You are on page 1of 17

ETAP

Project: Page: 1
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Peak

Generation Category (3): Minimum

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 40 41

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 17 0 0 16 0 15 48

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: RaichoorSS

Output Filename: C:\ETAP 1260\RaichoorSS\Peak - Minimum.lfr


ETAP
Project: Page: 2
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: Page: 3
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

110KV Main Bus 110.000 1 100.0 0.0

110KV Reserve Bus 110.000 1 100.0 0.0

220KV BUS (40) 220.000 1 90.0 0.0

Bus1 110.000 1 100.0 0.0

Bus2 110.000 1 100.0 0.0 17.290 0.000

Bus3 110.000 1 100.0 0.0

Bus4 110.000 1 100.0 0.0

Bus9 110.000 1 100.0 0.0

Bus10 33.000 1 100.0 0.0

Bus11 33.000 1 100.0 0.0

Bus12 33.000 1 100.0 0.0 2.880 2.160 0.720 0.540

Bus13 33.000 1 100.0 0.0

Bus14 0.630 1 100.0 0.0 0.960 0.395

Bus15 33.000 1 100.0 0.0

Bus16 0.320 1 100.0 0.0 0.673 0.280

Bus17 33.000 1 100.0 0.0

Bus18 110.000 1 100.0 0.0

Bus19 110.000 1 100.0 0.0

Bus20 11.000 1 100.0 0.0

Bus21 6.900 1 100.0 0.0

Bus22 6.900 1 100.0 0.0

Bus23 110.000 1 100.0 0.0

Bus24 11.000 1 100.0 0.0

Bus25 11.000 1 100.0 0.0

Bus26 0.433 1 100.0 0.0 0.960 0.395

Bus28 11.000 1 100.0 0.0

Bus29 0.433 1 100.0 0.0 0.960 0.395

Bus30 11.000 1 100.0 0.0

Bus31 0.433 1 100.0 0.0 1.913 0.769

Bus32 11.000 1 100.0 0.0

Bus33 0.433 1 100.0 0.0 1.913 0.769

Bus34 11.000 1 100.0 0.0

Bus35 0.433 1 100.0 0.0 0.290 0.124


ETAP
Project: Page: 4
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus36 0.433 1 100.0 0.0 0.288 0.000 0.072 0.000

Bus37 0.433 1 100.0 0.0 0.194 0.084

Bus39 11.000 1 100.0 0.0

Bus40 11.000 1 100.0 0.0

Bus41 11.000 1 100.0 0.0 0.731 0.303

Bus42 0.433 1 100.0 0.0 0.108 0.000 0.027 0.000

Bus43 11.000 1 100.0 0.0

Bus46 6.900 1 100.0 0.0

Total Number of Buses: 41 11.871 5.673 18.109 0.540 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

220KV BUS (40) 220.000 Swing 1 90.0 0.0

0.000 0.000
ETAP
Project: Page: 5
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable4 33MCUS3 35 300.0 0.0 3 75 0.637122 0.150000 0.0000415

Cable5 33MCUS3 300 500.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable6 33MCUS3 300 400.0 0.0 2 75 0.076302 0.105000 0.0000811

Cable7 33MCUS3 300 400.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable8 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable9 33MCUS3 300 500.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable11 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable12 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable13 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable14 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable15 33MCUS3 300 100.0 0.0 1 75 0.076302 0.105000 0.0000811

Cable17 33MCUS3 300 100.0 0.0 3 75 0.076302 0.105000 0.0000811

Cable19 33MCUS3 300 500.0 0.0 1 75 0.076302 0.105000 0.0000811

Line1 49.5 12000.0 0.0 1 75 0.100000 0.400000 0.0000036

Line2 49.5 3000.0 0.0 1 75 0.100000 0.450000 0.0000036

Line3 49.5 3000.0 0.0 1 75 0.100000 0.450000 0.0000036

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: Page: 6
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

2 3-Phase 100.000 220.000 110.000 10.00 45.00 0 0 0 0 0 10.0000 YNyn 0.000

T1 3-Phase 100.000 220.000 110.000 10.00 45.00 0 0 0 0 0 10.0000 YNyn 0.000

T2 3-Phase 40.000 110.000 33.000 10.00 45.00 0 0 0 0 0 10.0000 Dyn 0.000

T3 3-Phase 20.000 33.000 0.630 8.00 20.00 0 0 0 0 0 8.0000 Dyn 0.000

T4 3-Phase 6.000 33.000 0.320 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000

T5 3-Phase 45.000 110.000 11.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 0.000

T6 3-Phase 6.300 11.000 6.900 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000

T7 3-Phase 15.000 110.000 11.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 0.000

T8 3-Phase 1.250 11.000 0.433 6.00 3.50 0 0 0 0 0 6.0000 Dyn 0.000

T9 3-Phase 1.250 11.000 0.433 6.00 3.50 0 0 0 -2.500 0 6.0000 Dyn 0.000

T10 3-Phase 3.000 11.000 0.433 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000

T11 3-Phase 3.000 11.000 0.433 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000

T12 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000

T13 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000

T14 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 0 0 6.0000 Dyn 0.000

T15 3-Phase 0.500 11.000 0.433 6.00 7.10 0 0 0 -2.500 0 6.0000 Dyn 0.000

T16 3-Phase 6.300 11.000 6.900 6.00 8.50 0 0 0 0 0 6.0000 Dyn 0.000

2-Winding Transformer Load Tap Changer (LTC) Settings

Transformer Load Tap Changer Setting


Transformer Connected Buses ("*" LTC Side)
% Min. % Max.
ID Primary Bus ID Secondary Bus ID Tap Tap % Step Regulated Bus ID %V kV

2 * 220KV BUS (40) Bus1 -15.00 10.00 1.250 Bus1 100.00 110.000

T1 * 220KV BUS (40) Bus1 -15.00 10.00 1.250 Bus1 100.00 110.000

T2 * Bus9 Bus10 -15.00 5.00 2.500 Bus10 100.00 33.000

T3 * Bus13 Bus14 -5.00 5.00 1.250 Bus14 100.00 0.630

T4 * Bus15 Bus16 -5.00 5.00 1.250 Bus16 100.00 0.320

T5 * Bus19 Bus20 -15.00 7.50 1.406 Bus20 100.00 11.000

T7 * Bus23 Bus39 -15.00 5.00 2.500 Bus39 100.00 11.000

T16 * Bus43 Bus46 -5.00 5.00 1.250 Bus43 100.00 11.000


ETAP
Project: Page: 7
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

2 2W XFMR 220KV BUS (40) Bus1 0.22 10.00 10.00

T1 2W XFMR 220KV BUS (40) Bus1 0.22 10.00 10.00

T2 2W XFMR Bus9 Bus10 0.56 24.99 25.00

T3 2W XFMR Bus13 Bus14 2.00 39.95 40.00

T4 2W XFMR Bus15 Bus16 13.92 118.35 119.17

T5 2W XFMR Bus19 Bus20 0.62 27.77 27.78

T6 2W XFMR Bus20 Bus21 13.26 112.71 113.49

T7 2W XFMR Bus23 Bus39 3.33 66.58 66.67

T8 2W XFMR Bus25 Bus26 131.87 461.53 480.00

T9 2W XFMR Bus28 Bus29 128.57 449.99 468.00

T10 2W XFMR Bus30 Bus31 32.88 197.28 200.00

T11 2W XFMR Bus32 Bus33 32.88 197.28 200.00

T12 2W XFMR Bus34 Bus35 167.41 1188.27 1200.00

T13 2W XFMR Bus34 Bus36 167.41 1188.27 1200.00

T14 2W XFMR Bus34 Bus37 167.41 1188.27 1200.00

T15 2W XFMR Bus40 Bus42 163.22 1158.56 1170.00

T16 2W XFMR Bus43 Bus46 11.13 94.59 95.24

Cable4 Cable Bus10 Bus11 0.59 0.14 0.60 0.0406741

Cable5 Cable Bus11 Bus12 0.35 0.48 0.60 0.0441589

Cable6 Cable Bus11 Bus13 0.14 0.19 0.24 0.0706543

Cable7 Cable Bus11 Bus15 0.28 0.39 0.48 0.0353272

Cable8 Cable Bus11 Bus17 0.07 0.10 0.12 0.0088318

Cable9 Cable Bus24 Bus40 3.15 4.34 5.36 0.0049066

Cable11 Cable Bus24 Bus25 0.63 0.87 1.07 0.0009813

Cable12 Cable Bus24 Bus28 0.63 0.87 1.07 0.0009813

Cable13 Cable Bus24 Bus30 0.63 0.87 1.07 0.0009813

Cable14 Cable Bus24 Bus32 0.63 0.87 1.07 0.0009813

Cable15 Cable Bus24 Bus34 0.63 0.87 1.07 0.0009813

Cable17 Cable Bus39 Bus24 0.21 0.29 0.36 0.0029439

Cable19 Cable Bus24 Bus43 3.15 4.34 5.36 0.0049066

Line1 Line Bus1 Bus2 0.99 3.97 4.09 0.5227200

Line2 Line Bus2 Bus4 0.25 1.12 1.14 0.1306800

Line3 Line Bus2 Bus3 0.25 1.12 1.14 0.1306800

CB3 Tie Breakr Bus3 110KV Main Bus

CB4 Tie Breakr Bus4 110KV Main Bus

CB5 Tie Breakr 110KV Reserve Bus 110KV Main Bus

CB6 Tie Breakr 110KV Main Bus Bus9


ETAP
Project: Page: 8
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

CB8 Tie Breakr 110KV Main Bus Bus18

CB9 Tie Breakr Bus18 Bus19

CB10 Tie Breakr Bus21 Bus22

CB11 Tie Breakr 110KV Main Bus Bus23

CB13 Tie Breakr Bus3 110KV Reserve Bus

CB14 Tie Breakr Bus4 110KV Reserve Bus

CB15 Tie Breakr 110KV Reserve Bus Bus9

CB16 Tie Breakr 110KV Reserve Bus Bus23

CB17 Tie Breakr 110KV Reserve Bus Bus18

CB18 Tie Breakr Bus40 Bus41

CB22 Tie Breakr Bus22 Bus46


ETAP
Project: Page: 9
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

110KV Main Bus 110.000 99.025 -1.5 0 0 0 0 Bus3 -3.198 -1.696 19.2 88.3

Bus4 -3.198 -1.696 19.2 88.3

110KV Reserve Bus 1.480 0.799 8.9 88.0

Bus9 2.625 1.642 16.4 84.8

Bus18 0.812 0.153 4.4 98.3

Bus23 1.480 0.799 8.9 88.0

110KV Reserve Bus 110.000 99.025 -1.5 0 0 0 0 110KV Main Bus -1.480 -0.799 8.9 88.0

Bus3 -3.198 -1.696 19.2 88.3

Bus4 -3.198 -1.696 19.2 88.3

Bus9 2.625 1.642 16.4 84.8

Bus23 4.440 2.396 26.7 88.0

Bus18 0.812 0.153 4.4 98.3

* 220KV BUS (40) 220.000 90.000 0.0 29.873 6.867 0 0 Bus1 14.936 3.433 44.7 97.5 -10.000

Bus1 14.936 3.433 44.7 97.5 -10.000

Bus1 110.000 99.635 -0.9 0 0 0 0 Bus2 29.862 6.397 160.9 97.8

220KV BUS (40) -14.931 -3.199 80.4 97.8

220KV BUS (40) -14.931 -3.199 80.4 97.8

Bus2 110.000 99.079 -1.5 0 0 16.973 0.000 Bus1 -29.769 -6.539 161.5 97.7

Bus4 6.398 3.270 38.1 89.0

Bus3 6.398 3.270 38.1 89.0

Bus3 110.000 99.025 -1.5 0 0 0 0 Bus2 -6.397 -3.392 38.4 88.3

110KV Main Bus 3.198 1.696 19.2 88.3

110KV Reserve Bus 3.198 1.696 19.2 88.3

Bus4 110.000 99.025 -1.5 0 0 0 0 Bus2 -6.397 -3.392 38.4 88.3

110KV Main Bus 3.198 1.696 19.2 88.3

110KV Reserve Bus 3.198 1.696 19.2 88.3

Bus9 110.000 99.025 -1.5 0 0 0 0 Bus10 5.249 3.284 32.8 84.8 -2.500

110KV Main Bus -2.625 -1.642 16.4 84.8

110KV Reserve Bus -2.625 -1.642 16.4 84.8

Bus10 33.000 100.735 -2.3 0 0 0 0 Bus11 5.247 3.192 106.7 85.4

Bus9 -5.247 -3.192 106.7 85.4

Bus11 33.000 100.700 -2.3 0 0 0 0 Bus10 -5.245 -3.232 107.0 85.1

Bus12 3.610 2.664 77.9 80.5

Bus13 0.960 0.327 17.6 94.7

Bus15 0.674 0.250 12.5 93.7

Bus17 0.000 -0.009 0.2 0.0


ETAP
Project: Page: 10
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus12 33.000 100.675 -2.3 0 0 3.610 2.707 Bus11 -3.610 -2.707 78.4 80.0

Bus13 33.000 100.699 -2.3 0 0 0 0 Bus11 -0.960 -0.399 18.1 92.3

Bus14 0.960 0.399 18.1 92.3

Bus14 0.630 100.522 -2.5 0 0 0.960 0.395 Bus13 -0.960 -0.395 946.5 92.5

Bus15 33.000 100.698 -2.3 0 0 0 0 Bus11 -0.674 -0.286 12.7 92.0

Bus16 0.674 0.286 12.7 92.0

Bus16 0.320 100.271 -2.7 0 0 0.673 0.280 Bus15 -0.673 -0.280 1312.3 92.3

Bus17 33.000 100.700 -2.3 0 0 0 0 Bus11 0.000 0.000 0.0 0.0

Bus18 110.000 99.025 -1.5 0 0 0 0 110KV Main Bus -0.812 -0.153 4.4 98.3

Bus19 1.624 0.305 8.8 98.3

110KV Reserve Bus -0.812 -0.153 4.4 98.3

Bus19 110.000 99.025 -1.5 0 0 0 0 Bus20 1.624 0.305 8.8 98.3 -1.406

Bus18 -1.624 -0.305 8.8 98.3

Bus20 11.000 100.344 -1.8 0 0 0 0 Bus19 -1.624 -0.298 86.4 98.4

Bus21 1.624 0.298 86.4 98.4

Bus21 6.900 99.811 -2.8 0 0 0 0 Bus20 -1.621 -0.267 137.7 98.7

Bus22 1.621 0.267 137.7 98.7

Bus22 6.900 99.811 -2.8 0 0 0 0 Bus21 -1.621 -0.267 137.7 98.7

Bus46 1.621 0.267 137.7 98.7

Bus23 110.000 99.025 -1.5 0 0 0 0 Bus39 5.920 3.194 35.7 88.0 -2.500

110KV Main Bus -1.480 -0.799 8.9 88.0

110KV Reserve Bus -4.440 -2.396 26.7 88.0

Bus24 11.000 99.327 -3.7 0 0 0 0 Bus40 0.867 0.301 48.5 94.5

Bus25 0.976 0.448 56.7 90.9

Bus28 0.975 0.445 56.6 91.0

Bus30 1.928 0.858 111.5 91.4

Bus32 1.928 0.858 111.5 91.4

Bus34 0.847 0.240 46.5 96.2

Bus39 -5.904 -2.904 347.7 89.7

Bus43 -1.617 -0.245 86.4 98.9

Bus25 11.000 99.317 -3.7 0 0 0 0 Bus24 -0.976 -0.449 56.8 90.9

Bus26 0.976 0.449 56.8 90.9

Bus26 0.433 96.017 -6.1 0 0 0.960 0.395 Bus25 -0.960 -0.395 1441.7 92.5

Bus28 11.000 99.317 -3.7 0 0 0 0 Bus24 -0.975 -0.446 56.6 90.9

Bus29 0.975 0.446 56.6 90.9 -2.500

Bus29 0.433 98.656 -6.0 0 0 0.960 0.395 Bus28 -0.960 -0.395 1403.1 92.5

Bus30 11.000 99.307 -3.7 0 0 0 0 Bus24 -1.928 -0.858 111.5 91.4

Bus31 1.928 0.858 111.5 91.4

Bus31 0.433 97.029 -5.8 0 0 1.913 0.769 Bus30 -1.913 -0.769 2833.5 92.8
ETAP
Project: Page: 11
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus32 11.000 99.307 -3.7 0 0 0 0 Bus24 -1.928 -0.858 111.5 91.4

Bus33 1.928 0.858 111.5 91.4

Bus33 0.433 97.029 -5.8 0 0 1.913 0.769 Bus32 -1.913 -0.769 2833.5 92.8

Bus34 11.000 99.320 -3.7 0 0 0 0 Bus24 -0.847 -0.241 46.5 96.2

Bus35 0.292 0.136 17.0 90.6

Bus36 0.360 0.016 19.1 99.9

Bus37 0.195 0.089 11.3 90.9

Bus35 0.433 97.254 -5.6 0 0 0.290 0.124 Bus34 -0.290 -0.124 432.2 92.0

Bus36 0.433 98.618 -6.2 0 0 0.358 0.000 Bus34 -0.358 0.000 484.1 100.0

Bus37 0.433 97.951 -5.0 0 0 0.194 0.084 Bus34 -0.194 -0.084 287.2 91.8

Bus39 11.000 99.348 -3.7 0 0 0 0 Bus24 5.905 2.902 347.6 89.7

Bus23 -5.905 -2.902 347.6 89.7

Bus40 11.000 99.286 -3.7 0 0 0 0 Bus24 -0.867 -0.305 48.6 94.3

Bus42 0.136 0.002 7.2 100.0 -2.500

Bus41 0.731 0.303 41.8 92.4

Bus41 11.000 99.286 -3.7 0 0 0.731 0.303 Bus40 -0.731 -0.303 41.8 92.4

Bus42 0.433 101.596 -4.6 0 0 0.136 0.000 Bus40 -0.136 0.000 178.3 100.0

Bus43 11.000 99.389 -3.7 0 0 0 0 Bus24 1.618 0.241 86.4 98.9

Bus46 -1.618 -0.241 86.4 98.9

Bus46 6.900 99.811 -2.8 0 0 0 0 Bus43 1.621 0.267 137.7 98.7

Bus22 -1.621 -0.267 137.7 98.7


* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: Page: 12
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

110KV Main Bus 110.000 0 0 0 0 0 0 0 0 7.240 88.3 38.4

110KV Reserve Bus 110.000 0 0 0 0 0 0 0 0 8.922 88.3 47.3

220KV BUS (40) 220.000 0 0 0 0 0 0 0 0 30.652 97.5 89.4

Bus1 110.000 0 0 0 0 0 0 0 0 30.540 97.8 160.9

Bus2 110.000 0 0 16.973 0 0 0 0 0 30.479 97.7 161.5

Bus3 110.000 0 0 0 0 0 0 0 0 7.240 88.3 38.4

Bus4 110.000 0 0 0 0 0 0 0 0 7.240 88.3 38.4

Bus9 110.000 0 0 0 0 0 0 0 0 6.192 84.8 32.8

Bus10 33.000 0 0 0 0 0 0 0 0 6.142 85.4 106.7

Bus11 33.000 0 0 0 0 0 0 0 0 6.166 85.1 107.1

Bus12 33.000 2.880 2.160 0.730 0.547 0 0 0 0 4.512 80.0 78.4

Bus13 33.000 0 0 0 0 0 0 0 0 1.040 92.3 18.1

Bus14 0.630 0.960 0.395 0 0 0 0 0 0 1.038 92.5 946.5

Bus15 33.000 0 0 0 0 0 0 0 0 0.732 92.0 12.7

Bus16 0.320 0.673 0.280 0 0 0 0 0 0 0.729 92.3 1312.3

Bus17 33.000 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus18 110.000 0 0 0 0 0 0 0 0 1.653 98.3 8.8

Bus19 110.000 0 0 0 0 0 0 0 0 1.653 98.3 8.8

Bus20 11.000 0 0 0 0 0 0 0 0 1.651 98.4 86.4

Bus21 6.900 0 0 0 0 0 0 0 0 1.642 98.7 137.7

Bus22 6.900 0 0 0 0 0 0 0 0 1.642 98.7 137.7

Bus23 110.000 0 0 0 0 0 0 0 0 6.726 88.0 35.7

Bus24 11.000 0 0 0 0 0 0 0 0 8.153 92.2 430.8

Bus25 11.000 0 0 0 0 0 0 0 0 1.074 90.9 56.8

Bus26 0.433 0.960 0.395 0 0 0 0 0 0 1.038 92.5 1441.7

Bus28 11.000 0 0 0 0 0 0 0 0 1.072 90.9 56.6

Bus29 0.433 0.960 0.395 0 0 0 0 0 0 1.038 92.5 1403.1

Bus30 11.000 0 0 0 0 0 0 0 0 2.110 91.4 111.5

Bus31 0.433 1.913 0.769 0 0 0 0 0 0 2.062 92.8 2833.5

Bus32 11.000 0 0 0 0 0 0 0 0 2.110 91.4 111.5

Bus33 0.433 1.913 0.769 0 0 0 0 0 0 2.062 92.8 2833.5

Bus34 11.000 0 0 0 0 0 0 0 0 0.880 96.2 46.5

Bus35 0.433 0.290 0.124 0 0 0 0 0 0 0.315 92.0 432.2

Bus36 0.433 0.288 0 0.070 0 0 0 0 0 0.358 100.0 484.1

Bus37 0.433 0.194 0.084 0 0 0 0 0 0 0.211 91.8 287.2

Bus39 11.000 2500.0 0 0 0 0 0 0 0 0 6.580 89.7 347.6 13.9


ETAP
Project: Page: 13
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus40 11.000 0 0 0 0 0 0 0 0 0.919 94.3 48.6

Bus41 11.000 0.731 0.303 0 0 0 0 0 0 0.791 92.4 41.8

Bus42 0.433 0.108 0 0.028 0 0 0 0 0 0.136 100.0 178.3

Bus43 11.000 0 0 0 0 0 0 0 0 1.635 98.9 86.4

Bus46 6.900 0 0 0 0 0 0 0 0 1.642 98.7 137.7

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 14
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable5 Cable 432.68 78.41 18.12

Cable6 Cable 865.36 18.07 2.09

Cable7 Cable 432.68 12.72 2.94

Cable8 Cable 432.68 0.16 0.04

Cable9 Cable 432.68 48.59 11.23

Cable11 Cable 432.68 56.75 13.12

Cable12 Cable 432.68 56.65 13.09

Cable13 Cable 432.68 111.54 25.78

Cable14 Cable 432.68 111.54 25.78

Cable15 Cable 432.68 46.51 10.75

Cable17 Cable 1298.05 347.67 26.78

Cable19 Cable 432.68 86.41 19.97

2 Transformer 100.000 15.326 15.3 15.270 15.3

T1 Transformer 100.000 15.326 15.3 15.270 15.3

T2 Transformer 100.000 6.192 6.2 6.142 6.1

T3 Transformer 100.000 1.040 1.0 1.038 1.0

T4 Transformer 100.000 0.732 0.7 0.729 0.7

T5 Transformer 50.000 1.653 3.3 1.651 3.3

T6 Transformer 6.300 1.651 26.2 1.642 26.1

T7 Transformer 100.000 6.726 6.7 6.580 6.6

T8 Transformer 100.000 1.074 1.1 1.038 1.0

T9 Transformer 100.000 1.072 1.1 1.038 1.0

T10 Transformer 100.000 2.110 2.1 2.062 2.1

T11 Transformer 100.000 2.110 2.1 2.062 2.1

T12 Transformer 100.000 0.322 0.3 0.315 0.3

T13 Transformer 100.000 0.361 0.4 0.358 0.4

T14 Transformer 100.000 0.214 0.2 0.211 0.2

T15 Transformer 100.000 0.136 0.1 0.136 0.1

T16 Transformer 100.000 1.642 1.6 1.635 1.6

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 15
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

2 14.936 3.433 -14.931 -3.199 5.2 234.8 90.0 99.6 9.63

T1 14.936 3.433 -14.931 -3.199 5.2 234.8 90.0 99.6 9.63

Line1 29.862 6.397 -29.769 -6.539 93.5 -142.0 99.6 99.1 0.56

Line2 6.398 3.270 -6.397 -3.392 1.3 -122.3 99.1 99.0 0.05

Line3 6.398 3.270 -6.397 -3.392 1.3 -122.3 99.1 99.0 0.05

T2 5.249 3.284 -5.247 -3.192 2.1 92.9 99.0 100.7 1.71

Cable4 5.247 3.192 -5.245 -3.232 2.2 -40.7 100.7 100.7 0.03

Cable5 3.610 2.664 -3.610 -2.707 0.7 -43.8 100.7 100.7 0.03

Cable6 0.960 0.327 -0.960 -0.399 0.0 -71.6 100.7 100.7 0.00

Cable7 0.674 0.250 -0.674 -0.286 0.0 -35.8 100.7 100.7 0.00

Cable8 0.000 -0.009 0.000 0.000 0.0 -9.0 100.7 100.7 0.00

T3 0.960 0.399 -0.960 -0.395 0.2 4.3 100.7 100.5 0.18

T4 0.674 0.286 -0.673 -0.280 0.7 6.3 100.7 100.3 0.43

T5 1.624 0.305 -1.624 -0.298 0.2 7.5 99.0 100.3 1.32

T6 1.624 0.298 -1.621 -0.267 3.6 30.5 100.3 99.8 0.53

T7 5.920 3.194 -5.905 -2.902 14.6 292.0 99.0 99.3 0.32

Cable9 0.867 0.301 -0.867 -0.305 0.3 -4.5 99.3 99.3 0.04

Cable11 0.976 0.448 -0.976 -0.449 0.1 -0.9 99.3 99.3 0.01

Cable12 0.975 0.445 -0.975 -0.446 0.1 -0.9 99.3 99.3 0.01

Cable13 1.928 0.858 -1.928 -0.858 0.3 -0.6 99.3 99.3 0.02

Cable14 1.928 0.858 -1.928 -0.858 0.3 -0.6 99.3 99.3 0.02

Cable15 0.847 0.240 -0.847 -0.241 0.0 -0.9 99.3 99.3 0.01

Cable17 -5.904 -2.904 5.905 2.902 0.9 -1.6 99.3 99.3 0.02

Cable19 -1.617 -0.245 1.618 0.241 0.9 -3.7 99.3 99.4 0.06

T8 0.976 0.449 -0.960 -0.395 15.4 54.0 99.3 96.0 3.30

T9 0.975 0.446 -0.960 -0.395 14.6 51.1 99.3 98.7 0.66

T10 1.928 0.858 -1.913 -0.769 14.8 89.1 99.3 97.0 2.28

T11 1.928 0.858 -1.913 -0.769 14.8 89.1 99.3 97.0 2.28

T12 0.292 0.136 -0.290 -0.124 1.8 12.5 99.3 97.3 2.07

T13 0.360 0.016 -0.358 0.000 2.2 15.7 99.3 98.6 0.70

T14 0.195 0.089 -0.194 -0.084 0.8 5.5 99.3 98.0 1.37

T15 0.136 0.002 -0.136 0.000 0.3 2.1 99.3 101.6 2.31

T16 -1.618 -0.241 1.621 0.267 3.0 25.6 99.4 99.8 0.42

201.4 646.8
ETAP
Project: Page: 16
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 97.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

220KV BUS (40) Bus Under Voltage 220.00 kV 198.00 90.0 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus26 Bus Under Voltage 0.43 kV 0.42 96.0 3-Phase


ETAP
Project: Page: 17
12.6.0H
Location: Date: 10-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF2
Filename: RaichoorSS Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 29.873 6.867 30.652 97.46 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 29.873 6.867 30.652 97.46 Lagging

Total Motor Load: 11.871 5.673 13.157 90.23 Lagging

Total Static Load: 17.801 0.547 17.809 99.95 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.201 0.647

System Mismatch: 0.000 0.000

Number of Iterations: 3