TRX - THE EXCHANGE TRX rerneacmcnee APPLICATION FOR INSPECTION PROKAGE NANEINO | TRO? TAREF NO WOT_TAU2 AFL ST ROO 0008 a TRADE CONTRACTOR | WOT Bead ISSUEDATE/TINE | 2087018, Turdey AH 74/4 weve os Locariow eRioune | O° T9BTS AE Ten wher appa INSPECTION NOTICE: WE REQUEST YOUR INSPECTOR'S PRESENCE ACCORDING TO THE FOLLOWING SCHEDULE: [REQUESTED BY TRADE CONTRACTOR/ SUPPLIER: INSPECTION OATE & TME: 2019/2018, Thutsday (4.00om) WORKS COMVENCEMENT DATE eatue: 30 /A/(8 - 10 00 am INSPECTION TEM: Inspection for Cour Pre: astng & Casting (Gridine ATSIB19, A20820) PROWL SWE-EEVES GINO LNA Wahoi Sane RIVES CUNO CWA | waa/Sooe EVES Lino CWA Cm [BGwanst —| Cong Pe ove Bie ATHENS: [Cr sepayRoieveor | Bown core _b-D- suawreoey | wae: von sous ye | ona ; SO eletisax NGPECTEDBYSUPERVENCONSULTANT:LTOM ne ee Gay Cone Tener wane IRSPECTIN NOTE | precceren | Di revecreo {ED NEW DATE ATI DATE 8 TIME AM dens ww Atpi4 - Aw) Bo» ofa. SIGNATURE: fi are ate. 2{(0|(% = }-0% cme ] Cle REVEDAL WOR REDIRED. 1 7 yapecreonpostPoneD RESPONSE: (INSPECTION PASSED. [no 5 -NSPECTION REQUIRED: CI YES! O NEW AF: C)YES © NO ‘ACKNOWLEDGED BY LLPM: IOC nnspecrionnoncs: | faccerren | resecteo. 1 postpone NeW DATE THE mG Dae TINE: Sofeye Goa ‘COMMENTS m prteed dre caeee, souTure: RAE Bala Krishnan Ramasamy | Ste Manage im Gua OHERTHE 3 «lap Ee TIE-RRESAL VORSREGURED. Foch INSPECTION PROVED ic nsercrionFostronea Resronte mionasseo, _| REerectonseouren:Cles/ C0” | fawarechves. C) NO LL cA F302, 0000 ev (Date HoACINE TRxLO plein x pce AF Fo aoe LENDLEASE PROJECTS (MALAYSIA| REINFORCED CONCRETE WORKS INSPECTION CHECKLIST Toe WOT_1P02_CHK_ST_000T \) SDN BHD LENDLEASE MALL TP 02 ecation/Zone/Sub-Zone: 5) one a JAFINO. = wct_rp02_AF|_ST_RCC_0008_a level Block Tnk7 Aree Poa squch Fear Drawing Ref. No. «1P_st_ORG_MCO2_10200_82,60 K1P_ST_DRG_Mco2_61001_00.60 82 ae 920/820) | [pre of inspection: — 20/9/2018 [Material : (Approved / Not Approved) Hime: “200 PM [Method Statement: (Approved /atApecaved FoRMs [Setting out / postion acceptable Z 7 Ay ip [Support / External Struts & Form Tie / Wedges/Pin it ce hightened : Pe ¢ [Surface of formworks is clean & has no deformation ZAK aly “d_|Mould oil has been applied adequately ZALE a Lib 7 Kj [Formwork gaps sealed Lica Bye -T 7Hly [opening sizes / location as per drawings AM [= 714 — e_[Aienment /vetcaltyin accepted t qlee mls Th eleanliness of formwork ay BI i, [REINFORCEMENT ‘2 [brand, Grade, Type & Sue = [Fabrication satlsactory laps Adequate / Secured / Propery tighten Zz ' a_]link / Bars spacing is acceptable = Z Zz ule '@ [Minimum concrete cover is acceptable Zz = on Cleanliness feceireree [eure [Rebar test Pd |WATERSTOP (Where required) 2 [Waterstop installed as per manufacturer instruction | — yr rn b_[eorret water use forint and cleanness. i A [CONSTRUCTION JOINTS (Where required) '2 [Construction joints as per indicated in drawings Ne n NA [Surface of joints are clean and free form latance t "We have cri out all necestary iepectone and very that the above Kems/ activites conform to the contact specfegtons/ document Iwame Iwame a ria se 7 pee cian emoaS ae RUSS ame: tay sion K ae ee ston bate pate: rafal sean e044 | dpe sc opnicoe rate cont Hace) dese |cieceab [Approved By : [Acknowledged by: ha: Hee MM IA ner, BE iniia2t2 Kishnan Ramasam eT postion Co.w/ Ane ABA Postion: RE RR rostion? 3 a ae: ri( [iY oae: >i) ale pate hy cen’ constant tent’ consutont enctese N San Br mr aT ies Namg Bhs Prennme Cesve Ov fcr Troe. CHR ST-COOT “Tan Ra achange (1) Leslee gestion nei Tere Revo ne 2/05/2018 Tore °02_CHK_ST_0007 wera LENDLEASE PROJECTS (MALAYSIA) SON BHD LENDLEASE MALL m & Ma ‘TRADE CONTRACTOR/ SUPPLIER: REINFORCEMENT / FORMWORK / CONCRETING WORKS INSPECTION CHECKLIST P02 ceo te ‘TPO2, ZONE A reese WCT_TPO2_AFI_ST_RCC_0008_a |Level/ Block /Unit/ Area [Drawing Ref. No.: KTP__ST_DRG_MCO2_10200_82.G0_ Ba(eLaa/nt9, 20/820) KTP_ST_DRG_MCO02_61001_00.60 [Date of inspection 910) 20 [Material : (Approved / Not Approved) rime : 1d) am |Method Statement : (Approved / Not Approved) [concReTING [Concrete grade and quantities 'b [Embedded item (MEP services, others) are installed =WA- | PB [Construction / expansion joint acceptable =WA- [Al equipment provided such s vibrtor, ete fp | e—Exernalwrig stor & cite Tony proved ali esd wre rate Existing concrete area surface wetted/roughen |. 7 t Vewath PL Yue, £ Ioetore cast 74) W Wal eUCbere E_|Cube sample & Slump test taken etl 'h__|Concrete level marked for all drop 2Viyol 7 |Spacer enoven and accepted Zag [coRING a [Water curls totes tor 7 dope = pe b [correct rate of application if curing compund is used -Nk= | MA wood Cound ap pi} oe [7 AT [OTHERS J # gt th : Wea phe seo! ACTH wry oF corenete po. = Tic is oe ep ap apa emieae es 2 We have cre otal necessry nepections and very that th stove te ais conform fo the contact speciestone/ Sout Jenecked By: vital Initia inion: S2— Name IName:, Name: SAMARL SOY position is Position : position: S-E a st ee ey are Isc epicbiey Troe con csi) Lenceaze Projects) Son Bhs By: [approve By rps bial: WA lana: # han ital: LAD Name: AO UG - Nenu" Name: gt une ame Dok, Some ctor aaa ostion: Re postion: Joate: {0 ((¢ — 3° Opn Joate: 910 }1« Date: Ls Leo +] cents onsultont client's Consultant Lenclease Projects (M) Si Bhd fcr. TPa2. owe sT-o007 era rr tn ak chage (Rese Gunter Insgetion Cie Tense UUnont s0,30340000 Re 0 ev ate 205/038 PERI sae si “Drees AM : AAq /B\%- ay ae z oud Z 7 % ee 7, S Revision 01 Taz LENDLEASE PROJECTS (MALAYSIA) SDN BHD WCT_TP02_CHK_ST_0001 No. Prejeet TENDIEASE MAIL TRADE CONTRACTOR/ SUPPLIER’ Trade ee WCT CONSTRUCTION SDN BHD Package REINFORCED CONCRETE WORKS INSPECTION CHECKLIST tecston/ Zane/Sub-20ne: p92, 20NE A JAFINO: wcr_tP02_AFl_ST_RCC_0008_a Tevel/ Block JUnit] Area Drawing RefNo? iip_s1-Dno_NwCoa io200 B2.G0 82 (GL A19/819, a20/820) & KTP_ST_DRG_MC02_61001_00.60 | [Date of Inspection: — 20/9/2018 |Material : (Approved / Not Approved) [Time : “4.00PM [Method Sti SES ‘Approved) Description of Works > 7a TES FORMS ‘2 [Setting out / position is acceptable VA [Support / External Sate & form Te Wedges Pin » Jectonas Clo. Derek pai vedio ‘c__ [Surface of formworks is clean & has no deformation ZaATy a [Mould oi has been apoled adequately ZG e _|Formwork gaps sealed ZAl4 + _|Opening sizes / location as per drawings: he ZANT Zz g _ [Alignment / verticality in accepted A [Cleanliness of formwork REINFORCEMENT a_[Brend, Grade Type 8 Sie Z 'b_ [Fabrication satisfactory fl Y [Laps Adequate / Secured] Properly tighten Z [Link bars spacings acceptable ‘@ _ [Minimum concrete cover is acceptable L [Cleanliness ZF e_[Rebarrest IWATERSTOP (where reaured) 2 _[Waterstop installed as per manufacturer instruction | aie Z [correct water use for joint and cleanliness on bl [CONSTRUCTION JOINTS [where required) [onstruction joins as per incieated a drawings f r 7 6 arrest cestode tors unnen17™ + - STATUS OF INSPECTION We hve coed out al macs hopetonr nd verfyshee stove feats conformte ihe ona peter donee [checked By: ey: [checked By: ame Name 289 FE a PSae Name: PLY Position a auld Reena EE Position: Date v\ - pate: oAlillig sc afopocbly bas Daf: 1S Lenscre Project) Sn tha [Checked By: 8 |Acknowledged by: thy i. well ia Krishnan Ramasafny set aie f ae Nome :Taa ok Fuchange Frsive Oot positior C0. W/ ARETARA~ positon: RE/ RA Postion: § ~~ Date: 1 4 11 Date aialle pate: >| 4] cient’ constant: cients const LenceoseProcs bu) Sdn Bhat vor Teo One STO a oe a REINFORCEMENT / FORMWORK / CONCRETING WORKS INSPECTION CHECKLIST. Page no. Zaz cee] LENDLEASE PROJECTS (MALAYSIA) SDN BHD [Doc Ret. WOT_TP02_CHK_ST_0001 TRX [Project LENDLEASE MALL woaugoaee "TRADE CONTRACTOR/ SUPPLIER: Trade TPO WCT CONSTRUCTION SDN BHD Package: rocation/ Zone] Sub-Zone: P02, ZONE A [aFINe-= \WCT_TPO2_AF|_ST_RCC_0008_a 7 Brock JUnit] Area level? a B2 (GL A19/B19, 420/820) [Drawing Ref. No.: KTP__St_ORG_MCO2_10200_82.60 KTP_ST_DRG_NMcO2_61001_00.60 [Date of inspection : [Material : (Approved / Not Approved) [Method Statement : Approved / Not Approved) i T_ Tee] equal Sere ees, : or eas amen So a eee = ae [concreTing’ 2 [Concrete grade and quantities ate b_[émbedded item (MEP services, others) are installed | AJP, | —WA- | WZ <__ [Construction / expansion joints acceptable NAT [All equipment provided such as vibrator, etc Ze [= [external working platform & chute if any] provided Zit He 10 Ravi surrey 7 [tng concrete res auriace wetted rovghen ee TP ent Eo eu petore cast ZH le TM WAN coeete| [cue sample & Stump testaken io 1 [eonerete level marked for al drop Za? i [Spacer enough and accepted =2he caning 2 [Water curing i continued for? days Te |= k= 7a ct rate of application if curing compundis used | vl} =Nk- | Wh Fi kn, be A We have cared out al neesson inspections and very fa the above Rem avis confor te the contact spedicatons/docuTent [Checked By: [Checked By: By: ht s ota nia tintin; 2 Name Name : ah #9 Name: SAMmMEC Sam rcsiton: << postion: (7¢ Position: SE bate pate: 21 /9) pate: Sefa Joos sc anne) rode Comtoctor enol). Lenceose Projects (mt) Sdn Bhd [checked By: [Approved By ledged by: lav, A lua: CF ns Sere Name cin \ ww name: 2-7 Lona > Name: Zhe Srw—~y- pooch Position: | RE/ RA Position: | [PO bse: Sulit 4-98 Y™ — fone >/iie pete: 2-10-18 eecedieat cients consunt Lencteose Projects) Sdn Bh = oe TF ror Te0z CHK ST_000 “Tun Asa change (RH) este Caer Revision ate 24/0/2018 "BASEMENT? LAYOUT PLAN, Bier comernsrmrcoonnn Drewes roman meres (Dimes 1D semen APPROVED FOR CONSTRUCTION leonard guanasm eng aries fat saa aa sat a == sono a ta ana : Sosa so a — [aaa S sonst un |B Tet oo SS Sle 2 4 Feto_| ote & i ‘ont Sar que co zon owt i ea a aa EXCH =e. roe ioe = son _| ns Tex ea =e a os cae BASEMENT 2 OVERALL em Sear PLAN ca Soot a aa = oa eae ans HOP ST_oes ce soto 82.60 rAvY PERI 4 As Built Column Verticality before/after Cast wun SP we Ref. No: Bazment 2-AH/B14 Date: 90.4.2018 ‘Type of Column : C7, ¥90x456 As Built Column Verticality PRE [7] As Built Colurnn Verticality POST [—] Point Position Layout Pre I Post Bottom |” Mid Top | Bottom [ Mid Top Side x1 | 65] 624 626 Side YI | Side X2 I | [Side yo | 62 624 623 I Remark : _ Prepared by, Checked by, Zulhelmi Sfe/Husein Senior Land Surveyor “fran earr “onstruction SGn Bhd (Site Representative) (Head of Department) As Built Column Verticality before/after Cast no 82 il wee Ref. No: Basement 2-A20/20 Date:__ 17-4 201g Type of Column : C4 ¥50x¥50 As Built Column Verticality PRE [| As Built Column Verticality POST [—] Pre Post Bottom [ Mid | Top | Botiom [Mia Top Side [xr I | Side YI | | | Side x2 | 625 | eau | gas | Side y2 | 65 | 62 | 626 | I Remark: __ Prepared by, Checked by,, Zulhelmi Bf Husein z Senior Land Surveyor air Kare ISITUCOR SGn Bhd (Site Representative) (Head of Department) +9185 10 suon doug fuedwog » Ad09. anf y sanovamoes. QGTEQOQ v:NS ‘fa panos / am s a DIEpUEIS OU gM soUEpLCDge Ui paniwoon, oof FF SEE iim poy Buijooxd serena] Wwe ony SeewsauaS ay Gente 25 2807 eS eaay 35¥S00 of de stmag ww | wid Bae) aia iL OL SNOWY at a PZT LEED EL SSSOINWAS USHLO i om. 0/9. 204%, so4y | 9473020 NolEvOO So i Nie WwiviaHe“telaghaT rvente wie 24 Pwo SBSMildh SYRIANS OL G3NdaNs a ‘fees ves rsa 0.095 ofr Sajeeg ooops 3750) GHA NGS (VISAWT 23 2z A sreetSecio:4aiin HU a )

You might also like