You are on page 1of 8

Ref.

: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

RELAY DETAILS

RELAY FUNCTION AUX SUPPLY VOLTAGE

RELAY MAKE NOMINAL CURRENT


ACTIVATED
TYPE / STYLE
FUNCTIONS
S. NO.

SECTION 1: GENERAL INSPECTION:

DESCRIPTION STATUS NOTE


Preliminary general examination, prior to energizing
Energizing
Parameter and protection settings
Logic input connection
Logic output connection
Validation of the complete protection chain
Temperature sensor input connection to the relay ( if applicable )

EEIC Witness Client Approval


Name
Signature
Date

1
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

SECTION 2: PRIMARY SETTINGS RECORD:

General Description Setting

Characteristics Network frequency


  CT rating (Primary)
  CT rating (Secondary): 1A or 5A
  Residual CT or Ground fault CT ratio
VT connection
Rated primary voltage
Rated secondary voltage
Residual voltage

EEIC Witness Client Approval


Name
Signature
Date

2
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

SECTION 3: METERING TEST :

Checking the relay Accuracy for the metering function


Type of check Test performed Result (expected ) Display status
I1 =
Phase current and phase Secondary injection of CT CT rated primary I2 =
voltage input connection rated current, i.e. 1 A or 5 A current
I3 =
V1 =
Secondary injection of VT VT rated primary
rated phase-to-neutral phase-to-neutral V2 =
voltage Uns / √3 voltage Unp / √3
V3 =

=
Phase displacement
(V, I) 2=
0° 3=

Checking the Accuracy of the residual current and residual voltage inputs
Type of check Test performed Result (expected ) Display status
Residual current input Injection of 5 A into the core Io =
Injected current value
connection balance CT primary circuit
When applicable,
VT rated primary
secondary injection Vo =
phase-to-neutral
of the rated phase-to-neutral
voltage Unp/ √3
voltage of a phase VT Unp/ √3
Phase displacement
o =
(Vo, Io) 0°

EEIC Witness Client Approval


Name
Signature
Date

3
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

SECTION 4: PROTECTION TESTS

A- Current elements
Setting and Testing Points
Function t
t
curve I adjusted i injected td (expected acceptance
measured
)
51 P               
  51 P     
Over current
51P  
50P          
51 G
51 G
Earth fault  
51G
50G
46
Negative sequence
46

Setting and Testing Points


Function
I setting Time delay I injected T excepted error ± 5% Acceptance
Breaker failure 50BF

Setting and Testing Points


Function
I setting Time delay I injected T excepted error ± 5% Acceptance
Under current 37

EEIC Witness Client Approval


Name
Signature
Date

4
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

Setting and Testing Points


Function
I setting Time delay I injected T excepted error ± 5% Acceptance
Locked rotor 48

Setting and Testing Points


Function (SEPAM Relay) Es1 T1 error ± T2 error ±
Coeff. Es2 trip T1 alarm T2 trip Acceptance
alarm 5% 5%
Thermal over load 49RMS

Setting and Testing Points


Function (General ) Injected Overload T1 T2 Measured
I setting Curve Acceptance
current factor constant constant time
Thermal over load 49RMS

B: Voltage Elements
Setting and Testing Points
Function
U adjusted u applied T adjusted t measured error ± 5% Acceptance

Under voltage 27          

Over voltage 59          

Neutral voltage
59N          
displacement
Negative sequence
47
overvoltage

EEIC Witness Client Approval


Name
Signature
Date

5
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

Setting and Testing Points


Function  error ±
F adjusted f applied T adjusted t measured acceptance
5%
81L
Under frequency
81H

C: Directional elements
Setting and Testing Points
Function I T t error
curve  adjusted
i injected
adjusted measured ± 5%
Acceptance

Directional phase over current  67                


Directional earth fault  67 N

Setting and Testing Points


Function
P adjusted p applied T adjusted t measured error ± 5% acceptance
Directional active overpower 32P

Setting and Testing Points


Function
Q adjusted q applied T adjusted t measured error ± 5% acceptance
Directional reactive overpower 32Q

Setting and Testing Points


Function
I adjusted i applied ST adjusted ST measured error ± 5% acceptance
Excessive starting time 51LR

EEIC Witness Client Approval


Name
Signature
Date

6
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

Setting and Testing Points


Function Period of Number Number of
Period of time
time of starts starts error ± 5% acceptance
adjusted
applied adjusted measured
Starts per hour 66

Function Setting and Testing Points


  U adjusted u applied T adjusted t measured error ± 5% acceptance
Positive sequence under voltage 27D          
Remainant under voltage 27R

( 49T) RTD accuracy testing

Expected Actual Temperature Reading


Applied
Temperature Status
Resistance
Reading 1 2 3 4 5 6 7 8 9 10 11 12

EEIC Witness Client Approval


Name
Signature
Date

7
Ref.: EEICSR-F-55
FIELD TEST FORM Version: 3
MOTOR PROTECTION RELAY Date: Aug 29, 2014

CUSTOMER: SPCO-SOUTH PROJECT:


EQUIPMENT TAG NO.: SEL 749M DESCRIPTION: MOTOR PROTECTION RELAY
WORK ORDER NO: 3528784 PLANT NO. / LOCATION:
SPCO-SOUTH/SS4901/ 49YM32 / CBE492EAC
REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:

SECTION 5: TEST EQUIPMENTS LISTING AND CALIBRATION DATA

DEVICE MAKE CALIBRATION DATE CALIBRATION EXP.

Relay Test Unit

Advanced DMM

EEIC Witness Client Approval


Name
Signature
Date