Professional Documents
Culture Documents
SUBSTATION : CAP
PANEL NO : 13
SI.NO : 1VYV91319034
CT RATIO : 100/1 A
2. MEASUREMENT:
Inject current in the relay as per the table below. Observe the reading on the relay display, in primary
values.
Approved/Checked By:
TESTED BY ABB WITNESSED BY ABB APPROVED BY PPL
Mr. SANJEET KUMAR
Name: Mr. R.VIGNESH Mr. SUBRATA MAHAPATRA
BISWAL
Sign:
Approved/Checked By:
TESTED BY ABB WITNESSED BY ABB APPROVED BY PPL
Mr. SANJEET KUMAR
Name: Mr. R.VIGNESH Mr. SUBRATA MAHAPATRA
BISWAL
Sign:
Approved/Checked By:
TESTED BY ABB WITNESSED BY ABB APPROVED BY PPL
Mr. SANJEET KUMAR
Name: Mr. R.VIGNESH Mr. SUBRATA MAHAPATRA
BISWAL
Sign:
Start value low =0.1×In, Start value high =0.5×In Operate time= 2sec
REF INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (sec)
R 0.11
Y 0.11 2.0 2.023
B 0.11
Approved/Checked By:
TESTED BY ABB WITNESSED BY ABB APPROVED BY PPL
Mr. SANJEET KUMAR
Name: Mr. R.VIGNESH Mr. SUBRATA MAHAPATRA
BISWAL
Sign:
LED Checked OK
Measurements Checked in Relay Display OK
Binary inputs and Outputs are Checked OK
13. USING KIT DETAILS:
14. REMARKS:
Approved/Checked By:
TESTED BY ABB WITNESSED BY ABB APPROVED BY PPL
Mr. SANJEET KUMAR
Name: Mr. R.VIGNESH Mr. SUBRATA MAHAPATRA
BISWAL
Sign: