Professional Documents
Culture Documents
ST Co 107 R00 B
ST Co 107 R00 B
Contractor
Project No. Checked Description
Q.C
C.M
SURVEYOR
Electrical
Item No.
Amount Involved 57 m3
Date Of Inspection We certify that the above works have been checked in detail & are in strict
Requested conformity with the specs & approved drawings
Time Of Inspection 04:00 PM Requested By :ENG OSAMA SALEM Signature :
MHA Consultant
Checked Remarks
Location-CIVIL
SURVEYOR
CIVIL
ARCHITECTURAL
Mechanical
Electrical
Received By
Date
Contractor