1 Physical condition Equipment must be intact fitting, no damage, dent, scratches,
2 Dimensions Check the dimensions of combiner box as per drawing.
Mounting Check the mounting accessories inside the combiner which must be intact and well equipped.
3
accessories Check the internal component wiring of DC fuses, SPD.
4 Combiner rating Check isolator and fuse rating as per design.
5 Mounting location Mounting Location and position should be as per design.
Check structure vertical alignment with sprit level or water level.
AJB Mounting
6 Structure should not have rusting.
structure
Structure dimensions should be as per design.
Combiner must have proper tightness of nut‐bolt set with washer.
7 Nut‐bolts
No any loose connections shall be allowed.
8 Ground clearance Combiner should have ground clearance minimum 500 mm.
9 No of input/output Ensure the number of input and output from combiner box before connections.
10 Tagging/ferrule Output cables must be tagged with aluminium tags and input cable 4/6 mm² with cable ferrule.
11 Label Combiner box must have ID label with proper identification.
AC Cable‐ No loose connections, Lug must be properly crimped with covering of heat shrink
12 Connections sleeve. Termination nut‐bolts must be fully fastened with appropriate torque value.
MC4 connector must be properly fixed and securely tighten.
Ensure combiner body earthing with its mounting structure and structure earthing shall be
13 Combiner Earthing
connected to array earthing grid.
14 Sealing of gap All opening/gap must be sealed properly using silicon sealant.
INSPECTED BY‐ APPROVED BY‐ Checklist No‐ SSE‐QC‐ELE‐504 Rev0