LARSEN & TOUBRO LIMITED
GLOBAL ENGINEERING SERVICES
DOCUMENT NO DATE
PROJECT: BANDO CHEMICAL PLANT
Ly=1.25m
Density of concrete gc = 25 kN/m3 x
Density of soil gc = 8 kN/m3
Overburden pressure = 0 kN/m2 Mx
(including s.wt of grade slab) 0.5(p2+p1)
p1 p2
Truck access load = 0 kN/m2
Mz
Dimensional details : F.G.L
Column size (cx,cy) in mm = 300 x 300 .0 m Lvl
Footing size (Lx,Ly,D) in mm = 1250 x 1250 x 300
N.G.L X
Depth of Soil above Footing = 1.10 1.10 m .00 m Lvl
Foundation depth(below NGL) = 1.40 m P 1.4 m
Ht. of pedestal = 0.00 m M 1.4 m B.0.F
Area of footing A = 1.5625 m2 .30 m -1.4 m Lvl Z
Section modulus Zx = 0.33 m3
Zy = 0.33 m3
Design Force and Moment in kN amd kNm (from analysis file) Lx=1.25m
Node no Servicability Load case Pcol Mx MZ Fx Fz
0.5(p1+p4) 0.5(p2+p3)
0 1 36 0 -1.86 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 Support Node assumed at top
0 0 0 0 0 0 0 PTotal = (Pcol +wt of soil+footing+overburden ) of Footing
0 0 0 0 0 0 0
0 0 0 0 0 0 0 F.G.L Finished Ground Level
0 0 0 0 0 0 0
0 0 0 0 0 0 0 N.G.L Natural Ground Level
0 0 0 0 0 0 0
0 0 0 0 0 0 0 B.O.F Bottom Of Footing
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
DOCUMENT NO DATE
PROJECT: BANDO CHEMICAL PLANT
Load calculation:
Self wt of footing = 1.25x1.25x0.3x25 = 11.71875 kN
Wt of soil = ((1.25x1.25)-(0.3x0.3))x(1.4-0.3)x8 = 12.958 kN
Wt due to surcharge = ((1.25x1.25)-(0.3x0.3))x0 = 0 kN
Axial force on footing due to truck load = ((0.625x1.25)x0 = 0 kN
Moment acting on footing due to truck load = ((0.3125)x0 = 0.0 kN-m
Check for bearing capacity:
Factor for increasing S.B.C = 1.25
Allowable safe bearing capacity = 200+8x1.4 = 211.2 kN/m2 (for DL+LL)
Allowable safe bearing capacity = (200 x 1.25 +8x1.4) = 261.2 kN/m2 (for Lateral load case) i) (DL+EQ)
ii) (DL+WL)
Check for bearing Ratio
S.No L/c Ptotal Mxt Mzt p1 p2 p3 p4 pmax pmin pressure Pmax/qa
1 1 60.67675 0 -1.86 33.1192 44.54704 44.5 33.1 44.5 33.1192 ok 0.211 iii) (DL+LL+CRL+EQ)
2 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
3 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
4 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
5 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
6 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
7 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
8 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
9 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
10 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
11 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
12 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
13 0 0 0 0 0 0 0.0 0.0 0 change size #VALUE!
DOCUMENT NO DATE
PROJECT: BANDO CHEMICAL PLANT
Reinforcement along Z
Mux = 4.03 kNm/m Mulim = 0.1389xfck*b*d2
d = 235 mm
Mulim = 0.1330 xFck x b x d2
d2 = Mu x 106/(0.1389 x Fck x b x d2)
= 1212.109
dreq = 34.81535 HENCE SAFE
Mu/ bd2 = 0.072979
Ptreq = 0.016835
Astreq = 39.56116 mm2/m 523.5988 mm2/m
Ast(min) = 360 mm2/m = 450.00 mm2/m
Ast reqd = 360.00 mm2/m
Diameter of Ba = 10 mm
Req %Pt = 0.1 0.22
Required T10 @ 150 mm2/m c/c
Ptpro =
Check for one way Shear along X
Shear Force at dist d from face,Vu = 10.66 kN
β = 13.58245
τC = 0.340571
Nominal shear strength Vc = τC bd
= 104 kN