TRX - THE EXCHANGE
TRX ——————
mm eszax BcoHANGE APPLICATION FOR INSPECTION
PAGKAGENAMEINO | TPO2 AFIREF HO WOT_TPC2_AFL ST_RCC_0008.b
TRADE CONTRACTOR | WCT Berhad ISSUE DATE! TIME aero, Freey AST UTS
eS a wwearoweRoune | UAE
|NSPECTION NOTICE WE REQUEST YOUR INSPECTOR'S PRESENCE ACCORDING TO THE FOLLOWING SCHEDULE
REQUESTED BY TRADE CONTRACTORI SUPPLIER: ]
Ter we = e
INSPECTION DATE & TDM: 21/972018, Fray (3COpm) works comencensr oxreaTue 9 //ig - gam
INSPECTION TEM Inspection or Colnn Pe Cag & Casing (Gridine ATSEZO)
APPROVAL SiWS-FRYES ONO CWA | MehadStaeret-K2YES CWO DONA | Netra’ Saree fa YES LINO GNA
on Boece | Barcomery Pe orev Deals
ArTaCAMENTS) -
i 9% pory Rew’ Regan Dower
susmrteney: | NAME: Vikram ‘SIGNATURE: Me DATE & TIME:
SPECTED BY SUPERVISON CONBULTANT.Clom Cm ee GRY Done =|
Tasers I
wsrecrownonice: | pavaccepten | O) revecTeD | 0 Postpone -newoere are
naw: B-Thiwe Haw, sourure CF [OsTERTE: 31) 4[18 2 comm
coments: (0 [jy ~ To ATTACHED Cory oe cowAete 0-0.
Then sonaTune: 4] - [oureawe: Ove [l% 04 tm’
THe REVEDAL MORK REQUA¢D a
niseecTiON 1. APPROVED Cc—nsPecronpostPoneD
RESPONSE INSPECTION PASSED, RENSPECTICN ReQURED FIYES/ | RewareCTvES CD NO
ACKNOWLEDGED BY LPH:
Taare
nsrecronnonce: | efrccerteo | 0 rescreD- 1D ppstroweo -new oaTe & We
wae Puen] THHRUN AU LApagal ‘SIGNATURE he owreaTwe 2 foa/is 5 0pm
[Fomor paced fe me
Bala Krishnan Ramasemy
Sie Manager
“Tun Rash Exchange ties. Guar
DATE 8 TIME: PT 6a
INANE: | sionaTuRe:
lies ~ 8 —RENEDIAL WORKS REGURED, me
niseecTon sono ca to Che nepeorenrosthoneo
rene Febecrovbikeo | eAPecToNREaineD Ces!
NO
Newar:Cves 0 No
au on gaa 000
8 /Omte: 7092018
TROL ipsa ripen AF FoLENDLEASE PROMI
TRX
JECTS (MALAYSIA) SDN BHD.
Tore
‘WOT_TP02_CHK_ST_0007
LENDLEASE MALL
?
v
TRADE CONTRACTOR/ SUPPLIER:
WCT CONSTRUCTION SDN BHD.
REINFORCED CONCRETE WORKS INSPECTION CHECKLIST
Package
TP 02
82(GLar9/e20) ¢ |
tocation] Zone/ Sub Zone) sone a JAFINO:: wict_rpo2_AFL_ST_RCC_0008_b
[Cevel/ Block /Unit/ Area: [Drawing Ref. No.: «tp__st_oRG_MCo2_10200_82.60
{ kTP_ST_ORG_McO2_61001_00.60
Date of inspection: 21/97/2018
Material: (Approved / Nat Apacaued)
ft 3.00PM
Description of Works
Method Statement
(Approved / Net Approved)
FORMS
'a__ [Setting out / postion i acceptable — we HK LM
Seppe erg ae Fg Te ps7 Pin Fst
» Fightenea Cla. B& Wilkie) <7 Le | 7 [At ee as “od
e pene Ge ett ell Set crt a 7, i
‘d__|Mould oil has been applied adequately mye Be, {4 aus)
e __|Formwork gaps sealed ye roy
1 JOpening ses /Iocaton a3 per drawings heh
[Alignment /vertcaty in accepted v ALT qu ace oe
1h [eteanliness of formwork ZA qucinue wert
[REINFORCEMENT St
2 _[rand. Grade, Type & Sze z
12 [Fabrication satistactory
c|Laps Adequate / Secured / Properly tighten
[efi ccc cert Zz rok hp AFI
[Minimum concrete cover fs acceptable
Jeanine Z| wetter nf ST eee grt
Rebar test
WATERSTOP (Where required) id) -
2 [Waterstopinstalie as per manvfacturer instruction v
B [Correct water use for joint and cleanness
[CONSTRUCTION JOINTS (Where required)
2 [Construction joints as per indicated in drawings
1b Surface of joints ae clean and freeform atance
STATUS OF INSPECTION
We hae cried ot ot recesny specter and very tha the abe tens ets confor oh tact specTortoral donee
[Checked Bye [Checked [Checke ey:
eat ae tna + foi ADAP
ame Iwame Iuame aury
Postion ayes pate: raf) I
[Client's Consultont I [client's Consuftant LLendiease Projacts (M) Sdn Bhd
rar ea
wer reae_rx_eT_O0oT
taza change a) Use Quer
evan Oe 24/08/2018(aan Taz
LENDLEASE PROJECTS (MALAYSIA) SON BHD WOT_TPO2_ CHK ST 0007
y tx TENDLEASE MALL
een ooMt v TRADE CONTRACTOR/ SUPPLIER: =
WCT CONSTRUCTION SON BHD.
REINFORCEMENT / FORMWORK / CONCRETING WORKS INSPECTION CHECKLIST
[focation/ Zone/ Sub-Zone [AFINo,
eee 1902, 20NE A \WCT_1P02_AFI_ST_RCC_0008_b
Tevel/ Block JUnit] Area = [orawing Ref-No
Boek TOTRT We saaa) @ KeP__ST_DRG_McO2_10200_82.60
KTP_ST_DRG_MCO2_61001_00.60
Jbate of inspection: 21/9/2018
Material: (Approved / Not Approved)
3.00PM
[Method Statement : (Approved / Not Approved)
[cONCRETING
[Concrete grade and quantities
io
[Embedded item (MEP services, others) are installed
A _|
[Construction / expansion joint is acceptable
All equipment provided such a8 vibrator, ete
NINN el}
External working platform & chute (Tany] provided
Le to Pio vive ArCIEMT|
Existing concrete area surface wetted /roughen
loetore cast
eq y{ Fave Powe,
stot na tract
[Cube sample & Slump text taken
VS
h_|Concrete level marked forall drop
[Spacer enough and accepted
[CURING
2 [Water curing is continued for 7 days
Ae wt
Zi)
'b [Correct rate of application if curing
compundisused | AA
MA
(Cong enpan! apple ah le
LL Aad |
[OTHERS
KO ATID
ty
comet pD-
‘STATUS OF INSPECTION
We have cared out all necessary Inspections ard very thatthe above tems actives conform tothe contract specicaions/ document
[wer Trae cre STOO)
necked checked [checked By
Name Name: Hob Name: Santuse, Sears
position ola postion: A49 postion; SE
bate pate: y/alig pate: ata!
nc oriebe rose ont if ep) encore Peet) nha
[Checked By: [Approved By: [Acknowledged by:
a: Tout Imus: 2B ist: LT
tome: MOU by WAN Name: @. Tan atten. Name: “Cdga Seep
Positior Cp. WM) ARERR Position: RE/RA Position: PL
Joate >fralte loate: 3/10 fi 8 Date: =) 1p It
chert’ cosa cient’ Consent erteose Projets) nbd
= aaa
Inpecton Chee ergai APPROVED FOR CONSTRUCTION. |
T
sTPLAN
ee
Bree ccamerenacrconien
feruoncesraar cn
wtsone | 0 | | tne | 2 | | anne
eat |e] [ess || [a
aan] | “eas [st] | — ar
|e] | eer [en] | ~ er
eats] | “eee [too | ~ an
$26 open] [esas [en | | ene
ca ‘at _| | Er
2s ‘ian | eae a
a aut] | “Ea ft
ooo} ano) | Tar
ao | | “en
a wor] | Temas
et ater | [anes
So pr] | a0 t
‘aba nor] | are
eet oneo_| | ent oh
‘ots [arr
‘wooast_| [ea
‘moanr| |[~ ereFormwek Colyton Verticality Checking (eve} B2- 61)
13/978
Location: 823/820 = B23
‘
ete
L 4
a
Checked by Verified by
, V8 3/Y|8
cHeoR WAI KIT 7e Motel % Me
Lerdleace G') Sdm. 6d.
Prect Engineer~vous se |
see Vdd
none oy
nous 9
sou sy
tome sy
sous 9
wna sv
3 EEE
a
wou sy
nc st
wor sy
pea
sou 9
won se
au oY
wove 9
wore SY
wore
tou sv
nom sy |
now se
soy |PERI
Revision 01
Nov. 7.2018,
13Ref. No: Basemat 2~ Ald /B2p
Type of Column : €1, 950x750
As Built Column Verticality before/after Cast mu.
Date:
90.9 2018
As Built Column Verticality PRE
As Buill Column Verticality POST [—]
wee
&
Post
Bottom Top | Bottom | Mid | Top
Side XI
Side YI
Side x2 | 625 | eae | eas
[Side y2 | 625 Cae | ay
Remark:
Prepared by, Checked by,
ZuthelmiBinfHuesin
ira isa
(Site Representative)
Senior Land Surveyor
WCT Construction Sdn Bhd
(Head of Department)wr
eRPUOD y suo} J
4 Adoo S.saMoisno
moows — QSTEOOO vis
doug Avedwog,
Othe
4 wv O}T, ‘fa ponsooe
ir
cau + fas 9H9.Nos. conf LaHONOO SOUvEvI)
on 008 FF PARAS bib opy
Sarcoma a BampaG wes
e eine Cee eT Z 85 Sy
N B0¥S00. oe ae obimaa0 Wa wed B05 ota
0B JoetpiL 01 - snouticay
= ae
ost aeptz
ito Basses peor sus
tung paysedg,
o
\wBusie anssoPmiey)
iwi ure wearers
£20 wa / 20
‘ON None
Y
OM 0/0-204L KHL
‘AM3NN730 40 NONWO07
al wal
otc +w eo CRS corsrosanuos
undnnt
oor) 2 0630 pat
ISAVIVI) aU3YNOD INVA
onl
maa Je)
A)
aetiee0: aang, yun}
2.
)
+
ang,