3. Timing Test:
Phase Closing time Opening time(TC1) Opening time(TC2)
R
Y
B
TESTING & COMMISSIONING
ENERGY WORKS WONDER ENERGYPAC ENGINEERING LTD
2. Ratio Test:
Machine Generated Report.
TESTING & COMMISSIONING
ENERGY WORKS WONDER ENERGYPAC ENGINEERING LTD
Isolator Test:
Serial No:
Connection Applied R Y B
Voltage
Top-Earth 5000V DC
Connection Applied R Y B
Voltage
Top-Bottom 5000V DC
Bottom - 5000V DC