You are on page 1of 3

SITE TEST REPORT Date : 04 FEB, 18

FAUJI CEMENT COMPANY LIMITED Customer: FCCL


Contract No:
Name of substation: SS-15
Page 1 of 3
FEEDER O/C &E/F, Instantaneous & Under Voltage (50/51 50N/51N/27)
Panel No: = Doc No:
REF542 PLUS
422.B101.XTF03 1VCC008355T0156 Rev-B

1.0 - GENERAL DATA:


2.0 GENERAL INSPECTION & TESTING.
3.0
MANUFACTURER: ABB AUXILIARY VOLTAGE (DC): 110 VDC
1 Installation & wiring correct to relevant drawings. Verified
TYPE: REF542 PLUS -

2
PRODUCT Relay
ID: case connected
1VCF752000 to local earth bar. - Verified
-
SERIAL 1VFSG036952V201
3 NO:Time and Date Settings. Verified

4 Human Machine Interface. Verified

5 Relay Indications, Alarms and Trip contacts verify. Verified


SETTINGS OF PROTECTION FUNCTIONS

1 CT Ratio: 250/1 A Null CT: 100/1


4.0 METERING
Phase CT Ratio : 250/1 A Null CT: 100/1
Phase VT Ratio : 7.2kv/110 V
.Sr. No Injected Voltage Expected Voltage Measured Voltage
RY 110 7.2KV 7.2KV
YB 110 7.2KV 7.2KV
RB 110 7.2KV 7.2KV

5.0 OVER CURRENT LOW STAGE PROTECTION (51)


Note: In= 1A as per CT 250/1
Operating Time (Sec)

Measured Values (A) 2XTIMES


Set Value
Phase I> CURVE: IDMT EXT INV
(A)
Injected Current (A) Time Constant (k)= 0.4
EXP (Sec) Act (Sec)
R 1.7 10.6 10.6
0.85xIn
Y 1.7 10.6 10.6
B 1.7 10.6 10.6

5.1 OVER CURRENT HIGH STAGE PROTECTION (51)


Note: In= 1A as per CT 250/1

Set Value Operating Time (mS)


Phase I >> Measured Values (A)
(A) 2XTIMES

ABB FCCL

Name : Name :

Signature: ________________ Signature: ________________


SITE TEST REPORT Date : 04 FEB, 18
FAUJI CEMENT COMPANY LIMITED Customer: FCCL
Contract No:
Name of substation: SS-15
Page 2 of 3
FEEDER O/C &E/F, Instantaneous & Under Voltage (50/51 50N/51N/27)
Panel No: = Doc No:
REF542 PLUS
422.B101.XTF03 1VCC008355T0156 Rev-B
CURVE: IEC DFT

Pick Up (A) -
EXP (mSec) Act (mSec)
R 2.27 350 364
2.25xIn 2.27
Y 350 364
B 2.27 350 364

5.2 OVER CURRENT INSTANTANEOUS PROTECTION (50)


Note: In= 1A as per CT 250/1
Operating Time (S)

Set Value Measured Values (A) 2XTIMES


Phase I >>> CURVE: IEC DFT
(A)
Pick Up (A) -
EXP (mSec) Act (mSec)
R 11xIn 11 20 15
Y 11 20 15
B 11 20 15

5.3 EARTH FAULT PROTECTION (51N)


Note: In= 1A as per CT 100/1
Operating Time
Set Value Measured Values
Phase @2 *Ie> msec
Ie>
Pick Up Set Act

N
0.2xIn 0.21 200 195

NOTE: Neutral Overcurrent has only one stage.

6.0 UNDER VOLTAGE PROTECTION (27)


Set Value: 0.7x110/1.732= 44.5 V

Time (mSec)
Measured Values (A)
Set Value
Phase
(V)@ 70%
Pick Up (V) Expected (mSec) Actual (mSec)

R 44.5 V 44.1 750 756

ABB FCCL

Name : Name :

Signature: ________________ Signature: ________________


SITE TEST REPORT Date : 04 FEB, 18
FAUJI CEMENT COMPANY LIMITED Customer: FCCL
Contract No:
Name of substation: SS-15
Page 3 of 3
FEEDER O/C &E/F, Instantaneous & Under Voltage (50/51 50N/51N/27)

Respon Panel No: =


REF542 PLUS
Doc No:
422.B101.XTF03 1VCC008355T0156 Rev-B
sibilities 44.1 750 756
Y
Legend B 44.1 750 756
CSD
7.0 TEST EQUIPMENTS USED

Sl. No Description Model Make


1 3Ph RELAY TESTER CMC 356 OMICRON

ABB FCCL

Name : Name :

Signature: ________________ Signature: ________________