CHECKLIST 504  Equipment Name: 

SCB/AJB Installation   Equipment Rating: 


 
Date :    Reference Doc: 
Sr.No  ITEM CRITERION APPROVAL (✓/ ☓)  REMARKS 

1  Physical condition  Equipment must be intact fitting, no damage, dent, scratches,      
2  Dimensions  Check the dimensions of combiner box as per drawing.     
Mounting  Check the mounting accessories inside the combiner which must be intact and well equipped.     

accessories   Check the internal component wiring of DC fuses, SPD. 
4  Combiner rating  Check isolator and fuse rating as per design.     
5  Mounting location Mounting Location and position should be as per design.     
Check structure vertical alignment with sprit level or water level.      
AJB Mounting 
6  Structure should not have rusting. 
structure  
Structure dimensions should be as per design. 
Combiner must have proper tightness of nut‐bolt set with washer.     
7  Nut‐bolts  
No any loose connections shall be allowed. 
8  Ground clearance   Combiner should have ground clearance minimum 500 mm.     
9  No of input/output   Ensure the number of input and output from combiner box before connections.     
10  Tagging/ferrule  Output cables must be tagged with aluminium tags and input cable 4/6 mm² with cable ferrule.    
11  Label  Combiner box must have ID label with proper identification.     
AC Cable‐ No loose connections, Lug must be properly crimped with covering of heat shrink     
12  Connections  sleeve. Termination nut‐bolts must be fully fastened with appropriate torque value. 
MC4 connector must be properly fixed and securely tighten. 
Ensure combiner body earthing with its mounting structure and structure earthing shall be     
13  Combiner Earthing  
connected to array earthing grid. 
14  Sealing of gap  All opening/gap must be sealed properly using silicon sealant.     
INSPECTED BY‐  APPROVED BY‐  Checklist No‐ SSE‐QC‐ELE‐504 Rev0 
Sheet No‐ 1 OF 2 

INT/SIGN  INT/SIGN  Page size‐ A4 


 