ChapterⅠ
General Information
Safety Principle
-1-
Warning Put the machine to earth. To avoid thunderbolt, check relevant
instrument every some days.
Electrostatic Discharge(ESD)Protection
— Try to touch the edges of circuit board, and avoid touching components
directly.
-2-
Environmental Protection
Feedback
License agreement
Both SICK|MAIHAK and the 3rd-party have the soft copyright, only after
contracting with SICK|MAIHAK or acquiring software license, the customers
can make use of the software.
Warranty Limitations
-3-
immediately make one-year warranty. The warranty does not include normal
wear and tear, abnormal condition of operation, installation and
operation of negligence, or unauthorized modifications. Please note that
the supply-contract or sales contract on the details of each machine
warranty.
-4-
Chapter Ⅱ
Overview
-5-
stable work without influencing the accuracy.
Part Description
-6-
Figure 1 Schematic diagram of humidity instrument
-7-
Chapter Ⅲ
Installation
-8-
3 = Sample out: Φ6mm, ring-type connector
4 = Power supply wires
5 = Output signal wires
6 = Heated index lamp
7 = RS232 interface
8 = Temperature of the Connection location between heated tube outlet
Cable Connection
-9-
220V-PE = Protect Earth
220V-L = 220VAC Live wire
220V-N = 220VAC Neutral wire
H2O(4-20mA+) = gas humidity H2O output signal cable +
H2O(4-20mA-) = gas humidity H2O output signal cable _
- 10 -
Caution If there is electromagnetic disturbance in the industrial
conditions(such as motors), screen cables or independent
signal cables are advised to use.
1. Connect the analog output cables with the terminals: H2O (4-20mA +,4
-20mA-).
2. Connect the power wires with the terminals 220VAC (L, N, PE).
3. Now, Humidity measure system is to work normally.
- 11 -
Chart of Installation hole size
- 12 -
Chapter Ⅳ Operation
Start-up Operation
Serial Communication
SMC-290 C could communicate by using the RS232 serial port, amend and
inquire the current measurements as well.
Parameters value
baud 2400
Parity none
data bits 8
Stop bit 1
flow control no
- 13 -
Using Serial commands to adjust H2O (vol%)
With the command: modi ppmv? Inquire the current value of H2O amendment
For example
> modi ppmv ?
0.5000
It indicates that H2O amendment value is 0.5Vol%.
- 14 -
ChapterⅤ Routine maintenance and normal fault clearing
Routine maintenance
Cleanness
Use the soft and wet linen dipped into neutral cleanser to clean the
transmitter.
- 15 -
Chapter Ⅵ Calibration & Adjustment
SMC-209 C has been carried out strict calibration and adjustment in the
factory. Typical calibration period is two years. According to different
applications, more frequent inspections would be better. When you doubt
that the accuracy of device is out of index range, the device must be
calibrated.
- 16 -
ChapterⅦ Technical Specifications
Performance
Accuracy:
Gas humidity: while a.≤5.0%, absolute error should be ≤±1.5%
while b. >5.0%,relative error should be ≤±20%
Work scope of probe: 0…180℃
Response time (T90) (while the flow and pressure respectively meets 1L/min
and 1bar)
From heat to low temperature humidity environment: 150S
From low temperature humidity to heat environment: 10S
Humidity sensor: R-C type
Output signal: 4…20mA
Power supply: 220VAC
External load of analog output: the maximum 500Ω(to earth)
Current consumption: Max. value: 2 A
Power consumption (maximum): 25W
- 17 -
Technical Support
E-mail :
Fax :
Repair instructions
- 18 -
of transport.
5. Fit issue equipment well into a suitable strong box, and fill the buffer
and shock absorption material in the box to protect the equipment.
Please put the report together with box.
6. The boxes should be mailed to:
- 19 -