Testing Order

1. Lightning arresters
2. Line Isolators
3. Current Transformers
4. Voltage Transformers
5. HT Breakers
6. BUS isolators
7. Transformer isolators
8. LBS Panels
9. Cables
10. Transformers
11. Earth pits
12. Interface Wiring Check
13. Transformer Stability Test
----------------------------------------------------------------------------------------------------------------
1. Megger 5kV
2. Multi meter -2 Nos
3. Leakage tester 2 Nos
4. Earth Tester set
5. Clamp meter
6. Micro Ohm meter
7. Contact Resistance Meter
8. Transformer Winding Resistance meter
9. Timer Kit
10. Ratio kit
11. Knee point test kit
12. Hi pot kit (with Power supply unit and Diode)
13. CT Primary injection kit with Cables
14. Transformer Testing MCB Kit
15. 3 Phase VARIAC
16. 1 phase VARIAC
17. Polarity Test kit
18. DC Power pack
19. Phase sequence Tester
20. Extension box
21. Megger additional batteries
22. Connecting Leads (with Banana pin and Clips)
23. Crocodile clips
24. Calibration Certificates copy
25. Tools
1) Cutting Plier
2) Screw drivers
3) Screw driver set
4) Wire stripper
5) Tester
6) Box spanner
7) Spanner set (Double End and Ring Spanner)
8) Knife
9) Soldering iron set