This document provides instructions for generating three SAP reports: a maintenance cost report using transaction code IW39, a spare parts usage report for HTC machines using IW3M, and a material stock report per posting date using MB5b. Key steps include selecting date ranges, plants, and transaction types in the selection screen before exporting lists to Excel for further grouping and analysis.
This document provides instructions for generating three SAP reports: a maintenance cost report using transaction code IW39, a spare parts usage report for HTC machines using IW3M, and a material stock report per posting date using MB5b. Key steps include selecting date ranges, plants, and transaction types in the selection screen before exporting lists to Excel for further grouping and analysis.
This document provides instructions for generating three SAP reports: a maintenance cost report using transaction code IW39, a spare parts usage report for HTC machines using IW3M, and a material stock report per posting date using MB5b. Key steps include selecting date ranges, plants, and transaction types in the selection screen before exporting lists to Excel for further grouping and analysis.
2. Created on : Range Tanggal yang dibutuhkan Contoh : 01.01.2019 to 30.09.2019
3. Maint.Plant : Diisi plant yang mau di report
4. Execute
_List Of Order_
1. Sort Ascending di kolom Reference date
2. Export ke Xls ( Klik Menu List ---> Save --> File --> Spreadsheet --> Tentukan directory & Filename --> Generate ) 3. Pengelompokkan Biaya diolah di excel karena melihat diskripsi diorder dan filter equipment
*Report Pemakaian Sparepart Mesin HTC*
T-code : IW3M
_Selection field session_
1. Centang : Planned GI , Unplanned GI
2. Posting date : Range Tanggal yang dibutuhkan Contoh : 01.01.2018 to 30.09.2019 3. Plant : Diisi plant yang mau di report 4. Storage Location : 6002
_List Of Goods Movements_
1. Sort Ascending di kolom Posting date
2. Export ke Xls ( Klik Menu List ---> Save --> File --> Spreadsheet --> Tentukan directory & Filename --> Generate ) 3. Pengelompokkan Biaya diolah di excel
*Report Stock Material Perposting date*
T-code : MB5b
_Selection field session_
1. Plant : Diisi plant yang mau di report
2. Valuation type : New 3. Selection Date : Range Tanggal yang dibutuhkan Contoh : 01.01.2018 to 30.09.2019