Professional Documents
Culture Documents
Project: Page: 1
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 41 11.871 5.673 18.109 0.540 0.000 0.000 0.000 0.000
0.000 0.000
ETAP
Project: Page: 5
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T9 3-Phase 1.250 11.000 0.433 6.00 3.50 0 0 0 -2.500 0 6.0000 Dyn 0.000
T10 3-Phase 3.000 11.000 0.433 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
T11 3-Phase 3.000 11.000 0.433 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
T12 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000
T13 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000
T14 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000
T15 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 -2.500 0 6.0000 Dyn 0.000
T16 3-Phase 6.300 11.000 6.900 6.00 8.50 0 0 0 0 0 6.0000 Dyn 0.000
2 * 220KV BUS (40) Bus1 -15.00 10.00 1.250 Bus1 100.00 110.000
T1 * 220KV BUS (40) Bus1 -15.00 10.00 1.250 Bus1 100.00 110.000
Branch Connections
110KV Main Bus 110.000 99.025 -1.5 0 0 0 0 Bus3 -3.198 -1.696 19.2 88.3
110KV Reserve Bus 110.000 99.025 -1.5 0 0 0 0 110KV Main Bus -1.480 -0.799 8.9 88.0
* 220KV BUS (40) 220.000 90.000 0.0 29.873 6.867 0 0 Bus1 14.936 3.433 44.7 97.5 -10.000
Bus2 110.000 99.079 -1.5 0 0 16.973 0.000 Bus1 -29.769 -6.539 161.5 97.7
Bus9 110.000 99.025 -1.5 0 0 0 0 Bus10 5.249 3.284 32.8 84.8 -2.500
Bus12 33.000 100.675 -2.3 0 0 3.610 2.707 Bus11 -3.610 -2.707 78.4 80.0
Bus14 0.630 100.522 -2.5 0 0 0.960 0.395 Bus13 -0.960 -0.395 946.5 92.5
Bus16 0.320 100.271 -2.7 0 0 0.673 0.280 Bus15 -0.673 -0.280 1312.3 92.3
Bus18 110.000 99.025 -1.5 0 0 0 0 110KV Main Bus -0.812 -0.153 4.4 98.3
Bus19 110.000 99.025 -1.5 0 0 0 0 Bus20 1.624 0.305 8.8 98.3 -1.406
Bus23 110.000 99.025 -1.5 0 0 0 0 Bus39 5.920 3.194 35.7 88.0 -2.500
Bus26 0.433 96.017 -6.1 0 0 0.960 0.395 Bus25 -0.960 -0.395 1441.7 92.5
Bus29 0.433 98.656 -6.0 0 0 0.960 0.395 Bus28 -0.960 -0.395 1403.1 92.5
Bus31 0.433 97.029 -5.8 0 0 1.913 0.769 Bus30 -1.913 -0.769 2833.5 92.8
ETAP
Project: Page: 11
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal
Bus33 0.433 97.029 -5.8 0 0 1.913 0.769 Bus32 -1.913 -0.769 2833.5 92.8
Bus35 0.433 97.254 -5.6 0 0 0.290 0.124 Bus34 -0.290 -0.124 432.2 92.0
Bus36 0.433 98.618 -6.2 0 0 0.358 0.000 Bus34 -0.358 0.000 484.1 100.0
Bus37 0.433 97.951 -5.0 0 0 0.194 0.084 Bus34 -0.194 -0.084 287.2 91.8
Bus41 11.000 99.286 -3.7 0 0 0.731 0.303 Bus40 -0.731 -0.303 41.8 92.4
Bus42 0.433 101.596 -4.6 0 0 0.136 0.000 Bus40 -0.136 0.000 178.3 100.0
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 14
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line1 29.862 6.397 -29.769 -6.539 93.5 -142.0 99.6 99.1 0.56
Line2 6.398 3.270 -6.397 -3.392 1.3 -122.3 99.1 99.0 0.05
Line3 6.398 3.270 -6.397 -3.392 1.3 -122.3 99.1 99.0 0.05
Cable4 5.247 3.192 -5.245 -3.232 2.2 -40.7 100.7 100.7 0.03
Cable5 3.610 2.664 -3.610 -2.707 0.7 -43.8 100.7 100.7 0.03
Cable6 0.960 0.327 -0.960 -0.399 0.0 -71.6 100.7 100.7 0.00
Cable7 0.674 0.250 -0.674 -0.286 0.0 -35.8 100.7 100.7 0.00
Cable8 0.000 -0.009 0.000 0.000 0.0 -9.0 100.7 100.7 0.00
Cable9 0.867 0.301 -0.867 -0.305 0.3 -4.5 99.3 99.3 0.04
Cable11 0.976 0.448 -0.976 -0.449 0.1 -0.9 99.3 99.3 0.01
Cable12 0.975 0.445 -0.975 -0.446 0.1 -0.9 99.3 99.3 0.01
Cable13 1.928 0.858 -1.928 -0.858 0.3 -0.6 99.3 99.3 0.02
Cable14 1.928 0.858 -1.928 -0.858 0.3 -0.6 99.3 99.3 0.02
Cable15 0.847 0.240 -0.847 -0.241 0.0 -0.9 99.3 99.3 0.01
Cable17 -5.904 -2.904 5.905 2.902 0.9 -1.6 99.3 99.3 0.02
Cable19 -1.617 -0.245 1.618 0.241 0.9 -3.7 99.3 99.4 0.06
T10 1.928 0.858 -1.913 -0.769 14.8 89.1 99.3 97.0 2.28
T11 1.928 0.858 -1.913 -0.769 14.8 89.1 99.3 97.0 2.28
T12 0.292 0.136 -0.290 -0.124 1.8 12.5 99.3 97.3 2.07
T13 0.360 0.016 -0.358 0.000 2.2 15.7 99.3 98.6 0.70
T14 0.195 0.089 -0.194 -0.084 0.8 5.5 99.3 98.0 1.37
T15 0.136 0.002 -0.136 0.000 0.3 2.1 99.3 101.6 2.31
T16 -1.618 -0.241 1.621 0.267 3.0 25.6 99.4 99.8 0.42
201.4 646.8
ETAP
Project: Page: 16
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Critical Report
220KV BUS (40) Bus Under Voltage 220.00 kV 198.00 90.0 3-Phase
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3