You are on page 1of 9
TRX - THE EXCHANGE TRX —————— mm eszax BcoHANGE APPLICATION FOR INSPECTION PAGKAGENAMEINO | TPO2 AFIREF HO WOT_TPC2_AFL ST_RCC_0008.b TRADE CONTRACTOR | WCT Berhad ISSUE DATE! TIME aero, Freey AST UTS eS a wwearoweRoune | UAE |NSPECTION NOTICE WE REQUEST YOUR INSPECTOR'S PRESENCE ACCORDING TO THE FOLLOWING SCHEDULE REQUESTED BY TRADE CONTRACTORI SUPPLIER: ] Ter we = e INSPECTION DATE & TDM: 21/972018, Fray (3COpm) works comencensr oxreaTue 9 //ig - gam INSPECTION TEM Inspection or Colnn Pe Cag & Casing (Gridine ATSEZO) APPROVAL SiWS-FRYES ONO CWA | MehadStaeret-K2YES CWO DONA | Netra’ Saree fa YES LINO GNA on Boece | Barcomery Pe orev Deals ArTaCAMENTS) - i 9% pory Rew’ Regan Dower susmrteney: | NAME: Vikram ‘SIGNATURE: Me DATE & TIME: SPECTED BY SUPERVISON CONBULTANT.Clom Cm ee GRY Done =| Tasers I wsrecrownonice: | pavaccepten | O) revecTeD | 0 Postpone -newoere are naw: B-Thiwe Haw, sourure CF [OsTERTE: 31) 4[18 2 comm coments: (0 [jy ~ To ATTACHED Cory oe cowAete 0-0. Then sonaTune: 4] - [oureawe: Ove [l% 04 tm’ THe REVEDAL MORK REQUA¢D a niseecTiON 1. APPROVED Cc—nsPecronpostPoneD RESPONSE INSPECTION PASSED, RENSPECTICN ReQURED FIYES/ | RewareCTvES CD NO ACKNOWLEDGED BY LPH: Taare nsrecronnonce: | efrccerteo | 0 rescreD- 1D ppstroweo -new oaTe & We wae Puen] THHRUN AU LApagal ‘SIGNATURE he owreaTwe 2 foa/is 5 0pm [Fomor paced fe me Bala Krishnan Ramasemy Sie Manager “Tun Rash Exchange ties. Guar DATE 8 TIME: PT 6a INANE: | sionaTuRe: lies ~ 8 —RENEDIAL WORKS REGURED, me niseecTon sono ca to Che nepeorenrosthoneo rene Febecrovbikeo | eAPecToNREaineD Ces! NO Newar:Cves 0 No au on gaa 000 8 /Omte: 7092018 TROL ipsa ripen AF Fo LENDLEASE PROMI TRX JECTS (MALAYSIA) SDN BHD. Tore ‘WOT_TP02_CHK_ST_0007 LENDLEASE MALL ? v TRADE CONTRACTOR/ SUPPLIER: WCT CONSTRUCTION SDN BHD. REINFORCED CONCRETE WORKS INSPECTION CHECKLIST Package TP 02 82(GLar9/e20) ¢ | tocation] Zone/ Sub Zone) sone a JAFINO:: wict_rpo2_AFL_ST_RCC_0008_b [Cevel/ Block /Unit/ Area: [Drawing Ref. No.: «tp__st_oRG_MCo2_10200_82.60 { kTP_ST_ORG_McO2_61001_00.60 Date of inspection: 21/97/2018 Material: (Approved / Nat Apacaued) ft 3.00PM Description of Works Method Statement (Approved / Net Approved) FORMS 'a__ [Setting out / postion i acceptable — we HK LM Seppe erg ae Fg Te ps7 Pin Fst » Fightenea Cla. B& Wilkie) <7 Le | 7 [At ee as “od e pene Ge ett ell Set crt a 7, i ‘d__|Mould oil has been applied adequately mye Be, {4 aus) e __|Formwork gaps sealed ye roy 1 JOpening ses /Iocaton a3 per drawings heh [Alignment /vertcaty in accepted v ALT qu ace oe 1h [eteanliness of formwork ZA qucinue wert [REINFORCEMENT St 2 _[rand. Grade, Type & Sze z 12 [Fabrication satistactory c|Laps Adequate / Secured / Properly tighten [efi ccc cert Zz rok hp AFI [Minimum concrete cover fs acceptable Jeanine Z| wetter nf ST eee grt Rebar test WATERSTOP (Where required) id) - 2 [Waterstopinstalie as per manvfacturer instruction v B [Correct water use for joint and cleanness [CONSTRUCTION JOINTS (Where required) 2 [Construction joints as per indicated in drawings 1b Surface of joints ae clean and freeform atance STATUS OF INSPECTION We hae cried ot ot recesny specter and very tha the abe tens ets confor oh tact specTortoral donee [Checked Bye [Checked [Checke ey: eat ae tna + foi ADAP ame Iwame Iuame aury Postion ayes pate: raf) I [Client's Consultont I [client's Consuftant LLendiease Projacts (M) Sdn Bhd rar ea wer reae_rx_eT_O0oT taza change a) Use Quer evan Oe 24/08/2018 (aan Taz LENDLEASE PROJECTS (MALAYSIA) SON BHD WOT_TPO2_ CHK ST 0007 y tx TENDLEASE MALL een ooMt v TRADE CONTRACTOR/ SUPPLIER: = WCT CONSTRUCTION SON BHD. REINFORCEMENT / FORMWORK / CONCRETING WORKS INSPECTION CHECKLIST [focation/ Zone/ Sub-Zone [AFINo, eee 1902, 20NE A \WCT_1P02_AFI_ST_RCC_0008_b Tevel/ Block JUnit] Area = [orawing Ref-No Boek TOTRT We saaa) @ KeP__ST_DRG_McO2_10200_82.60 KTP_ST_DRG_MCO2_61001_00.60 Jbate of inspection: 21/9/2018 Material: (Approved / Not Approved) 3.00PM [Method Statement : (Approved / Not Approved) [cONCRETING [Concrete grade and quantities io [Embedded item (MEP services, others) are installed A _| [Construction / expansion joint is acceptable All equipment provided such a8 vibrator, ete NINN el} External working platform & chute (Tany] provided Le to Pio vive ArCIEMT| Existing concrete area surface wetted /roughen loetore cast eq y{ Fave Powe, stot na tract [Cube sample & Slump text taken VS h_|Concrete level marked forall drop [Spacer enough and accepted [CURING 2 [Water curing is continued for 7 days Ae wt Zi) 'b [Correct rate of application if curing compundisused | AA MA (Cong enpan! apple ah le LL Aad | [OTHERS KO ATID ty comet pD- ‘STATUS OF INSPECTION We have cared out all necessary Inspections ard very thatthe above tems actives conform tothe contract specicaions/ document [wer Trae cre STOO) necked checked [checked By Name Name: Hob Name: Santuse, Sears position ola postion: A49 postion; SE bate pate: y/alig pate: ata! nc oriebe rose ont if ep) encore Peet) nha [Checked By: [Approved By: [Acknowledged by: a: Tout Imus: 2B ist: LT tome: MOU by WAN Name: @. Tan atten. Name: “Cdga Seep Positior Cp. WM) ARERR Position: RE/RA Position: PL Joate >fralte loate: 3/10 fi 8 Date: =) 1p It chert’ cosa cient’ Consent erteose Projets) nbd = aaa Inpecton Chee erga i APPROVED FOR CONSTRUCTION. | T sTPLAN ee Bree ccamerenacrconien feruoncesraar cn wtsone | 0 | | tne | 2 | | anne eat |e] [ess || [a aan] | “eas [st] | — ar |e] | eer [en] | ~ er eats] | “eee [too | ~ an $26 open] [esas [en | | ene ca ‘at _| | Er 2s ‘ian | eae a a aut] | “Ea ft ooo} ano) | Tar ao | | “en a wor] | Temas et ater | [anes So pr] | a0 t ‘aba nor] | are eet oneo_| | ent oh ‘ots [arr ‘wooast_| [ea ‘moanr| |[~ ere Formwek Colyton Verticality Checking (eve} B2- 61) 13/978 Location: 823/820 = B23 ‘ ete L 4 a Checked by Verified by , V8 3/Y|8 cHeoR WAI KIT 7e Motel % Me Lerdleace G') Sdm. 6d. Prect Engineer~ vous se | see Vdd none oy nous 9 sou sy tome sy sous 9 wna sv 3 EEE a wou sy nc st wor sy pea sou 9 won se au oY wove 9 wore SY wore tou sv nom sy | now se soy | PERI Revision 01 Nov. 7.2018, 13 Ref. No: Basemat 2~ Ald /B2p Type of Column : €1, 950x750 As Built Column Verticality before/after Cast mu. Date: 90.9 2018 As Built Column Verticality PRE As Buill Column Verticality POST [—] wee & Post Bottom Top | Bottom | Mid | Top Side XI Side YI Side x2 | 625 | eae | eas [Side y2 | 625 Cae | ay Remark: Prepared by, Checked by, ZuthelmiBinfHuesin ira isa (Site Representative) Senior Land Surveyor WCT Construction Sdn Bhd (Head of Department) wr eRPUOD y suo} J 4 Adoo S.saMoisno moows — QSTEOOO vis doug Avedwog, Othe 4 wv O}T, ‘fa ponsooe ir cau + fas 9H9.Nos. conf LaHONOO SOUvEvI) on 008 FF PARAS bib opy Sarcoma a BampaG wes e eine Cee eT Z 85 Sy N B0¥S00. oe ae obimaa0 Wa wed B05 ota 0B JoetpiL 01 - snouticay = ae ost aeptz ito Basses peor sus tung paysedg, o \wBusie anssoPmiey) iwi ure wearers £20 wa / 20 ‘ON None Y OM 0/0-204L KHL ‘AM3NN730 40 NONWO07 al wal otc +w eo CRS corsrosanuos undnnt oor) 2 0630 pat ISAVIVI) aU3YNOD INVA onl maa Je) A) aetiee0: aang, yun} 2. ) + ang,

You might also like