Professional Documents
Culture Documents
Protection Functions
Enabled Disabled
IEC No. Description Relay Description
50/51 Over Current protection [50/51] PHASE OC Enabled -
50N/51N Earth fault Protection [50N/51N] E/Gnd Enabled -
Negative Sequence Disabled
46 [46] NEG SEQ OC -
Overcurrent Protection
Thermal Overload Disabled
49 [49] THERM OL -
Protection
37 Under Current Protection [37] UNDER CURRENT - Disabled
E- LED function
S no Led no Function Checked Remarks
1 LED 5 Over Current Low tI>
2 LED 6 Over Current High tI>>
3 LED 7 Earth Fault Current Low tIe>
4 LED 8 Earth Fault Current High tIe>>
TESTED BY WITNESSED BY
Signature Signature
Md. Mohsin
Name Sr. Engr, (T&C), Energypac Name
Engineering Ltd.
Date 10-05-2017 Date
RELAY SITE TEST REPORT
Project Name: Turnkey contract for design, supply, construction, installation,
testing & commissioning work for extension of existing 33kV indoor bay-
breaker and control room building at 132/33 kV cox’s bazar grid sub-station
under cox’s bazar PBS.
Relay Sl.No: 33841499/10/16
Contractor Energypac Engineering Ltd.
Substation Cox’s bazar 132kV Grid Substation
Relay Manufacturer ALSTOM
Inject current in the relay as per the table below. Observe the reading on the relay display in Primary values. Inject Current
through the relay connector.
CT RATIO: 1600/5 A
Test phase Injected Current (A) Time setting (Sec) Operating time (Sec)
R-Y 20.0 0 0.052
Y-B 20.0 0 0.053
R-B 20.0 0 0.056
TESTED BY WITNESSED BY
Signature Signature
Md. Mohsin
Name Sr. Engr, (T&C), Energypac Name
Engineering Ltd.
Date 10-05-2017 Date
RELAY SITE TEST REPORT
Project Name: Turnkey contract for design, supply, construction, installation,
testing & commissioning work for extension of existing 33kV indoor bay-
breaker and control room building at 132/33 kV cox’s bazar grid sub-station
under cox’s bazar PBS.
Relay Sl.No: 33841499/10/16
Contractor Energypac Engineering Ltd.
Substation Cox’s bazar 132kV Grid Substation
Relay Manufacturer ALSTOM
Relay setting
Test phase Injected Current Time setting (Sec) Operating time (Sec)
Ie >>
Instrument Used
TESTED BY WITNESSED BY
Signature Signature
Md. Mohsin
Name Sr. Engr, (T&C), Energypac Name
Engineering Ltd.
Date 10-05-2017 Date