You are on page 1of 3
CELADON PARK TOWER 3 Foe hueras Se Makati Development Corporation Si urna “fF bonioce technology canter, Strat cor Fae, REQUEST FOR APPROVAL pone eer Te: sn, ce: v From: okay Deveepment Coraton sent: ser i 2019 Response Raqued SEPT 7209 subject NNETHOb STATEMENT ~ BACKFILLING WORKS. ‘ransmital 10 sv" Structural Consultant ‘abril no. : 37-0000-008-0 reve, nen sabia date a CD resbrital 1 23 ate. we tte cern /ranulachaer Spe. Seen, is and paragreph/ craving, eal lero 5 SETS _ werhoo sratenenr—enckritine woRKs = nn + . ‘rom contactor ‘rom onacar* reosved by Svea Structural Consultant ir remars on above submsion ‘For Ravi & Aeproval transmittal to: Makati Development Corp. ca Consultant ‘aston enews on) Arevioned owed as correcodnoted © oes D disapproved revise & resi Toes ‘le etued ‘ale reqired fon] —¥ consultant * received by: Makati Development Corp. ‘thor eras On abeve submission {OuvELoPMENTCoRPoR, me ‘ATION en Pork = Phase 3 moc Coy j copies: << Owner ited © MUSE ETF eee ai FE Goat Sgt Ep = VENT CoNrRc &4mpc Method Statement - Backfilling Works OBJECTIVE ‘The method statement by which the excavation and backfll with suitable fils carried out. Backfiling work shall comply with all the specified requirements for compaction of earthwork. PREPARATORY WORKS 1. After the forms are removed, all trash, wood chips and other debris shall be removed from areas to be backfilled. Backtill materials shall consist of approved site excavated materials and shall be free from brush, roots and other unsuitable ‘materials which would be determined to compaction requirements 2. No backiill shall be placed against walls or other vertical surfaces until they have been inspected and backfilling is authorized. 3. Do not backfill before the foundation concrete cures. In ideal weather conditions it ‘normally takes up to 28 days for concrete to fully cure. 4. Trenches shall not be backfilled unt ines have been tested and approved by the Engineer. Material for backfill shall be approved as specified above and shall be Carefully placed and compacted to the density equal to the adjacent area. Approved portable tampers shall be used for compacting fil material in trenches and fill adjacent to walls. 5. Carry out survey to obtain original ground level, excavation level and final backfilled level MAKATI DEVELOPMENT CORPORATION Lif, Bonifacio Technology Canter 31" Steet cor. 2"Averue, Bonita Global Cy “Togui, Meio Mania, Puippines "Tel Nes. (02) 717-8600 1030 ae vw makateeyorp om ph Pampc MATERIALS 1. Common fil hall be approved materials free from roots and stumps. Common or borrow fll shall be used i ste excavated materials are unsuitable or insufficient 2. Selected fil: Materials shall placed where specified and indicated on the plan and ‘shall consist of gravel, crushed rock, crushed adobe, or combination thereof. WORK METHODOLOGY 1. Prepare access to the working area and plan forthe dump truck and plant movernonts 2. Transport fil and spread suitable matetial and compact as required 3. Fill shall be evenly spread horizontally layers of not more than 200mm in thickness. Each layer shall be wetted and compacted by appraved mechanical vibratory Compaction machine or roller. 4, Repeat step 3 until the required level is achieved. cs Bea peat a Com pt wn PAT, 5. The finished sub-grade shal be reasonably smooth and compacted and ready to receive the base course for the pavements, 8. Submit Request for Inspection Fom for jin inspectiog sii Séneral Earthworks Excavation And Back svecton Chest Prepared Judeus Clemente M. Du MOC ~ Field Engineer Celadon Park Tower 3 MAKATI DEVELOPMENT CORPORATION. “iF. Bonifacio Tecnology Centar 21" Steet cor, 2" Avenue, Boafac Glatal Cy ‘agus, Meio Mani, Phikopines Tel Nos. (02)717-5500 "0 30 ‘wu makatieveor.com ph

You might also like