ASME NQA-1–2012

(Revision of ASME NQA-1–2008)

Quality Assurance
Requirements for
Nuclear Facility
Applications

A N A M E R I C A N N AT I O N A L STA N DA R D
ASME NQA-1–2012
(Revision of ASME NQA-1–2008)

Quality Assurance
Requirements for
Nuclear Facility
Applications

A N A M E R I C A N N AT I O N A L S TA N D A R D

Two Park Avenue • New York, NY • 10016 USA


Date of Issuance: March 15, 2013

The next edition of this Standard is scheduled for publication in 2014.

ASME issues written replies to inquiries concerning interpretations of technical aspects of this
Standard. Interpretations are published on the ASME Web site under the Committee Pages at
http://cstools.asme.org/. [Interpretations are also included with each edition.]

Errata to codes and standards may be posted on the ASME Web site under the Committee Pages to
provide corrections to incorrectly published items, or to correct typographical or grammatical errors
in codes and standards. Such errata shall be used on the date posted.

The Committee Pages can be found at http://cstools.asme.org/. There is an option available to


automatically receive an e-mail notification when errata are posted to a particular code or standard.
This option can be found on the appropriate Committee Page after selecting “Errata” in the “Publication
Information” section.

ASME is the registered trademark of The American Society of Mechanical Engineers.

This code or standard was developed under procedures accredited as meeting the criteria for American National
Standards. The Standards Committee that approved the code or standard was balanced to assure that individuals from
competent and concerned interests have had an opportunity to participate. The proposed code or standard was made
available for public review and comment that provides an opportunity for additional public input from industry, academia,
regulatory agencies, and the public-at-large.
ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
ASME does not take any position with respect to the validity of any patent rights asserted in connection with any
items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for
infringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expressly
advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is
entirely their own responsibility.
Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as
government or industry endorsement of this code or standard.
ASME accepts responsibility for only those interpretations of this document issued in accordance with the established
ASME procedures and policies, which precludes the issuance of interpretations by individuals.

No part of this document may be reproduced in any form,


in an electronic retrieval system or otherwise,
without the prior written permission of the publisher.

The American Society of Mechanical Engineers


Two Park Avenue, New York, NY 10016-5990

Copyright © 2013 by
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
Printed in U.S.A.
CONTENTS
(A detailed Contents precedes each NQA Part.)

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
Preparation of Technical Inquiries to the Nuclear Quality Assurance Committee . . . . . . . . . vii
Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
Part I Requirements for Quality Assurance Programs for Nuclear Facilities
(From Former NQA-1). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Part II Quality Assurance Requirements for Nuclear Facility Applications . . . . . . . . . . . . . . . . . 34
Part III Guidance for Implementing Part I and II Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 115
Part IV Guidance on the Application and Use of NQA-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 184

iii
ASME NQA-1–2012 PART I, CONTENTS

PART I: REQUIREMENTS FOR QUALITY


ASSURANCE PROGRAMS FOR NUCLEAR
FACILITIES
(FROM FORMER NQA-1)

CONTENTS

Introduction 4
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
400 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Requirement 1 Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
200 Structure and Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
300 Interface Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Requirement 2 Quality Assurance Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
200 Indoctrination and Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
300 Qualification Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
400 Records of Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
500 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Requirement 3 Design Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
200 Design Input . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
300 Design Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
400 Design Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
500 Design Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
600 Change Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
700 Interface Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
800 Software Design Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
900 Documentation and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Requirement 4 Procurement Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
200 Content of the Procurement Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
300 Procurement Document Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
400 Procurement Document Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Requirement 5 Instructions, Procedures, and Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Requirement 6 Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

1
PART I, CONTENTS ASME NQA-1–2012

200 Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18


300 Document Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Requirement 7 Control of Purchased Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
200 Supplier Evaluation and Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
300 Bid Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
400 Control of Supplier-Generated Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
500 Acceptance of Item or Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
600 Control of Supplier Nonconformances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
700 Commercial Grade Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Requirement 8 Identification and Control of Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
200 Identification Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
300 Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Requirement 9 Control of Special Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
200 Process Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Requirement 10 Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
200 Inspection Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
300 Inspection Hold Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
400 Inspection Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
500 In-Process Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
600 Final Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
700 Inspections During Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Requirement 11 Test Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
200 Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
300 Test Procedures (Other Than for Computer Programs) . . . . . . . . . . . . . . . . . . 24
400 Computer Program Test Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
500 Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
600 Test Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Requirement 12 Control of Measuring and Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
200 Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
300 Calibration and Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Requirement 13 Handling, Storage, and Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
200 Special Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
300 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
400 Tools and Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
500 Operators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
600 Marking or Labeling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Requirement 14 Inspection, Test, and Operating Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Requirement 15 Control of Nonconforming Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

2
ASME NQA-1–2012 PART I, CONTENTS

200 Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
300 Segregation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
400 Disposition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Requirement 16 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Requirement 17 Quality Assurance Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
200 Generation of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
300 Authentication of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
400 Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
500 Receipt Control of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
600 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
700 Retention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
800 Maintenance of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Requirement 18 Audits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
200 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
300 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
400 Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
500 Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
600 Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
700 Follow-Up Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

3
PART II, CONTENTS ASME NQA-1–2012

(12) PART II: QUALITY ASSURANCE REQUIREMENTS


FOR NUCLEAR
FACILITY APPLICATIONS

CONTENTS

Introduction 37
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
400 Planning and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
500 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
600 Multiunit Facility Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Subpart 2.1 Quality Assurance Requirements for Cleaning of Fluid Systems and
Associated Components for Nuclear Power Plants. . . . . . . . . . . . . . . . . . . . . . . . 39
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
300 Cleanness Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
400 Manufacturing Phase Cleanness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
500 Cleanness Prior to Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
600 Cleanness During Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
700 Maintenance of Installation Cleanness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
800 Preoperational Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
900 Layup and Postlayup Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
1000 Postoperational Repairs and Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
1100 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Tables
302.5 Summary Table for Cleanness Classes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
304.1 Water Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
304.4 Flushing Requirements for Hydraulic, Instrument Control, and
Lubrication Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Subpart 2.2 Quality Assurance Requirements for Packaging, Shipping, Receiving,
Storage, and Handling of Items for Nuclear Facilities . . . . . . . . . . . . . . . . . . . . 48
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
300 Packaging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
400 Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
500 Receiving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
600 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
700 Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Subpart 2.3 Quality Assurance Requirements for Housekeeping at Nuclear
Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

34
ASME NQA-1–2012 PART II, CONTENTS

200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60


300 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Subpart 2.4 Installation, Inspection, and Testing Requirements for Power,
Instrumentation, and Control Equipment at Nuclear Facilities . . . . . . . . . . . . . 63
Subpart 2.5 Quality Assurance Requirements for Installation, Inspection, and Testing of
Structural Concrete, Structural Steel, Soils, and Foundations for Nuclear
Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
300 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
400 Preconstruction Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
500 Inspection of Soils and Earthwork . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
600 Inspection of Foundation Pile and Caisson Construction . . . . . . . . . . . . . . . . . 66
700 Inspection of Concrete Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
800 Inspection of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
900 Data Analysis and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
1000 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Table
506 Required In-Process Tests for Compacted Fill . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Subpart 2.7 Quality Assurance Requirements for Computer Software for Nuclear Facility
Applications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
300 Software Acquisition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
400 Software Engineering Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
500 Standards, Conventions, and Other Work Practices . . . . . . . . . . . . . . . . . . . . . . 78
600 Support Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
700 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Subpart 2.8 Quality Assurance Requirements for Installation, Inspection, and
Testing of Mechanical Items for Nuclear Facilities. . . . . . . . . . . . . . . . . . . . . . . . 80
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
300 Preinstallation Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
400 Installation Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
500 Systems Turnover Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
600 Data Analysis and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
700 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Subpart 2.14 Quality Assurance Requirements for Commercial Grade Items and
Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
200 CGI Definition Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
300 Utilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
400 Technical Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
500 Critical Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
600 Methods of Accepting Commercial Grade Items and Services . . . . . . . . . . . . 89
700 Commercial Grade Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
800 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
900 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Subpart 2.15 Quality Assurance Requirements for Hoisting, Rigging, and
Transporting of Items for Nuclear Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . 93
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

35
PART II, CONTENTS ASME NQA-1–2012

300 Types of Handling Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94


400 Design Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
500 Acceptance Criteria for Manufactured Handling Equipment . . . . . . . . . . . . . 97
600 Testing, Inspection, and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
700 Control of the Use of Handling Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
800 Qualifications of Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
900 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Subpart 2.16 Requirements for the Calibration and Control of Measuring and Test
Equipment Used in Nuclear Facilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Subpart 2.18 Quality Assurance Requirements for Maintenance of Nuclear
Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
300 Preventive Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
400 Corrective Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
500 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
Subpart 2.20 Quality Assurance Requirements for Subsurface Investigations for Nuclear
Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
300 Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
400 Field Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
500 Laboratory Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109
600 Engineering Evaluation and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
700 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
Subpart 2.22 Quality Assurance Requirements for Management Assessment and Quality
Improvement for Compliance With 10 CFR 830 and Department of
Energy (DOE) Order 414.1 for DOE Nuclear Facilities . . . . . . . . . . . . . . . . . . . . . 111
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
200 Management Assessment Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
300 Quality Improvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113
400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
500 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

36
ASME NQA-1–2012 PART III, CONTENTS

PART III: GUIDANCE FOR IMPLEMENTING PART (12)

I AND II REQUIREMENTS

CONTENTS

Introduction 117
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
SUBPART 3.1 GUIDANCE FOR IMPLEMENTING PART I REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . 118
Subparts
3.1-1.1 Implementing Guidance for Part I, Requirement 1: Organization . . . . . . . . . . 119
3.1-2.1 Implementing Guidance for Part I, Requirement 2: Quality Assurance
Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
3.1-2.2 Implementing Guidance for Part I, Requirement 2: Quality Assurance
Programs, Lead Auditor Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123
3.1-2.3 Implementing Guidance for Part I, Requirement 2: Quality Assurance
Programs, Inspection and Test Personnel Qualification . . . . . . . . . . . . . . . . . . 125
3.1-2.4 Implementing Guidance for Part I, Requirement 2: Quality Assurance
Programs, Management Assessment of the QA Program Using
Surveillance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127
3.1-3.1 Implementing Guidance for Part I, Requirement 3: Design Control . . . . . . . . 130
3.1-4.1 Implementing Guidance for Part I, Requirement 4: Procurement Document
Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134
3.1-7.1 Implementing Guidance for Part I, Requirement 7: Control of
Purchased Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 139
3.1-10.1 Implementing Guidance for Part I, Requirement 10: Inspection . . . . . . . . . . . . 142
3.1-16.1 Implementing Guidance for Part I, Requirement 16: Corrective Action . . . . . 143
3.1-17.1 Implementing Guidance for Part I, Requirement 17: Quality Assurance
Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146
3.1-17.2 Implementing Guidance for Part I, Requirement 17: Quality Assurance
Records, Electronic Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 149
3.1-18.1 Implementing Guidance for Part I, Requirement 18: Audits . . . . . . . . . . . . . . . 151
Figures
300 Sample Form for Record of Lead Auditor Qualification . . . . . . . . . . . . . . . . . . . 124
600 Logic Chart for Determining Appropriate Quality Requirements . . . . . . . . . . 137
300 Corrective Action Process Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145
SUBPART 3.2 GUIDANCE FOR IMPLEMENTING PART II REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . 155
Subparts
3.2-2.1 Implementing Guidance for Part II, Requirement 2.1: Cleaning of Fluid
Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156
3.2-2.7 Implementing Guidance for Part II, Requirement 2.7: Quality Assurance
Requirements for Computer Software for Nuclear Facility
Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157

115
PART III, CONTENTS ASME NQA-1–2012

3.2-2.14 Implementing Guidance for Part II, Requirement 2.14: Quality Assurance
Requirements for Commercial Grade Items and Services,
Commercial Grade Computer Programs, and Software Services . . . . . . . . . 162
3.2-2.15 Implementing Guidance for Part II, Requirement 2.15: Hoisting, Rigging,
and Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176
3.2-2.18.1 Implementing Guidance for Part II, Requirement 2.18: Maintenance of
Nuclear Facilities, Establishing and Maintaining Equipment
Histories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177
3.2-2.18.2 Implementing Guidance for Part II, Requirement 2.18: Maintenance of
Nuclear Facilities, Engineering Evaluations of Equipment Failures . . . . . . 178
3.2-2.20 Implementing Guidance for Part II, Requirement 2.20: Subsurface
Investigations for Nuclear Power Plants, Sample Control and
Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180
Table
501 Typical Critical Characteristics to Consider for Computer Programs . . . . . . . 169
SUBPART 3.3 NONMANDATORY GUIDANCE ON QUALITY ASSURANCE PROGRAM
REQUIREMENTS FOR COLLECTION OF SCIENTIFIC AND TECHNICAL
INFORMATION FOR SITE CHARACTERIZATION OF HIGH-LEVEL NUCLEAR
WASTE REPOSITORIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181
Nonmandatory Appendix 7A-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182
Nonmandatory Appendix 11A-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183

116
PART IV, CONTENTS ASME NQA-1–2012

(12) PART IV: GUIDANCE ON THE APPLICATION AND


USE OF NQA-1

CONTENTS

Introduction 187
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187
SUBPART 4.1 GUIDES ON USE AND COMPARISON OF NQA-1 WITH OTHER QUALITY
REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
Subparts
4.1.1 Guidance to Modification of an ISO 9001:2008, Quality Management
Systems Standard for Compliance With NQA-1–2008, Part I With the
NQA-1a–2009 Addenda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
200 NQA Reference Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
300 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
400 Application of NQA-1 to ISO 9001 QMS Program . . . . . . . . . . . . . . . . . . . . . . . . 189
4.1.2 Guidance on the Use of NQA-1–2008/1a–2009 for Compliance With
Department of Energy Quality Assurance Requirements 10 CFR 830,
Subpart A and DOE O 414.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202
200 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202
300 DOE Rule and Order General QAP Requirements . . . . . . . . . . . . . . . . . . . . . . . . 202
400 DOE Rule and Order QA Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202
4.1.3 Guidance on the Use of NQA-1–2000 for Compliance With 10 CFR 71
and/or 10 CFR 72 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
200 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
300 Summary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
4.1.4 Guidance to Modification of an IAEA GS-R-3 Quality Program to Meet
NQA-1a–2009 Requirements and Modification of an NQA-1a–2009
Quality Program to Meet IAEA GS-R-3 Requirements . . . . . . . . . . . . . . . . . . 214
100 Purpose and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214
300 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214
400 How to Use This Guide to Achieve Compliance With GS-R-3 or
NQA-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215
Tables
200-1 Corresponding NQA Sections (Requirement 1) to ISO Sections ............ 189
200-2 Corresponding NQA Sections (Requirement 2) to ISO Sections ............ 190
200-3 Corresponding NQA Sections (Requirement 3) to ISO Sections ............ 191
200-4 Corresponding NQA Sections (Requirement 4) to ISO Sections ............ 192
200-5 Corresponding NQA Sections (Requirement 5) to ISO Sections ............ 192
200-6 Corresponding NQA Sections (Requirement 6) to ISO Sections ............ 193

184
ASME NQA-1–2012 PART IV, CONTENTS

200-7 Corresponding NQA Sections (Requirement 7) to ISO Sections . . . . . . . . . . . . 194


200-8 Corresponding NQA Sections (Requirement 8) to ISO Sections . . . . . . . . . . . . 195
200-9 Corresponding NQA Sections (Requirement 9) to ISO Sections . . . . . . . . . . . . 196
200-10 Corresponding NQA Sections (Requirement 10) to ISO Sections . . . . . . . . . . . 197
200-11 Corresponding NQA Sections (Requirement 11) to ISO Sections . . . . . . . . . . . 197
200-12 Corresponding NQA Sections (Requirement 12) to ISO Sections . . . . . . . . . . . 198
200-13 Corresponding NQA Sections (Requirement 13) to ISO Sections . . . . . . . . . . . 199
200-14 Corresponding NQA Sections (Requirement 14) to ISO Sections . . . . . . . . . . . 199
200-15 Corresponding NQA Sections (Requirement 15) to ISO Sections . . . . . . . . . . . 200
200-16 Corresponding NQA Sections (Requirement 16) to ISO Sections . . . . . . . . . . . 200
200-17 Corresponding NQA Sections (Requirement 17) to ISO Sections . . . . . . . . . . . 201
200-18 Corresponding NQA Sections (Requirement 18) to ISO Sections . . . . . . . . . . . 201
300 10 CFR 830 Subpart A, Dated January 10, 2001; §830.121, Quality
Assurance Program; DOE O 414.1C, Dated June 17, 2005 . . . . . . . . . . . . . . . 203
400 10 CFR 830 Subpart A, Dated January 10, 2001; §830.122, Quality
Assurance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204
300 10 CFR 71 and 10 CFR 72 Criteria Addressed by NQA-1 . . . . . . . . . . . . . . . . . . 208
I The Extent to Which GS-R-3 Addresses NQA-1 Requirements . . . . . . . . . . . . . 216
II The Extent to Which NQA-1 Addresses GS-R-3 Requirements . . . . . . . . . . . . . 226
SUBPART 4.2 GUIDES ON APPLICATION OF NQA-1 TO WORK PROCESSES AND
ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
Subparts
4.2.1 Guidance on Graded Application of Nuclear Quality Assurance (NQA)
Standard for Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
200 Research and Development Quality Assurance Through Peer Review . . . . . . 236
300 A Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237
400 Quality Assurance Research and Development Applications . . . . . . . . . . . . . . 238
500 Research and Development Quality Assurance Glossary of Terms . . . . . . . . . 238
600 Application of NQA-1 to Research and Development Activities . . . . . . . . . . . 238
700 Technology Life Cycle (Subpart 4.2.1) and Technology Readiness
Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243
4.2.2 Guidance for Managing Electronic Information . . . . . . . . . . . . . . . . . . . . . . . . . . . 245
100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245
200 Electronic Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245
300 Electronic Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245
400 Electronic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246
4.2.3 Guidance on the Qualification of Existing Data . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
200 Selecting Data Sets for Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
300 Data Qualification Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
400 Qualification Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
500 Documentation of Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 248
4.2.4 Guidance on the Control of Scientific Investigations . . . . . . . . . . . . . . . . . . . . . . 249
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249
200 Planning and Performing Scientific Investigations . . . . . . . . . . . . . . . . . . . . . . . . . 249
300 Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249
400 Sample Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 250
500 Peer Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 250
4.2.5 Guidance on the Transition From Construction to Operation for Nuclear
Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252
200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252
300 Transition Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252
400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254

185
PART IV, CONTENTS ASME NQA-1–2012

4.2.6 Guidance on Quality Assurance for Decommissioning of Nuclear


Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255
100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255
200 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255
300 Predecommissioning Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256
400 Control During Decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258
500 Postdecommissioning Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259
600 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259
Figure
103 Technology Life Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236
Table
600-1 Applicability to Research and Development Activities . . . . . . . . . . . . . . . . . . . . 239
600-2 Software Within Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239
700 Comparison of Subpart 4.2.1 Technology Life Cycle and Technology
Readiness Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244

186

You might also like