MASTER DATA
1, Functional Locations
2. Work Centers
3, Equipments
4. Bill Of Materials
5. Measuring Pointers And Counters
6. Permits
7. Warranties
8. Class and Characterstics
9. Task list
10. Catlogues partners
11. Serial numbers
12. Partners.
TABS
1. General 2. Location 3. Organisation 4. Structure
General
1. Class
2. Object type
Location
1. Maintenance plant
2. Location
3. Room
4. Plant section
5. \work center
Organisation
1. Company code
2. Business Area
3. Cost center
Structure
1. Superior functional location
2. Installl Spec
3. Equi installed
4. Construction Type
Configuration
1. Create Structure Indicator for functional Locations
2. Define Category for reference functional Location
3. Define feild selection for functional location
2. Workcenter:
The Work center usually represents one person or a
department, responsible for ensuring that the
maintenance work in an order is executed
Functions:
1) Costing can be detrmined based on the standard
values specified to the activity types.
2) Scheduling can be done in the operations
Basic Data
Default values
Capacities
Scheduling
Costing
CONFIGURATION:-
1. Work center Category -0005
2. Feild Selection for workcenter
3. Task list Usage keys
4. Control Keys
3. Equipment:Equipments are movable , individual
inventories
for example : Machines, Production equipment ,
Production resource tools ( PRTS) ,Test equipments
( scale ,guages) , vehicles
Equipments are installed in the functional locations and
their usage
Tabs
1. General
2. Location
3. Organization
4. Structure
5. Class and Docs
6. Warranty and Partner.
General :-
Class and Object type
Location
Organisation’
Structure
Configuration :-
Basic Settings :
Equipment Category -M
Define feild selection for Equipment Master record
Set veiw Profile for technical objects
IF U WANT TO ADD SOME FEILDS IN THE
EQUIPMENT MASTER WE DO IT WITH
CLASSIFICATION.
4. Bill of materials (BOM): formally a structured list of
spare parts . for Example : a wheel , which comprises of
tyre , tube , and a rim .
9. Catalogs :
Catlogs is used in various business process to capture the
technical information related to maintenance history in the
form of codes . we can store catlog code and describe
them in catlogs .
Ex for catlogues are 1) damages 2) cause of damage 3)
object parts 4) tasks 5) actions
Call control
Call Horizon: with help of call horizon we can define when
order should be generated , For EX:- if call horizon is 100% and
cycle length is 30 days ,the next call date will be after 30 days
scheduling period: the complete period of maintenance plans.
Scheduling indicators
Time: for every 30 days order will be generated
Time key date: maintenance order will b e generated exactly on
particular date of every month .
Factory calendar: system will only consider the working days of a
company excluding the holidays
Completion requirement check box :
start of cycle: decides when the cycle should be started.
date determination
:
shift factor early completion
shift factor late completion
tolerance .
CALIBARATION PROCESS
Can u explain Calibaration Process?
In Calibration process the pre requisite will be assigning
inspection type to Order type(as 14). Then we create
Master Inspection Character and Sampling procedure.
Then we create Task List, here we select 300 QM category
for Equipment and 310 for Function Location and assign
Master Inspection Character and sampling procedure in
task list.
We create work order, and adopt the Task list here.
When the Order is released inspection Lot will be
generated followed by results recording (QE17) and usage
decision (QA32)
FOLLOW UP ACTIONS IN CALIBARATION ORDER
Refrubrishment Process :-is servicing of defective spares to
bring it to a Workable condition. Refurbished spare parts are
parts that can be repaired either internally or sent out to be
repaired by an external vendor. The parts are then placed back
into inventory for future use. This process is necessary for
parts that are no longer commercially available and for parts
that can be overhauled and re-used at a fraction of the price of
a new item
Integration
For mapping of refrubrishment business process needs close
integration between Material Management (MM) and Plant
Maintenance (PM) modules. Needed major pre-requisites are
as follows:
Prerequisites
A material master record must be created in the system for the
repairable spares.
Unique identification is only possible if the individual pieces
of material have been serialized.
Split Valuation functionality needs to be configured well
and should have three valuation types
New
Refurb
Defective
Requisition
Defective Material will be issued to vendor as Material
2. Scheduling of an order ?
Scheduling is arranging the date and time and resources
and materials required for planning the operations to be
done in a work order
Scheduling Types :
1. Forward: In farword scheduling start date will be
given an end date will be(getting decided )
calculated by the system.
2. Backword : In backward scheduling end date will
be given and start date will be (getting decided )
calculated .
3. Current date :
4. Only capacity requirements:
Automatic Scheduling:
3. Offset in ip10?
6. Scheduling of an order?
7. Calibration process?
YASH TECHNOLOGIES
1. TELL ME ABOUT YOUR SELF
3. Gaps identified
https://answers.sap.com/questions/11786402/sap-pm-
implementation-in-thermal-power-plant.html
LAKSHMAN BRO INTERVIEW questions?
15) How many implementations have you done? What are the
different phases you were involved? what is your role?
16) Challenges you have faced in your role?
17) Can you work independently?
18) Can you handle workload stresS?
19) Can you please talk about your domain experience?
20) What are maintenance Assemblies?
21) How can you link a material BOM to an Equipment?
22) Have you worked on SAP interfacing with third party
applications?
23) Common issues and complex issues you faced in your
organization?
24) Have you worked on IDOCS?
25) what are your responsibilities in your current
organization?
26) Basic configurations required for plant maintenance?
27) Different between Implementation, Roll-out, Support and
Upgrade project?
28) Planned cost not visible in maintenance order, how to
check and resolve?
29) Valuation categories, value categories.?
30) Control Keys and their u
LAKSHMAN INTERVIEW QUESTIONS
SAP FI INTEGRATION:
Call control
Call Horizon: with help call horizon we can define when
order should be generated , For EX:- if call horizon is 100%
and cycle length is 30 days ,the next call date will be after 30
days
scheduling period: the complete period of maintenance plan
Scheduling indicators
Time: for every 30 days order will be generated
Time key date: maintenance order will b e generated exactly
on particular date of every month .
Factory calendar: system will only consider the working days
of a company excluding the holidays
Completion requirement check box :
start of cycle: decides when the cycle should be started.
date determination:
shift factor early completion
shift factor late completion
tolerance .
CALIBRATION ORDER
FOLLOW UP ACTIONS AFTER USAGE DECESSION
For Example
We need to define equipment Category to upload
Equipment master data .
INTEGRATION
MM-PM Integration:
1) For internal procurement , Item category (L) , goods issue will be done
against the reservation.
SAP CO: Activity Based costing calculations of Labour cost for Work
Order.
Work Order settlement – Settlement Profile.
Cost Analysis reporting.
SAP FI: linkage of asset number in the equipment master record.
Asset equipmentsynchronization.
Ending Hr Quantity
Reading (editable)
Ending KM Quantity
Reading (editable)
Name of
Development (Short Equipment Log Sheet Entry
Description)
19 .Tables :
1. Equipment :
EQUI –Equipment
EQUZ—Equipment time segment
, EQKT ---Equipment text
2. Functional location :
IFLOT=Functional location
IFLOTX= Functional location Text
6. Measuring documents:
IMRG = Measuring Documents
7. Maintenance plan : MPLA,MMPT,MHIS .
8. Measuring Point=IMPTT