You are on page 1of 1

SPLICING REQUIREMENT OF REINFORCING BARS "Ls" or "Ld"

BEAMS COLUMNS FLOOR SLABS NOTE :

REMOVAL OF FORMS & SHORINGS CAMBER REQUIREMENT


CLEAR SPAN MINIMUM TIME PERIOD
STRUCTURAL ELEMENTS BETWEEN SUPPORTS (DAYS) ELEMENT MINIMUM CAMBER

NOTE : NOTE :

INTERIOR COLUMN TYP. PLAN OF BEAM /


TERMINATION BEND GIRDER COL. JOINT
TYP. BEAM PENETRATION DETAIL

BEAM RE-BAR CORNER / EXTERIOR COL.


TERMINATION BEND TYPICAL BEAM & GIRDER RE-BAR LAYOUT TERMINATION BEND

STANDARD DETAILS

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
NAPOLEON B. TORIBIO NELSON S. ANTONIO DOMICIANO B. LUSICA 9
STRUCTURAL DESIGN STRUCTURAL DESIGN PROJECT MANAGER
STANDARD ONE-STOREY STANDARD DETAILS S-2
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 16
POSITION: STRUCTURAL ENGINEER POSITION: STRUCTURAL ENGINEER SCHOOL BUILDING
PRC No.: 32516 TIN No.: 107-915-002 PRC No.: 14234 TIN No.: 178-384-258 OIC, BUILDING DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 5-CLASSROOM )

You might also like