You are on page 1of 2

QUESTIONS

Large scale changes to an application can be achieved using _____ Branch by Abstraction
Capacity testing _______________. technical aspects
____________ testing was derived from hardware testing. Smoke
Collection of executable codes is known as ____________. Binaries
The continuous deployment must be followed to practice continuous 1
A build that fails __________ stage will not be deployable. Acceptance
Accurev is a _____________________________ system. Stream Based Version Control
A build can be triggered by a version control tool. 1
Build-time dependency should be present when an application is ru 0
People who do the deployment should be part of creating the depl 1
Build tools can be categorised as __________________. Both
Release candidate is created after the change passes through the Commit Stage
Continuous deployment aims at making feedback loops as short as 1
Dependencies between components must be represented using __ Directed acyclic graph
Time taken to fix a broken build is measured using _____________ Build repair rate
New instance of ___________ is created upon every check-in. All
What are the principle(s) that are basic for an effective configuration management?
A build is triggered whenever there is a change in the _________.
Disciplined technique for restructuring a code without modifying its external behavior is _________
User acceptance testing is done in the ______ stage. Manual Stage
Deployment pipeline is an extension of ______________. Continuous Integration
Component is separated from codebase when ______________.
Number of transactions a system can process in a given timespan, is measured using _____________
______________ is a non-functional test.
In branch by abstraction model, features are developed in _________.
___________ stage asserts that the system works at the technical level.
Response time of the requests are verified using __________________.
Feature toggles is possible in version control systems.
An environment that is in a properly deployed state is known as ____________.
Environment constitutes _________________________. All
Static code analysis is performed in the _____________.
Functional testing is a verification activity. 1
Automated implementation of an application's build, test, and deployment process is called as __
User acceptance testing is a verification activity. 0
Value delivered by an application is validated through __________ All
Testing done in a customer's environment is know as ____________ Beta
MTTR is
_____________________ is a paradigm to move code from check-in t Deployment Pipeline
Steps to be followed to release the application first time is part of Release Plan
__________________ stage takes the delivery team beyond continu Acceptance
Configuration information can be supplied using All
Only positive scenarios are validated in ___________ testing.
Trunk Based development

Both the options

TRUE
0
Task-Oriented
Acceptance Stage

Cyclometric dependency

Deployment Pipeline
Both
Both
Refactoring
Acceptance

All
Scalability
Performance
Feature Branch
Manual Test
Longevity Testing
1
Baseline

Unit Test

Continuous Integration

Mean Time to Repair

Hardware

You might also like