CONTRACTOR AL-AHLEIA SWITCHGEAR CO.

, KUWAIT TESTED DATE: 23-09-2013


CONTRACT No. MEW/C/4305-2011-2012
CUSTOMER MINISTRY OF ELECTRICITY & WATER, KUWAIT
SUBSTATION NAME MESSILA-I-132/11.5kV SUBSTATION - ITEM NO.4

BAY NAME & No. 11KV CABLE FEEDER - K01


TEST DESCRIPTION NON - DIRECTIONAL O/C & E/F PROTECTION RELAY TEST

Relay Manufacturer Siemens Reyrolle Nominal Current 1A

Relay Type 7SR1102-1HA12-1AA0 Frequency 50 Hz

Relay Serial No. 103457106/046 Auxiliary supply 220V DC


1. Protection Device :

2. Function Settings :

Characteristic of
O/C Protection 51-1 Is = 1.00xIn 51-1 TMS = 0.35 50-1 Is = 3.00xIn 50-1 Ts = 0.04 S
Characteristic of
E/F Protection 51G-1 Is = 0.20xIn 51G-1 TMS = 0.30 50G-1 Is = 0.80xIn 50G-1 Ts = 0.05 S

3. Current Transformer Data :

Manufacturer AL-AHLEIA
Phase Ratio Rated burden Accuracy class Core
R/Y/B 400/1 15VA 5P10 T1
CT Star point formation: Towards Bus bar Towards Line

4. Measurement Check :

Secondary Primary Current (A) Shown in Relay


Phase Injected Current
R Y B N
(A)
R,Y,B,N 1.0 400 400 401 401
Measurement Accuracy: ±1% of In

5.Function Test of O/C & E/F Protection :

CONTRACTOR MEW
Tested by Witnessed by Approved by
NAME ER.S.RAMESH ER.A.ABDUL KHALEEL

SIGNATURE MEW FOREMAN

DATE
PAGE 1 OF 3
CONTRACTOR AL-AHLEIA SWITCHGEAR CO., KUWAIT TESTED DATE: 23-09-2013
CONTRACT No. MEW/C/4305-2011-2012
CUSTOMER MINISTRY OF ELECTRICITY & WATER, KUWAIT
SUBSTATION NAME MESSILA-I-132/11.5kV SUBSTATION - ITEM NO.4

BAY NAME & No. 11KV CABLE FEEDER - K01


TEST DESCRIPTION NON - DIRECTIONAL O/C & E/F PROTECTION RELAY TEST

(A) Over Current IDMT :

Settings for IDMT 51-1 Is = 1.00xIn 51-1 TMS = 0.35 IEC SI Curve

Pick Up Drop Out Measured Operating Time Calculated Time Range


(Sec)
Phase Value Value (Sec)
(A) (A)
2 x Is 5 x Is 10 x Is 2 x Is 5 x Is 10 x Is

R 1.050 1.014 3.514 1.497 1.035


3.325 - 1.423 - 0.997 -
Y 1.050 1.017 3.513 1.499 1.044
3.675 1.571 1.102
B 1.049 1.017 3.509 1.507 1.051
Operation Accuracy: 105% of Is ± 4% Reset Accuracy: >95% of Ioptd Operation Time Accuracy: ±5%

(B) Over Current DMT :

Settings for DMT 50-1 Is = 3 In 50-1 Ts = 0.040 s

Measured Operating Time


Pick up value
Calculated Operating Time (mSec)
(A)
(mSec)
R Y B R Y B

3.000 3.003 2.998 65 - 85 73.6 75.3 79.3


Operation Accuracy: ±5% Operation Time Accuracy: Ts+35mSec ±10mSec

(C) Earth Fault IDMT :

CONTRACTOR MEW
Tested by Witnessed by Approved by
NAME ER.S.RAMESH ER.A.ABDUL KHALEEL

SIGNATURE MEW FOREMAN

DATE
PAGE 2 OF 3
CONTRACTOR AL-AHLEIA SWITCHGEAR CO., KUWAIT TESTED DATE: 23-09-2013
CONTRACT No. MEW/C/4305-2011-2012
CUSTOMER MINISTRY OF ELECTRICITY & WATER, KUWAIT
SUBSTATION NAME MESSILA-I-132/11.5kV SUBSTATION - ITEM NO.4

BAY NAME & No. 11KV CABLE FEEDER - K01


TEST DESCRIPTION NON - DIRECTIONAL O/C & E/F PROTECTION RELAY TEST

Settings for IDMT 51G-1 Is = 0.20xIn 51G-1 TMS = 0.30 IEC SI Curve
Pick Up Drop Out Measured Operating Time Calculated Time Range
Phase Value Value (Sec) (Sec)
(mA) (mA) 2 x Is 5 x Is 10 x Is 2 x Is 5 x Is 10 x Is
R 214 208 3.063 1.291 0.904
2.850 1.219 0.855
Y 215 209 3.078 1.289 0.900
-3.150 -1.347 -0.945
B 214 210 2.986 1.292 0.903

Operation Accuracy: 105% of Is ± 4% Reset Accuracy: >95% of I optd Operation Time Accuracy: ±5%
(D) Earth fault DMT :

Settings for DMT 50G-1 Is = 0.8 In 50G-1 Ts = 0.05 s


Calculated Time Range Measured Operating Time
Pick up value
(mSec) (mSec)
(mA)
R Y B R Y B
75 - 95
796 796 799 86.6 80.6 86.5
Operation Accuracy: ±5% Operation Time Accuracy: Ts+35mSec ±10mSec
6) Check List :
a) Body Earth Checked ---------------------------------------------
b) Test Block Connections are Checked ---------------------------------------------
c) All LED’s are Checked ---------------------------------------------
d) Output Contacts are Checked ---------------------------------------------
e) Watchdog Contact is Checked ---------------------------------------------
f) CT Shorting links Checked ---------------------------------------------
Testing Equipment Used : OMICRON CMC356 – SERIAL NUMBER : BH913C

CONTRACTOR MEW
Tested by Witnessed by Approved by
NAME ER.S.RAMESH ER.A.ABDUL KHALEEL

SIGNATURE MEW FOREMAN

DATE
PAGE 3 OF 3