Operations Management
Company History
2
Dore-Dore
Company Background
4
Dore-Dore
Existing Scenario(1990)
6
Dore-Dore
Replenishment
7
HOSIERY:
Key factor of its customer service strategy was
KNITWEAR:
DD did not offer replenishment of children’s
Dore-Dore
The Problem Statement
9
Dore-Dore
Cost Structure for Hosiery
13
Knitting 0.99
Sewing 0.95
Ironing 0.15
Yarn Sewing
and and
Knitting
Fabric Dyeing Cutting Finishin
Supplier (2 g
(5 (1 week
s weeks
weeks average (3
average
(2.5 average through weeks
through
months lead put average
put
average time) time) through
time)
lead put
time) time )
Dore-Dore
Production Details
16
(Knitwear)
80% of knit wear production was sold under Dore-Dore label
while remaining 20 % was divided between two other private
channels, Chantal de Thomas & Monde des Enfants
The average production batch size in sewing was 200 pieces
Dore-Dore
20
Advantages :
Quick replacement and repairing of broke down
machine.
Replacement might also require set up period of
5 to 10 minutes only.
Workers in the cell balanced their work
Dore-Dore
Cell Results
21
batch sizes
Second cell of 6 workers is organized
sewing operation
Dore-Dore
22
of sewing operation
Cell Decision Making
Workers were provided with training to solve
Dore-Dore
Operations- Hosiery Division
24
Dyer
365 styles/season
35,000 annual
Dyed
Rejected
Yarn
after QC
SKUs
Central Factory at
Batch Size:- 120
Gres (Handles 200 pairs (same size,
ton raw material
inventory) color; different
size)
Knitti
ng
Gres
Knitting 1 out of 11
floor knitting Dore-Dore
shops
Dore-Dore
• Batch Throughput time:- 2-3 weeks QC+
• Labour content/pair = 1-4 minutes; effective time per batch = (120*3)/60 = 6 hrs packaging/
• Good ergonomics; only women workers (107) Embroidery
• QC followed by packaging (1st floor)
• Embroidery (13 workers) (location: Basement)
• Laundry, a prerequisite (4 workers)
• Batch Throughput time:- 1 week
• Actual Production time per pair = 1 min, implies effective time per batch = (120*1)/60 = 2hrs
Ironing
• Only men workers (20), difficult ergonomics hot steamy , noisy room
• 10-15 ft. high machines
• Location:- Basement
• Batch Throughput time:- 1 week Toe
• Actual Production time per pair = 1 min, implies effective time per batch = (120*1)/60 = 2hrs
• Poor ergonomics Closing
• Heavy Yarn:- Automatic; Light yarn: Blind loop process
• Only female workers (92)
• Location: Ground floor
• Batch Throughput time:- 1 week
• Actual Production time per pair = 6-8 mins, implies effective time per batch = (120*7)/60 = 14 hrs
• Automatic machines produced knitted tubes Knittin
• Centrally programed Designs onto cassettes, only men workers g
• Reprogram time:- few minutes
• Setup /recalibration time :-1 hr – 2 days
• 24*7 operations
• 0.6% defects + 10%) second quality product
25
Operation Sequence
Proposal for Autonomous
Groups in Hosiery
26
Manufacturing
Claude Enfert, Director of Manufacturing of the
hosiery division, believed that if total manufacturing
throughput time fell to one week, finished goods
hosiery inventory would drop 30-40%
Then he envisioned a one day throughput time for
Dore-Dore
27
systems
Limited capacity of MRP system in size
Dore-Dore
Hosiery Division
30
Dore-Dore
Alternate Layout
31
2
6 6
2 2
Dore-Dore
Alternate Layout
32
Dore-Dore
Calculations- Knitwear
33
Sewing operation
For Previous layout:
Labor content: 10 mins, Workers: 42,
= 30000 units
Dore-Dore
34
Cellular Layout
Workers= 6, labor content: 10 mins per pair
Dore-Dore
Children’s Knitwear Division
35
Dore-Dore
Calculations- Hosiery
36
Division
Previous Layout:
Knitting operation: (1 week –Batch throughput time,7 days a week,
24 hrs, production time=7 min/pair)
Cycle time = 7 minutes/pair, Available time = 24 x 60 = 1440 min
Dore-Dore
37
8 hrs
Lunch + break = 30mins+15mins+15mins = 1 hr
Available time for production per shift = 7hrs
Labor content= 1 min/pair, Total labors= 92
Dore-Dore
38
= 24
Capacity = 24 x 7 x60/0.25 = 40320 pairs
Actual production = 37000 pairs
% Utilization = 37000/40320 =91.7 %
Dore-Dore
39
days
WIP = 33 x 37000 = 1,221,000 pairs
Cost of FG >1,221,000*(7.8+17.42)/2 +
2,365,591*7.8
> 15,396,810 + 18,451,610 FF
> 33,848,420 FF
Therefore Finished Goods Inventory = 33,848,420/
31 =1,091,884 pairs
Dore-Dore
42
Cellular Layout:
They are converting post-knitting processes
into cellular layout.
Close the toe:
7 workers, Labor content = 1 min/pair
Dore-Dore
43
Ironing Machine:
2 workers, Labor content = 0.25 min/pair
Capacity = 2 x 420 / 0.25 = 3360 pairs
Bottleneck = 2780 pairs / team = 5560 pairs/cell
No of cells = (92 + 24 + 120)/36 = 236/36 = 6.55
For 6.5 cells = 13 teams. No of workers = 234
Additional 2 members can be given to the Bottle neck ie QC of
two different Cells.
This would increase the capacity of that one particular cell by
by = 1* 420 / 1.36 = 308
The new capacity of the cell would be =5560+308= 5868 pairs
Total capacity = (5560 x 4.5) + (5868 x 2) = 36756 pairs
Dore-Dore
Hosiery Division
44
Dore-Dore
45
Thank You
Dore-Dore