TOTAL INTERNAL GAS TECHNICAL

GAS DOWNTIME METER GAS GENSET


DATE FLOWING
GAS SALE(SCM) FT-10 FT-9A CONSUMPTION FLARING TOTAL GAS PRODUCTION (SCM)
REASON READING RUNNING HOURS
HOURS (SCM) (SCM)

QPS PARBATPUR PRODUCTION DPR DAY SHIFT NIGHT SHIFT TOTAL SALE OPENING 12210556 340153 PAD-B(62.5 KVA)-20 296
OIL AND NATURAL GAS CORPORATION LIMITED

7661
C1 - 8 Hrs
7.08.22 16 (Less Gas
Offtake due to
CLOSING 12217641 340153 JH#2(125 KVA)-20 280 0
power cut)
1670 5415 7085 JH#2(250 KVA) -
DIFFERENCE
7085 TOTAL GAS CONSUMPTION
576
OBJECTS PUMP PUMP PUMP WELL CHP
SEAM PERFORATION PUMP DEWATERING CUMULATIVE WELL
DRILLED UNDER COAL INTAKE SETTING TECHNICAL RUNNING RPM/ SPM/ TORQUE (ft-lbs) / LIQUID FLOWING GAS FLOW RATE
WELL ID INTERVAL INTERVAL PUMP TYPE DOWNTIME RATE DEWATERING DOWNTIME (kg/sq.cm) OBSERVATIONS PERIOD of LAST WOR REMARKS
DEPTH (m) TESTING/ SEAM DEPTH DEPTH BOTTOM (m) HOURS FREQ(Hz) CURRENT (A) LEVEL (m) HOURS (SCMD)
(m) (m) REASON (m3/day) AFTER WOR (m3) REASON OPEN CLOSE STABLE
PRODUCTION (m) (m) (hrs) (hrs)

OBJ - I
XIV-A 559.75-570.75 559.65-570.75 554.1
BAREFOOT 399 m (S) *Increased frequency to 17.0 on failing to establish dewatering . *During last WOR, even after trying several times failed
SRP TUBING (Sand
JH#01 670
PUMP screen
527.95 577.1 0 C1 - 24 Hrs - 0.0 - - as on - C1-24 Hrs - 15 - - *Slug flow through tubing. 02/10/19 -14/10/19 to clear sand below 577.1m, so kept technical bottom at
491.5-499.5, 502.5- *Well head valve kept closed 577.1m, suspected caving.
OBJ - II XV 491.2-508.1 shoe) 4/04/22
504, 506.5-508

*In view of very poor dewatering rate and little gas from
OBJ - IV XI 768.5 - 779.5 771 - 775 obj -I, II & III, commingled production from objects-IV&V
517 m (S) started on 01/04/2013.
SRP TUBING *Well flowed intermittently for maintaining low CHP in JH#15.
JH#1A 1158
PUMP
795.81 765.06 842 0 C1 - 24 Hrs - 0.0 - - as on - C1-24 Hrs - 15 - -
*Well head valve closed.
04/08/19-10/08/19 *During WOR started on 25/07/14, After releasing stuck
681 – 687, 688.5 - 3/08/22 polish rod, while pulling out tubing the string got
OBJ - V XIII 681 - 690
690 snapped, since fishing failed. Completed the well at its
existing technical bottom (842.38m).
OBJ - II VIII 1057-1074 1061-1067
997.5-1004, 997.5-1003.5, 1013-
OBJ - III IX 1077
1012.5-1015 1014 *Object-I (barefoot) was isolated placing bridge plug at
(T/S)
OBJ - IV XI 806-816 808-812 433 m (S) 1108m
SRP TUBING 1083.07 *Gas supplied to 250kVA G.G set and 125 KVA GG Set at JH#2
JH#02 1272.8 OBJ - V XIII 723-728 723-727
PUMP (Sand
1018.2 1108.7 0 C1 - 24 Hrs - 0.0 1682.2 - as on 20 C1-4 Hrs - 20 13 16
also.
31/07/21-09/08/21 *Commingled production from objects II to VIII started on
OBJ - VI XIV 660-668 662-666 4/04/22 29/02/2008.
screen
OBJ - VII XIVA 610-620 615-617 *During last workover found bottom clear at 1108m.
shoe)
546-557 ,
OBJ - VIII XV 548-550
564-656.5
OBJ - IV XI 749-759 755.5-758.5 * Obj-I (Barefoot), II & III ( not perforate due to fish) are
OBJ - V XIII 682-688 685-688 under fish.Re-stimulation jobs carried out in Obj- IV to VII
453 m (S)
SRP TUBING 25.8-27.4-25.6 (D) during the period 14/10/12 to 01/01/13 and drilled the
JH#03 1191 OBJ - VI XIV 625-632 628-631 PUMP
818.94 796.1 858 0 C1 - 24 Hrs 14 0.0 - as on 16 C1-8 Hr - 18 13 14 *Greasing of SRP unit carried out on 15/03/22. 06/10/18-09/10/18
cement plug up to 860m.
25.6-36.7-25.8 (U)
14/03/22 *Carried out Bio stimulation and Augmentation job by
539.5-540.5,
OBJ - VII XV 538-543 TERI (2 times) for increasing production.
541.5-542.5
OBJ - III IX 981-984.5 982-984
* Obj-I (Barefoot), & II are under fish. Fish top is at 1038m
OBJ - IV XII 847-855 852-855 &Commingled production from Obj- III to IX started on
OBJ - V XIII 767.5-773.5 770-773 14/01/2005. During wor (10/11/11 to 16/11/11), After
251 m (D)
OBJ - VI XIV 721-728 725-728 SRP ROD 5.0/ 23.1-27.5-23.2 (D) 1018m, sand bailing failed and milling was done up to
JH#04 1251
PUMP
1001.3 815.8 1033.5 12 C1 - 12 Hrs 7.0 2511.7 as on 16 C1-8 Hr - 20 13 14
*SPM kept at 5 as the pump is of lower capacity.
10/08/21-17/08/21
1030.75m, then again sand bailing done up to 1035.12m.
OBJ - VII XIVA 660-668 663-668 26.2 23.2-26.5-23.1 (U)
30/07/22 *Designed & implemented new A/L R/I plan based on
OBJ - VIIIA 613-617.5 614-617
XV actual deviation data collected during last WOR.
OBJ - VIIIB 601-606 602.5-605.5
*Sand removal possible only through bailing.
OBJ - IX XVII 315-320 316-319
OBJ - IA IX 926 - 930.5 928.5 - 930
OBJ - IB 909.5 - 914 912 - 914 *Well kept closed since 26/11/18
OBJ - II XI 880.5 - 883.5 880 - 882 SRP TUBING
JH#05 1185
OBJ - III XII 836.5 - 839.5 837 - 839 PUMP
968.88 940.89 1029 ISOLATED WELL 10/11/18- 22/11/18 *Isolated gas producer well.
OBJ - IV XIII 770.5 - 778.5 776 - 778
OBJ - V XIV 708 - 713 710 - 712
OBJ - IA V-VII 853 – 880 876.6 – 874.5 *During last WOR,initially cleared the well up to 1035m.
OBJ - IB 863.5 – 861.5 But while R/I scrapper, it got held up at 603.03m. So
OBJ - II VIII 797 – 804 803.5 – 801.5 20 Nos. of cleared the depth by circulation and reciprocation of
JH#06 1075 OBJ - IIIA IX 760 – 763.5 763 – 761 EUE TUBING
183.13 NA 709.03 ISOLATED WELL 23/06/12- 03/07/12
string from 603.03 to 709.03m
OBJ - IIIB X 751.5 – 756 754 – 752
*Well kept closed since 03/07/12
OBJ - IV XIII 665.8 – 669.6 669 – 666
*Isolated gas producer well.
OBJ - V XV 600.4 – 603.5 603.5 – 600.5
11129 *Well kept closed since 31/10/13 due to no water flow.
10 Nos. of
JH#07 TOTAL XV
EUE TUBING
NA NA 754.5 NO GAS BREAK (HORIZONTAL WELL) 04/04/17- 09/04/17
*Bridge plug at 755m
METERAGE

10265 TOP: 897.5 (MD)/ 719 (TVD), 166 m (D) *Well under activation. *Well kept closed since 05/05/19 due to tubing thread
150/ 137-200 ftlbs/ 31/01/22-
JH#08 TOTAL BOTTOM: 904.5 (MD)/ 723.5 (TVD), PCP 917.02 868.59 936 24 - 61.4 10876.6 as on - B4- 24 Hrs - - - - *Currently operating at maximum possible RPM. wash out. Thus, R/I moulded guides during last WOR
49.2 22.8-24.2 A 05/02/22
METERAGE WINDOW CUT: 853.6 - 858.5 27/07/22 *Echo survey showed decreasing water level at slow pace. (31/1/22-5/2/22).
OBJ - I V-VII 979.5 – 988.5 982 – 986
OBJ - II VIII 908 – 912 909 – 912
466 m (D)
789 – 791, 789.5 – 791, 793 – 110/ 187 ftlbs/ *Well conditions stable. *Runned in NOV PCP - capacity 40 m3/100 RPM
JH#09 1124 OBJ - III XII PCP 1001 899 1054 24 - 37.2 7068.9 as on - B4 -24 Hrs - 7 - -
*Observed gas break on 10.02.22.
8/01/22-19/01/22
*Runned in 12nos. Tail pipes only below the pump.
792-795 795 36.1 18.9 A
30/07/22
OBJ - IV XIV 732.5 - 739.5 733.5 – 737
OBJ - V XV 607.5 – 615.5 609 – 612
OBJ - IA III-IV 1194-1213 1205.5-1209.5
OBJ - IB III-IV 1157-1192 1184-1190
1065-1075.5, *PCP stopped on 10.03.22 due to hugh torque.
OBJ - II V-VII 1078-1080.5, 1069-1075 *Circulation job carried out on 17.03.22 to release rotor stuckup
1093-1094 of JH#10 PCP. Total Volume Pumped: 750 L. Total Pumping
OBJ - III IX 1001-1005 1001.5-1004.5 time: 82 min. Max Pressure:950 psi, Surfactant used: 20 L.
JH#10 1314.3 OBJ - IV XI 864.5-872 866-871 PCP 1085 1055 1286 WELL KEPT CLOSED DUE TO ROTOR STUCK UP Pumping pressure increased from 700 psi to 950 psi after 600 L
01/12/21-09/12/21 *All objects have been opened.
OBJ - V XIII 788-793.5 789-793 pumping and circulation could not be observed. Flowback was
746-750, not established.
OBJ - VI 748-750
751-755 *Echometer reading as on 11/03/22 was 265m (D)
OBJ - VII 683-688 684-686
627-632, 629-631,
OBJ - VIII
642-647 644-646

JH#11 697 ISOLATED WELL TO BE PERFORATED AND TESTED


JH#12 1515 ISOLATED WELL, OPERATIONS SUSPENDED AS ITC RIG NOT REMOVED FROM JH#12 SITE, TESTING NOT COMPLETED
JH#13 1606 OBJ-V 1122.5- 1127.5 1116 ISOLATED WELL, PERFORATION & PRE-FRAC OF OBJ-I TO V COMPLETED. HF DONE ON OBJ-III,IV & V. POST FRAC JOB DONE ON OBJ-III ONLY 23/12/2013 *WOR to be deployed for further testing.

*Well kept closed due to poor influx.


JH#14 1144 OBJ- I VIII 959.5-965 960- 965 PCP 1027.69 984.99 1113 DE-HOOKED PCP DRIVEHEAD FROM WELLHEAD FOR W/O Echometer survey: 65m (S) as on 22/03/21 28/02/18- 31/03/18
*Perforation and HF of OBJ-I were C/O in MARCH-18

OBJ - I XIII 634 – 642.5 636 - 641 *Carried out circulation Job and Made PCP operational. Job
242 m (D)
170/ 241.4 ftlbs details are as follows: Job start: 12:15Hrs, Max Pull: 9.5T, Max *Perforation and HF jobs of OBJ-I, II & III were carried out
JH#15 935 OBJ - II XIV 577.5 – 584.5 579 - 583 PCP 702.48 664.9 905.5 24 - 86.4 16780.0 as on 16.5 B4- 7.5 Hrs - - - 7
Pr: 700Psi, Total vol pumped: 5bbl water + 20L of surfactant, Job
23/01/22- 28/01/22
in the period 19/04/18-20/05/18
32.6 19.9 A
OBJ - III XIV-A 527.25 – 542 530 -538
30/07/22 ended at 12:45 Hrs.
.
REMARKS WELL TESTING DATA GENSET RUNNING DATA
1. Less gas offtake by consumer due to power cut GAS CURRENT
FLOWING RUNNING HSD/GAS
WELL ID PRODUCTION CHP MAX CHP MIN POTENTIAL SL No. SITE ENGINE DETAILS REMARKS
HRS HRS CONSUMPTION
(SCM) (SCMD)
2. Laying of 4" pipeline from JH#1 to JH#3 under progress.

Gas Genset 250 kVA,


3. Sent 1600 L of HSD to I/C WSS, Gomia. JH#1 1
Doosan
- - -

Gas Genset 125 KVA, Green


4. Received 12KL of HSD at JH#2.
JH#1A 2
Power
20 296 SCM GG Set ran from 6:00 Hrs to 12:00 Hrs and again from 12:00 hrs to 06:00 hrs.
JH#2

5. Servicing of 250 kVA Doosan GG set. JH#2 3 DG Set 200 kVA, Cummins - - -

DG Set 200 kVA, Greaves


3. Test run of JH#02, Fire engine and Jeep mounted fire water pump. JH#3 4
Cotton
- - -

4. JH#3 fire water pump not operational due to priming issue since April-22. Kindly do the needful. 5 DG Set 125 kVA Cummins 4 38 L DG Set ran from 8:00 Hrs to 12:00 Hrs
JH#4
6 DG Set 62.5 kVA Ashok
PAD-A 20 76 L DG Set ran from 6:00 Hrs to 8:00 Hrs and 12:00 Hrs to 6:00 Hrs
Leyland
JH#8 7 DG Set 40 KVA
DG failed to start as servicing is due
Ashok Leyland - -

Gas Genset 62.5 KVA,


JH#9 8
Ashok Leyland
20 280 SCM GG Set ran from 6:00 Hrs to 8:00 Hrs and 12:00 Hrs to 6:00 Hrs
PAD-B
JH#10 9 DG Set 180 KVA, Cummins 4 - DG Set ran from 8:00 Hrs to 12:00 Hrs.

JH#15

NEAR MISS REPORT NIL

SHIFT I/C Dilip Kumar, Ch. F/M (D) Rajesh Kr Singh, AEE(P)
Electrical -
Mechanical Shree Kant Prasad, Ch. F/M(D)