TEST REPORT FOR CURRENT TRANSFORMER

DATE OF TESTING:
1. NAME PLATE DETAILS:

Location :
Designation :
Panel :

Make :
Serial No :
Ratio :
Class :
Burden :

2. INSULATION RESISTANCE:

PROCEDURE:-
1. CT Insulation resistance testing, CT incoming and outgoing must be Isolate from External
circuit.
2. If not disconnected the test measurement will also include the characteristics of connected
circuit.
3. Insulation Resistance testing verifies that the insulating material, which makes up the
moulded cases or Insulation of CT winding are performing correctly.
4. A Insulation Resistance measuring instrument applies a known DC Voltage (as per IEC
standard). The DC voltage applies for 1 minute with different combination as requires (as per
below mentioned circuit).

M/S. INEL PSE M/S. INEL PSE M/S.


References
Tested By Verified By Witnessed By

Name NIRMAL KUMAR


Signature
Designation TESTING ENGINEER MANAGER TECHNICAL
CLIENT IP / TR / F / CT / 003
CUSTOMER TR NO / IPSE / BLR /
LOCATION SHEET OF

Applied DC
RФ YФ BФ
Voltage Reference
( Ω) ( Ω) ( Ω)
(V)
Primary - Earth
Primary – Secondary
Secondary - Earth

3. WINDING RESISTANCE TEST:

PROCEDURE:
1. The test helps to find winding resistance of CT primary and Secondary windings.
2. We can check the winding resistance of CT by using multi-meter or four wire Resistance
method.
3. Connect multi-meter probes to primary (P1-P2) and secondary (1S1-1S2) and check the
winding resistance.

Phase reference/ Rɸ Yɸ Bɸ
Secondary (Ω) (Ω) (Ω)
P1 – P2

1S1 - 1S2

4. KNEE POINT VOLTAGE TEST:

PROCEDURE:

M/S. INEL PSE M/S. INEL PSE M/S.


References
Tested By Verified By Witnessed By

Name NIRMAL KUMAR


Signature
Designation TESTING ENGINEER MANAGER TECHNICAL
CLIENT IP / TR / F / CT / 003
CUSTOMER TR NO / IPSE / BLR /
LOCATION SHEET OF

1. Knee Voltage check only applicable of Special Protection Class.


2. We need to use Step-up Transformer or single –Phase Variac to apply voltage at
secondary side and Primary of CT must be open or Isolate from the load.
3. The Voltage must be apply as per Nameplate detail.

5. RATIO TEST:
PROCEDURE:-

1. CT ratio describes as ratio of primary current to secondary current at full load.


2. We inject current on primary side of CT using loading transformer
3. CT secondary should be short or connect to load
4. Observe the secondary current through leakage clamp meter.
5. Compare the ratio of primary and secondary current as per nameplate of CT
Note: CT secondary must closed path while do Ratio test.
Measured Secondary Current
Injected (A)
Primary
Current RΦ YΦ BΦ
(A) 1S1 - 1S2 1S1 - 1S2 1S1 - 1S2

50%

100%

M/S. INEL PSE M/S. INEL PSE M/S.


References
Tested By Verified By Witnessed By

Name NIRMAL KUMAR


Signature
Designation TESTING ENGINEER MANAGER TECHNICAL