You are on page 1of 1

Concrete Pouring Form Received by MHA

Project Name KEMPINSKI MADINAH HOTEL Project No 1865

Contractor SARH ATTQNIA CONTRACTION Project Location CENTRAL AREA AL SALAM ST

Contract No. 012018 Pouring Submittal No. ST-CO-105-R00

To Consultant MOHAMED HARASANI ARCHITECTS Date 15-04-2019

Contractor
Project No. Checked Description

Q.C

C.M

SURVEYOR

CIVIL BA – CE ‫ بين محوري‬W6 ‫صب جزء من حائط القص الدائري‬


‫ ميغا باسكال‬60 : ‫( قوة الخرسانة‬W.P) SRC ‫بالبدروم الرابع خرسانة‬
ARCHITECTURAL PART(A)
‫بحسب المكان المشار إليه بالمخطط المرفق‬
Mechanical ‫ شركة تطوير‬:‫المورد‬
Electrical

Item No.

Amount Involved 32 m3
Date Of Inspection We certify that the above works have been checked in detail & are in strict
Requested conformity with the specs & approved drawings
Time Of Inspection 11:00 AM Requested By :ENG OSAMA SALEM Signature :

MHA Consultant
Checked Remarks

Location-CIVIL

SURVEYOR

CIVIL

ARCHITECTURAL

Mechanical

Electrical

Application Approved As Noted Date

Application Not Approved ENG ALI HURMUZLU Date


A) – Concreting shall only proceed when action is only approved as noted
B) – Approval of this document does not release contractor of his obligations
C) – If concreting is not started within 24 hours of approval, another approval has to be obtained

Received By
Date