joint which might be damaged if run
through the slips.The hanger flange is also a useful aid in fishing operations with its ability to
hold varying diameter toolstrings such as wireline tools. Vertical tooth type dogs can be used
in the hanger flange to prevent pipe or tool rotation.
Power Tongs
Power tongs are used to make up and break out the pipe connections.They are located in the
workbasket and controlled hydraulically from the control panel.
Work Basket
The workbasket is the work platform of a HWO unit and is located at the top of the hydraulic
jack and on which the operator and assistant perform the manual functions including the
picking up, laying down, stabbing, making up or breaking out of the pipe joints.
Control Panel
The control panel is mounted in the work basket and is usually in two sections, one for the
operator’s use and one for his assistant. From here, all of the unit functions are controlled,
generally shared between them with the exception of the BOP shear rams which are normally
operated from the deck.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
Work
Basket
Fluid Storage
And
Gin Processing
Pole
Choke
System
Stationary
Slips
Hoses
Work
Window Stripper Bowl
Tool House
Hanger Flange
Mud Pump
Fill Line Drain Line
Bleed
Line
Equalise
Tool Box Line Ground Based BOP
Control Units
Spares
Choke Upper Kill
Line Line Power Unit
Fuel
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
Power Pack
The power pack and it’s accessories consist of a diesel engine and hydraulic pumps. The
output from the pumps is regulated to the various pressure ratings of the hydraulic functions.
It displays the various function pressure on gauges.
Hose Package
The hose package transports the hydraulic fluid to and from the various functions, some of
which are high up on the unit and are therefore of considerable length. Some of the hoses can
experience very high pressures and must be thoroughly tested before use.
BOP System
The BOP configuration is dependent upon whether the HWO unit is being used as a rig on
a well which has been killed, or in the snubbing mode rigged up above the Xmas tree. If on
the former, the BOP configuration will be like that in a drilling situation and may be covered
by the operator’s well control policies and procedures. If on a snubbing job, the configuration
is quite different being rigged up above the Xmas tree. Refer to Section 7 for all well control
equipment and procedures.
Strippers
The strippers control well pressure when snubbing or any time surface well pressure is
encountered.There is a variety of stripper rubber materials for different pressure regimes and
well fluids. These will vary in well life according to their resistance to the well fluids, gas or
erosion due to roughness of the wall of the pipe being run, or pulled.
Circulating System
Pumps, chiksans, Kelly hose and a circulating swivel are the main components of the circulating
system.The pumps are generally high pressure in order to cope with the maximum anticipated
circulating and surface pressure.
If nitrogen is to be used, the hose and chiksans should be suitably rated for such service.
A safety valve or Kelly cock must always be installed between the Kelly and the swivel
to allow safe changing of the hose or swivel, if necessary.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
Wireline is the oldest and most common type of well servicing method. It is extremely
efficient, economic and relatively easy to rig up and deploy.
Electric line services provide essential information about the reservoir and the completion
and performs many services, typically:
Logging - depth determination, cement bonding, sonic, nuclear, temperature, pressure, spinner,
caliper, density, dipmeter, profile and so on.
• Calipering.
• Downhole sampling.
• Perforating.
• Setting bridge plugs, packers and cement retainers.
• etc.
This is achieved by communicating with the tools through the conductor cable.
Mechanical wireline also known as slickline (as the line has a smooth OD), is used to conduct
mainly mechanical operations such as:
The slickline unit can also be rigged up with braided line for heavy duty wireline operations
such as running heavy, large tools or performing heavier duty fishing operations.
A more recent development in wireline services is the Heavy Duty Wireline Unit used mainly
for fishing jobs where regular fishing methods have failed. These units, in conjunction with
heavy duty tooling, are so powerful they can destroy normal wireline tools and devices, if
desired.
Although wireline conducts most tasks required for well servicing, it is obviously limited in its
abilities. It also has a role in dead well servicing as it is normally required for plugging the well
to make it safe prior to Xmas tree removal and BOP installation. It is also used to conduct
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
remedial operations such as setting bridge plugs, re-perforating etc. It’s greatest limitation, due
to using gravity as it’s motive force, is in working in high angle or horizontal wells with
inclination angles higher than 70˚.
As pointed out earlier, there are two types of wireline unit - the electric line or logging unit
and the mechanical or slickline unit. Both types of unit are constructed similarly in that they
have:
• Power pack.
• Operator’s/engineer’s cabin.
• Winch, including a wireline drum or reel.
• Spooling or measuring head.
• Weight indicator and pulleys.
Wireline units must be self contained and able to be mounted on a truck (or trailer) or
portable to enable trucking and/or shipping to the well site. A typical wireline unit is shown
in Figure 4.2.
Power Pack
The power pack is normally a diesel driven hydraulic unit and provides hydraulic power
through supply and return hoses to the winch. Power packs are normally fireproofed and
certified for division 1, zone 2 hazardous areas.
Operator’s/Engineer’s Cabin
The cabin is an integral part of the winch unit situated directly behind the drum for direct
observation and monitoring of the wireline spooling. It contains the winch and possibly the
power pack operating controls. In an electric line unit, it also contains all of the electronic
instrumentation, computing and log printing equipment. Electric line units have fine smooth
controls for accurate logging operations whereas the slickline unit has a wide range of speeds
for both fine and very fast operation when jarring.
Winch
The winch consists of the wireline reel driven by a hydraulic motor controlled from the
console in the cabin all of which is mounted in the unit frame. Hydraulic power is supplied
from the power pack.
The reel controls have a forward and reverse directional valve, a number of gear ratios to cover
a wide range of speeds and a hydraulic bypass valve for fine control within each gear range.
The reel is driven by chain drive from the gearbox and has a brake band. If there is two reels
on the winch, slickline and braided, there is an additional manual operated clutch system for
reel selection.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
Spooling Head
The spooling or measuring head controls the winding of the wire off and onto the reel and
also measures the length of wire spooled off the drum. The depth measurement is given on a
odometer via a cable drive and a precisely machined measuring wheel (one for each size
wire).The wire is held against the measuring wheel by pressure wheels to eliminate slippage.
Electric line units usually have electronic type depth measurement devices.
The weight indicator can be mounted on the hay pulley or be an integral part of the spooling
head.
If mounted at the hay pulley, the weight sensor is a load cell placed between the hay pulley
and the tie down chain.The cell is connected to the indicator situated in the unit with a long
hydraulic hose. The system is graduated for the wire to pass around the hay pulley at an
included angle of 90˚ If this angle is not maintained, there will be an error in the readings.
Correction tables are available which correct for varying angles.
Modern units usually have more sophisticated type weight indicators, some hydraulic and
others electronic. These units must be regularly serviced and checked for accuracy as this is
fundamental to wireline service especially using relatively low strength wire.
The hay pulley is the device used to turn the wire from the horizontal plane to the vertical up
to the lubricator stuffing box sheave. As well as turning the wire it also moves the forces
generated on the wire into the same axis as the lubricator reducing any possible bending
moments. It has been known for a hay pulley failure due to severance of the tie down chain,
causing the lubricator to break off the well.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
Electric line
Cable used on electric line units can be either monoconductor, coaxial or multiconductor
braided line and supplied for various service conditions. Each particular type has a range of
sizes and specific uses according to the required service or tool being run. Careful handling of
electric line is essential, especially with the smaller sizes and when rigging up, to prevent line
damage and penetration of the core insulation leading to subsequent loss of signal.
Slickline
Slickline is a high strength monofilament steel line and is available in common sizes of 0.082
ins., 0.092 ins., 0.108 ins. and 0.125 ins.These are also supplied for various services conditions.
Being slick the OD of the wire is easy to seal around using a simple packing device called a
stuffing box where as the cable requires a grease seal arrangement.
Braided Line
Braided wireline used for heavier duty wireline operations is supplied in 3/16 ins. and 7/32 ins.
sizes.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
The wireline lubricator when assembled acts like pressure vessel on top of the Xmas tree into
which the wireline tools are ‘lubricated’. It consists of:
• Wellhead adapter.
• Wireline BOPs or wireline valve.
• Lower lubricator section(s).
• Upper lubricator section(s).
• Stuffing box or grease head.
• Line wiper.
It is extremely important that a wireline lubricator pressure rating meets the maximum
anticipated surface well pressure. Lubricators must be designed, not only to withstand the
stress caused by internal pressure but also from stresses caused by jar action or high pulling
forces.
To install the tools, the lubricator must first be isolated from well pressure at the Xmas tree,
usually the swab valve, and all pressure bled off through the bleed-off valve. The lubricator is
then broken out at the connection immediately above the BOPs and the tools, after attaching
to the toolstring, are pulled up into the lubricator bore and the lubricator re-installed. The
lubricator should then be pressure tested before opening the tree and running in the hole.
Wellhead Adapter
This is basically a crossover to mate the BOP to the tree cap and is usually a quick type
connection named a ‘quick union’. In some cases the adapter may be from a quick union to
a tree flange.
Wireline BOPs
Wireline BOPs (sometimes referred to as wireline valve) are installed immediately above the
wellhead adapter or on top of a wellhead riser. In some situations for ease of operation and
safety, a BOP may be placed both above the tree and on top of a riser.
On slickline operations in low pressure wells, a single BOP is installed dressed with slickline
rams to close and seal around the wire. On high pressure wells a dual BOP is used, the lower
rams dressed for slickline and the uppers with blind. The injection point is used to pump
grease if there is leakage past the rams.
When running cable, a dual BOP is used with both rams dressed for the particular cable size
and a grease injection point also available between the rams.
In a situation where slickline and braided line are both being used, a triple BOP would be
installed with the lower and middle rams dressed for the braided line and the upper for
slickline.
On electric line jobs, triple BOPs are used, the upper rams being blind.
© ABERDEEN DRILLING SCHOOLS 2001 4-11
ILLIN G S
N DR C
EE
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
These are sections of thick wall tube usually between 8 to 10 ft. long with quick union
connections at each end and made up in a total length to accommodate the longest tool to be
run.They are installed immediately above the BOPs and usually have the same bore size as the
Xmas tree.The section above the BOPs must have two bleed-off valves (contingency for one
being plugged by debris or hydrates).
Riser sections, used in offshore platforms to reach from the wellhead deck to another working
deck, are similar to lubricator sections except they are generally much longer in length and
may be installed between the wellhead adapter and the BOPs. They may also be of even
thicker section to support the increased weight being carried.
These accommodate the toolstring which has a smaller OD than the toolstrings which are
normally 1 ins., 11/2 ins. and 2 ins., although larger sizes are available for heavy duty work.
The section connecting to the lower lubricator will have a connection to mate with that of
the lower lubricator sections (or visa versa).
The stuffing box or grease head terminates the top of the lubricator.
The stuffing box contains packing which is squeezed to seal around the line. The packing is
squeezed by an adjustable packing nut which is hand adjusted although most stuffing boxes
are now being supplied by remote hydraulic actuated packing nuts so that they can be adjusted
from the deck eliminating the need for personnel to be lifted up to the top of the lubricator
and, hence, is safer. The stuffing box also incorporates a sheave which turns the wire through
180˚, from the outside of the lubricator into the bore.
The grease head is used on braided line, electric line or plain cable. It seals around cable by
grease being pumped, at higher pressure than that inside the lubricator, into the small annulus
space between a set of flow tubes and the cable filling the cable interstices. The grease, being
at higher pressure, tends to flow downwards into the lubricator and also upwards out of the
tubes.
The upward flow is forced out through a return line for disposal by activating a cable pack off
above the tubes. Downward flow is only constrained by the differential pressure applied between
the grease and the lubricator pressure. Adjustments must be made to maintain the optimum
conditions between grease lost to the hole, amount of gas entrained in the grease returns and
differential pressure.
Line Wiper
This is a tool which attaches to the hay pulley when the wire is being pulled to remove all
contaminants from the wire before it is spooled.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
Well servicing using coiled tubing (C/T) has grown significantly with the development of
tooling and tubing technology. In recent years the size of tubing available has increased from
the original 1 ins. through 11/4 ins., 11/2 ins., 13/4 ins. and now 2 ins. Even larger sizes are now
being used as siphon strings etc. but these are not yet generally used as workstrings. Along
with this increase in size of tubing has come material improvements to give higher performance.
C/T units have largely replaced snubbing units for operations on completed wells and their
versatility, due to new tooling developed, has extended their range of capabilities in recent
years. The range of services now provided includes:
Much of the recent increase in capability is due to the increased performance of downhole
motors which provided the ability to rotate enabling drilling and milling operations etc.
The limitation of C/T is usually the pressure rating of circa 5,000 psi. and the depth to which
it can be run, constrained by it’s relative low strength. It is also limited in it’s service life due to
the bending cycles over the reel, and to a lesser extent the goose neck, in conjunction with
the service conditions it encounters.
These bending cycles force the tubing to exceed it’s elastic limit inducing fatigue, and, therefore,
reducing the working life before failure.Tubing under pressure while passing over the reel and
goose neck, dramatically decreases this cycle time to failure. Most C/T service companies
have developed computer programmes, using logging databases, to determine the time to
failure for each tubing size and type of material to which a factor of safety is applied.This is an
inexact science but, due to the safety factor, there is actually very few recorded well site
incidents due precisely to tubing failure. More than likely, service life is much shorter than
actual life.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
All C/T units, See Figure 4.3, are constructed similarly and consist of:
The cabin houses all of the controls for the reel and the injector head, and also all electronic
logging systems and instrumentation. The controls operate the hydraulic valves and pressure
supplied from the power pack. It is placed directly behind the reel to provide the operator
with a full view of all activities especially the spooling of the tubing off and on the reel.
Tubing Reel
The reel stores the tubing which is coiled around the core of the reel. Ideally the core should
be as large a diameter as possible to prevent severe bending of the tubing but must be of a
manageable size for transporting to and from well sites. The radius of the core of the reel is
sharper than that of the goose neck e.g. 24 ins. (4 ft. dia.) versus 72 ins. for 11/4 ins. tubing,
hence most tubing fatigue is caused at the reel.
The reel is driven by chain from a hydraulic motor controlled from the control cabin. The
tubing is pulled off the reel up over the gooseneck by the injector. The reel holds constant
back tension to prevent the spool unravelling and to keep the tubing steady.
The power pack is the provider of all hydraulic power. It consists of a skid mounted diesel
engine and hydraulic pumps and supplies regulated pressure for all the systems in the reel,
injector head, BOPs and the control cabin.
Goose Neck
The gooseneck is simply a guide which accepts the tubing coming from the reel and leads it
into the injector chains in the vertical plane. The goose neck guides the pipe using sets of
rollers in a frame spaced on the recommended radius for the tubing being run i.e. 72 ins. with
11/4 ins. tubing etc.
Injector
The injector is the motive device which imparts upward or downward movement to the
tubing and is mounted above the BOPs on the wellhead. It must be supported as the connection
to the BOPs is not designed to absorb the weight and lateral forces caused by the tension in
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
the tubing from the reel.This support can be a crane for land wells (providing the lifting gear
and pad eyes are rated for the weight of equipment and forces encountered) or to a mast or
derrick offshore. Free standing frames with hydraulic jacking legs are also available where no
other means of rigging up is available.
Movement is imparted to the tubing by sets of travelling chains equipped with gripper blocks
which are hydraulically driven.The gripper blocks grip by friction which is adjustable through
a hydraulic piston applying pressure across the chains. This pressure must be sufficiently high
enough to grip the tubing eliminating slippage but not excessively high enough to crimp the
tubing.
Stripper
The stripper is situated below the injector head in the injector head frame. It is designed to be
as close as possible to the gripper chains to prevent buckling due to snubbing forces. The
stripper is hydraulically controlled to press the rubber element against the tubing to create a
seal.
The stripper rubber is exposed to wear from the roughness of the pipe OD and will need to
be changed from time to time which can be done on the wellhead by closing the BOPs and
removing well pressure.
BOP System
The BOPs are very similar in function to wireline BOPs and are mounted above a wellhead
adapter. They usually have four sets of rams dressed as follows, top to bottom:
• Blind.
• Shear.
• Slip.
• Pipe.
The shear rams usually have the ability to cut stiff wireline i.e. C/T with electric line cable
inside it, used on C/T logging operations.
In some areas of the world, an additional Shear/Seal valve is installed between the BOPs and
the wellhead adapter as a tertiary barrier.The shear seal valve has the ability to cut the tubing
and effect a seal. It is generally tied into a higher volume hydraulic pressure supply than
available from the C/T unit such as a rig Koomey or independent system etc.
4.3.2 Tubing
There are a number of coiled tubing manufacturers but they are mainly US or Japanese
companies. Some of the US companies use Japanese supplied steel for tubing manufacture.
The normal method of tubing manufacture is to produce rolled plate steel which is cut into
long flat strips. Each strip is then progressively folded round with rollers and formed into a
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
LC
ON G
TROL TRAININ
long spiral. When it is completely formed into a round tube, the edges, now abutting, are
welded.These individual lengths are then welded together to produce the length required to
be contained on a shipping reel. Continuously milled tubing has now been introduced but is
much more costly.
The common steel used is an American alloy grade A606 type 4 modified, suitably quenched
and tempered, which provides the best economic combination of ductility and strength to
combat the cyclic bending stresses. By specially selecting billets from the furnace to meet
particularly tight tolerances of chemistry, higher grades can be produced such as QT-800.
More exotic pipe materials are also being manufactured but have corresponding cost penalties.
In conjunction with the C/T unit, many of the services require additional auxiliary equipment
such as pumping or nitrogen services.These may require cryogenic converter pumps, tankage,
hoppers, filtration units and interconnecting piping. These are connected up to the tubing
reel inlet swivel which allows the reel to rotate while still pumping.
Any hazardous materials must be handled appropriately by ensuring that they are located in a
safe area and all necessary safety handling precautions taken. For instance when using nitrogen,
the deck below the equipment should be covered with wood and trays to contain and protect
the deck from damage due to spillage, and water available to wash down the deck if nitrogen
does breach the barriers.
C/T Tooling
Tooling can be categorised into standard toolstrings and specialist tools. These toolstrings
contain the standard tools used in all applications to which the specialist tools are attached.
The complete assembly is referred to as the Bottom Hole Assembly (BHA).
• Tubing connector.
• Dual flapper valves.
• Emergency release sub.
• Circulating subs.
• Swivels.
• Bull noses.
Specialist tooling:
• Downhole motors.
• Jetting nozzles.
• Wireline type hydraulic operated tools.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL INTERVENTION SERVICES
CE
L
ON G
C
TROL TRAININ
The dual flapper valves are an integral element in well control as they contain well pressure
from the inside of the tubing.The dual flappers give double isolation and meets most legislative
requirements. Therefore, when the BOP tubing rams are closed well pressure is contained to
both below the rams and from the tubing, hence the well is safe for corrective actions. A split
in the tubing below the BOPs circumvents the dual flappers seals and, in this situation, the
shear rams would be closed to contain well pressure.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 5
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
LC
ON G
TROL TRAININ
Damage to the formation can be caused by many mechanisms. Although some of these may
be due to well conditions, the majority are through contamination of the formation by foreign
substances not only during the drilling, completing and producing phases but also during the
servicing of a well. These damage mechanisms are described in Section 5.1 below.
The types of damage which can occur during the different phases of a well’s life are described
in the following section. See Figure 5.1 for the effects of skin damage to the well pressure
profile.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
L
ON G
C
TROL TRAININ
5.1.1 Drilling/Casing
Drilling fluids usually contain chemicals and/or solids as bridging agents to control the loss of
drilling fluids. Fluid losses can lead to well control problems and are also expensive to replenish
especially when using the more exotic mud systems such as Pseudo or Oil based muds etc.
Similar damage can be caused during the casing cementing process for the production casing
by cement pre-flushes and cement slurries.
Non-damaging drilling fluids are often used to penetrate the producing formations when the
wells are to be completed with open hole, barefoot or gravel pack type completions. In the
main, however, damage done during the drilling is not a serious problem in most wells as they
are usually to be perforated. The perforating depths, under normal circumstances, exceed the
depth of any damage areas. They also generally have a total flow area greater than the tubing
area, hence there is little impediment to achieving maximum production rates. Perforating is
usually carried out in a clear non-damaging fluid such as brine or fresh water so that minimal
post perforating damage is caused.
When damage exceeds the perforating depth or occurs in an open hole type completion, this
may be reduced by acidising or fracturing.
5.1.2 Completing
The damage caused during the completing phase, compared to drilling, is generally minimal
if good completion designs and practices are employed. Most damage caused would be through
contamination by fluids or pills used containing loss control materials (LCM) and other foreign
bodies.
With current technology it is easy to complete wells and displace to clean filtered brines or
fresh water before perforating, thereby reducing the risks of any damage occurring. Also, most
perforating is done with an underbalance pressure in the tubing which reduces the amount of
invasion. This underbalance is created by displacing the tubing (fully or partially) to a lighter
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
LC
ON G
TROL TRAININ
gravity fluid such as diesel, base oil or fresh water. If a fluid cannot provide sufficient underbalance
or if a very high underbalance is demanded, nitrogen can be used although is much more
costly.
If the well is to have an open hole type completion, then the well fluids programme should be
designed to prevent formation damage. However, in practice this is difficult and most engineers
acknowledge damage will be caused to some extent. In the situation where LCMs need to be
used to support the workover fluid, the engineer must select a material which can be easily
removed afterwards. Sized salt or calcium carbonate are examples where the former is cleared
by flushing with water and the later with an acid wash.
5.1.3 Producing
Although it maybe of some surprise, damage can occur during the producing phase of a well.
This is normally due to the production of asphalt, wax or scales but can also be due to other
chemicals contacting the formation.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
L
ON G
C
TROL TRAININ
Damage will be caused by some well interventions and most notably when fluids are placed
against the formation.
To prevent the risk of any of these occurring, it is obviously that well interventions require
thorough planning to minimise formation damage.
It should be an aim in any programme to prevent any damaging fluid from contacting the
formation, if possible. If this cannot be achieved, then the use of clear non-damaging filtered
brines should be adopted. In some cases where it is necessary to use LCM or similar materials
then a post servicing stimulation should be considered to reduce the damage.
The best means of preventing formation damage is to isolate the fluids entirely from the
formation by installing a barrier in the form of a mechanical plug but this is only possible if
the well programme does not require work below the lowest plugging point.The most common
method of installing a barrier is by setting a plug in a packer tailpipe nipple on wireline
leaving well fluid or gas across the formation. The plug can then be inflow tested to confirm
there is no leak. If the tubing is to be removed from the well, wireline plugs can only be
installed in completions with permanent or permanent retrievable style packers.An alternative
when working on monobore type completions, is to install a retrievable through-tubing
bridge plug close to the top of the formation.This has an advantage in that the packer or liner
hanger packer above can be removed without disturbance of the barrier.
Whatever type of device is used for plugging, it must be designed so that it can be recovered
from the well after the work is completed.The plug will likely be covered by some scale, rust
and other debris and although most of it can be removed by washing or bailing, some will
remain. Most devices used generally have a long mandrel with a fishneck which stands above
the plug enabling washing and latching with a pulling tool. Other devices such as pump-
through plugs, allow the plug to be opened by application of tubing pressure above it where
5-4 © Aberdeen Drilling Schools 2001
ILLIN G S
N DR C
EE
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
LC
ON G
TROL TRAININ
after the well can be opened up to clean out the fill first before recovering the plug.
Once the tubing is successfully plugged and plug tested, the well can be circulated to the
workover fluid, i.e. brine, etc.
Fluids used in completing or servicing operations have many applications.They are employed
in perforating, cementing, fracturing, acidising, well killing, re-completing, milling, drilling,
cleaning out and preventing fluid losses.They may also have an important long term function
as an annulus packer or completion fluid.
To provide the properties required for each of the above, many types of fluids are utilised, e.g.
drilling muds, milling fluids, brines (including seawater), salt saturated brines, diesel and dead
oil. Some like the drilling or milling fluids, must have cuttings carrying capability, cool the bit
or mill and reduce friction to deliver hydraulic energy downhole. Others used, say for circulating
purposes or to provide an overbalance only, may be clear brines or seawater etc. Completion
or packer fluids are usually solids free to prevent drop out and sticking but are also dosed with
biocide, corrosion and/or scale inhibitors for long term protection of the formation and
tubulars exposed to the fluid. However, one important function of them all, whether used as
a completion fluid or in a re-completion, is that they must provide an overbalance at the
packer depth in case of a leak to control well pressure.
Generally, the most economic fluid which meets all of the criteria is used and, if possible, it
should be solids free and non-damaging. This criteria would tend to result in clear brines
being used as they are cheap, readily obtainable, easily transportable and easily filtered in
normal weight ranges. However the points which makes them desirable are also their worst
features in that they have no bridging capability and are easily lost into the formation (unless
the well is plugged). In this case, an LCM pill is usually placed against the formation to
prevent or reduce the losses.
The solids in the LCM pill are often designed to be removed by post re-completion flushing
or acidising.The use of a high viscous pill as an LCM is not recommended as the long chain
molecules which plugs the pores cannot be removed by these methods.
At one time it was felt that poor well performance was due to other reasons other than by
damage from drilling muds and other fluids. When it was recognised that some formations
were sensitive to invasion by foreign fluids and particles that operators began to look closely
at this subject, observing that fresh water was the biggest culprit. After this revelation, the use
of low water loss muds, cements and non-aqueous fluids became the norm.
Clear brines have become the commonest workover fluids as they not only meet most of the
criteria but are also a good medium in which to run and install tools and equipment.They are
weighted by salts to achieve the desired densities.
Brines are available in weights ranges from 8.3 to 21.0 lbs./gal.The heavier brines can be very
corrosive to metals and hazardous to personnel, hence require special handling. Personnel
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
L
ON G
C
TROL TRAININ
Composition of Brines
The following list shows the various types of brines, composition and weight ranges:
Brine Selection
Selection of the brine is not simply by picking the brine best fitting the particular weight
range required or by cost. For instance, the weight range of sodium chloride may provide the
hydrostatic pressure required in a well (say 9 ppg) but it causes shales and clays to swell
reducing permeability. Therefore if clays were present, as observed from cores etc., the brine
selected should be potassium or calcium chloride. Potassium chloride is corrosive and an
inhibitor should be added to maintain a pH of 7 to 10.
Preparation of Brines
Brines are normally supplied in stored liquid form at the higher end of the weight range
available and is transported in bulk to the well site.The density is normally adjusted by adding
water. In some rare circumstances where a higher weight was desired or if the liquid had been
accidentally contaminated with water, salt supplied in sacks would be added to build to the
correct weight.
Field mixing is not recommended as the handling systems usually are not able to meet the
high standard of cleanliness required to prevent contamination of the brine from incompatible
liquids or solids.
When brine densities reach saturation point, the salt will either crystallise or settle out and
pose a real hazard to operations.Temperature changes in the well can also cause crystallisation
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PREVENTION OF FORMATION DAMAGE
CE
LC
ON G
TROL TRAININ
or solids fall out. Crystallisation is sometimes called freezing as it appears to form like ice.
Filtration and Cleanliness
Brines are usually filtered to a predetermined level of cleanliness, selected to meet the demands,
by a filtration unit or a centrifuge. There are two main types of filtration units used are a DE
Filtration Unit and a Cartridge Unit.
The former uses Diatomaceous Earth formed as a cake on the faces of plates pressed together
through which the fluid is pumped.
The health of personnel and protection of the environment is paramount. The lower density
brines such as sodium chloride are not harmful but the higher density brines are exceedingly
toxic. These should be handled carefully and all personnel involved in mixing, storage and
handling should wear protective clothing and goggles. An emergency dousing shower should
also be easily accessible close to the workplace.
Some brines are also very corrosive to workwear such as leather boots and all precautions
should be taken to avoid contact or to ensure they are thoroughly washed after contact.
Pollution Control
In most countries, there is legislation regarding the use of hazardous materials, therefore,
disposal should be in accordance to the local laws and the well site appropriately constructed
to capture and retain leakage or spillage. All movement or spillage of these materials should be
recorded and the appropriate authorities notified.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 6
6. PRESSURE BASICS
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
6. PRESSURE BASICS
Force
Pressure = ––––
Area
Therefore, the formula can be changed to calculate the force from a given pressure and a unit
area:
In the oilfield, pressure is usually expressed as the pounds of force that is applied against a one
square inch area, i.e. pounds per square inch (psi.).Therefore, when a gas is placed in a pressure
tight container, it exerts a pressure on all sides of the container. If the gas pressure is 100 psi.,
it exerts a force of 100 pounds (lbs.) on each square inch of the container area. Similarly, if a
liquid is placed in a can, it exerts a pressure on the sides and bottom of the container due to
the weight of the liquid which is also expressed as psi. In well control, both of these effects are
of the utmost importance.
A fluid is any substance that is not solid and can flow. Liquids, like water and oil are fluids. Gas
is also a fluid. Under certain conditions, salt, steel and rock can become fluid and in fact almost
any solid can become fluid under extreme pressure and temperature. In well control, fluids
such as gas, oil, water and completion fluids, brines and mud are encountered.
Fluids exert pressure which is caused by the density, or weight of the fluid. This is normally
expressed in pounds per gallon (ppg) or pounds per cubic foot ( lbs./ft.3 ). Other abbreviations
for these are lbs/gal and ppf 3 .
As the pressure developed by a fluid is relative to the true vertical depth, it is often expressed
as psi. per foot (psi./ft.). This is termed the fluid’s pressure gradient. The pressure gradient for
a fluid is relative to the fluid’s weight or density.The higher the density, the higher the pressure
gradient. To understand this relationship, it is helpful to visualise a cubic foot of fluid; See
Figure 6.1.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
7.48 lbs.
––––––– = 7.48 lbs./ft.2
1 ft.2
1 ft.2 = 12 ins. x 12 ins. area = 144 ins.2, therefore the pressure per ins.2 is
7.48 lbs.
––––––– = 0.052 psi.
144 ins.2
This relationship between a fluid weight in ppg and gradient pressure in psi./ft. is always the
same, therefore 0.052 is a constant.
Example:
Example:
The weight of a fluid (fresh water) which has a gradient of 0.433 psi./ft.
0.433 psi./ft
–––––––––– = 8.33 ppg.
0.052
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
Many fluids in the oilfield are also expressed in specific gravity (SG) as well as weight in ppg.
It is also necessary to be able to convert SG to pressure gradient in order to calculate hydrostatic
pressures.
SG is the ratio of the weight of a fluid (liquid) to the weight of fresh water. Fresh water weighs
8.33 ppg and salt water is nominally valued at 10 ppg. Therefore, the SG of salt water is:
10ppg
SG of Salt Water = ––––– = 1.2
8.3ppg
The SG of fresh water is 1.0. As the gradient of fresh water is known to be 0.433 psi./ft., to
obtain the gradient of a fluid, it is simply necessary to multiply its SG by 0.433 psi./ft.
Example:
What is the hydrostatic pressure (HP) exerted by a true vertical 5,000 ft. column of brine with
an SG of 1.17?
= 2,533 psi.
API gravity is another value used to express relative weight of fluids and was introduced by
the American Petroleum Institute to standardise the weight of oilfield fluids at a base temperature
of 60˚ F. Water in this case was also used as the standard and assigned the value of 10 API
gravity.
To convert from specific gravity to API gravity, the following formula is used.
141.5
SG = ––––––––––
131.5 + API
Example:
141.5
SG = ––––––––– = 0.876
131.5 + 30˚
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
Hydrostatic pressure (HP) is the pressure developed by a fluid at a given true vertical depth in
a well.‘Hydro’ means water, or fluids which exert pressure like water and ‘static’ means motionless.
So hydrostatic pressure is the pressure created by a stationary column of fluid.The hydrostatic
pressure of any fluid can be calculated at any true vertical depth (TVD) provided the pressure
gradient of the fluid is known.
The previous calculations have dealt with fluid pressure with a gradient of one foot depth but
it is now simple to determine the pressure exerted by a fluid at any true vertical depth by
multiplying that pressure gradient by the true vertical height of the column in feet. The true
vertical height of the column is the important factor in the equation, as it’s volume or shape
is irrelevant.
Example:
A 500 ft. TVD column of fresh water, what is the hydrostatic pressure ?
= 216.5 psi.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
Example:
What is the hydrostatic pressure of a 6,750 ft. well, filled with a 0.478 psi./ft. pressure gradient
fluid which has a TVD of 6,130 ft. ?
= 2,930 psi.
Example:
A 12,764 ft. TVD well is filled with a 15 ppg fluid, what is the BHP?
= 9,956 psi.
Equipped with this knowledge, it is now easy to calculate the hydrostatic pressure with two of
more fluids in a well provided the depths (TVD) of the fluid interfaces are known. Using the
same formula, the HP for each fluid section is calculated in the same way and the sum of the
individual calculations gives the HP at the bottom hole or well.
Example:
A 10,500 ft.TVD well has two fluids in the well, a 15 ppg fluid from TD to 7,125 ft. and 8.33
ppg fluid to surface, what is the HP at the bottom of the well ?
= 2,633 psi.
= 3,086 psi.
= 5,719 psi.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
Most well servicing operations entails working with live wells whether using a through-
tubing method or rig intervention. Even with a rig operation, the well must be prepared by
being killed prior to the intervention. This involves dealing with gas in the well.
Production wells with gas in the fluids will exert a static surface pressure equal to the formation
pressure less the hydrostatic pressure in the production bore.The gas entrained in the productions
fluids will segregate from the liquids as shown in Figure 6.3. In a static situation, the closed in
tubing head pressure (CITHP) and hydrostatic pressure will balance the formation pressure.
As discussed earlier, gas is also a fluid and exerts a hydrostatic pressure. Being compressible
pressure affects the density of the gas. A set of correction factors are used which are used to
calculate hydrostatic pressures at varying TVDs with a range of gas gravities, refer to Table 6.1.
The correction factor, according to the TVD of the gas column and the gas gravity, is multiplied
by the CITHP:
Total Gas Pressure = Correction Factor x CITHP i.e. surface pressure + gas hydrostatic
Example:
What is the HP of a 5,000 ft.TVD column of 0.7 SG gas with a closed in tubing head pressure
of 1,650 psi?
= 212.85psi.
Using the calculations already given in earlier sections and the gas correction factors, hydrostatic
pressures in relatively complicated systems can now be determined.
Example:
What is the differential pressure between the annulus and tubing at a circulation device installed
at a depth of 8,200 ft. TVD in the tubing string ?
To help in the calculation, it is sometimes better to make a sketch; See Figure 6.3.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
600 CITHP
0.6 SG Gas
32 API Oil
Packer
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
= 4,387 psi.
= 52 psi.
HP of oil column
141.5
Oil SG = ––––––––
131.5 + 32
= 0.865
= 1,575 psi.
= 1,627 psi.
= 600 + 1,627
= 2227 psi
= HP of annulus - HP of tubing
= 2,160 psi.
If the circulation device were to be opened, then the opening toolstring would be exposed to
2,160 psi. differential pressure. If using wireline, this pressure differential would need to be
equalised before opening the device.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
Some rocks contain fluids like water, oil and gas which are contained in tiny openings or
pores. In a rock with pores, the measurement of the ratio of the pore volume to volume of the
rock material is termed ‘porosity’. The linkage between pores is the flowpath for any fluids
and is extremely important, e.g. a rock with many large pores which are not interconnected
will not have any flow potential to the hole drilled into the formation, i.e. the fluids would be
locked in place.The interconnection of pores make the rock permeable and the measurement
of this factor is termed ‘permeability’.
Formation pressure is the pressure of the fluids contained in the pores of a formation rock and
are classified into three categories:
• Normal
• Subnormal
• Abnormal.
Formation pressure or pore pressure is said to be normal when it is caused solely by the
hydrostatic head of the sub-surface water contained in the formations and there is pore to
pore pressure communication with the atmosphere.
Dividing this pressure by the true vertical depth gives an average pressure gradient of the
formation fluid, normally between 0.433 psi./ft. and 0.465 psi./ft. The North Sea area pore
pressure averages 0.452 psi./ft. In the absence of accurate data, 0.465 psi./ft., which is the
average pore pressure gradient in the Gulf of Mexico, is often taken to be the ‘normal’ pressure
gradient.
NOTE: The point at which atmospheric contact is established may not necessarily
be at sea-level or rig site level.
Prior to a well intervention, all the well’s parameters are generally well known and the risk of
encountering unexpected formation pressures is small. If there is any doubt over formation
pressure, a BHP survey should be conducted as the first operation in the programme.
Subnormal pressures occur in formations where the pressure gradient is less than ‘normal’.
These are found mainly in mountainous areas or in producing formations where fluids have
been extracted reducing the formation pressure.
Normal Formation Pressure is equal to the hydrostatic pressure of water extending from the
surface to the subsurface formation.Thus, the normal formation pressure gradient in any area
will be equal to the hydrostatic pressure gradient of the water occupying the pore spaces of
the subspace formations in that area.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
The magnitude of the hydrostatic pressure gradient is affected by the concentration of dissolved
solids (salts) and gases in the formation water. Increasing the dissolved solids (higher salt
concentration) increases the formation pressure gradient whilst an increase in the level of
gases in solution will decrease the pressure gradient.
For example, formation water with a salinity of 80,000 ppm sodium chloride (common salt)
at a temperature of 25˚C has a pressure gradient of 0.465 psi./ft. Fresh water (zero salinity) has
a pressure gradient of 0.433 psi./ft.
Temperature also has an effect as hydrostatic pressure gradients will decrease at higher
temperatures due to fluid expansion.
In formations deposited in an offshore environment, formation water density may vary from
slightly saline (0.44 psi./ft.) to saturated saline (0.515 psi./ft.). Salinity varies with depth and
formation type. Therefore, the average value of normal formation pressure gradient may not
be valid for all depths. For instance, it is possible that local normal pressure gradients as high as
0.515 psi./ft. may exist in formations adjacent to salt formations where the formation water is
completely salt-saturated.
A pressure which is higher than the definition given for normal pressure is abnormal. The
principal causes of abnormal pressures are:
Under-compaction in shales
When first deposited, shale has a high porosity. More than 50% of the total volume of un-
compacted clay-mud may consist of water in which it is laid. During normal compaction, a
gradual reduction in porosity accompanied by a loss of formation water occur as the thickness
and weight of the overlaying sediments increase. Compaction reduces the pore space in shale,
as compaction continues water is squeezed out. As a result, water must be removed from the
shale before further compaction can occur.
Not all of the expelled liquid is water, hydrocarbons may also be flushed from the shale.
If the balance between the rate of compaction and fluid expulsion is disrupted such that fluid
removal is impeded then fluid pressures within the shale will increase.The inability of shale to
expel water at a sufficient rate results in a much higher porosity than expected for the depth
of shale burial in that area.
Salt Beds
Continuous salt depositions over large areas can cause abnormal pressures. Salt is totally
impermeable to fluids and behave plastically. It deforms and flows by recrystallisation. Its
properties of pressure transmission are more like fluids than solids, thereby exerting pressures
equal to the overburden load in all directions.The fluids in the underlying formations cannot
escape as there is no communication to the surface and thus the formations become over
pressured.
© Aberdeen Drilling Schools 2001 6-11
ILLIN G S
N DR C
EE
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
Mineralisation
The alteration of sediments and their constituent minerals can result in variations of the total
volume of the minerals present. An increase in the volume of these solids will result in an
increased fluid pressure. An example of this occurs when anhydrite is laid down. If it later
takes on water crystallisation, its structure changes to become gypsum, with a volume increase
of around 35%.
Tectonic Causes
Faulting
Faults may cause abnormally high pressures. Formation slippage may bring a permeable
formation laterally against an impermeable formation preventing the flow of fluids. Non-
sealing faults may allow fluids to move from a deeper permeable formation to a shallower
formation. If the shallower formation is sealed then it will be pressurised from the deeper
zone.
Diapirism
A salt diapirism is an upward intrusion of salt to form a salt dome. This upthrust disturbs the
normal layering of sediments and over pressures can occur due to the folding and faulting of
the intruded formations.
Extension Extension
Compression Compression
Compression Compression
Amount of
Shortening
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
Reservoir Structure
Abnormally high pressures can develop in normally compacted rocks. In a reservoir in which
a high relief structure contains oil or gas, an abnormally high pressure gradient as measured
relative to surface will exist as shown in the following Figure 6.5.
Figure 6.5a Shows how the anticline differs from a dome in that it’s shape is long and narrow.
Figure 6.5c Shows stratigraphic trap. The size of the stratigraphical trap on the left is limited
only by it’s hydrocarbon content while the one on the right is self limiting.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
The amount of pressure a formation can withstand before it splits is termed the fracture
pressure. The pressure of fluid in a well must exceed formation pressure before the fluid can
enter a formation and cause a fracture. Fracture pressure is expressed in psi., as a gradient in
psi./ft., or as a fluid weight equivalent in ppg.
In order to plan a conventional rig well intervention, it is necessary to have some knowledge
of the fracture pressures of the formation to be encountered. If wellbore pressures were to
equal or exceed this fracture pressure, the formation would break down as the fracture was
initiated, followed by loss of workover fluid, loss of hydrostatic pressure, loss of primary well
control and irreparable damage to the formation. Most operating companies have strict policies
and procedures to ensure the fracture pressure is never exceeded (unless the formation was to
be deliberately fractured for reservoir productivity improvement through sand fracing operations,
etc.). Unless the service is to conduct remedial operations on or in the casing across the
formation, it is preferred to isolate the formation from the kill fluid by installing a barrier or
plug.
Fracture pressures are related to the weight of the formation matrix (rock) and the fluids
(water/oil) occupying the pore space within the matrix, above the zone of interest.These two
factors combine to produce what is known as the overburden pressure. Assuming the average
density of a thick sedimentary sequence to be the equivalent of 19.2 ppg then the overburden
gradient is given by:
Since the degree of compaction of sediments is known to vary with depth, the gradient is not
constant.
Onshore, since the sediments tend to be more compacted, the overburden gradient can be
taken as being close to 1.0 psi./ft. Offshore, however the overburden gradients at shallow
depths will be much less than 1.0 psi./ft. due to the effect of the depth of seawater and large
thickness of unconsolidated sediment.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
LOTs and FITs determine if the cement seal between the casing and the formation is adequate
and the maximum pressure or fluid weight that the formation(s) can withstand without
fracturing. As the leak-off test actually causes a fracture to determine the fracture gradient, it
is rarely used in well servicing operations and the FIT is adopted.
Whichever is to be performed, it must be ensured that the well is fully circulated to the
correct weight workover fluid and the pump deliverability is sufficient.
Leak-Off Test
The test is performed by applying an incremental pressure from the surface to the closed
wellbore/casing system until it can be seen that fluid is being injected into the formation.
Leak-off tests should normally be taken to this leak-off pressure unless it exceeds the pressure
to which the casing was tested.
• Before starting, gauges should be checked for accuracy.The upper pressure limit should
be determined.
• The casing should be pressure tested before well operations commence.
• Circulate and condition the mud, check mud density in and out.
• Close BOPs.
• With the well closed in, the pump is used to pump a small volume at a time into the
well typically a 1/4 or 1/2 bbl per min. Monitor the pressure build up and accurately
record the volume of mud pumped. Plot pressure versus volume of mud pumped.
• Stop the pump when any deviation from linearity is noticed between pump pressure
and volume pumped.
• Bleed off the pressure and establish the amounts of mud, if any, lost to the formation.
In non-consolidated or highly permeable formations fluid can be lost at very low pressures. In
this case the pressure will fall once the pump has been stopped and a plot such as that shown
in Figure 6.6a will be obtained. Figure 6.6b and Figure 6.6c show typical plots for consolidated
permeable and consolidated impermeable formations respectively.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
Pressure
Leak-Off Point
Pressure
Cumulative Volume
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
LC
ON G
TROL TRAININ
An FIT can be performed when it is not acceptable to fracture a formation. In a FIT, fluid is
pumped into the shut in well until a predetermined pressure is reached that is determined to
be below the pressure to break down the formation. This value used is usually obtained by
assessing information from well’s completion report and nearby well data.
With data from the formation integrity test, the maximum pressure which can be applied
without fracturing the formation and the maximum fluid weight can be determined.
The applied surface pressure at which leak-off occurred or at FIT pressure, is the maximum
allowable annulus surface pressure with the fluid weight in use at that time. MAASP is the
maximum surface pressure that can be tolerated before reaching the formation fractures.
or re-written as:
or as:
MAASP is only valid if the well is full of the original fluid during the LOT or FIT; if the fluid
weight in the well is changed, MAASP must be recalculated.
The calculated MAASP is no longer valid if influx fluids enter into the well.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRESSURE BASICS
CE
L
ON G
C
TROL TRAININ
However, in practise MAASP is calculated as a percentage of the original casing burst pressure
rating. This percentage is derived from experience and the age of the well casings, i.e. if the
well is old and it is suspected there is casing corrosion or wear, the percentage will be lower
than that of a more recently developed well. In general, the pressure rating is 80% of original
burst. This pressure is used in the equation in place of the formation breakdown pressure.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 7
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
The most likely involvement of the use of well kill procedures during a live well intervention
is to prepare it for a dead well workover. This entails killing the well by displacement of the
well fluids from the completion tubing and sump to workover fluid. There are a number of
kill procedures that are available depending on the circumstances that prevail such as tubing
and casing integrity, ability to circulate the fluid in the annulus, formation pressure and
characteristics of the completion methods and formation parameters that may control techniques
such as reverse pumping into the formation. Individual wells must be evaluated to determine
the most effective procedure.
The most common well control methods are:
• Reverse circulation
• Bullheading
• Lubricate and bleed.
• Deploying Coiled Tubing and displacing tubing.
As the completion tubing is normally full of well fluids and the tubing/casing annulus full of
completion or packer fluid, then it is easier to conduct a reverse circulation kill as the gravities
of the fluids will tend to keep them segregated as they are pumped up the tubing.The preferred
method is to install a wireline set plug as low as possible in the well below the packer (e.g.
packer tailpipe), if possible, to isolate the formation from the kill fluid, and then reverse circulate
to kill the well.
Bullheading is only recommended where it causes no damage to the formation and some
operators have strict policies stating if, and under what conditions, this method may be used.
Lubricate and bleed is the least preferred and is only used when there is some obstacle to
conducting the other methods. For instance, it may be a combination of an obstruction in the
tubing which prevents the running of wireline to open a circulating path (e.g. a partially
closed valve) and a blockage or tight formation preventing bullheading.
Prior to initiating well killing operations, several safety precautions must be exercised. The
well must be shut-in in advance of operations to stabilise bottomhole pressure and allow time
to inspect and service the Xmas tree. The tree valves and sub-surface safety valves should be
tested to ensure they comply with API criteria. Where practicable, each annulus should be
checked for H2S and any found dealt with.
The well shall then be isolated from all external control systems, the lines isolated by double
barrier isolation and depressurised. The only exception is during kill operations when
hydrocarbons are being flowed to the production system.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
This kill method is the safest, and probably the simplest, as it uses the natural U-tubing effect,
of the different gravities of fluids in the annulus and tubing, to flow the well fluids out
through the Xmas tree choke and existing flowlines to the production facilities. The only
pump pressure required is to equalise across the circulation device before opening and, when
the kill fluid is near in balance tubing-to-tubing/casing annulus and circulating friction losses
need to be overcome.
This method requires a circulation path between the tubing and tubing/casing annulus to be
opened by operating a circulation device in the completion string or punching a hole with
wireline.The procedure is even more effective if a plug can be installed to isolate the completion/
packer and kill fluid from the formation, but this is dependent upon the whether or not
operations are to be carried out below this point. If there is no plug, the old dirty completion/
packer fluid may contaminate the formation if losses occur before the clean kill fluid gets
around into the tubing.
The well is circulated with a back pressure maintained on the tubing so that a constant
bottomhole pressure can be maintained so as to eliminate any further flow of reservoir fluids
into the well. In other words, maintaining a hydrostatic head on a formation that is greater
than the actual formation pressure, but obviously one that is not too much greater, otherwise
there will be excessive fluid loss, or even fracturing of the formation. To prevent any further
inflow of formation fluids it is common practice to maintain a tubing pressure that is some
200 psi. higher than the shut-in pressure. This will ensure that when pumping is started, the
kill fluid pressure on the formation will be higher than the formation pressure. As the kill fluid
is pumped to the tubing the surface pressure can be slowly reduced in proportion to the
amount of fluid rise in the tubing.
One of the main reasons for using the reverse circulation method is that it is easier to pump
maintaining oil and/or gas on top of the kill fluid than it is to force the oil and gas down
below the kill fluid.There is as a result far less contamination of the kill fluid with well fluids,
and there is less of a problem in establishing a clean kill fluid for circulation.
The slightly higher hydrostatic head on a formation is maintained during the kill operation
reducing the chance of influx of the formation fluids. As the kill fluid moves up the tubing,
the back pressure held on the tubing head is reduced. This can be shown in the form of a
graph with tubing head pressure against time (assuming a constant pumping rate) or tubing
head pressure against quantity pumped; See Figure 7.1.
The operator on the choke will reduce pressure in accordance with the graph which is based
on tubing capacity and the pumping rate. If there is a fluctuating pump rate then there will
have to be communication between the pump operator and the operator on the tubing head
so that the pressure is reduced at the correct rate.
The reverse circulation method can be used for all types of wells except possibly those with
very high production rate and very low reservoir pressure. In this case it is not possible to have
a kill fluid of sufficiently low hydrostatic head to kill the well without heavy losses or where
it is not possible to fill the tubing without exceeding the reservoir pressure.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
An alternative method of using a circulation kill method is to use coiled tubing which can be
run into the well under pressure.The well can then be killed by pumping mud down the small
bore coiled tubing and back up the tubing/coiled tubing annulus. The procedure is the same
as for the reverse circulation kill though, of course, this is actually a forward circulation procedure.
The back pressure is held as before on the tubing to control the bottomhole pressure. This
method would be used where it was not possible to establish communication around the
tubing shoe or through a sliding sleeve, and where it is not desirable to bullhead.
Tubing Volume
TUBING PRESSURE (PSI)
BARRELS PUMPED
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
The annulus gas lift pressure was bled off to zero in preparation for the annulus to be filled
with water. However, the annulus pressure increased again to its initial value in 18 hours
indicating a leak in the tubing.Wireline services retrieved the sub-surface safety valve (SCSSV)
and run a gauge ring to the landing nipple below the production packer.
A dummy safety valve was set in the SCSSV landing nipple and no increase in annulus
pressure was observed when the annulus pressure was bled down indicating the leak was at
the SCSSV.
Attempts to set a plug below the packer failed possibly due to corroded tubing.
Generate an appropriate procedure to kill the above well ensuring that the BHP does not
exceed the reservoir pressure by 150 psi. and construct a kill graph.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
Using tables:
NOTE: It is expected that most of the tubing oil below the packer will be displaced
by annulus fluid (0.435 psi./ft.) filtering through to the perforations.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
1725
psi
5250 ft 1725
psi
5600 ft
8000 ft
gas lift
valve in
SPM
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
Step 3: Calculate The Required Kill Fluid Weight To Balance Reservoir Pressure
3,450
b) Kill fluid gradient = ––––– = 0.418 psi./ft.
8,250
and hence fresh water (gradient 0.433 psi./ft.) can be used to kill the well as it provides a
hydrostatic pressure of 3,572psi
Since it takes 18 hours for pressure equalisation between the tubing and annulus, the tubing
leak must be small. Since a gas lift mandrel was set at 5,600 ft. it seems likely that the fluid level
in the annulus is at this depth.
The preferred method to kill the well is a reverse kill method. Therefore holes must be
punched in the tubing as close as possible to the packer; this can be performed using wireline
techniques using explosive tubing perforators.
1. Connect one side outlet of the tubing head spool (THS) to a pump with a pressure
rating of at least 5,000 psi.; this can be a cement pump.
2. Connect the other side outlet of the THS to a choke manifold.
3. Install a wireline lubricator on to the Xmas tree.
4. Pressure test all surface equipment as per company policy.
5. Connect the suction line of the pump to the kill fluid tank of sufficient capacity; in this
case a minimum of 300 bbls. will be required.
6. Connect the outlet of the choke manifold to a separator and the outlet of this separator
to the kill fluid tank.
7. Calibrate the brine tank and install a level indicator.
8. Start the pump and open the choke. Manipulate the choke in such a way that the
annulus pressure remains initially at 1,725 psi.
Every barrel of kill fluid pumped into the annulus represents an equivalent height of:
1
–––––– = 45.2 ft.
0.0221
The increase in hydrostatic pressure in the annulus will be 20 – 45.2 x 0.1 = 15 psi.
The volume of kill fluid to fill the annulus (assumed initial level of 5,600 ft.) will be
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
This implies that the annulus pressure will need to be reduced by 15 psi. for every barrel of kill
fluid that fills the annulus.
9. Monitor the volume of kill fluid in the tank continuously. The choke must be
manipulated such that the annulus pressure (pump pressure) will drop by
the calculated amount (15 psi.) for every barrel lost to the annulus.
10. Keep circulating and manipulating the choke until the entire annulus is
filled with kill fluid.
11. Connect the choke manifold to the production side outlet of the Xmas tree.
12. Pressure test all connections as per company policy.
13. Connect the outlet of the separator to an empty tank of sufficient capacity.
In this case a minimum of 100 bbls. will be sufficient.
14. Perforate the tubing just above the packer.
Differential pressure will be 3,469 – 3,350 = 119 psi. which could cause problems during
wireline operations.
15. Start pumping kill fluid into the annulus such that the THP follows the calculated kill
graph which ensures that the bottomhole pressure will be equal to or slightly above the
reservoir pressure.
16. Continue circulating until the well is filled with kill fluid.
17. Check for fluid losses. If severe losses are observed then consideration should be given
to acid degradable LCM materials as a kill fluid additive or a cement plug installed.
18. Check that the well does not flow.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
1725
psi
5250 ft 0
psi
5600 ft
8000 ft
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
The THP at the start of the kill operation will be 1,725 psi. and this pressure should drop off
fairly rapidly as water (0.435 psi./ft.) enters the tubing and gas leaves the tubing at surface.
= 3,484 psi.
which is higher than the reservoir pressure (but not higher than 150 psi.) indicating that the
well should be dead before the oil reaches the surface.
= 5,250 – Htgas.
The height of the water in the tubing will be 5,250 – 64 = 5,186 ft.
The volume of water in the tubing will be 5,186 x 0.0073 = 37.86 bbls.
Thus the well will be dead after pumping 37.86 bbls. of kill fluid into the annulus and the
choke at the tubing outlet can be fully opened and circulation of the entire well performed
with fresh water of volume 242.5 bbls.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
0
psi
0
2750 ft
psi
8000 ft
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
The graph for the annulus reduction in pressure and the kill graph for the tubing pressure are
shown in Figure 7.4.
1725 1725
1500 1500
psi psi
1000 1000
500 500
20
30
10
100
110
130
70
80
90
10
20
30
40
50
60
124 120
37.86
bbls bbls
Figure 7.5 - Annular Pressure Reduction and Tubing Pressure Kill Graphs
This method consists of pumping kill fluid to the well and forcing the well fluids back into
the formation without pumping at a rate which will fracture the formation, the latter being
somewhat difficult when trying to kill a well with fracture production. This method is the
only method possible when a well has been completed without tubing. It can also be used
when the tubing has been landed in a packer and the circulation devices, such as a sliding
sleeve, has jammed.This would mean that it is not possible to establish circulation around the
tubing shoe or near the tubing shoe (other than by perforating the tubing).
In this method the pump rate has to be high enough to ensure that the rate the kill fluid is
moving down the tubing is faster than it will free fall. This will prevent the contamination of
the kill fluid by oil in an oil well, and gas cutting in a gas well. In effect, a piston effect is
required so that the kill fluid is going down the tubing as a piston sweeping all the well fluids
before it: An example of a bullhead/squeeze kill is shown in Figure 7.5.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
LC
ON G
TROL TRAININ
Normally this method only finds use in wells with small tubings and with high permeabilities
allowing adequate pumping rates. In larger tubings (31/2"+) and in low permeability wells,
this method is time consuming and difficult, resulting in gas cutting of the kill fluid especially
in gas wells and wells with high gas/oil ratios.This method also has the potential draw back in
that some of the kill fluid is inevitably pumped away to the formation.
Displaced Tubing
Tubing Burst Limit
10570
10000
8000
2000
10
40
50
60
20
30
bbls
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
PRODUCTION WELL KILL PROCEDURES
CE
L
ON G
C
TROL TRAININ
For a gas well, or gas filled tubing, an alternative method is to use the lubrication kill. In this
method varying amounts of mud are lubricated into the well, and the well pressure is bled off
after each batch of mud has been lubricated into the well.
Calculate the capacity of the tubing and pump half this volume of kill fluid to the well.
Observe the well (1/2 to 1 hour), the tubing head pressure will drop due to the hydrostatic
head of the initial kill mud pumped.When the tubing head pressure is constant, the next step
is taken.
Pump kill fluid for about 3 - 5 minutes, and not more than about 10 barrels, and making sure
that the tubing head pressure does not go more than 200 psi. above the observed static pressure
taken in step 2.
Bleed off gas from the tubing at a high rate immediately after pumping the batch of kill fluid.
The amount of drop in tubing head pressure could be equal to the amount of hydrostatic
head of the mud pumped. If the bleeding off is not carried out quickly, the additional pressure
due to the extra hydrostatic head will cause mud losses and the sooner the tubing head is
reduced, the smaller the loss will be.
Repeat the pump and bleed and observe the tubing head pressure after each step. If necessary,
reduce the quantity of kill fluid if the amount of gas being bled off is excessive. After repeated
pumping of batches of mud and the well is deemed dead, observe the well for a considerable
period before starting and further work.
If the fluid level is too low, then the kill fluid has been too heavy and additional lighter fluid
should be added until the well is full of fluid.
Alternatively, if the well will not die, it could be that too much gas was bled off or some of the
kill fluid was blown out of the well during the bleed off cycle, resulting in gas flowing into the
well bore. Wait for the well to settle and after re-appraising the situation, carry on with the
batch and bleed procedure until the well is completely dead.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
SECTION 8
8.1 GENERAL
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
8.1 GENERAL
This section illustrates the various well control systems and equipment used with the various
well intervention methods described in Section 3 and well control methods in Section 6.
An HWO unit is utilised on both live well interventions and dead well workovers. When
utilised on workovers, the well control is similar to a rig operation, requiring the well to be
killed and plugged and the Xmas tree replaced by a BOP stack on the casing head. The only
difference in well control equipment may be in the workstrings used where check valves may
be installed to the BHA as additional primary well control.
In place of the rig circulation system, pumps, tankage, mixing hoppers and hard piping would
have to be provided unless the operation was rig assisted.
However, when used in snubbing operations, the pressure control systems are significantly
different.The equipment used for snubbing operations is described in the sub-section below.
Snubbing operations with an HWO unit entails installation of the well control equipment
onto the top of the Xmas tree for ‘through-tubing’ work. BOP configurations for snubbing
operations are shown in Section 7.2.2 below. The arrangements shown illustrate stripping
pipe rams for running collared pipe but an annular preventer can be used when running non-
upset or tapered connections such as Hydril PH6, etc.
Workstring BHAs also contain barrier systems for primary and secondary pressure control.
NOTE: The snubbing configurations shown are generic and may not conform to
individual service companies’ policy and procedures.There is no API
standard for snubbing well control equipment and development of the
method has been driven by the users.The configurations listed meet the
absolute minimum and it would be common practice for additional safety
to be added.
An equalising loop must be used when stripper rams are being used but is not necessary when
using annular preventers on non-upset pipe or pipe with tapered upset connections. Equalising
loops should be constructed with flanged connections.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Operating features:
1. This is the very minimum arrangement for 0 - 5,000 psi.WP and one size of pipe only.
2. If a leak occurs to either of the strippers, both pipe rams would be closed to allow repair
and re-instatement of the strippers. Two pipe rams provide block and bleed.
3. Two tree valves must be available to be closed when stripping in the BHA, therefore
spacing out to have enough distance to accommodate the BHA is crucial.
4. The pipe rams should not be used for stripping unless in an emergency situation.
5. When the upper pipe rams are closed, the flow line and chokes can be used.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Bleed Off
Threaded pipe loops
Acceptable Strippers
To Pump Line
Safety
Choke
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Operating features:
1. This is the very minimum arrangement for 5,000 - 10,000 psi.WP and one size of pipe
only.
2. If a leak occurs to either of the strippers, both the pipe rams would be closed to allow
repair and re-instatement of the strippers.
3. Two tree valves or a combination of both tree valves and blind rams must be available to
be closed when stripping in the BHA, therefore spacing out to have enough distance to
accommodate the BHA is crucial.
4. When the upper-pipe or blind rams are closed, the flow line and chokes can be used.
5. The pipe rams should never be used for stripping unless in an emergency situation.
6. With drill pipe in the hole, the blind rams can be changed to pipe rams and the drill
pipe can be reciprocated through the upper rams while retaining the two bottom rams
in reserve.
7. The combination of shear and blind rams provide ultimate safety, if secondary well
control fails.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Bleed Off
Strippers
To Pump Line
Safety
Safety
To Kill Line Choke
Shear
Sensor
Hydraulic
Controlled Safety
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Operating features:
1. This is the very minimum arrangement for over 10,000 psi. WP and one size of pipe
only.
2. If a leak occurs to either of the strippers, both the pipe rams would be closed to allow
repair and re-instatement of the strippers.
3. Two tree valves or a combination of both valves and blind rams must be available to be
closed when stripping in the BHA, therefore spacing out to have enough distance to
accommodate the BHA is crucial.
4. When the upper pipe or blind rams are closed, the flow line and chokes can be used.
5. The upper pipe rams can be used for stripping in an emergency situation.
6. The combination of shear and blind rams provide ultimate safety, if secondary well
control fails.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Bleed Off
Strippers
To Pump Line
Safety
Blind
To Kill Line
Safety
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
The BHA shown is typical and must be accompanied by having a safety valve on hand in the
work basket.
Operating features:
Various configurations may be used for differing applications providing they meet with the
minimum requirements outlined above.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Bleed Off
Strippers
To Pump Line
Safety
Blind
To Kill Line Choke
Hydraulic
Controlled Sensor
Shear
Safety
Safety
The Wellhead must have a
minimum of two functional
blind BOP’s, gate valves or a
combination of both
ON
EE
N DR
ILLIN G S
C
8-10
TROL TRAININ
G
HO
CE OL S •
NTRE
PRIMARY SECONDARY
LANDING WORK
BPV SINGLE JOINT
A
BHA BPV NIPPLE STRING
PRIMARY SECONDARY
LANDING WORK
SINGLE JOINT BPV
B
STANDARD BPV
CONFIGURATIONS
PRIMARY SECONDARY
LANDING WORK
C
BHA BPV PUP JOINT 6 FT LONG BPV SINGLE JOINT NIPPLE STRING
IWCF WELL INTERVENTION PRESSURE CONTROL
PRIMARY SECONDARY
LANDING WORK
CONFIGURATION
NON-STANDARD BPV
SECONDARY
PRIMARY
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Most well servicing is accomplished using wireline methods which are relatively simple to rig
up and conduct operations, compared to other methods.The development of wireline pressure
control systems have made this service one of the safest in the industry.
Braided line (i.e. electric line and swab line) and slickline pressure control equipment is similar
in design and operation but do have some differences which are outlined below.
Operating features:
1. The stuffing box is adjustable (manually, or more commonly hydraulically) to cater for
packing wear.
2. The lubricator is an intrinsic part of the primary well control system along with the
stuffing box.
3. If the stuffing box leaks, the wireline BOP wire/blind rams can be closed on the wire
to repair the packing.
4. If the rams leak, the wire can be cut with a wire cutting actuator or the upper master
valve, although this may lead to valve damage.
Operating features:
1. The stuffing box is adjustable (manually, or more commonly hydraulically) to cater for
packing wear.
2. The lubricator is an intrinsic part of the primary well control system along with the
stuffing box.
3. If the stuffing box leaks, the upper wireline BOP wire/blind rams can be closed on the
wire to repair the packing.
4. If the upper rams leak, the lower rams can be used.
5. If the wire is broken and expelled from the lubricator, both rams can be closed to
provide double isolation.
6. If the rams leak, the wire can be cut with a wire cutting actuator or the upper master
valve, although this may lead to valve damage.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
SHEAVE
STUFFING BOX
LUBRICATOR SECTIONS
LUBRICATOR SECTIONS
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
SHEAVE
STUFFING BOX
LUBRICATOR SECTIONS
LUBRICATOR SECTIONS
BLIND RAMS
WIRELINE RAMS
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Operating features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
FLOW TUBE
FLOW TUBE
GREASE CONNECTION
LUBRICATOR SECTIONS
LUBRICATOR SECTIONS
BLIND RAMS
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Operating features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
LINE WIPER
PACK OFF
HYDRAULIC CONNECTION
GREASE CONNECTION
(GREASE OUT)
FLOW TUBE
TOOL CATCHER
LUBRICATOR SECTION
QUICK UNION
TRIPLE
BOP
WELLHEAD ADAPTER
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Coiled tubing operations are very similar in method to snubbing operations, except that the
C/T unit uses an injector head with travelling chains instead of a hydraulic jacking unit. The
BOP stack, however is simplified due to the coiled tubing being of smaller diameter and non-
upset allowing a stripper to be used. Specialised BOPs have also been developed with gripper
rams to cater for easier pipe retrieval if ever the pipe is sheared.
C/T operations are generally limited to a maximum of 5,000 psi., although this may be
increased in future through new tubing technology.
All C/T BHAs include double check valves for inside primary pressure control except in very
special circumstances.
Operating features:
Operating features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
Subsea wells can be serviced by means of subsea workover systems. There are two systems in
current use, one for conventional susbsea trees and the other for the newer generation of
spool trees. The former is described in Section 8.5.1 below and the latter in 8.5.2.
Conventional subsea well interventions are conducted through a subsea workover riser systems
which are deployed from floating vessels or from jack-up rigs in shallower waters. Riser
systems are attached to the top of subsea Xmas trees and, after completing the appropriate test
procedures, allow live well servicing by wireline or coiled tubing methods.
Pressure control is provided at surface by a Xmas tree fitted with a lift frame which
accommodates the pressure control equipment installed on the top of the tree. Other than
this, pressure control is exactly the same as that described in the previous sections except that
vessel movement gives additional rigging up and operational problems. However, the workover
riser system must also have subsea pressure control capabilities in the event of a emergency
disconnection or a riser failure. Subsea pressure control is provided by a subsea lower riser
assembly (LRA) and an emergency disconnect package (EDP) which can safely close in the
well and disconnect the riser, with or without wireline or coiled tubing through the subsea
tree, in the event of an emergency.
These systems maintain the well in a safe condition until the problems arisen are overcome
and the riser can be re-attached. Operations can then be recommenced and fishing operations
initiated, if required.
Due to the capital costs of conventional workover riser systems, and the incompatability
between the various manufacturer’s designs, this drove the industry to develop the spool tree
and associated intervention systems utilising standard drilling rig subsea BOP riser systems.
The subsea BOPs were utilised for connection to the tree and to provide pressure control in
conjunction with a subsea test tree which latches onto the spool tree tubing hanger. Pressure
is contained within the subsea tree and it’s riser to the surface which is terminated with a
surface test tree in the conventional well test fashion.The BOP rams are closed on the subsea
test tree slick joint to provide a barrier to any well pressure below the BOPs. In the event of
an emergency, the subsea tree can be closed, the subsea riser disconnected before the BOP
shear/blind rams are closed above the tree valve section and the drilling riser disconnected.
The main problem thrown up by this method of well intervention was the lack of bore size in
standard subsea test tree riser systems initially available which has driven the design of systems
with bores sizes now up to 7 inches in diameter.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
L
ON G
C
TROL TRAININ
Subsea test tree systems must have a cutting capability to sever any wireline or coiled tubing
run through the BOPs.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
WELL CONTROL EQUIPMENT
CE
LC
ON G
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX A
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Boyle’s Law
P1V1 = P2V2
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX B
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Accumulator Bank Isolator Valve The opening and closing device located upstream
of the accumulators in the accumulator piping
which stops flow of fluids and pressure in the piping.
Annular Preventer A device which can seal around any object in the
wellbore or upon itself. Compression of a reinforced
elastomer packing element by hydraulic pressure
effects the seal.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Back Pressure (Casing, Choke Pressure) The pressure existing at the surface on the casing
side of the drill pipe/annulus flow system.
Blind Rams (Blank, Master) Rams whose ends are not intended to seal against
any drill pipe, tubing or casing. They seal against
each other to effectively close the hole.
Blind/Shear Rams Blind rams with a built-in cutting edge that will
shear tubulars that may be in the hole, thus allowing
the blind rams to seal the hole. Used primarily in
subsea systems.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Feed-in (Influx, Inflow) The flow of fluids from the formation into the
wellbore.
Fluid Density The unit weight of fluid; e.g., pounds per gallon
(lbs/gal).
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Formation Competency
(Formation Integrity) The ability of the formation to withstand applied
pressure.
Formation Competency Test
(Formation Integrity Test) Application of pressure by superimposing a surface
pressure on a fluid column in order to determine
ability of a subsurface zone to withstand a certain
hydrostatic pressure.
Formation Pressure (Pore Pressure) Pressure exerted by fluids within the pores of the
formation (See Pore Pressure).
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Inside Blowout Preventer A device that can be installed in the drill string
that acts as a check valve allowing drilling fluid
to be circulated down the string but prevents
back flow.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Kill Fluid Density The unit weight e.g. pounds per gallon (lbs/gal),
selected for the fluid to be used to contain formation
pressure.
Kill Rate Circulating Pressure Pump pressure required to circulate kill rate volume.
Lost Circulation (Lost Returns) The loss of whole well control fluid to the wellbore.
Lost Returns See Lost Circulation.
Minimum Internal Yield Pressure The lowest pressure at which permanent deformation
will occur in metals.
Mud-gas Separator A vessel for removing free gas from the drilling/kill
fluid returns.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Pit Volume Indicator A device installed in the drilling fluid tank to register
the fluid level in the tank.
Pit Volume Totaliser A device that combines all of the individual pit
volume indicators and registers the total fluid
volume in the various tanks.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Pressure Gradient, Normal The normal pressure divided by true vertical depth.
Primary Well Control The primary well control system or device on the
well.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX C
C. PREVENTERS
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
C. APPENDIX - PREVENTERS
C.1.1 Introduction
The annular preventer consists of a flexible reinforced element that can seal any size tubular.
The element is squeezed round the tubular by a piston of relatively large area. Because of this,
the operating pressure is relatively low (usually regulated between 0 and 1,500 psi as needed)
and so pipe can be stripped into the hole under pressure if necessary. Table C.1 shows some
recommended closing pressures.
If upset pipe has to be stripped through an annular, the rubber is forced out whenever a tool
joint passes through it.This in turn forces fluid from the closing side of the piston and so surge
chambers are needed to handle this flow. (See Figure C.1) shows a Hydril GK (surface type)
preventer.
The majority of annular preventers currently in use are manufactured by Hydril (Types MSP,
GK, GL, GX), Shaffer (Spherical) and Cameron (Type D), these are illustrated (See Figure
C.1, Figure C.2, Figure C.3 together with a summary of major operating features.
The following are the most important aspects of the operation of annular preventers:
• To obtain maximum sealing life, hydraulic closing pressures should conform to the
manufacturer’s recommendations for pressure testing and operational use of the preventers.
Excessive closing pressures, when coupled with wellbore pressure sealing effects, cause
high internal stresses in the element and reduce element life.
• Cavities should be flushed out and the element inspected following each well. Preventers
should be stripped and inspected annually. Seals should be replaced and all sealing surfaces
inspected.
• Cap seals should be replaced when changing elements.
• Tooling, especially mills and bits, should be run cautiously through BOPs to minimise
element damage. Elements of annular preventers do not, on occasions, retract fully.
• The type of elastomer (natural rubber, synthetic rubber, neoprene) used in the packing
element should be the most suitable for a particular wellhead environment; Figure C.1 and
Figure C.2
• Although most models and sizes of annular preventer will seal an open hole in an emergency
operation, it is not recommended, as such gross deformation of the elastomer causes cracking
and accelerated wear.
• Closing pressures should be regulated to the pressures specified by the manufacturers.This
information should be available at the rigsite.
When stripping, the closing pressure should be regulated to the minimum required for a
slight weeping of well fluid past the element. Closing pressures higher than this will increase
element wear. The pipe should be moved slowly, particularly as tool joints pass through the
element.The manufacturers also provide information regarding recommended closing pressures
during stripping operations. Surge vessels on the closing ports will help to smooth-out surge
pressures as tool joints pass through the element.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Operating Features:
Figure C.1- Hydril Annular Preventer - ‘GK’ 41/16" 10,000 15,000 & 20,000 psi WP
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Operating Features:
If the annular packing element wears out during stripping or well killing operations, the
element can be changed without having to pull the pipe. After the pipe rams are closed and
locked below the annular preventer and both the hydraulic and well pressure below is bled
off, the cover of the preventer can be unbolted and the packing element lifted out with a
tugger or hoist line.With the element above the preventer, the damaged unit can be split and
removed from the pipe. A new element would be installed in reverse sequence of the above.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Ring Groove
Wear Plate
Latched Head
Packing Unit
Seals Hydraulic Connection
Operating Features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Secondary Chamber
Connected To
Opening Chamber (S - O)
Secondary Chamber
Connected To
Closing Chamber (S - C)
Secondary Chamber
Connected To
Marine Riser (CB)
OPENING PRESSURE
CLOSING PRESSURE
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
PACKING
UNIT
OPENING
CHAMBER
PISTON
CLOSING
CHAMBER
Operating Features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Operating Features:
• Cameron’s Type D annular preventer requires 3,000 psi hydraulic closing pressure for
positive closure with no pipe in the preventer.This requires a bypass arrangement around
the 1,500 psi annular regulator on 3,000 psi closing units.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Figure C.7- Cameron 20,000 psi WP Annular Blowout Preventer Sealing Element
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Operating Features:
1. Will close on open hole (but not recommended). As the contractor piston is raised by
hydraulic pressure, the rubber packing unit is squeezed inward to a sealing engagement
with anything suspended in the wellbore. Compression of the rubber throughout the
sealing area assured a seal-off against any shape.
2. Requires higher closing pressure in subsea applications.As the contractor piston is raised
by hydraulic pressure, the rubber packing unit is squeezed inward to a sealing engagement
with anything suspended in the wellbore. Compression of the rubber throughout the
sealing area assured a seal-off against any shape.
3. Some sealing assistance is gained from the well pressure.
4. No provision for measuring piston travel.
Hydril’s and Shaffer’s annular preventers are claimed to provide positive closure with
1,500 psi closing unit pressure when the rubber elements are new.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Only packing elements which are supplied by the manufacturer of the annular preventer
should be used. New or repaired units obtained from other service companies should not be
used since the preventer manufacturers cannot be held responsible for malfunction of their
equipment unless their elements are installed. See Table C.2.
Table C.3 - Annular Preventers - Gallons of Fluid Required to Operate on Open Hole
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
It is not possible to detail every type of ram preventer manufactured for all the applications for
which they are used including rig, snubbing, coiled tubing and wireline operations. The
following are only typical examples of those in use.
C.2.1 Cameron
The U II blowout preventer provides a BOP system (including CAMRAM elastomer sealing)
that meets the API 6A rating of 250˚F service.The U II includes an internally ported hydraulic
bonnet stud tensioning system, a short stroke bonnet, bore type bonnet seals, and the proven
advantages of the U BOP design.
• The introduction of the CAMRAM packer has set a new industry standard in meeting the
250˚F and withstand excursions to 300˚F Presently, the API standard excludes these critical
sealing elements from the rating, which covers only the metal components of the BOP
system.
• CAMRAN packers and top seals made with CAMLAST are available for high temperature
and high H2S service.
• The bonnets of the U II preventer are opened and closed hydraulically. The bonnet studs
are hydraulically stretched to the correct preload by pressure applied behind a piston which
acts on a load rod in the stud. The nut is tightened and pressure is released. Pressure is
supplied by an air-powered hydraulic pump via internal porting in each end of the BOP
body.
• The short stroke bonnet reduces the opening stroke by about 30%, reduces the overall
length of the preventer, and reduces the weight supported by the ram change pistons.
• The bore type bonnet seal fits into a seal counterbore in the body and has metal anti-
usion rings.
• The U II blowout preventer wedgelocks act directly on the operating piston tailrod. The
operating system can be interlocked using sequence caps to ensure that the wedgelock is
opened before pressure applied to open the preventer.
• A ram bearing pad can be attached to the bottom of each ram to reduce ram bore wear.
• All Cameron U II BOPs are manufactured to comply with NACE and all regulatory body
specifications.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
C.2.2 Double U II
Operating Features:
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Operating Features:
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
C.2.4 Shaffer
On shaffer type LWS or SL rams, the locking device is actuated automatically whenever the
ram is closed. Called the Poslock, this system uses segments that move out radically from the
ram piston and lock into a groove in the circumference of the operating cylinder whenever
the ram is closed. When hydraulic closing pressure is applied, the complete piston assembly
moves inward and pushes the ram towards the wellbore. With the rams closed, the closing
pressure then forces a locking piston inside the main piston to move further inwards and force
out the segments. A spring holds the locking piston in this position so that the segments are
kept locked in the groove even if closing pressure is lost. When hydraulic opening pressure is
applied, the locking cone is forced outward. This allows the locking segments to retract back
into the main piston which is then free to move outwards and open the ram.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
C.2.5 Hydril
Operating Features:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Shaffer Shear Rams shear pipe and seal the wellbore in one operation. They also function as
Blind or CSO (Complete Shut Off) Rams for normal operation.To ensure adequate shearing
force, a minimum of 14" pistons are required when operating Shaffer Shear Rams.The hydraulic
closing pressure for normal shearing is 3,000 psi or blind operation at 1,500 psi accumulator
pressure.When shearing pipe in a subsea BOP stack, 3,000 psi accumulator pressure is required.
When shearing, the lower blade passes below the sharp lower edge of the upper ram block
and shears the pipe.The lower section of cut pipe is accommodated in the space between the
lower blade and the upper holder. The upper section of cut pipe is accommodated in the
recess in the top of the lower ram block. Closing motion of the rams continues until the ram
block ends meet. Continued closing of the holder squeezes the semicircular seals upward into
the sealing contact with the seat in the BOP body and energises the horizontal seal. The
closing motion of the upper holder pushes the horizontal seal forward and downward on top
of the lower blade, resulting in a tight sealing contact. The horizontal seal has a moulded-in
support plate which holds it in place when the Rams are open.
The shaffer Shear Rams are also available for H2S service which meets the requirements of
NACE Standard MR-01-75. Shaffer Shear Rams are covered by U.S. Patent No. 3,736,982.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
9 2,000
3,000 2.6 5.3
5,000 2.6 5.3
10,000
163/4 2,000
3,000 2.3 6.8
5,000 2.3 6.8 2.03 5.54
10,000 2.3 6.8 2.06 7.11 2.41 10.6
263/4 2,000
3,000 1.0 7.0
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
1. When closing the well, the string is picked up say 20 ft off bottom. The annular preventer
is then closed and the fail-safes opened against a closed choke.
2. The tool joint is then spaced out for the correct pipe rams.
3. The string is stripped down until the tool joint is “hung off ” on the rams. The correct
operating pressure to set on the manifold regulator is directly related to the well bore
pressure.
For example: Operating ratio 10:56:1. Working pressure of BOP stack 10,000 psi.
This pressure does not include an allowance for friction losses so the minimum pressure
would be say 1000 psi : 1000 psi x 10.56 = 10560 lbs closing force.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX D
D. CHOKES
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
D. APPENDIX - CHOKES
Cameron K choke beans come in two styles, positive and combination.The positive bean has
a fixed orifice diameter. The combination bean has a fixed diameter and a throttling taper at
the entry.The combination bean is used with an adjustable choke needle to make incremental
changes to orifice sizes smaller than the fixed orifice.
The part numbers of the positive and combination beans are determined by desired orifice
size. K1 positive bean orifice sizes range from 4/64" to 64/64". K2 positive bean orifice sizes
range from 4/64" to 128/64". K3 positive bean orifice sizes range from 4/64" to 192/64".
K1 combination bean sizes range from 6/64" to 64/64". K2 combination bean sizes range form
6
/64" to 128/64". K3 combination bean sizes range from 6/64" to 192/64".
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX E
E.1 INTRODUCTION
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
E.1 INTRODUCTION
Wells in which Wireline Services are performed may contain a wide range of wellhead pressures
(WHP), for example from a few psi. up to several thousand psi.This pressure is normally due
to the natural pressure of the producing formation into which the well has been drilled.
Working in a pressurised well allows remedial or investigative work to be performed without
‘killing’ the well. Although killing the well is safer, it is a costly, time consuming exercise
requiring a rig and perhaps damaging the producing formation in the process.
Current Wellhead Pressure Equipment and practices allows a wire to be run in and out of the
well.Various wireline tools can be run and retrieved with a high degree of safety. Despite this,
wireline operations with pressure in the well require highly-qualified personnel and rigorous
operating and safety procedures since the safety/control of the well is under their management.
To enable the tools to be run into the well under pressure, the surface equipment shown
below is required. Each component on the following list is discussed in the next sections.
• Quick Unions
• Wellhead Adapter
• Pump-in Tee
• Wireline Valve (BOP)
• Lubricator - Bleed Off Valve
• Safety Check Union
• Stuffing Box
• Hydraulic Packing Nut
• Grease Injection Head
• Flow Tubes
• Grease Injection System
• Hay Pulley
• Weight Indicator
• Wireline Counter
• Wireline Clamps.
The relative positions of some of these components are shown in Figure E.1
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
The connections used to assemble the Lubricator and related equipment are referred to as
Quick Unions; See Figure E.2.They are designed to be quickly and easily connected by hand.
The box end receives the pin end which carries an O-ring seal. The collar has an internal
Acme thread to match the external thread on the box end. This thread makes up quickly by
hand and should be kept clean.The O-ring forms the seal to contain the pressure and should
be thoroughly inspected for damage and replaced if necessary. A light film of oil or grease
helps in the make up of the union and prevents cutting of the O-ring.
Pipe wrenches, chain tongs or hammers should never be used to loosen the collar of the
union. If it cannot be turned by hand, all precautions must be taken to make sure that the well
pressure has been completely released.
The collar of the union will make up by hand when the pin end (with the O-ring) has been
shouldered against the box end. When the collar bottoms out, it should be backed off
approximately one quarter turn to eliminate any possibility of it sticking due to friction when
the time comes to disconnect it.
Rocking the lubricator to ensure it is perfectly straight will assist in loosening the quick
union. In addition, ensure that tugger lines and hoists are properly placed to lift the lubricator
assembly directly over the wellhead.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
All Wellhead Adapters are crossovers from the Xmas tree to the bottom connection of the
WirelineValve or Riser. It is important to check that the correct type of threads with appropriate
pressure ratings are used on the top and bottom of the adapter.
Three types of Wellhead Adapter, See Figure E.3, are in common use:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
The Pump-in Tee, when rigged up, is placed between the Wellhead adapter and the wireline
BOP. Therefore, Quick Union sizes and pressure ratings must be compatible with all surface
equipment.
Pump-in Tees may be required as part of a wireline rig-up. By connecting a kill-line to the
Chiksan/Weco connection, the well can be killed in an emergency situation. This line can
also be used to pressure test or release pressure from the surface equipment.
NOTE: On some locations, the pump-in tee will be part of the wellhead adapter.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
a) Description
A Wireline Valve; See Figure E.5, must always be installed between the Wellhead/ Xmas tree
and Wireline Lubricator. This valve is a piece of safety equipment that can close around the
wireline and seal off the well below it. This enables the pressure to be bled off above it,
allowing work or repairs to be carried out on equipment above the valve without pulling the
wireline tools to surface. A positive seal is accomplished by means of rams which are manually
or hydraulically closed without causing damage to the wire.
Hydraulically actuated Wireline Valves are more commonly used because of the speed of
closing action and ease of operation. During an emergency, often the valve is not easily
accessible to allow fast manual operation and therefore remote actuation is preferred.
Single or dual ram valves are available in various sizes and in a full range of working pressure
ratings. Dual rams offer increased safety during slick line work and allow the injection of
grease to secure a seal on braided wireline. They are used particularly in gas wells, or wells
with a gas cap.
Wireline Valves are fitted with equalising valves that allow Lubricator and well pressure to
equalise prior to opening the rams when wireline operations are to be resumed.Without this,
if the valve rams were to be opened without first equalising, the pressure surge could blow the
toolstring or wire into the top of the Lubricator, causing damage or breakage.
• To enable well pressure to be isolated from the lubricator when leaks develop etc. without
cutting wire by closing the master valve.
• To permit assembly of a wireline cutter above the rams.
• To permit dropping of wireline cutter or cutter bar.
• To permit ‘stripping’ of wire through closed rams only when absolutely necessary.
A mechanical or hydraulic force is applied to close the rams to seal against well pressure. The
sealing elements are arranged so that the differential pressure across them forces them closed
and upwards, assisting in the sealing action.
Figure E.6 shows the ram configuration of a Wireline Valve. Blind rams close without wire
and will also close on 0.108 in. wire without damage. Both 3/16 in. and 7/32 in. rams have a
semi circular groove in each of the two ram faces to permit the ram to close and seal on 3/16
in. or 7/32 in. braided line.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
NOTE: Ensure that the correct guide is installed as an incorrect guide may damage or cut the wire.
d) Equalising Valves
Permits equalisation of pressure from below the closed rams, after bleed off of the lubricator.
The equalising valve must be opened and closed prior to use.
A check should be made to ensure that the equalising assembly is not inverted and that the
retainer screw is towards the bottom of the valve; See Figure E.5.
When operating with stranded/braided line, it is strongly recommended that a twin valve or
two single valves (one on top of the other), be installed and equipped with the appropriate
size moulded rams with the lower rams inverted to shut off from above. This enables grease
injection between the rams to block off the interstices of the braided line, preventing leakage
through the internal parts of the wire.
NOTE: If the BOP fails test, the equalising valve should be checked to confirm it is fully closed.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
The Lubricator is, in effect, a pressure vessel situated above the Xmas Tree, subject to the
wellhead shut-in pressure and also test pressures. For this reason, it should be regularly inspected
and tested in accordance with Statutory Regulations.
All Lubricator sections and accessories subject to pressure must be stainless steel banded; the
band should be appropriately stamped with the following data:- maximum working pressure,
test pressure, and date and rating of last hydrostatic test.
a) Description
A Lubricator allows wireline tools to enter or be removed from the well under pressure. It is
a tube of selected ID. and can be connected with other sections to the desired length by
means of Quick Unions; See Figure E.7.
The lowermost Lubricator section normally has one or more bleed off valves installed; a
pressure gauge can be connected to one of the valves to monitor pressure in the Lubricator. If
the Lubricator has no facility to install valves then a Bleed-off Sub, a short Lubricator section
with two valves fitted, should be connected between the Wireline Valve and Lubricator.
Quick Unions connect Lubricator sections together and to the Wireline Valve; these unions
have Acme type threads and seal by means of an O-ring, thereby requiring only tightening by
hand; See Figure E.8.
b) Construction
Lubricators for normal service (up to 5,000 psi.) can be made of carbon or manganese steel.
Over 5,000 psi., consideration should be given to sour service as quantities of H2S can be
absorbed into the steel of the Lubricator body and heat treatment becomes necessary.
All Lubricator sections must have full certification from the manufacturer or test house. A
standard colour code identifies different pressure ratings of lubricator.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
A colour coding system is usually implemented. The colour coding system uses one or two
bands of colour to identify the service. For example in the Shell Expro system, the pressure
rating is identified by the base colour of the item (e.g. lubricator) or accessory and should
satisfy the following:
3,000 Red
15,000 Yellow
Table E.1 - Colour Coding and Pressure Rating of Pressure Control Equipment
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
The Stuffing Box; See Figure E.9, is a sealing device connected to the top of the Lubricator
sections and in conjunction with the lubricator is the primary pressure control on the well.
It allows the wireline to enter the well under pressure and also provides a seal should the
wireline break and be blown out of the packing. The Stuffing Box will cater for all sizes of
slickline but the size of the wire must be specified to ensure the correct packing rubbers are
installed.
If the wireline breaks in the well, the loss of weight on the wire at surface allows well pressure
to eject the wire from the well.To prevent well fluids leaking out the hole left by the wire, an
Internal Blow Out Preventer Plunger is forced up into the Stuffing Box by well pressure and
seals against the lower gland.
A packing nut and gland located at the top of the Stuffing Box can be adjusted to compress
the packing and seal on the wireline. Hydraulically controlled Packing Nuts are available to
ease operation should the packing require to be compressed during wireline operations.These
are controlled remotely by a hand pump and this avoids the need for manual adjustment of
the Packing Nut.
For slickline operations, the top sheave is normally an integral part of the Stuffing Box. This
reduces the rig up equipment required and the large 10 or 16 ins. sheaves can handle the
larger OD. wire with less fatigue and breakdown
.
Wireline sealing devices fulfil one of two functions:
For solid wirelines, only pressure containing Stuffing Boxes are utilised.The standard Stuffing
Box is available in 5,000 psi. and 10,000 psi. pressure ratings although higher pressure ratings
are now also available.
The essential function of the Wireline Stuffing Box is to ensure containment or sealing off
around solid wirelines, whether stationary or in motion, at the upper end of the Lubricator
during wireline operations. In addition, most Stuffing Boxes contain a BOP plunger which is
forced out of the packing section to seal off flow in the event of wireline breakage.
A swivel-mounted (360˚ free movement) sheave wheel and guard are fitted to the top half of
the Stuffing Box. The wheel is positioned so as to maintain the passage of the wire through
the centre of the packing rubbers.
The sheave guard on the Stuffing Box is designed to trap any wire which breaks on the
surface before it drops downhole.
The adjustment to the packing retainer nut at the top of the Lubricator is time consuming
and a Hydraulic Packing Nut; See Section E2. E.2.7, can be installed so that control can be
executed from the deck.
E-12 © Aberdeen Drilling Schools 2001
ILLIN G S
N DR C
EE
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
The Hydraulic Packing Nut assembly, See Figure E.10, is designed for a standard Wireline
Stuffing Box to allow remote adjustment of the packing nut.This method is a safe and convenient
way of regulating the packing nut. Regulation is made from a ground position by means of a
hydraulic hand pump and hose assembly.
a) Benefits
The need for a person to climb the lubricator is eliminated.
The hand pump is positioned away from the nut itself, and therefore possible escaping well
fluid.
b) Operation
The Hydraulic Packing Nut Assembly includes a piston which has a permissible travel of 0.4
in. enclosed in a housing. The housing has a 1/4" NPT connection for a hydraulic hose.
The area above the piston is arranged so that when hydraulic pressure is applied to this area,
the piston is forced downward against the force of the spring. This downward action of the
piston is transmitted to the upper packing gland. This is designed to cause the Stuffing Box
packing to be squeezed around the wireline, sealing off well fluids within the Stuffing Box.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
To supply grease under pressure the following equipment is required to rig up the Grease
Injector Head:
The Grease Injection Head; See Figure E.11, is designed to effectively seal off stranded wirelines,
such as fishing and logging cables. The Grease Injection Head utilises grease or honey oil,
pumped under high pressure from a grease pump, into a very small annular space between the
outside of the wire and the inside of a tube covering it. The high pressure fluid provides two
sealing mechanisms:
• Since stranded lines have interstices between the strands and between layers which cannot
be packed off in a more direct, conventional manner, the sealing fluid fills these spaces, depriving
the well fluid of escape paths inside and around the wire.
• The sealing fluid in the small annular space is held at a higher pressure than that in the well,
forming a barrier to the flow of wellhead fluids and gases.
This results in the complete sealing and also lubrication of the wireline which reduces friction.
NOTE: When calculating the amount of stem required to overcome the well pressure, a percentage must
be added to compensate for friction.
The Grease Injection Control Head is composed of three flow tube sleeves, a flow tube sleeve
coupling, a quick union pin end, a flow hose and a line rubber and hydraulic packing nut
assembly at the upper end.The amount of flow tube sleeve used depends on the well pressure.
For 3/16" Braided Line:
3 flow tubes 0 - 4,000 psi.
4 flow tubes 4,000 - 6,000 psi.
5 or 6 flow tubes 6,000 - 10,000 psi.
The flow tubes are close-fitting around the wireline and they, along with the flow tube
sleeves, form the main length of the grease head. This appreciable length affords sufficient
length to form an effective pressure barrier.
The flow tube sleeves are simplified body parts which hold the various other components
rigidly together and seal them. In addition, they are made of a very hard metal and the wire
predominantly bears on them, preventing wear on the other parts. The flow tube coupling
forms a junction for the flow tubes and also as the point of entry for the grease.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Grease Out
Flow Tube
Flow Tube
Grease In
Flow Tube
Quick Union
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
The Hydraulic Packing Nut is a simple but efficient device which is remotely operated by a
hydraulic hand-pump assembly.The Hydraulic Packing Nut is actuated by pumping pressure
into the cylinder. When a complete seal is established, the pressure is maintained by closing
the valve at the hand pump assembly. The pressure may be relieved by opening the valve and
thus relaxing the seal.Thus, the piston in the packing nut is retracted by a strong spring when
the pressure is relieved from the piston.
The body has a port into which is assembled a flow hose to lead off any seepage that migrates
through the line and finds its way above the two flow tubes.
The optional differential pressure regulator valve, when used, controls the flow of grease to
the control head which is supplied by the grease supply system. In all cases, the grease is
delivered at a pressure of 350 psi. to 400 psi. greater than the wellhead pressure.
A range of flow tubes; See Figure E.12 are available with small increments of IDs so as to
provide an effective seal over the life of a wireline which reduces in size with usage.
The OD. of the line should be measured and the size of the tubes selected for the closest fit
(ID. of flow tubes should be 0.004 in. - 0.006 in. larger than OD. of wireline). Slip each tube
in turn over the wire and physically check that they do not grip the wire as this can lead to
‘bird caging’ of the outer strands when running in the well.This is an effect where the drag on
the outer strands gradually holds them back with regard to the inner strands so they become
loose and spring out from the cable like a bird’s cage until they jam at the packing nut. If the
packing nut is too tight it can also cause this same effect. (Alternatively, if the tubes are too big,
they will not create an effective barrier and too much grease will be wasted.)
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
The system is designed to deliver grease as demanded under continuous operation within the
parameters of a single pump unit.
There are two circuits on the unit for control/drive air and grease and both are described
below:
a) Grease System
The system pump draws grease from the grease reservoir through the pump suction tube and
it is pumped to the outlet port which is split into two lines. One line delivers grease to the
control panel vent valve which allows the operator to vent grease pressure to atmosphere via
a short hose into an alternate grease reservoir which is not in use (this is normally permissible
as grease from this source should be clean; however, care should be taken to isolate grease from
airborne contamination).The other line is the grease supply line plumbed via a rotary valve to
hose storage reels and then to the appropriate grease head; See Figure E.12.
The grease return line via the hose reel, rotary valve, and system pressure gauge leads to a
system pressure control vent valve from which the vented grease flow rate is controlled. This
grease is plumbed (now at atmosphere pressure) through a short flexible hose to a waste
grease container and should not be re-used as this may be contaminated. Excessive grease
returns will indicate incorrectly sized flow tubes.
NOTE: If a 5/16" line is used, the supply pump must be fitted with at least a 3/4" ID. hose to ensure
adequate supply to retain seal.
b) Pneumatics
The drive air enters the unit via a bulkhead quick connect to a pressure control valve which
is pilot controlled from the control panel and also acts as a stop/start control. A separate supply
is plumbed to the control panel into a three way, two position valve. Position one is where the
supply is blocked with the reservoir vented to atmosphere, position two is where the supply
air is directed to the reservoir via the reservoir lid pressure controller; both allow the operator
an auto pre-set reservoir pressurisation or vent to atmosphere in one control valve.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
WARNING: HIGH PRESSURE - Never allow any part of the human body to come in front of or
in direct contact with the grease outlet. Accidental operation of the pump could cause an
injection into the flesh. If injection occurs, medical aid must be immediately obtained
from a physician.
WARNING: COMPONENT RUPTURE - This unit is capable of producing high fluid pressure
as stated on the pump model plate.To avoid component rupture and possible injury, do
not exceed 75 cycles per minute or operate at an air inlet pressure greater than 150 psi.
(10 bar).
WARNING: SERVICING - Before servicing, cleaning or removing any component, always disconnect
or shut off the power source and carefully relieve all fluid pressure from the system.
This device can be included in braided/stranded wireline Lubricator hook-ups just below the
Grease Injection Head. The wire is threaded through both these units and in the event that
the wire breaks and is blown out of the Grease Injection Head, the well pressure will
automatically shut off by the Safety Check Union. Shut-off is accomplished by the velocity of
the escaping well effluents causing a piston to lift a ball up against a ball seat; See Figure C.14.
Well pressure holds the ball against the seat.This device does in fact fulfil the same function as
the internal WirelineValve in the solid wireline Stuffing Box.As with all Lubricator equipment,
this Safety Check Union is furnished with Quick Unions.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX F
F.1 INTRODUCTION
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
F.1 INTRODUCTION
When planning a Coiled Tubing operation, include a rough draft on well control requirements
for the particular application. One of the main reasons for this is that it may be a significant
factor regarding the amount of items required in the well equipment stack-up.
Both the well characteristics and the type of operation should be considered as they determine
the minimum size and type of well control devices that need to be employed to safely and
successfully conduct the programme.
In Coiled Tubing operations both internal and external pressure control must be assessed.
‘Internal’ refers to the inside of the coiled tubing and ‘External’ to the coiled tubing annulus.
The typical Well Control Stack is:
• Stripper
• BOP
• Riser
• Shear Seal
Starting from the top of the tree, many operators utilise a single shear/seal device which is
flanged to the tree irrespective of well conditions and the operation to be carried out. This is
generally a tertiary barrier. Other operators only use a shear/seal device when they deem it
applicable.The bore diameter and cutting capabilities of the shear/seal will depend largely on
the type of toolstring.
On top of the Xmas tree or a shear/seal, if used, is a crossover flange to quick union sectional
riser continuing to the operating level, i.e. rig floor or platform deck, with any additional stick
up height that is required.
The BOP is mounted directly on top of the riser using any crossovers which are required.The
BOP can be either be a conventional quad BOP, or the later style Comb BOP’s. Combi’s were
developed to be shorter and therefore have less stick up.
The stripper/packer or stuffing box attaches to the top of the BOPs.This piece of equipment
is normally bolted to the underside of the injector head. A tandem stripper/packer or even an
annular BOP can be installed between the standard stripper/packer and the BOP for additional
safety particularly when the well conditions may cause premature stripper rubber wear.
Whichever combination of BOPs is selected in the stack-up for an operation, it should include
a closed barrier to allow safe stripper/packer rubber replacement and a backup barrier.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
A combination of pressure control barriers are used in coiled tubing operations to provide
both internal pipe and external pipe pressure control.
For external pressure control the barriers during normal operations are stripper/packers,
annular BOPs and BOP pipe rams. Strippers or annular BOPs are considered as primary
barriers and the BOPs as secondary barriers.
The internal barrier during normal operations are double BHA check valves. Both check
valves together are considered as the primary barrier and the BOP cutter rams secondary.
BOP shear/seal rams or cutter gate valves are barriers on both sides and are considered tertiary
barriers.
Check valves are installed in the coiled tubing BHA above the disconnect sub. They provide
primary inside pressure control.
The four most common types used are shown in Figure F.1, Figure F.2, Figure F.3, and Figure
F.4
F.3.2 Stripper/Packer
The stripper/packer is located at the top of the pressure control stack-up attached to the
injector head and is the primary pressure control barrier. It is constantly energised throughout
the coil tubing operation to effect a seal against the tubing; See Figure F.5, Figure F.6, Figure
F.7 and Figure F.8. As it is in constant use, on high pressure or gas wells, the elastomer sealing
element can wear out quite rapidly, hence the contingency requirement for a back-up stripper
or annular BOP.
An example of such a rig up is shown in Figure F.11. As stated above, this back-up unit would
only be brought into use if the first packing element failed. Used in conjunction with the
tubing rams in the BOPs, this provides an additional barrier and allows safer access to change
the worn elastomers in the first stripper.
In other circumstances the back-up stripper may be used to allow operations to continue
without having to repair the first stripper
Because of the increased height due to using tandem stripper/packers, a new development
introduced is the radial stripper/packer; 4.This reduces the stack up height by about half and
makes changing the elastomers a very simple task.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
F.3.3 BOPs
The BOP is the secondary barrier in pressure control. As a failsafe device, the BOP should
only be operated as a safety device and with careful consideration and not used for any other
use such as a means of “parking” the tubing while at depth.
A standard quad BOP is configured with four rams; See Figure F.9 and Figure F.10
• Blind Rams
Blind rams only seals on open hole when the elastomers on each ram meet and seal. If there
is pipe across the ram area the seal cannot be effected.
• Shear Rams
Shear rams have the ability to cut tubing. When using C/T logging i.e. tubing with logging
cable through it, the shear rams must have the capability to cut both. There is no seal on this
function. Extreme caution should be taken when functioning any of the rams as accidental
functioning of the shear rams could potentially be very dangerous and at best causes a fishing
job.
• Slip Rams
The slip ram is designed to hold the full tubing weight, and it too has no sealing function.The
slip toolface can mark the tubing significantly and induce an area where premature cracking
can occur. Caution should be used when considering the use of these rams as the slip toolface
can significantly mark the tubing and induce an area where premature cracking can occur.
• Tubing Rams
Tubing rams are used to effect a seal against the tubing.Wellbore pressure aids in the sealing of
the ram when a differential is created, by bleeding off above. Both this ram and the blind ram
do not hold pressure from above.
A Combi BOP incorporates the functions of two upper and the two lower types of rams into
one unit and in so doing reduces rig up height and simplifies the controls system. However, it
would be necessary to alter the well control procedures accordingly.
A triple Comb is a model which has two combination slip/tubing rams as well as the
combination shear/blind rams. A triple Comb combined with two radial stripper/packers
provides a shorter stack up than a conventional stack-up; See Figure F.11.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
F.3.4 Shear/Seal
This device is usually a 61/8" bore Comb ram with single cut and seal rams; See Figure F.12.
This provides a single cut/seal function for installation safety and is the tertiary barrier. In the
event of a platform emergency, a designated person is responsible for it’s closure but normally
the platform manager’s permission is sought time permitting.
To illustrate the main components of a typical hydraulic ram, a sectioned drawing of a shear/
seal actuator is illustrated; See Figure F.13.
Figure F.14 shows the height of a typical stack up arrangement using a dual Comb on the tree,
a triple Comb BOP, a quick union connector, a tandem and standard stripper/packer.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
F.4.1 Introduction
Initially look at the different factors which control any Coiled Tubing operation.These factors
when combined in the right order, and planned properly, will see the completion of a successful
coiled tubing operation.
Gas Well
Gas wells cause undue wear to stripper rubbers and, hence, it may be necessary to provide an
additional stripper/packer, to complement the standard package.
Toolstring Length
The operation will dictate the length of the tool string which in turn may affect the rig up,
e.g. length of riser, pick up height of the injector and stick up height of well control equipment.
See Figure F
Type of Rig
A semi-submersible drilling or workover vessel requires the addition of a heavy duty lifting
frame installed between the block and the surface tree in which to support the injector and
BOPs.
Drilling rigs can usually accommodate the width of injectors quite easily but in certain
circumstances the “A” frame height can be restrictive.
Workover rigs tend to have smaller “V” doors than conventional drilling rigs, and dimensions
of this should be checked against the injector size available.
On land well operations where there is no means of holding back the injector against the pull
of the tubing from the reel, an adjustable stand is required to support the forces with the
ground.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Rig floor working space should not be restricted with unnecessary items of equipment or
tubulars in the derrick. The main access and emergency exit points should not be restricted.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
BOPs are now available in several different configurations. The standard is a quad, i.e.; with
four separate ram functions. The trend now is to combine the rams to form Combi BOPs.
The most common configuration is the Triple Combi. This BOP combines the two top
functions and eliminates the need to pull pipe as is necessary after the shear on the quad.
The shear/seal is a large single cut and seal device. This is normally flanged on top of the
wellhead and used only as a last resort.The shear/seal usually is of a size equal to the wellbore,
and is capable of cutting the toolstring.
Control Hoses
On a semi-submersible the injector and the BOPs may be a considerable height above the
drillfloor. This must be considered with the position of the power pack and control house,
whereby extensions to the control hoses may be required.
Similarly on a platform, if the coiled tubing is to be run from the pipe deck to the skid deck,
the control hoses may again require extensions.
Support Stand
The standard type support stand is manually operated and requires constant monitoring in
live well situations. If the operation is performed with the well on production, and cold
liquids introduced through the coiled tubing this will cause the riser to contract, the support
stand may become trapped under the injector.
A hydraulic support type stand has built in relief valves to release the pressure should the riser
shrink.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
All procedures are dependent on a combination of the position of the tool string in the well
bore, and the wellhead pressure.
In the event of a platform shutdown the well must be made safe. To carry out this operation
does not require the full crew, and only one operator should remain to function the well
control equipment, as outlined below:
The Stripper/packer should be energised sufficiently with hydraulic pressure, so that it will
contain any well bore fluids, but not restrict the running of the coiled tubing.
Should the element start leaking and it cannot be energised to stem the leak, the following
should be implemented:
F.5.3 Leak Between the Top of the Tree and the Stripper/Packer
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
The tubing ruptures as it comes over the gooseneck and separates. Initially this can be a
potentially hazardous, and serious situation.The seriousness is dependant on the tubings internal
pressure, the wellhead pressure, and the type of medium within the tubing:
The tubing separates downhole. In this situation the procedure becomes a little more
complicated, but less hazardous if handled correctly:
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX G
G.1 INTRODUCTION
G4 SNUBBING EQUIPMENT
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
G.1 INTRODUCTION
It is essential that prior to any snubbing/HWO operation the safety issues are addressed.
Reference should be made to relevant sections of the appropriate Safety Manual.
At the safety meeting all aspects of the operation and detailed contingency plans should be
discussed. Snubbing/HWO emergency procedures will form the basis of these contingency
plans. Of particular importance are the aspects of Well Control Procedures.
Aspects of well control must be included in the planning and equipment selection process.
Snubbing operations are performed on live wells and particular emphasis must be given to the
required well control competencies and equipment to be used for each individual application.
A combination of pressure control barriers are used in snubbing operations to provide both
internal pipe and external pipe pressure control similar to coiled tubing operations addressed
in Appendix F.
For external pressure control the barriers during normal operations are stripper rams, annular
BOPs and BOP pipe rams. The stripper rams or annular BOPs are considered as primary
barriers and the safety BOPs as secondary barriers.
Internal barriers during normal operations are double BHA check valves. The lowermost
check valve is considered the primary barrier with the upper being the secondary.An advantage
of snubbing over coiled tubing is that a wireline installed check valve can be run into the
BHA on failure of the other check valves and is the secondary barrier.
BOP shear/seal rams are barriers on both sides and are considered tertiary barriers.
Pressure control requirements for workover operations are covered API RP 53.These documents
do not, however, address snubbing operations.
The expertise within the industry is with a small group of specialised contractors, who posses
the required equipment and competence. However, it is incumbent upon the asset holder (or
his delegated representative) to ensure that all activities carried out on the asset (the well) are
conducted in a manner to provide for complete well control.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Most of the equipment used in snubbing operations consists of ram and annular type BOPs
and chokes which are already described in Appendix A.
A typical snubbing rig ups for various well pressures, pipe sizes are shown in Section 7. They
effectively consist of the equipment described in the following sections.
Stripper bowls are pressure containment devices for use during low pressure pipe moving
operations, usually below 2,000psi. At these pressures, pipe running speed and efficiency can
be increased by using these devices for the primary annular seal rather than the normal
blowout preventers, since the airlock cycle operations are eliminated.
For upset pipe two stripper pipe rams are used to effect a seal on the outside of the pipe.These
rams are operated by the unit operator from a control panel located in the basket. They are
regular ram type BOPs which are opened and closed in sequence to allow the upsets to pass
into the well.
The pressure trapped between the two stripper rams when the lower stripper ram is closed is
bled off through a choke in the bleed off line.To open the lower stripper ram after closing the
upper ram, pressure is equalised across the lower ram by the equalising loop.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
When more than one pipe size is being run, a set of stripper BOPs for each size must be
included in the rig up.
To repair a damage stripper ram, normally two safety pipe rams are closed on the pipe to
provide two barriers (in some areas of the world this convention is not recognised).
Tandem annular BOPs are normally used when running non upset pipe. One of the annulars
is contingency for damage to the first annular.There is a great advantage when using annulars
in that there is no requirement for a bleed off or equalising line and, therefore, running speed
are faster.
Safety BOPs are used for safety only.They are closed on the pipe to effect a seal when there is
either a leak downstream or when the stripper or annular rubbers need redressing.They differ
from the stripper rams in that they may be dressed primarily for sealing against the pipe rather
than stripping.
A set of shear and blind rams are installed as a tertiary barrier. To prevent the pipe dropping
after severance, additional safeties are added below the shears.
After the snubbing unit is installed, the integrity of the wellhead and the well control equipment
must be established before operations commence.This is accomplished by a series of pressure
test procedures to sequentially:
• Test the tertiary pressure control system against a closed Xmas tree valve.
• Test the secondary control system against the tertiary system.
• Test the primary control system against the tertiary system.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Work
Basket
Fluid Storage
And
Gin Processing
Pole
Choke
System
Stationary
Slips
Hoses
Work
Window Stripper Bowl
Tool House
Hanger Flange
Mud Pump
Fill Line Drain Line
Bleed
Line
Equalise
Tool Box Line Ground Based BOP
Control Units
Spares
Choke Upper Kill
Line Line Power Unit
Fuel
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
The configuration of BHAs with regard to check valve and back pressure valve location and
function is essential for safety at the start of running or the end of pulling a workstring:
• BPVs used must be as strong as the tubing and are located at the bottom of the string for
normal operations. However they may be placed higher if using gases for foam jetting or
nitrogen lifting, reducing the inventory of gas which may blow back if there is a failure in
the pumping equipment lines.
• When using abrasive fluids such as cement, it is advisable to install pump-out type valves in
the event of plugging or flow cutting. They are also used if reverse circulating is required.
• Standard* back pressure valve configurations are shown in Figure G.2. The configurations
in A and C are preferred. In B it must be closely checked to ensure the wireline plug can
be set in the nipple. A long end cap may hold up on the top back pressure valve and
prevent the lock mandrel from setting in the nipple.The non-standard configuration in D
may be too long to allow closing in the well when the nipple is at the top of the mast.
When using pump-out BPVs, the configuration in E should be used but the pump-out
ball for expending the BPVs must first be passed through the nipple to check clearance.
* Standard in this context means a practise which has become a “standard” within the service
companies who provide snubbing/HWO services to the industry and is not an
institutionalised type standard.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
E is a special configuration when having to use a pump out check valve for
operational reasons. Due to the check valve being expendable by pumping down
a drop ball, another check valve cannot be installed above it. For this reason, primary
inside well control is only the single check valve. If expended, the secondary
system is a wireline check valve installed in the nipple by wireline.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
There are three main areas involving HWO activities where hazards are identified:
• HWO operation.
• Well control.
• Use of HWO auxiliary equipment.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Hydraulic hose bursting Conduct proper check on all hose connection valves and pumps.
Re-active:
Make sure unit is secure prior to shutting down engine for repairs.
Ensure slip inserts are free from grease, pipe dope and scale
whilst RIH or POOH.
Re-active:
Close in all slips and secure with clamp prior to changing out worn
slip inserts.
Rams closing too slow Ensure correct preventer pump pressure is maintained for the rams
being used.
Valves sticking whilst Ensure equalise and bleed-off valves are functioning properly
opening or closing (as BOP will not open if pressure is trapped between rams).
Re-active:
Close in tubing rams below stripper BOP and manually lock in.
Bleed off pressure. Open rams and change out stripper inserts.
Ensure valves are greased properly with correct grease.
Slow movement of jack Ensure all jack pumps are at correct settings.
Jack jumps when moving up Ensure counter balance valves are operational and free from grit.
or down
Re-active:
Check all settings for pumps, and that pumps are all functional.
Continued
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Ensure tool joints are made up to correct torque and seals are OK.
Tool joints are doped When running or pulling under pressure ensure TIW valves
properly are used at every joint whilst making up or breaking out tubing.
Renew springs and ball and seats.
Check for defective or worn Follow correct rig up and running procedures.
tools and equipment
Slinging lifts Follow correct lifting and slinging procedures whilst rigging up
equipment.
Re-active:
At the first sign of any wear or tear, secure unit and shut down
power pack, if necessary and carry out repairs. All worn
guy wires and winch cables should be changed-out.
(These repairs should be done immediately.)
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX H
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Three types of end and outlet flanges are controlled by this specification:
Type 6B may also be used as threaded flanges. Some type 6BX blind flanges may also be used
as test flanges. Segmented flanges are used on dual, triple, and quadruple completion wells and
are integral with the equipment.
H.1.2 Design
Type 6B, 6BX, and segmented flanges are designed for use in the combinations of nominal
size ranges and rated working pressure as shown in Table H.1.
b) Type 6B Flanges.
• General.
API Type 6B flanges are of the ring joint type and are not designed for make-up
face- to-face.The connection make-up bolting force reacts on the metallic ring gasket.
The Type 6B flanges shall be of the through-bolted or studded design.
• Dimensions
(1) Standard Dimensions.
Dimensions for Type 6B integral, threaded, and weld neck flanges shall conform to
Table H.2, Table H.3 and Table H.4
Dimension for Type 6B blind flanges shall conform to those referenced in Table H.1
Dimensions for ring grooves shall conform to Table H.5 and Table H.6
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Bore Diameter and Wall Thickness.The bore diameter JL shall not exceed the values shown in
Table H.2, Table H.3 and Table H.4. The specified bore shall not result in a weld-end wall
thickness less than 87.5 percent of the nominal wall thickness of the pipe to which the flange
is to be attached.
Weld End Preparation. Dimensions for weld end preparation shall conform to Table H.2
Taper - When the thickness at the welding end is 3/32" or greater than that of the pipe, and
the additional thickness decreases the inside diameter, the flange shall be taper bored form the
weld and at a slope not exceeding 3 to 1.
NOTE: Due to smaller maximum bore dimensions,Type 6B weld neck flanges are not intended to be
welded to equipment in this specification.Their purpose is to bolt to another 6B flange and
provide a transition to be welded to a pipe.
• Flange Face. Flange face may be flat or raised on the ring, joint side and shall be fully
machined. Flange back face may be fully machined or spot faced at the bolt holes. The
flange back face or spot faces shall be parallel to the front face within one degree and the
thickness after facing shall conform to the dimensions of Table H.2, Table H.3 and Table
H.4
• Gaskets. Type 6B flanges shall use Type R or Type RX Gaskets in accordance with
Section IH.1.3.
• Corrosion Resistant Ring Grooves.Type 6B flanges may be manufactured with corrosion
resistant overlays in the ring grooves. Prior to application of the overlay, preparation of the
ring grooves shall conform to the appropriate dimensions. Other weld preparations may
be employed where the strength of the overlay alloy equals or exceeds the strength of the
base materials.
• Ring Groove Surface. All 23˚ surface on ring grooves shall have a surface finish no
rougher than 63 RMS.
RATED SEGMENTED
WORKING
PRESSURE
Type 6B Type 6BX Dual Triple or Quadruple
2,000 21/16 thru 211/4 263/4 - -
3,000 21/16 thru 203/4 263/4 - -
5,000 21/16 thru 11 135/8 thru 211/4 13/8 thru 41/16 x 41/4 113/16 thru 41/16 x 41/4
10,000 - 113/16 thru 211/4 - -
15,000 - 113/16 thru 183/4 - -
20,000 - 113/16 thru 135/8 - -
Table H.1 - Rated Working Pressure and Size Ranges of API Flanges
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Figure H.2- Weld End Preparation for Type 6B and 6BX Weld Neck Flanges
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
BC LSSS
Table H.2- Basic Flange, Bolt and Hub and Bore Dimensions for
2000psi Rated Working Pressure
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
B OD OD C K T Q X
BC LSSS
LL LC LT LN HL HL JL
Table H.3 - Basic Flange, Bolt and Hub and Bore Dimensions
for 3,000 psi. Rated Working Pressure
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
B OD OD C K T Q X
BOLT DIMENSIONS
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
General
The section covers Type R, RX, and BX ring gaskets for use in flanged connections.Types R
and RX Gaskets are interchangeable on 6B flanges. Only Type BX gaskets are to be used 6BX
flanges.Type RX and BX gaskets provide a pressure energised seal but are not interchangeable.
Design
• Dimensions. Ring gaskets shall conform to the dimensions and tolerances specified in
Figure H.6 and Figure H.7 and must be flat within 0.2% of ring outside diameter to a
maximum of 0.015 inches.
• R and RX Gaskets.
1. Surface Finish. All 23( surface on Type R and RX gaskets shall have a surface finish
no rougher than 63 RMS.
2. RX Pressure Passage Hole. Certain size RX gaskets shall have one pressure passage
hole drilled through their height as shown in Table H.6.
• BX Gaskets.
1. Surface Finish. All 23( surface on Type BX gaskets shall have a surface finish no
rougher than 32 RMS.
2. Pressure Passage Hole. Each BX gasket shall have one pressure passage hole drilled
through its height as shown in Figure H.8
• Re-use of Gaskets.
Ring gaskets have a limited amount of positive interference which assures
the gasket will be joined into sealing relationship in the flange grooves, these gaskets
shall not be reused.
Materials
• a. PSL 0. Gasket material for PSL 0 shall conform to appropriate standards.
• b. PSL 1-4. Gasket material for these levels shall conform to appropriate standards.
• c. Coating and Platings.
1. General. Coatings and platings are employed to aid seal engagement while minimising
galling and to extend shelf life. Coating and plating thicknesses shall be 0.0005 inch
maximum.
2. Metallic. Cadmium, zinc, copper and tin coatings or platings are acceptable for
service temperatures up to 250(F.
3. Non-metallic. Non-metallic coatings are acceptable if they do not interfere with the
sealing of the ring gasket.
Marking
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
TOLERANCES
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Ring No. Pitch Width of Height of Height of Width of Radius in Depth of Width of Radius in Approx.
Dia. of Ring Ring Ring Flat of Octagonal Groove Groove Groove Distance
Ring & Oval Octagonal Octagonal Ring between
Groove Ring made up
Flanges
P A B H C R1 E F R1 S
R 20 2.688 0.313 0.56 0.50 0.206 0.06 0.25 0.344 0.03 0.16
R 23 3.250 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 24 3.750 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 26 4.000 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 27 4.250 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 31 4.875 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 35 5.375 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 37 5.875 0.438 0.59 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 39 6.375 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 41 7.125 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 44 7.625 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 45 8.313 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 46 8.313 0.500 0.75 0.69 0.341 0.06 0.38 0.521 0.06 0.13
R 47 9.000 0.750 1.00 0.94 0.485 0.06 0.50 0.781 0.06 0.16
R 49 10.625 0.438 0.69 0.63 0.305 0.09 0.31 0.469 0.03 0.19
R 50 10.625 0.625 0.88 0.81 0.413 0.06 0.44 0.656 0.06 0.16
R 53 12.750 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 54 12.750 0.625 0.88 0.81 0.413 0.06 0.44 0.656 0.06 0.16
R 57 15.000 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 63 16.500 1.000 1.31 1.25 0.681 0.06 0.62 1.063 0.09 0.22
R 65 18.500 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 66 18.500 0.625 0.88 0.81 0.413 0.06 0.44 0.656 0.06 0.16
R 69 21.000 0.438 0.69 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 70 21.000 0.750 1.00 0.94 0.485 0.06 0.50 0.781 0.06 0.19
R 73 23.000 0.500 0.75 0.69 0.341 0.06 0.38 0.531 0.06 0.13
R 74 23.000 0.750 1.00 0.94 0.485 0.06 0.50 0.781 0.06 0.19
R 82 2.250 0.438 - 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 84 2.500 0.438 - 0.63 0.305 0.06 0.31 0.469 0.03 0.19
R 85 3.125 0.500 - 0.69 0.341 0.06 0.38 0.531 0.06 0.13
R 86 3.563 0.625 - 0.81 0.413 0.06 0.44 0.656 0.06 0.16
R 87 3.938 0.625 - 0.81 0.413 0.06 0.44 0.656 0.06 0.16
R 88 4.875 0.750 - 0.94 0.485 0.06 0.50 0.781 0.06 0.19
R 89 4.500 0.750 - 0.94 0.485 0.06 0.50 0.781 0.06 0.19
R 90 6.125 0.875 - 1.06 0.583 0.06 0.56 0.906 0.06 0.19
R 91 10.25 01.250 - 1.50 0.879 0.09 0.69 1.313 0.09 0.16
R 99 9.250 0.438 - 0.63 0.305 0.06 0.31 0.469 0.03 0.19
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
NOTE: The pressure passage hole illustrated in the RX Ring cross section in rings RX-82 through
RX-91 only. Centreline of hole shall be located at mid point of dimension C. Hole diameter
shall be 0.06 inches for rings RX-82 through RX-85, 0.9 inches for rings RX-86 and RX-
87, and 0.12 inches for rings RX-88 through RX-91.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Ring Pitch Outside Width of Width of Height of Height Radius Depth of Width of Radius Approx.
No. Dia. of Dia. of Ring Flat Outside of Ring in Ring Groove Groove in Distance
Ring & Ring Bevel Groove between
Groove made up
Flanges
P OD A C D H R E F R S
RX 20 2.688 3.000 0.344 0.182 0.125 0.750 0.06 0.25 0.344 0.03 0.38
RX 23 3.250 3.672 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 24 3.750 4.172 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 25 - 4.313 0.344 0.182 0.125 0.750 0.06 0.25 0.344 0.03 -
RX 26 4.000 4.406 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 27 4.250 4.656 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 31 4.875 5.297 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 35 5.875 5.797 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 37 5.875 6.297 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 39 6.375 6.797 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 41 7.125 7.547 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 44 7.625 8.047 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 45 8.313 8.734 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 46 8.313 8.750 0.531 0.263 0.188 1.125 0.06 0.38 0.531 0.06 0.47
RX 47 9.000 9.656 0.781 0.407 0.271 1.625 0.09 0.50 0.781 0.06 0.91
RX 49 10.625 11.047 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 50 10.625 11.156 0.656 0.335 0.208 1.250 0.06 0.44 0.656 0.06 0.47
RX 53 12.750 13.172 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 54 12.750 13.281 0.656 0.335 0.208 1.250 0.06 0.44 0.656 0.06 0.47
RX 57 15.000 15.422 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 63 16.500 17.391 1.063 0.582 0.333 2.000 0.09 0.63 1.063 0.09 0.84
RX 65 18.500 18.922 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 66 18.500 19.031 0.656 0.335 0.208 1.250 0.06 0.44 0.656 0.06 0.47
RX 69 21.000 21.422 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 70 21.000 21.656 0.781 0.407 0.271 1.625 0.09 0.50 0.781 0.06 0.72
RX 73 23.000 23.469 0.531 0.263 0.208 1.250 0.06 0.38 0.531 0.06 0.59
RX 74 23.000 23.656 0.781 0.407 0.271 1.625 0.09 0.50 0.781 0.06 0.72
RX 82 2.250 2.672 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 84 2.500 2.922 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 85 3.125 3.547 0.531 0.263 0.167 1.000 0.06 0.38 0.531 0.06 0.38
RX 86 3.563 4.078 0.594 0.335 0.188 1.125 0.06 0.44 0.656 0.06 0.38
RX 87 3.938 4.453 0.594 0.335 0.188 1.125 0.06 0.44 0.656 0.06 0.38
RX 88 4.875 5.484 0.688 0.407 0.208 1.250 0.06 0.50 0.781 0.06 0.38
RX 89 4.500 5.109 0.719 0.407 0.208 1.250 0.06 0.50 0.781 0.06 0.38
RX 90 6.125 6.875 0.781 0.479 0.292 1.750 0.09 0.56 0.906 0.06 0.72
RX 91 10.250 11.297 1.388 0.780 0.297 1.781 0.09 0.69 1.313 0.09 0.75
RX 99 9.250 9.672 0.469 0.254 0.167 1.000 0.06 0.31 0.469 0.03 0.47
RX 201 - 2.026 0.226 0.126 0.057 0.445 0.02** 0.16 0.219 0.03 -
RX 205 - 2.453 0.219 0.120 0.072* 0.437 0.02** 0.16 0.219 0.02 -
RX 210 - 3.844 0.375 0.213 0.125* 0.750 0.03** 0.25 0.375 0.03 -
RX 215 - 5.547 0.469 0.210 0.167* 1.000 0.06** 0.31 0.469 0.03 -
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
ON
EE
N DR
H-14
ILLIN G S
C
TROL TRAININ
G
HO
CE OL S •
NTRE
Ring No. Nominal Outside Height of Width of Dia of Flat Width of Hole Size Depth of Outside Width of
Size Dia. of Ring Ring Flat Groove Dia. of Groove
Ring Groove
OD H A ODT C D E G N
BX 150 111/16 2.842 0.366 0.366 2.790 0.314 0.06 0.22 2.893 0.450
BX 151 1113/16 3.008 0.379 0.379 2.954 0.325 0.06 0.22 3.062 0.466
BX 152 21/16 3.334 0.403 0.403 3.277 0.346 0.06 0.23 3.395 0.498
BX 153 29/16 3.974 0.448 0.448 3.910 0.385 0.06 0.27 4.046 0.554
BX 154 31/16 4.600 0.448 0.448 4.531 0.419 0.06 0.30 4.685 0.606
BX 155 41/16 5.825 0.560 0.560 5.746 0.481 0.06 0.44 5.930 0.698
BX 156 71/16 9.367 0.733 0.733 9.263 0.629 0.12 0.33 9.521 0.921
BX 157 9 11.593 0.826 0.826 11.476 0.709 0.12 0.50 11.774 1.039
BX 158 11 13.860 0.911 0.911 13.731 0.782 0.12 0.56 14.064 1.149
BX 159 135/8 16.800 1.012 1.012 16.657 0.869 0.12 0.62 17.033 1.279
IWCF WELL INTERVENTION PRESSURE CONTROL
BX 160 135/8 15.850 0.938 0.541 15.717 0.408 0.12 0.67 16.063 0.786
BX 161 165/8 19.347 1.105 0.638 19.191 0.482 0.12 0.56 19.604 0.930
BX 162 165/8 18.720 0.560 0.560 18.641 0.481 0.06 0.33 18.832 0.750
BX 163 183/4 21.896 1.185 0.684 21.728 0.516 0.12 0.72 22.185 1.006
BX 164 183/4 22.463 1.185 0.968 22.295 0.800 0.12 0.72 22.752 1.290
BX 165 211/4 24.595 1.261 0.728 24.417 0.550 0.12 0.75 24.904 1.071
BX 166 211/4 25.198 1.261 1.029 25.020 0.851 0.12 0.75 25.507 1.373
BX 167 263/4 29.696 1.412 0.516 29.896 0.316 0.06 0.84 30.249 0.902
BX 168 263/4 30.198 1.412 0.632 29.928 0.432 0.06 0.84 30.48 1.018
BX 169 51/8 6.831 0.624 0.509 6.743 0.421 0.06 0.38 16.955 0.666
BX 170 9 8.584 0.560 0.560 8.505 0.481 0.06 0.33 8.696 0.705
BX 171 11 10.529 0.560 0.560 10.450 0.481 0.06 0.33 10.641 0.705
BX 172 135/8 13.113 0.560 0.560 13.034 0.481 0.06 0.33 13.225 0.705
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
APPENDIX I
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
Hydrates are crystalline water structures filled with small molecules. In oil / gas systems they
will occur when light hydrocarbons (or carbon dioxide) are mixed with water at the correct
temperature and pressure conditions.
A very open, cage-like structure of water molecules is the backbone of hydrates.This structure
which bears some resemblance to a steel lattice in a building can theoretically be formed in
ice, liquid water, and water vapour. In practice however, hydrates are only formed in the
presence of liquid water.The crystal framework is very weak and collapses soon if not supported
by molecules filling the cavities in the structures.
Methane, Ethane, CO2 and H2S are the most suitable molecules to fill cavities. Propane and
Isobutane can only fill the larger cavities. Normal butane and heavier Hydrocarbons are too
big and tend to inhibit hydrate formation.
Tests indicate that Hydrate formation is comparable with normal crystallisation.‘Undercooling’
is possible, but the slightest movement within and undercooled mixture, or the presence of a
few crystallisation nuclei will cause a massive reaction. Once the crystallisation has started,
hydrates may block a flowline completely within seconds.
The formation of hydrates is governed by the crude composition, water composition,
temperature and pressure. In most cases the crude composition cannot be changed. Hydrates
can be dissolved / prevented by a temperature increase or a pressure decrease. A chemical
hydrate inhibition can be performed by changing the composition of the water.
Under the correct conditions of temperature and pressure, hydrates will form spontaneously.
At high pressures, hydrates may form at relatively high temperatures; e.g. at 2900 psi they can
begin to form at about 77˚ F .
Hydrates do not require a pressure drop to form. However, the refrigeration effect from a
small pressure drop, such as a stuffing box leak, may be sufficient to produce optimum pressure
and temperature conditions for hydrate formation.
Hydrates can form under flowing or static conditions.The first indication of them forming in
the tubing or annular flow string is a drop in flowing wellhead pressure followed by an
initially slow then progressively rapid drop in wellhead flowing temperature.
During well operations, the greatest danger posed by hydrates is the plugging of the tubing
string downhole. The biggest risk area for this occurring is on offshore installations from the
seabed upwards where temperatures are generally the lowest.
A hydrate plug in the tubing string under flowing or static conditions results in; being unable
to run or pull wireline tools, unable to squeeze or circulate the well dead, and unable to flow
the well to remove the hydrates. Also, hydrates may prevent vital equipment, such as the
Downhole Safety Valve from functioning correctly. Thus a downhole hydrate plug gives rise
to a potentially dangerous situation and must be avoided at all costs.
It is also hazardous when it forms in surface pressure control equipment preventing operation
of valves, etc or plugging lubricators or risers. The latter may fool an operator into believing
that the pressure has been bled off when may be trapped behind the plug.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Hydrate pressure / temperature formation conditions can be predicted for natural gas (Figure
I.1). Hydrate prevention is normally accomplished by the injection of methanol or glycol
downhole or at the Xmas Tree. The quantity of glycol or methanol required to suppress
hydrates depends on pressure, temperature, water cut and flowrate.
For the prevention of hydrates caused by the introduction of water whilst pressure testing for
wireline entry, 60% glycol will have to be added to the water for use as a hydrate suppresser
(See Table I.1, on freezing points of water/glycol mixes).
100/0 -7 1.115
90/10 -28 1.109
80/20 -43 1.101
70/30 -60 1.091
60/40 -60 1.079
50/50 -44 1.068
After the glycol/water has been thoroughly mixed, no separation of the solution will occur.
The glycol/water solution can therefore be left in the pump unit for the duration of the
programme without the solution deteriorating. Mono-ethylene glycol may be mixed with
fresh water or sea water without any adverse effect, although sea water id preferred as it in
itself is less likely to cause a hydrate than fresh water.
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
TEMPERATURE AT WHICH
GAS HYDRATES WILL FREEZE
( From KAZT )
The purpose of this chart is to determine the temperature below which hydrates will form
when sufficient liquid water is present.
4000
3000
2000
1000
900
PRESSURE FOR HYDRATE FORMATION PSIA
800 E
700 H AN
ET
600 M
500
400
V
300 RA
G
6
0.
200
7
0.
0 0.9 .8
1. 0
100
90
80
70
60
35 40 45 50 55 60 65 70 75 80 85
TEMPERATURE ˚F
Example : with 0.7 specific gravity gas at 1000 psia, hydrates may be expected at 64˚F at
200 psia. This would be 44˚F.
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
L
ON G
C
TROL TRAININ
Present techniques for prevention of hydrates are mainly geared to a live well with a gas cap
in the tubing. This allows methanol introduced at the Xmas Tree to gravitate down to the
hydrate level, and therefore act directly on top of a hydrate, should it occur.
Consideration must be given to a perforated well which has not yet been “cleaned up” as gas
will migrate throughout the tubing during the completion of perforation activities.
To minimise the risk of hydrate formation in the well bore and surface equipment, the following
action points must be taken:-
• 1. The fluids used for well operations should be incapable of supporting a hydrate. For
example, water free base oil, diesel or water glycol mixes may be selected.
• 2. Prior to opening a well flow, methanol injection must be started at maximum rate and
continued until the flowline temperature is high enough to prevent hydrate formation
at that FTHP (see Fig I.2)
• 3. Use only a 60/40 mono-ethylene/sea water mix when pressure testing
• 4. Inject glycol at the grease injection head during wireline operations.
Continually inject methanol at the Xmas Tree during all well operations.
Curing Hydrates
The main guidance for removal of a hydrate plug is to reduce the pressure or increase the
temperature, or use methanol, or any combination of these.
NOTE:- The risk is that if pressure is bled down from one side of a hydrate it will begin to dissolve. As
it dissolves, differential pressure can act upon one side of the plug and may cause it to be
dislodged at considerable velocity. Bleeding down can be effective in dissolving a hydrate, but it
is not recommended as a routine practice. However, once a full column of fluid (preferably
methanol) has been established above the hydrate plug then bleeding down the pressure above
to destroy the hydrate can be considered.The full column of liquid will act as a cushion and
prevent the dissolved plug achieving high velocities caused by the differential pressure across it.
Curing a hydrate problem in particular sections of the system has been accomplished by the
following measures:-
RD
HO
• ABE
OL S •
IWCF WELL INTERVENTION PRESSURE CONTROL
& WEL
NTRE
CE
LC
ON G
TROL TRAININ
If during injection of methanol no increase in THP is observed (this will indicate that the
tubing is not completely blocked) then begin to bleed down the tubing taking careful note of
the volume and type of returns.
If during injection of methanol an increase in THP is observed (this will indicate that the
tubing is blocked) then only bleed down the THP to point below bubble point so as to create
a gas cap above the hydrate. Methanol injected will then stand a better chance of reaching the
hydrate.