You are on page 1of 157

/

INDEX OF PROJECT COMPLETION MANUAL

Section/
Part No. Category Code Item Name Description Remark
System

Part 1 Process System Completion Manual

Mechanical Completion Dossier


Part 1.1

Sect. 1 13022-00000-PC-PP-001 Piping Blasting and Painting

Sect. 2 Piping Fabrication and installation

2.1 04000 13022-04000-PC-PP-001 Ammonia Unit

2.2 06000 13022-06000-PC-PP-001 Urea Unit

2.3 31000 13022-31000-PC-PP-001 Instrument & Service Air & N2 System

2.4 37000 13022-37000-PC-PP-001 Outer Piping

2.5 26000 13022-26000-PC-PP-001 Ammonia Condensate Stripping

2.6 51000 13022-51000-PC-PP-001 Flare System

2.7 29000 13022-29000-PC-PP-001 Steam System

Sect. 3 Test-pack for Pressure Test

3.1 04000 13022-04000-PC-TP-001 Ammonia Unit

3.2 06000 13022-06000-PC-TP-001 Urea Unit

3.3 31000 13022-31000-PC-TP-001 Instrument & Service Air & N2 System

3.4 37000 13022-37000-PC-TP-001 Outer Piping

3.5 26000 13022-26000-PC-TP-001 Ammonia Condensate Stripping

3.6 51000 13022-51000-PC-TP-001 Flare System

3.7 29000 13022-29000-PC-TP-001 Steam System

Sect. 4 Construction(Equipment)

4.1 04000 13022-04000-PC-M-001 Ammonia Unit

4.2 06000 13022-06000-PC-M-001 Urea Unit

4.3 31000 13022-31000-PC-M-001 Instrument & Service Air & N2 System

4.4 26000 13022-26000-PC-M-001 Ammonia Condensate Stripping

4.5 51000 13022-51000-PC-M-001 Flare System

Sect. 5 00000 13022-00000-PC-NT-001 Welder Qualification and NTT

Part 1.2 Commissioning & Start-up Dossier

Sect. 1 00000 13022-00000-PC-CS-001 Commissioning & Start-up Dossier

Page 1 of 157
/
INDEX OF PROJECT COMPLETION MANUAL

Section/
Part No. Category Code Item Name Description Remark
System

Part 2 Non-Process System Completion Manual

Sect. 1 HVAC

1.1 06000 13022-06000-PC-HVAC-001 Urea Unit Prilling Tower

Sect. 2 Telecommunication

2.1 34000 13022-34000-PC-TC-001 Power Supply & Distribution System

2.3 38000 13022-38000-PC-TC-001 Communication

Sect. 3 Electric

3.1 04000 13022-04000-PC-EL-001 Ammonia Unit

3.2 06000 13022-06000-PC-EL-001 Urea Unit

3.3 31000 13022-31000-PC-EL-001 Instrument & Service Air & N2 System

3.4 34000 13022-34000-PC-EL-001 Power Supply & Distribution System

3.5 35000 13022-35000-PC-EL-001 Center Control Room

3.6 37000 13022-37000-PC-EL-001 Outer Piping

3.7 26000 13022-26000-PC-EL-001 Ammonia Condensate Stripping

3.8 51000 13022-51000-PC-EL-001 Flare System

Sect. 4 Instrument

4.1 04000 13022-04000-PC-IN-001 Ammonia Unit

4.2 06000 13022-06000-PC-IN-001 Urea Unit

4.3 31000 13022-31000-PC-IN-001 Instrument & Service Air & N2 System

4.4 35000 13022-35000-PC-IN-001 Center Control Room

4.5 37000 13022-37000-PC-IN-001 Outer Piping

4.6 26000 13022-26000-PC-IN-001 Ammonia Condensate Stripping

4.7 51000 13022-51000-PC-IN-001 Flare System

4.8 29000 13022-29000-PC-IN-001 Steam System

Part 3 Material and Equipment

Sect. 1 Package Material

Material Acceptance
1.1 00000 13022-00000-PC-PM-001 (include Pipe/Equipment/Electric/Instrument)

Page 2 of 157
/
INDEX OF PROJECT COMPLETION MANUAL

Section/
Part No. Category Code Item Name Description Remark
System

Part 4 Technical Passport

Sect. 2 13022-00000-PC-TP-001 Safety Inspection of Pressure Equipment & Piping

Sect. 4 13022-00000-PC-TP-002 Check Safety of Valve

Part 5 Civil Work completion

Sect. 1

1.1 04000 13022-04000-PC-CV-001 Ammonia Unit

1.2 06000 13022-06000-PC-CV-001 Urea Unit

1.3 31000 13022-31000-PC-CV-001 Instrument & Service Air & N2 System

1.4 37000 13022-37000-PC-CV-001 Outer Piping

1.5 26000 13022-26000-PC-CV-001 Ammonia Condensate Stripping

1.6 51000 13022-51000-PC-CV-001 Flare System

1.7 29000 13022-29000-PC-CV-001 Steam System

Part 6 As-built Drawing

Sect. 1 13022-00000-AD-001 As-Built Drawing

Part 7 Reference Documents

Sect. 1 13022-00000-YN-M--001 Design Change

Sect. 2 13022-00000-YN-M-002 Construction Procedure & ITP

Sect. 3 13022-00000-YN-M-003 PQR and WPS

Page 3 of 157
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah

DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
I Manufacture Data Record
1 Procedure
2 Stasiun Penerimaan Tebu & Pendahuluan
3 Stasiun Gilingan
4 Stasiun Pemurnian
5 Stasiun Penguapan
6 Stasiun Masakan, Pendinginan, dan Putaran
7 Stasiun Pengeringan dan Pengemasan
8 IPAL & Utility
9 Stasiun Boiler
10 Stasiun Pembangkit Listrik
TAR ISI
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

Jembatan Timbang untuk Truk Tebu dan Molasses


II.1.1
Control Room
Electric Gantry Cane Crane
II.1.2
Panel Control Room
Meja Tebu
II.1.3
Cane Tumbler
II.I.4 Autocane Feeding
II.1I.1 Cane Carrier 1
Cane Cutter 1
II.1I.2
Slip Ring Cane Cutter 1
II.1I.3 Cane Cutter 2
II.1I.4 HDHS
II.1I.5 Lube Oil
II.1I.6 Carrier Elevator (Cane Carrier 2)
Motor Intermediate
II.1I.7
Dhonelly Chute 1-4
II.1I.8 Gear Box Siemens 1
II.1I.9 Planetary 2
II.1I.10 Planetary 3
II.1I.11 Gear Box Siemens 4
II.1I.12 Inverter Room
II.1I.13 Sistem Pelumas Gilingan
II.1I.14 Rotary Screen Nira Mentah
II.1I.15 Pompa Nira Mentah Belum Tersaring
II.1I.16 Pompa Nira Mentah Tersaring
II.1I.17 Tangki Nira Mentah Tersaring
II.1I.18 Pompa Nira Tertimbang
II.1I.19 Bagasse Handling
II.1I.20 Magnetic Flowmeter Gilingan
II.1II.1 Pompa Imbibisi A B
II.1II.2 Juice Heater 1-3
II.1II.3 Pompa Kondensat Juice Heater A B
II.1II.4 Buffer condensate Tank
II.1II.5 Defekator 1-2
II.1II.6 Blower sulfitasi tower
II.1II.7 Sulfitasi Tower
II.1II.8 Rotary Sulfur Burner
II.1II.9 Screw Conveyor Sulfur
II.1II.10 Sublimator
II.1II.11 Sulfited Juice Pump
II.1II.12 Tangki Nira Tersulfitasi
II.1II.13 Clarifier
II.1II.14 Pompa Flokulan
II.1II.15 Flocculan Tank Agitator
II.1II.16 Flash tank
II.1II.17 Clear Juice screen (DSM)
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

II.1II.18 Pompa Nira Kotor


II.1II.19 Tangki Nira Kotor
II.1II.20 Pompa Nira Jernih
II.1II.21 Tangki Nira Jernih
II.1II.22 Rotary Vacuum Filter
II.1II.23 Bagacillo Fan
II.1II.24 Mud Feed Mixer Rotary Vacuum Filter
II.1II.25 Mud Recirculation Pump
II.1II.26 Hot Water Pump
II.1II.27 Tangki Air Siraman
II.1II.28 Tangki Air Jatuhan
II.1II.29 Cake Belt Conveyor RVF
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

II.1II.30 Injection Pump RVF


II.1II.31 Vacuum Pump RVF
II.1II.32 Mud Recirculation Tank Agitator
II.1II.33 Pompa Filtrat 1-4
II.1II.34 Tangki Filtrat
II.1II.35 Tangki Barometric Condensor 1-2
II.1II.36 Tangki Receiver
II.1II.37 Tangki Cyclone
II.1II.38 Cake Storage Bin
II.1II.39 Control Room Pemurnian
II.1II.40 Juice Flow meter (Juice Smoothing)
II.1II.41 Sensor pH Nira Terdefekasi
II.1V.1 Evaporator 1A
II.1V.2 Evaporator 1B
II.1V.3 Evaporator 2
II.1V.4 Condensate Receiver Evaporator Pump A-F
II.1V.5 Condensate Receiver Evaporator Tank 1 - 3
II.1V.6 Pompa Injeksi Evaporator
II.1V.7 Pure Condensate tank
II.1V.8 Sweet Condensate tank
II.1V.9 Condensor Evaporator
II.1V.10 Pompa Nira Kental
II.1V.11 Tangki Nira Kental
II.V.1 Vacuum pan A
II.V.2 Pompa Injeksi Vacuum Pan A B C
II.V.3 Palung Pendingin A
II.V.4 Pompa Rota A
II.V.5 Jet Condensor A
II.V.6 Vacuum pan C
II.V.7 Pompa Rota C
II.V.8 Jet Condensor C
II.V.9 Vacuum pan D
II.V.10 Palung Pendingin D
II.V.11 Pompa Rota D
II.V.12 Jet Condensor D
II.V.13 Condensate Pump A B
II.V.14 Tangki Condensate
Pompa Remelter C D
II.V.15
Tangki Remelter
High Grade Centrifuge SHS 1
II.V.16
Control room
II.V.17 Screw Distributor Gula SHS
Peti Stroop
II.V.18
Peti Klare
II.V.19 Tanki Tetes
II.V.20 Pompa Klare
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

II.VI.1 Belt conveyor 1


II.VI.2 Belt conveyor 2
II.VI.3 Vibrating Screen
II.VI.4 Bucket elevator
II.VI.5 Sugar Dryer
II.VI.6 Ventury Tank
Bag sugar conveyor 1
II.VI.7
Bag sugar conveyor 2
II.VI.8 Sugar Bin
Timbangan Line 1
II.VI.9
Timbangan Line 2
Bag sewing 1
II.VI.10
Bag sewing 2
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

II.VI.11 Control Room Pengemasan


II.VII.1 Pompa Spray Pond 1/2
II.VII.2 Pompa Spray Pond 4
II.V1II.1 Cooling Tower Fan A B
II.V1II.2 Cooling Water Pump A B
II.V1II.3 Demin Water Pump A B
II.V1II.4 Demin Tank
II.V1II.5 Condensate Pump A B
II.V1II.6 CTT Pump A B
II.V1II.7 Condensate Treatment Tank
Air Compressor A B
II.V1II.8
Shelter Instrument Air
II.IX.1 WTP Plan System
II.X.1 Boiler Steel Structure
II.X.2 Boiler Auxiliary
II.X.3 Boiler Proper
II.X.4 Boiler Control Room
II.XI.1 Steam Turbine Generator Siemens
II.XI.2 Lube Oil System
II.XI.3 Control Room STG
II.XII.1 Trafo
II.XII.2 MV Switchgear
II.XII.3 Diesel Engine Generator
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

k Truk Tebu dan Molasses


RPGM-PM-BAPP-001-001-001

RPGM-PM-BAPP-001-002-001

RPGM-PM-BAPP-001-003-001

RPGM-PM-BAPP-001-004-001
RPGM-PM-BAPP-002-001-001
RPGM-PM-BAPP-002-002-001
RPGM-PM-BAPP-002-002-002
RPGM-PM-BAPP-002-002-003
RPGM-PM-BAPP-002-003-001
RPGM-PM-BAPP-002-003-002
RPGM-PM-BAPP-002-004-001

RPGM-PM-BAPP-002-005-001

RPGM-PM-BAPP-002-006-001
RPGM-PM-BAPP-002-006-002
RPGM-PM-BAPP-002-006-003
RPGM-PM-BAPP-002-006-004
RPGM-PM-BAPP-002-006-005
RPGM-PM-BAPP-002-007-001
RPGM-PM-BAPP-002-008-001
RPGM-PM-BAPP-002-010-001
RPGM-PM-BAPP-002-011-001
RPGM-PM-BAPP-002-011-003
RPGM-PM-BAPP-002-012-001
RPGM-PM-BAPP-002-013-001
RPGM-PM-BAPP-002-014-001
RPGM-PM-BAPP-002-009-001
RPGM-PM-BAPP-003-001-001
RPGM-PM-BAPP-003-001-004
RPGM-PM-BAPP-003-001-006
RPGM-PM-BAPP-003-002-001
RPGM-PM-BAPP-003-002-003
RPGM-PM-BAPP-003-002-004
RPGM-PM-BAPP-003-002-005
RPGM-PM-BAPP-003-002-006
RPGM-PM-BAPP-003-002-007
RPGM-PM-BAPP-003-002-008
RPGM-PM-BAPP-003-002-010
RPGM-PM-BAPP-003-003-001
RPGM-PM-BAPP-003-003-002
RPGM-PM-BAPP-003-003-003
RPGM-PM-BAPP-003-003-004
RPGM-PM-BAPP-003-003-005
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-003-006
RPGM-PM-BAPP-003-003-007
RPGM-PM-BAPP-003-003-009
RPGM-PM-BAPP-003-003-011
RPGM-PM-BAPP-003-004-001
RPGM-PM-BAPP-003-004-003
RPGM-PM-BAPP-003-004-004
RPGM-PM-BAPP-003-004-005
RPGM-PM-BAPP-003-004-007
RPGM-PM-BAPP-003-004-009
RPGM-PM-BAPP-003-004-010
RPGM-PM-BAPP-003-004-011
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-004-012
RPGM-PM-BAPP-003-004-014
RPGM-PM-BAPP-003-004-016
RPGM-PM-BAPP-003-004-017
RPGM-PM-BAPP-003-004-021
RPGM-PM-BAPP-003-004-022
RPGM-PM-BAPP-003-004-023
RPGM-PM-BAPP-003-004-024
RPGM-PM-BAPP-003-004-025
RPGM-PM-BAPP-003-005-001
RPGM-PM-BAPP-003-006-001
RPGM-PM-BAPP-003-006-002
RPGM-PM-BAPP-004-001-001
RPGM-PM-BAPP-004-001-002
RPGM-PM-BAPP-004-001-003
RPGM-PM-BAPP-004-001-004
RPGM-PM-BAPP-004-001-006
RPGM-PM-BAPP-004-001-013
RPGM-PM-BAPP-004-001-015
RPGM-PM-BAPP-004-001-016
RPGM-PM-BAPP-004-001-017
RPGM-PM-BAPP-004-002-001
RPGM-PM-BAPP-004-002-003
RPGM-PM-BAPP-005-001-001
RPGM-PM-BAPP-005-001-002
RPGM-PM-BAPP-005-001-003
RPGM-PM-BAPP-005-001-004
RPGM-PM-BAPP-005-001-005
RPGM-PM-BAPP-005-002-001
RPGM-PM-BAPP-005-002-003
RPGM-PM-BAPP-005-002-004
RPGM-PM-BAPP-005-003-001
RPGM-PM-BAPP-005-003-003
RPGM-PM-BAPP-005-003-004
RPGM-PM-BAPP-005-003-005
RPGM-PM-BAPP-005-004-001
RPGM-PM-BAPP-005-004-002
RPGM-PM-BAPP-002-009-001
RPGM-PM-BAPP-002-009-001

RPGM-PM-BAPP-005-006-001

RPGM-PM-BAPP-005-006-002

RPGM-PM-BAPP-005-007-001

RPGM-PM-BAPP-005-008-001
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-001-001
RPGM-PM-BAPP-006-001-002
RPGM-PM-BAPP-006-002-001
RPGM-PM-BAPP-006-003-001
RPGM-PM-BAPP-006-004-001
RPGM-PM-BAPP-006-004-002

RPGM-PM-BAPP-006-005-001

RPGM-PM-BAPP-006-006-001

RPGM-PM-BAPP-006-007-001

RPGM-PM-BAPP-006-007-002
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-007-003
RPGM-PM-BAPP-007-001-001
RPGM-PM-BAPP-007-001-002
RPGM-PM-BAPP-008-001-001
RPGM-PM-BAPP-008-001-003
RPGM-PM-BAPP-008-002-001
RPGM-PM-BAPP-008-002-002
RPGM-PM-BAPP-008-003-001
RPGM-PM-BAPP-008-004-001
RPGM-PM-BAPP-008-004-002

RPGM-PM-BAPP-008-005-001

RPGM-PM-BAPP-009-001-001
RPGM-PM-BAPP-010-001-001
RPGM-PM-BAPP-010-001-002
RPGM-PM-BAPP-010-001-003
RPGM-PM-BAPP-010-001-004
RPGM-PM-BAPP-011-001-001
RPGM-PM-BAPP-011-001-002
RPGM-PM-BAPP-011-001-003
RPGM-PM-BAPP-012-001-001
RPGM-PM-BAPP-012-002-001
RPGM-PM-BAPP-012-003-001
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Prosedur

I STASIUN TEBU
II.1.1 Jembatan Timbang untuk Truk Tebu dan Molasses
Control Room
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
Prosedur Inspeksi Fabrikasi
II.1.2 Electric Gantry Cane Crane
Panel Control Room
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
Prosedur Inspeksi Fabrikasi
II.1.3 Meja Tebu
Cane Tumbler
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
Prosedur Inspeksi Fabrikasi
II.I.4 Autocane Feeding
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
Prosedur Inspeksi Fabrikasi

II STASIUN GILINGAN
II.1I.1 Cane Carrier 1
II.1I.2 Cane Cutter 1
Slip Ring Cane Cutter 1
II.1I.3 Cane Cutter 2
II.1I.4 HDHS
II.1I.5 Lube Oil
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.6 Carrier Elevator (Cane Carrier 2)
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.7 Motor Intermediate
Dhonelly Chute 1-4
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.8 Gear Box Siemens 1
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.9 Planetary 2
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.10 Planetary 3
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Prosedur

II.1I.11 Gear Box Siemens 4


Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.12 Inverter Room
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.13 Sistem Pelumas Gilingan
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.14 Rotary Screen Nira Mentah
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.15 Pompa Nira Mentah Belum Tersaring
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.16 Pompa Nira Mentah Tersaring
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.17 Tangki Nira Mentah Tersaring
Prosedur Inspeksi Lapangan
ITP Pekerjaan Civil (Shop)
II.1I.18 Pompa Nira Tertimbang
II.1I.19 Bagasse Handling

III STASIUN PEMURNIAN


II.1II.1 Pompa Imbibisi A B
II.1II.2 Juice Heater 1-3
II.1II.3 Pompa Kondensat Juice Heater A B
II.1II.4 Buffer condensate Tank
II.1II.5 Defekator 1-2
II.1II.6 Blower sulfitasi tower
II.1II.7 Sulfitasi Tower
II.1II.8 Rotary Sulfur Burner
II.1II.9 Screw Conveyor Sulfur
II.1II.10 Sublimator
II.1II.11 Sulfited Juice Pump
II.1II.12 Tangki Nira Tersulfitasi
II.1II.13 Clarifier
II.1II.14 Pompa Flokulan
II.1II.15 Flocculan Tank Agitator
II.1II.16 Flash tank
II.1II.17 Clear Juice screen (DSM)
II.1II.18 Pompa Nira Kotor
II.1II.19 Tangki Nira Kotor
II.1II.20 Pompa Nira Jernih
II.1II.21 Tangki Nira Jernih
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Prosedur

II.1II.22 Rotary Vacuum Filter


II.1II.23 Bagacillo Fan
II.1II.24 Mud Feed Mixer Rotary Vacuum Filter
II.1II.25 Mud Recirculation Pump
II.1II.26 Hot Water Pump
II.1II.27 Tangki Air Siraman
II.1II.28 Tangki Air Jatuhan
II.1II.29 Cake Belt Conveyor RVF
II.1II.30 Injection Pump RVF
II.1II.31 Vacuum Pump RVF
II.1II.32 Mud Recirculation Tank Agitator
II.1II.33 Pompa Filtrat 1-4
II.1II.34 Tangki Filtrat
II.1II.35 Tangki Barometric Condensor 1-2
II.1II.36 Tangki Receiver
II.1II.37 Tangki Cyclone
II.1II.38 Cake Storage Bin
II.1II.39 Control Room Pemurnian
II.1II.40 Juice Flow meter (Juice Smoothing)
II.1II.41 Sensor pH Nira Terdefekasi

IV STASIUN PENGUAPAN
II.1V.1 Evaporator 1A
II.1V.2 Evaporator 1B
II.1V.3 Evaporator 2
II.1V.4 Condensate Receiver Evaporator Pump A-F
II.1V.5 Condensate Receiver Evaporator Tank 1 - 3
II.1V.6 Pompa Injeksi Evaporator
II.1V.7 Pure Condensate tank
II.1V.8 Sweet Condensate tank
II.1V.9 Condensor Evaporator
II.1V.10 Pompa Nira Kental
II.1V.11 Tangki Nira Kental

V STASIUN MASAKAN
II.V.1 Vacuum pan A
II.V.2 Pompa Injeksi Vacuum Pan A C D
II.V.3 Palung Pendingin A
II.V.4 Pompa Rota A
II.V.5 Jet Condensor A
II.V.6 Vacuum pan C
II.V.7 Pompa Rota C
II.V.8 Jet Condensor C
II.V.9 Vacuum pan D
II.V.10 Palung Pendingin D
II.V.11 Pompa Rota D
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Prosedur

II.V.12 Jet Condensor D


II.V.13 Condensate Pump A B
II.V.14 Tangki Condensate
Pompa Remelter C D
II.V.15
Tangki Remelter
High Grade Centrifuge SHS 1
II.V.16
Control room
II.V.17 Screw Distributor Gula SHS
Peti Stroop
II.V.18
Peti Klare
II.V.19 Tanki Tetes
II.V.20 Pompa Klare

VI STASIUN PENGEMASAN
II.VI.1 Belt conveyor 1
II.VI.2 Belt conveyor 2
II.VI.3 Vibrating Screen
II.VI.4 Bucket elevator
II.VI.5 Sugar Dryer
II.VI.6 Ventury Tank
Bag sugar conveyor 1
II.VI.7
Bag sugar conveyor 2
II.VI.8 Sugar Bin
Timbangan Line 1
II.VI.9
Timbangan Line 2
Bag sewing 1
II.VI.10
Bag sewing 2
II.VI.11 Control Room Pengemasan

VII STASIUN IPAL & UTILITY


II.VII.1 Pompa Spray Pond 1/2
II.VII.2 Pompa Spray Pond 4
II.VII.3 Cooling Tower Fan A B
II.VII.4 Cooling Water Pump A B
II.VII.5 Demin Water Pump A B
II.VII.6 Demin Tank
II.VII.7 Condensate Pump A B
II.VII.8 CTT Pump A B
II.VII.9 Condensate Treatment Tank
Air Compressor A B
II.VII.10
Shelter Instrument Air
II.VII.11 WTP Plan System

VIII STASIUN LISTRIK / STG


II.VIII.1 Steam Turbine Generator Siemens
INSPECTION AND TEST PLAN FOR TURBINE SUPERVISORY PANEL
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Prosedur

INSPECTION & TEST PLAN FOR INSTALLATION STEAM TURBINE AN


II.VIII.2 Lube Oil System
INSPECTION & TEST PLANT FOR LUBE OIL SYSTEM
II.VIII.3 Control Room STG
II.VIII.4 Trafo
II.VIII.5 MV Switchgear
II.VIII.6 Diesel Engine Generator
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN

uk Tebu dan Molasses

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007
PGM-QC-PRC-100-002 d

d
PGM-QC-PRC-100-003 d
PGM-EG-PRC-100-007
PGM-QC-PRC-100-002 ds

c
PGM-QC-PRC-100-003
PGM-EG-PRC-100-007
PGM-QC-PRC-100-002

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007
PGM-QC-PRC-100-002

D
PGM-QC-PRC-100-003
PGM-EG-PRC-100-007 ds

PGM-QC-PRC-100-003 c
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007

PGM-QC-PRC-100-003
PGM-EG-PRC-100-007
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN

TEST PLAN FOR TURBINE SUPERVISORY PANEL PGM-COM-PRO-007


EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN

T PLAN FOR INSTALLATION STEAM TURBINE AND AUXILIARY PGM-QC-PRC-100-031

T PLANT FOR LUBE OIL SYSTEM PGM-MC2B01305


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

Jembatan Timbang untuk Truk Tebu dan Molasses


II.1.1
Control Room
Engineering Drawing
As Built Drawing [GA, Detail, dll
Plan lay out dan Detail ( Jembatan Timbang )
Plan Lay Out dan Detail ( Control Room Jembatan Timbang)
GAMBAR KONSTRUKSI JEMBATAN TIMBANG TRUCK TEBU DAN TRU
GAMBAR KONSTRUKSI PIPA CANE PREPARATION STATION
Data Sheet
DATA SHEET JEMBATAN TIMBANG TRUCK TEBU DAN MOLASSES
Detail Calculation
PERHITUNGAN PONDASI JEMBATAN TIMBANG KAPASITAS 50 TON
Quality Assurance Plan
QUALITY ASSURANCE PLAN
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Electric Gantry Cane Crane
II.1.2
Panel Control Room
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI ELECTRIC GANTRY CRANE
LAYOUT GIRDER UNLOADING CRANE
GAMBAR KONSTRUKSI PANEL STASIUN PENERIMAAN TEBU
Data Sheet
DATA SHEET ELECTRIC GANTRY CRANE
Detail Calculation
PERHITUNGAN MODIFIKASI CRANE BEAM EKSISTING BANGUNAN
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
Meja Tebu
II.1.3
Cane Tumbler
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI MEJA TEBU
GAMBAR MODIFIKASI BUILDING MEJA TEBU
GAMBAR PONDASI MODIFIKASI BUILDING MEJA TEBU
ARRANGEMENT MEJA TEBU DAN CANE LEVELLER
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
II Stasiun Penerimaan Tebu

GAMBAR STAGING PANEL MEJA TEBU


GENERAL ARRANGEMENT CANE PREPARATION MEJA TEBU - GILIN
GAMBAR KONSTRUKSI PANEL STASIUN PENERIMAAN TEBU
Data Sheet
DATA SHEET MEJA TEBU

Detail Calculation
PERHITUNGAN PONDASI MEJA TEBU
PERHITUNGAN MEJA TEBU
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.I.4 Autocane Feeding
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CONTROL ROOM AUTO CANE FEEDING
GAMBAR KONSTRUKSI AUTO CANE FEEDING
Data Sheet
DATA SHEET AUTO CANE FEEDING
AUTO CANE FEEDING KONTROL FILOSOFI
AUTO CANE FEEDING I/O LIST
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN
Author:

beri kode
uk Tebu dan Molasses D : Drawin
RPGM-PM-BAPP-001-001-001 ds : Data s
c : perhit
untuk setia
dimasukan
tail ( Jembatan Timbang ) PGM-CV1A01101 D
etail ( Control Room Jembatan Timbang) PGM-CV1A06101 D
KSI JEMBATAN TIMBANG TRUCK TEBU DAN TRUCK MOLASSES PGM-MC1A01101 D
KSI PIPA CANE PREPARATION STATION PGM-MC1B00101

ATAN TIMBANG TRUCK TEBU DAN MOLASSES PGM-MC1A01201 DS

NDASI JEMBATAN TIMBANG KAPASITAS 50 TON PGM-CV1A01201 C

PGM-QC-PRC-100-010

RPGM-PM-BAPP-001-002-001

KSI ELECTRIC GANTRY CRANE PGM-MC1A02101 D


PGM-MC1A02102 D
KSI PANEL STASIUN PENERIMAAN TEBU PGM-EL1A00101 D

TRIC GANTRY CRANE PGM-MC1A02201 DS

DIFIKASI CRANE BEAM EKSISTING BANGUNAN MEJA TEBU PGM-CV1B20301 C

PGM-QC-PRC-100-010

RPGM-PM-BAPP-001-003-001

PGM-CV1A03101 D
ASI BUILDING MEJA TEBU PGM-CV1B20101 D
MODIFIKASI BUILDING MEJA TEBU PGM-CV1B20102 D
EJA TEBU DAN CANE LEVELLER PGM-MC1A03102 D
EPCC Revitalisasi PG Mojo Author:

Sragen - Jawa Tengah -IRC di hapus semua

DOKUMEN AKHIR -data manufacture


dan sertifikat
DAFTAR ISI menyusul, dokumen
ada di pak bekti (QC)
DESKRIPSI NO. DOKUMEN
Author:

beri kode
PGM-MC1A31103 D D : Drawin
EMENT CANE PREPARATION MEJA TEBU - GILINGAN #1 PGM-MC1B00102 D ds : Data s
c : perhit
KSI PANEL STASIUN PENERIMAAN TEBU PGM-EL1A00101 D untuk setia
dimasukan
PGM-MC1A03201 DS

PGM-CV1A03301 C
PGM-MC1A03301 C

PGM-QC-PRC-100-010

RPGM-PM-BAPP-001-004-001

CONTROL ROOM AUTO CANE FEEDING PGM-CV1A04101 D


KSI AUTO CANE FEEDING PGM-MC1A04101 D

PGM-MC1A04201 DS
NG KONTROL FILOSOFI PGM-IC1A04201 DS
PGM-IC1A04202 DS

PGM-QC-PRC-100-010
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan

II.1I.1 Cane Carrier 1


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PAVEMENT STASIUN PENDAHULUAN & GILINGAN
GAMBAR KONSTRUKSI CANE CARRIER 1
GRAND DESIGN LAYOUT STASIUN PENERIMAAN - STASIUN GILINGA

Data Sheet
DATA SHEET MODIFIKASI MAIN CANE CARRIER
Detail Calculation
PERHITUNGAN MAIN CANE CARRIER
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
Cane Cutter 1
II.1I.2
Slip Ring Cane Cutter 1
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CANE CUTTER 1
Gambar Dimensional Cane Cutter 1
GAMBAR ARRANGEMENT CANE CUTTER - 1
GENERAL ARRANGEMENT FOR ACB PF CORRECTION CAPACITOR F
GENERAL ARRANGEMENT FOR ARS PANEL WITH SLIP REGULATOR
Data Sheet
DATA SHEET CANE CUTTER 1
Detail Calculation
PERHITUNGAN PONDASI CANE CUTTER 1
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.3 Cane Cutter 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CANE CUTTER 2
GAMBAR DIMENSIONAL CANE CUTTER 2
GAMBAR ARRANGEMENT CANE CUTTER - 2
Data Sheet
DATA SHEET CANE CUTTER 2
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.4 HDHS
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI HEAVY DUTY HAMMER SHREDDER ( HDHS )
GAMBAR KONSTRUKSI HDHS
GAMBAR KONSTRUKSI CANE LEVELLER SEBELUM HDHS
ARRANGEMENT STGING CANE LEVELLER SEBELUM HDHS
GAMBAR KUNSTRUKSI SLIP RING MOTOR HDHS
GAMBAR KONSTRUKSI PANEL ELEKTRIKAL HDHS
HEAVY DUTY HAMMER SHREDDER FOUNDATION LOAD DATA

Data Sheet
DATA SHEET LEVELLER SEBELUM HDHS
DATA SHEET SLIP RING MOTOR HDHS
ELECTRICAL LOAD SCHEDULE UNTUK HDHS
ELECTRICAL CABLE SCHEDULE UNTUK HDHS
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
IOM
INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR HD
Manufacture Data Record or MC per equipment
MDR untuk HDHS
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.5 Lube Oil
Engineering Drawing
As Built Drawing [GA, Detail, dll
BEARING & COOLER WATER PIPING ( MAIN & DRAIN ) FOR HDHS
BEARING LUBRICATION PIPING FOR HDHS
FORCED LUBRICATION SYSTEM FOR HDHS

Data Sheet
Detail Calculation
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.6 Carrier Elevator (Cane Carrier 2)
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI CANE CARRIER 2
Data Sheet
DATA SHEET MODIFIKASI CANE CARRIER 2
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
Motor Intermediate
II.1I.7
Dhonelly Chute 1-4
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KUNSTRUKSI INTERMEDITE CARRIER 1
GAMBAR KUNSTRUKSI MODIFIKASI INTERMEDIATE CARRIER 1
GAMBAR KUNSTRUKSI MODIFIKASI INTERMEDIATE CARRIER 2
GAMBAR KONSTRUKSI MODIFIKASI INTERMEDIATE CARRIER 3
Data Sheet
DATA SHEET INTERMEDIATE CARRIER ( MODIFIKASI )
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.8 Gear Box Siemens 1
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI PENGGERAK MILL 1 DAN 4
GAMBAR KONSTRUKSI PENGGERAK MILL 1
GAMBAR KONSTRUKSI PERALATAN ELEKTRIKAL PENGGERAK MILL
PROCESS & INSTRUMENTATION DIAGRAM MILLING STATION
Data Sheet
DATA SHEET PENGGERAK MILL 1
Detail Calculation
PERHITUNGAN PONDASI PENGGERAK MILL 1 DAN 4
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.9 Planetary 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PENGGERAK PONDASI PENGGERAK MILL 2
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
GAMBAR KONSTRUKSI PENGGERAK MILL # 2
DETAIL STAGING PENGGERAK MILL 2
GENERAL ARRANGEMENT PENGGERAK MILL 2 & 3
PANEL LISTRIK MILL 2 & MILL 3
GAMBAR MAINHOLE GEARBOX 2 & 3
Data Sheet
DATASHEET PENGGERAK GILINGAN 2
Detail Calculation
PERHITUNGAN PENGGERAK GILINGAN #2
PERHITUNGAN STRUKTUR KOLOM DAN PONDASI PENGGERAK MIL
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.10 Planetary 3
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI PENGGERAK MILL 3
GAMBAR KONSTRUKSI PENGGERAK MILL # 3
DETAIL STAGING PENGGERAK MILL 3
GENERAL ARRANGEMENT PENGGERAK MILL 2 & 3
PANEL LISTRIK MILL 2 & MILL 3
GAMBAR MAINHOLE GEARBOX 2 & 3
Data Sheet
DATASHEET PENGGERAK GILINGAN 3
Detail Calculation
PERHITUNGAN PENGGERAK GILINGAN #3
PERHITUNGAN STRUKTUR KOLOM DAN PONDASI PENGGERAK MIL
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.11 Gear Box Siemens 4
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI PENGGERAK MILL 1 DAN 4
GAMBAR KONSTRUKSI PENGGERAK MILL 4
GAMBAR KONSTRUKSI PERALATAN ELEKTRIKAL PENGGERAK MILL
PROCESS & INSTRUMENTATION DIAGRAM MILLING STATION
Data Sheet
DATA SHEET PENGGERAK MILL 4
PERHITUNGAN PONDASI PENGGERAK MILL 1 DAN 4
Quality Assurance Plan
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.12 Inverter Room
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR STRUKTUR PANEL ROOM GILINGAN
GAMBAR ARSITEK PANEL ROOM GILINGAN
LIGHTING SYSTEM FOR INVERTER ROOM
Data Sheet

Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi

IOM

Manufacture Data Record or MC per equipment

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1I.13 Sistem Pelumas Gilingan
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI SISTEM PELUMAS & PENDINGIN METAL GIL
ISOMETRIK STASIUN GILINGAN
P & ID SISTEM PELUMAS GILINGAN
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
Data Sheet
DATA SPESIFIKASI SISTEM PELUMAS DAN PENDINGIN METAL GILIN
Detail Calculation

Quality Assurance Plan


QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.14 Rotary Screen Nira Mentah
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR STRUKTUR DAN PONDASI ROTARY JUICE SCREEN
GAMBAR KONSTRUKSI SCREEN NIRA MENTAH
DETAIL ARR.SCREEN NIRA MENTAH
GAMBAR LAYOUT SCREEN NIRA MENTAH
Data Sheet
DATA SHEET SCREEN NIRA MENTAH
Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI ROTARY JUICE HEATER S
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.15 Pompa Nira Mentah Belum Tersaring
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA MENTAH BELUM TERSARING
GAMBAR KONSTRUKSI POMPA NIRA MENTAH BELUM TERSARING
Data Sheet
DATA SHEET POMPA NIRA MENTAH BELUM TERSARING
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA MENTAH BELUM TERSARIN
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.16 Pompa Nira Mentah Tersaring
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA MENTAH TERSARING
GAMBAR KONSTRUKSI POMPA NIRA MENTAH TERSARING
Data Sheet
DATA SPESIFIKASI POMPA NIRA MENTAH TERSARING
DATA SPESIFIKASI POMPA NIRA MENTAH TERSARING
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA MENTAH TERSARING
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.17 Tangki Nira Mentah Tersaring
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI NIRA MENTAH TERSARING
LAYOUT TANGKI NIRA MENTAH TERSARING CAP. 6 M3
GAMBAR KONSTRUKSI TANGKI NIRA MENTAH TERSARING CAP. 6 M
Data Sheet
DATA SHEET TANGKI NIRA MENTAH TERSARING
Detail Calculation
PERHITUNGAN PONDASI TANGKI NIRA MENTAH TERSARING
Quality Assurance Plan
QUALITY ASSURANCE PLAN
Fabrication or Erection Procedure
Prosedur Inspeksi Fabrikasi
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.18 Pompa Nira Tertimbang
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA MENTAH TERTIMBANG
GAMBAR KONSTRUKSI POMPA NIRA MENTAH TERTIMBANG
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan

Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA MENTAH TERTIMBANG
Quality Assurance Plan
IOM
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.19 Bagasse Handling
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI BAGGASE HANDLING
GAMBAR KONSTRUKSI BAGASSE HANDLING
DETAIL BAGASSE CARRIER II ( DOUBLE DECK ) UNTUK BOILER ISG
DETAIL BAGGASE CARRIER I ( SINGLE DECK ) UNTUK BOILER ISGEC
ARRANGEMENT STAGING BAGGASE HANDLING
GAMBAR KONSTRUKSI PANEL BAGASSE HANDLING
Data Sheet
DATA SPESIFIKASI BAGASSE HANDLING SYSTEM
Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI BAGGASE HANDLING
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1I.20 Magnetic Flowmeter Gilingan
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet
DATASHEET MAGNETIC FLOW METER
Data Spesifikasi Peralatan Elektrikal Magnetic Flowmeter
Data Spesifikasi Peralatan Instrument Magnetic Flowmeter
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
III Stasiun Gilingan
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-002-001-001

STASIUN PENDAHULUAN & GILINGAN PGM-CV2D01101 D


CANE CARRIER 1 PGM-MC1B02101
T STASIUN PENERIMAAN - STASIUN GILINGAN PGM-MC1A00101

ASI MAIN CANE CARRIER PGM-MC1B02201 DS

PGM-MC1B02301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-002-001
RPGM-PM-BAPP-002-002-002

PGM-CV1B04101 D
PGM-MC1B04101 D
NT CANE CUTTER - 1 PGM-MC1B04102 D
ENT FOR ACB PF CORRECTION CAPACITOR FOR 350 KW CUTTER MOTOR PGM-EL1B04102 D
ENT FOR ARS PANEL WITH SLIP REGULATOR FOR 350 KW CUTTER MOTOR PGM-EL1B04101 D

PGM-MC1B04201 DS

ASI CANE CUTTER 1 PGM-CV1B04301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-002-002-003

PGM-CV1B05101 D
L CANE CUTTER 2 PGM-MC1B05101 D
NT CANE CUTTER - 2 PGM-MC1B05102 D

PGM-MC1B05201 DS

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-003-001

AVY DUTY HAMMER SHREDDER ( HDHS ) PGM-CV1B06101 D


PGM-MC1B06101 D
CANE LEVELLER SEBELUM HDHS PGM-MC1B16101 D
G CANE LEVELLER SEBELUM HDHS PGM-MC1B16102 D
SLIP RING MOTOR HDHS PGM-MC1B21101 D
PANEL ELEKTRIKAL HDHS PGM-EL1B21101 D
R SHREDDER FOUNDATION LOAD DATA PGM-CV1B06102

R SEBELUM HDHS PGM-MC1B16201 DS


PGM-MC1B21201 DS
HEDULE UNTUK HDHS PGM-EL1B21102 DS
HEDULE UNTUK HDHS PGM-EL1B21202 DS

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

ATION AND MAINTENANCE MANUAL FOR HDHS PGM-MC1B06301 IM

RPGM-PM-BAPP-002-003-002

ATER PIPING ( MAIN & DRAIN ) FOR HDHS PGM-MC1B06102 D


N PIPING FOR HDHS PGM-MC1B06103 D
SYSTEM FOR HDHS PGM-MC1B06104 D

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-004-001

CANE CARRIER 2 PGM-MC1B03102 D

ASI CANE CARRIER 2 PGM-MC1B03201 DS

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-005-001
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

INTERMEDITE CARRIER 1 PGM-MC1B12102 D


MODIFIKASI INTERMEDIATE CARRIER 1 PGM-MC1B20101 D
MODIFIKASI INTERMEDIATE CARRIER 2 PGM-MC1B20102 D
MODIFIKASI INTERMEDIATE CARRIER 3 PGM-MC1B20103 D

DIATE CARRIER ( MODIFIKASI ) PGM-MC1B20201 DS

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-006-001

NGGERAK MILL 1 DAN 4 PGM-CV1B11101 D


PENGGERAK MILL 1 PGM-MC1B07101 D
PERALATAN ELEKTRIKAL PENGGERAK MILL 1 & 4 PGM-EL1B07101 D
NTATION DIAGRAM MILLING STATION PGM-PS1000102-1 D

PGM-MC1B07201 DS

ASI PENGGERAK MILL 1 DAN 4 PGM-CV1B11301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-006-002

PONDASI PENGGERAK MILL 2 PGM-CV1B09101 D


EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

PENGGERAK MILL # 2 PGM-MC1B09101 D


PGM-MC1B09102 D
ENT PENGGERAK MILL 2 & 3 PGM-MC1B00103 D
PGM-EL1B00102 D
PGM-CV1B22101 D

PGM-MC1B09201 DS

ERAK GILINGAN #2 PGM-MC1B09301 C


TUR KOLOM DAN PONDASI PENGGERAK MILL 2 PGM-CV1B09301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-006-003

NGGERAK MILL 3 PGM-CV1B10101 D


PENGGERAK MILL # 3 PGM-MC1B10101 D
PGM-MC1B10102 D
ENT PENGGERAK MILL 2 & 3 PGM-MC1B00103 D
PGM-EL1B00102 D
PGM-CV1B22101 D

PGM-MC1B10201 DS

ERAK GILINGAN #3 PGM-MC1B10301 C


TUR KOLOM DAN PONDASI PENGGERAK MILL 3 PGM-CV1B10301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-006-004
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

NGGERAK MILL 1 DAN 4 PGM-CV1B11101 D


PENGGERAK MILL 4 PGM-MC1B08101 D
PERALATAN ELEKTRIKAL PENGGERAK MILL 1 & 4 PGM-EL1B07101 D
NTATION DIAGRAM MILLING STATION PGM-PS1000102-1 D

PGM-MC1B08201 DS
ASI PENGGERAK MILL 1 DAN 4 PGM-CV1B11301 C

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-006-005

ANEL ROOM GILINGAN PGM-CV1B21101 D


NEL ROOM GILINGAN PGM-CV1B21102 D
R INVERTER ROOM PGM-EL1B05101 D

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-007-001

SISTEM PELUMAS & PENDINGIN METAL GILINGAN PGM-MC1B15101 D


PGM-MC1B11104 D
PGM-PS1B15101 D
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

TEM PELUMAS DAN PENDINGIN METAL GILINGAN PGM-MC1B15201 DS

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-008-001

AN PONDASI ROTARY JUICE SCREEN PGM-CV1B11102 D


SCREEN NIRA MENTAH PGM-MC1B11101 D
PGM-MC1B11102 D
EEN NIRA MENTAH PGM-MC1B11103 D

PGM-MC1B11201 DS

TUR DAN PONDASI ROTARY JUICE HEATER SCREEN PGM-CV1B11302 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-010-001

MPA NIRA MENTAH BELUM TERSARING PGM-CV1B17101 D


POMPA NIRA MENTAH BELUM TERSARING PGM-MC1B17101 D

IRA MENTAH BELUM TERSARING PGM-MC1B17201 DS

ASI POMPA NIRA MENTAH BELUM TERSARING PGM-CV1B17301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-002-011-001

MPA NIRA MENTAH TERSARING PGM-CV1B19101 D


POMPA NIRA MENTAH TERSARING PGM-MC1B19101 D

MPA NIRA MENTAH TERSARING PGM-MC1C01201 DS


MPA NIRA MENTAH TERSARING PGM-MC1B19201 DS

ASI POMPA NIRA MENTAH TERSARING PGM-CV1B19301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-011-003

NGKI NIRA MENTAH TERSARING PGM-CV1B18101 D


MENTAH TERSARING CAP. 6 M3 PGM-MC1B18102 D
TANGKI NIRA MENTAH TERSARING CAP. 6 M3 PGM-MC1B18101 D

NIRA MENTAH TERSARING PGM-MC1B18201 DS

ASI TANGKI NIRA MENTAH TERSARING PGM-CV1B18301 C

PGM-QC-PRC-100-010

PGM-QC-PRC-100-002

RPGM-PM-BAPP-002-012-001

MPA NIRA MENTAH TERTIMBANG PGM-CV1C01101


POMPA NIRA MENTAH TERTIMBANG PGM-MC1C01101
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN

ASI POMPA NIRA MENTAH TERTIMBANG PGM-CV1C01301

RPGM-PM-BAPP-002-013-001

GGASE HANDLING PGM-CV2A03101 D


BAGASSE HANDLING PGM-MC2A03101 D
RIER II ( DOUBLE DECK ) UNTUK BOILER ISGEC PGM-MC2A03101-1 D
RIER I ( SINGLE DECK ) UNTUK BOILER ISGEC PGM-MC2A03101-2 D
NG BAGGASE HANDLING PGM-MC2A03101-3 D
PANEL BAGASSE HANDLING PGM-EL2A03101 D

GASSE HANDLING SYSTEM PGM-MC2A03201 DS

TUR DAN PONDASI BAGGASE HANDLING PGM-CV2A03301 C

RPGM-PM-BAPP-002-014-001

PGM-MC1B13201 DS
tan Elektrikal Magnetic Flowmeter PGM-EL1B13201 DS
tan Instrument Magnetic Flowmeter PGM-IC1B13201 DS
EPCC Revitalisasi PG Mojo Author: Author:
Sragen - Jawa Tengah beri kode
-IRC di hapus semua D : Drawing
ds : Data shee
DOKUMEN AKHIR -data manufacture dan c : perhitung
sertifikat menyusul, untuk setiap d
DAFTAR ISI dokumen ada di pak sudah dimasu
bekti (QC)
DESKRIPSI NO. DOKUMEN
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

II.1II.1 Pompa Imbibisi A B


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PAVEMENT STASIUN PEMURNIAN
ISOMETRIK STASIUN PEMURNIAN
EQUIPMENT LAYOUT STASIUN PEMURNIAN
GAMBAR PONDASI POMPA IMBIBISI
GAMBAR KUNSTRUKSI POMPA IMBIBISI
PANEL LISTRIK POMPA IMBIBISI
GAMBAR KONSTRUKSI PANEL ST.PEMURNIAN
Data Sheet
DATA SHEET POMPA IMBIBISI
Detail Calculation
Perhitungan Pondasi Pompa Imbibisi
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.2 Juice Heater 1-3
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CLEAR JUICE HEATER
GAMBAR PONDASI JUICE HEATER
General Arrangement Juice Heater
Layout Juice Heater LP 360 M2
DETAIL LAYOUT STAGING JUICE HEATER LP 360 M
GAMBAR RELOKASI STAGING JUICE HEATER EXISTING
STAGING JUICE HEATER LP 360M2

Data Sheet
Data Sheet Juice Heater
Detail Calculation
PERHITUNGAN PONDASI DAN STRUKTUR BAJA JUICE HEATER
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.3 Pompa Kondensat Juice Heater A B
Engineering Drawing
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

As Built Drawing [GA, Detail, dll


PONDASI POMPA KONDENSATE U-JUICE HEATER
GAMBAR KUNSTRUKSI POMPA KONDENSAT JUICE HEATER
PANEL LISTRIK POMPA KONDENSATE JUICE HEATER 1,2,3.

Data Sheet
Data Sheet Pompa Kondensat Juice Heater
Detail Calculation
Perhitungan Pondasi Pompa Condensate U/ Juice Heater
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.4 Buffer condensate Tank
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI BUFFER CONDENSATE TANK
GAMBAR PONDASI BUFFER CONDENSATE TANK
Data Sheet
DATA SHEET BUFFER CONDENSATE TANK
Detail Calculation
PERHITUNGAN PONDASI BUFFER CONDENSATE TANK
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.5 Defekator 1-2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI DEFEKATOR 1 & 2
GAMBAR MODIFIKASI ATAP DEFEKATOR
GAMBAR STAGING ATAP SULFUR TOWER & DEFEKATOR
GAMBAR KONTRUKSI DEFEKATOR 1 KAPASITAS 15M3
GAMBAR INSTALASI DEFEKATOR 1 & 2
GAMBAR KONSTRUKSI PEMBAGI SUSU KAPUR UNTUK SPLITTER BO
GAMBAR KONTRUKSI DEFEKATOR 2 KAPASITAS 2,5 M3
GAMBAR INSTALASI DEFEKATOR & SULFITASI TOWER
STAGING INSTALASI DEFEKATOR DAN SULFITASI TOWER
GAMBAR SEBELUM DAN SESUDAH INSTALASI DEFEKATOR & SULFI
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Data Sheet
DATA SHEET DEFEKATOR 1
DATA SHEET DEFEKATOR 2
Detail Calculation
PERHITUNGAN PONDASI DAN STRUKTUR BAJA DEFEKATOR 1 & 2
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.6 Blower sulfitasi tower
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI SEPARATOR SULFITASI TOWER
Data Sheet

Detail Calculation

Quality Assurance Plan


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Fabrication or Erection Procedure


Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.7 Sulfitasi Tower
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR INSTALASI DEFEKATOR & SULFITASI TOWER
STAGING INSTALASI DEFEKATOR DAN SULFITASI TOWER
GAMBAR SEBELUM DAN SESUDAH INSTALASI DEFEKATOR & SULFI
GAMBAR KONSTRUKSI SULFITASI TOWER
GAMBAR KONSTRUKSI ACTUATOR PENJATAH KAPUR
Data Sheet
DATA SPESIFIKASI SULFITASI TOWER
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.8 Rotary Sulfur Burner
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI ROTARY SULFUR BURNER
GAMBAR KUNSTRUKSI ROTARY SULFUR BURNER
Data Sheet
DATA SPESIFIKASI ROTARY SULFUR BURNER
Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI ROTARY SULFUR BURNER
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.9 Screw Conveyor Sulfur
Engineering Drawing
As Built Drawing [GA, Detail, dll
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

GAMBAR PONDASI SCREW SULFUR HOOPER


GAMBAR KONSTRUKSI SCREW CONVEYOR SULFUR
GAMBAR KUNSTRUKSI SULFUR HOPPER
GENERAL ARRANGEMENT SITEM GAS SULFUR
Data Sheet
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.10 Sublimator
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI SUBLIMATOR
GAMBAR KONSTRUKSI SUBLIMATOR
Data Sheet

Detail Calculation
PERHITUNGAN PONDASI TANGKI SUBLIMATOR
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.11 Sulfited Juice Pump
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA MENTAH TERSULFITASI
GAMBAR KONSTRUKSI SULFITED JUICE PUMP
Data Sheet
DATA SPESIFIKASI SULFITED JUICE PUMP
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA MENTAH TERSULFITASI
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Manufacture Data Record or MC per equipment


Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.12 Tangki Nira Tersulfitasi
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI NIRA TERSULFITASI
GAMBAR KONSTRUKSI TANGKI NIRA MENTAH TERSULFITASI
Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.13 Clarifier
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CLARIFIER
GAMBAR MODIFIKASI ATAP CLARIFIER
GAMBAR KONSTRUKSI CLARIFIER KAPASITAS 225 M3 / JAM
LAYOUT CLARIFIER KAPASITAS 225 M3 / JAM
GAMBAR KONSTRUKSI CLARIFIER STATION
DETAIL STAGING CLARIFIER KAPASITAS 225 M3 PER JAM
DETAIL CLARIFIER
Data Sheet
DATA SHEET CLARIFIER
Detail Calculation
PERHITUNGAN PONDASI DAN STRUCTURE BAJA CLARIFIER
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.14 Pompa Flokulan
Engineering Drawing
As Built Drawing [GA, Detail, dll
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.15 Flocculan Tank Agitator
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONTRUKSI TANGKI FLOKULAN
Data Sheet
DATA SPESIFIKASI TANGKI FLOKULAN
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.16 Flash tank
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI FLASH TANK
GAMBAR KONSTRUKSI FLASH TANK
GAMBAR STAGGING FLASH TANK
Data Sheet
DATA SPESIFIKASI FLASH TANK
Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI FLASH TANK
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

II.1II.17 Clear Juice screen (DSM)


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI CLEAR JUICE SCREEN
Data Sheet
DATA SHEET CLEAR JUICE SCREEN
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.18 Pompa Nira Kotor
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA KOTOR
GAMBAR KUNSTRUKSI POMPA NIRA KOTOR
Data Sheet

Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA KOTOR
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.19 Tangki Nira Kotor
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI NIRA KOTOR
GAMBAR KONSTRUKSI TANGKI NIRA KOTOR UNTUK CLARIFIER
Data Sheet
DATA SHEET TANGKI NIRA KOTOR UNTUK CLARIFIER
Detail Calculation
PERHITUNGAN PONDASI TANGKI NIRA KOTOR
Quality Assurance Plan
Inspection & Test Plan
Fabrication or Erection Procedure
Installation Manual
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.20 Pompa Nira Jernih
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA JERNIH
GAMBAR KONSTRUKSI POMPA NIRA JERNIH
Data Sheet
DATA SPESIFIKASI POMPA NIRA JERNIH
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA JERNIH
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.21 Tangki Nira Jernih
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI NIRA JERNIH
GAMBAR KONTRUKSI TANGKI NIRA JERNIH 4 M3
Data Sheet
DATA SHEET TANGKI NIRA JERNIH
Detail Calculation
PERHITUNGAN PONDASI TANGKI NIRA JERNIH
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.22 Rotary Vacuum Filter
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI ROTARY VACUUM FILTER DAN AUXILIARY
GAMBAR KONSTRUKSI ROTARY VACUUM FILTER
GAMBAR INSTALASI ROTARY VACUUM FILTER
GENERAL ARRANGEMENT ROTARY VACUUM FILTER
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

GAMBAR STAGING ROTARY VACUUM FILTER


GAMBAR STAGING PANEL RVF STATION
GAMBAR KONSTRUKSI PANEL ROTARY VACUUM FILTER
Data Sheet
DATA SHEET ROTARY VACUUM FILTER
Detail Calculation
PERHITUNGAN PONDASI ROTARY VACUUM FILTER DAN AUXULARY
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
MANUAL INSTRUCTION FOR ROTARY VACUUM FILTER
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.23 Bagacillo Fan
Engineering Drawing
As Built Drawing [GA, Detail, dll

GAMBAR KONSTRUKSI BAGACILLO FAN


Data Sheet
DATA SPESIFIKASI BAGACILO FAN
DATA SHEET BAGACILLO SCREEN DAN HOOPER
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.24 Mud Feed Mixer Rotary Vacuum Filter
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KUNSTRUKSI MUD FEED MIXER RVF
Data Sheet
DATA SHEET MUD FEED MIXER ROTARY VACUUM FILTER
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.25 Mud Recirculation Pump
Engineering Drawing
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

As Built Drawing [GA, Detail, dll


GAMBAR KUNSTRUKSI MUD RECIRCULATION PUMP
GAMBAR PONDASI TANGKI NIRA KOTOR
GAMBAR PONDASI POMPA NIRA KOTOR
Data Sheet
DATA SHEET MUD RECIRCULATING PUMP
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA KOTOR
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.26 Hot Water Pump
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI HOT WATER PUMP
GAMBAR KONSTRUKSI POMPA HOT WATER UNTUK VACUUM FILTE
Data Sheet
DATA SHEET POMPA HOT WATER UNTUK VACUUM FILTER
Detail Calculation
PERHITUNGAN PONDASI HOT WATER PUMP
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.27 Tangki Air Siraman
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI AIR SIRAMAN
GAMBAR KONSTRUKSI TANGKI AIR SIRAMAN RVF
Data Sheet
DATA SHEET TANGKI AIR SIRAMAN
Detail Calculation
PERHITUNGAN PONDASI TANGKI AIR SIRAMAN
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.28 Tangki Air Jatuhan
Engineering Drawing
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

As Built Drawing [GA, Detail, dll

GAMBAR KONSTRUKSI TANGKI JATUHAN CONDENSOR RVF


Data Sheet

Detail Calculation
PERHITUNGAN KAPASITAS SALURAN AIR JATUHAN
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.29 Cake Belt Conveyor RVF
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI CAKE BELT CONVEYOR RVF
Data Sheet
DATA SPESIFIKASI CAKE BELT CONVEYOR RVF
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.30 Injection Pump RVF
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA INJEKSI RVF
GAMBAR KONSTRUKSI POMPA INJEKSI RVF
Data Sheet
DATA SHEET POMPA INJEKSI RVF
Detail Calculation
PERHITUNGAN PONDASI POMPA INJEKSI RVF
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.31 Vacuum Pump RVF
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA VACUUM RVF
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

GAMBAR KONSTRUKSI VACUUM PUMP RVF


Data Sheet

Detail Calculation
PERHITUNGAN PONDASI POMPA VACUUM RVF
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.32 Mud Recirculation Tank Agitator
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI MUD TANGKI
GAMBAR KONSTRUKSI MUD TANK
Data Sheet
DATA SHEET MUD TANK
Detail Calculation
PERHITUNGAN PONDASI MUD TANK
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.33 Pompa Filtrat 1-4
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA FILTRAT RVF
GAMBAR KUNSTRUKSI POMPA FILTRAT
Data Sheet

Detail Calculation
PERHITUNGAN PONDASI POMPA FILTRATE RVF
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.34 Tangki Filtrat
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI TANGKI FILTRAT
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

DATA SPESIFIKASI TANGKI FILTRAT


Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.35 Tangki Barometric Condensor 1-2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI BAROMETRIC CONDENSOR ROTARY VACUUM
GAMBAR MODIFIKASI ATAP BAROMETER CONDENSOR RVF
Data Sheet
DATA SHEET BAROMETRIC CONDENSOR
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue

Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.37 Tangki Cyclone
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI BAGASSE CYCLONE RVF
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.38 Cake Storage Bin
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CAKE STORAGE BIN
GAMBAR DESAIN ATAP CAKE HOPPER RVF
GAMBAR KONSTRUKSI CAKE STORAGE BIN RVF
DETAIL CAKE STORAGE BIN
Data Sheet
DATA SPESIFIKASI CAKE STORAGE BIN RVF
Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI CAKE STORAGE BIN
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.39 Control Room Pemurnian
Engineering Drawing
As Built Drawing [GA, Detail, dll]

Data Sheet
Detail Calculation
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.40 Juice Flow meter (Juice Smoothing)
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet
DATA SHEET JUICE MASS FLOWMETER
Data Spesifikasi Peralatan Instrument Juice Flowmeter (Juice smoot
Detail Calculation
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IV Stasiun Pemurnian

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1II.41 Sensor pH Nira Terdefekasi
Engineering Drawing
As Built Drawing [GA, Detail, dll
Data Sheet
DATA SHEET SENSOR UNTUK PH METER NIRA TERDEFEKASI
Detail Calculation
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-002-009-001

NT STASIUN PEMURNIAN PGM-CV2D01102


PGM-MC1C01102
UT STASIUN PEMURNIAN PGM-MC1C00101
PGM-CV1B07101 D
UKSI POMPA IMBIBISI PGM-MC1B12101 D
PGM-EL1B12101 D
KSI PANEL ST.PEMURNIAN PGM-EL1C00101

PGM-MC1B12201 DS

PGM-CV1B07301 C

RPGM-PM-BAPP-003-001-001

CLEAR JUICE HEATER PGM-CV1C03102


PGM-CV1C03101 D
PGM-MC1C03101 D
PGM-MC1C03102 D
AGING JUICE HEATER LP 360 M PGM-MC1C03104 D
I STAGING JUICE HEATER EXISTING PGM-MC1C03105 D
PGM-MC1C03103 D

PGM-MC1C03201 DS

NDASI DAN STRUKTUR BAJA JUICE HEATER PGM-CV1C03301 C

RPGM-PM-BAPP-003-001-004
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

ONDENSATE U-JUICE HEATER PGM-CV1C05101 D


UKSI POMPA KONDENSAT JUICE HEATER PGM-MC1C05101 D
MPA KONDENSATE JUICE HEATER 1,2,3. PGM-EL1C05101 D

Kondensat Juice Heater PGM-MC1C05201 DS

si Pompa Condensate U/ Juice Heater PGM-CV1C05301 C

RPGM-PM-BAPP-003-001-006

BUFFER CONDENSATE TANK PGM-CV1C04101 D


BUFFER CONDENSATE TANK PGM-MC1C04101 D

ER CONDENSATE TANK PGM-MC1C04201 DS

NDASI BUFFER CONDENSATE TANK PGM-CV1C04301 C

RPGM-PM-BAPP-003-002-001

PGM-CV1C06101 D
ASI ATAP DEFEKATOR PGM-CV1C06102 D
ATAP SULFUR TOWER & DEFEKATOR PGM-CV1C08101-1 D
KSI DEFEKATOR 1 KAPASITAS 15M3 PGM-MC1C06101 D
SI DEFEKATOR 1 & 2 PGM-MC1C06102 D
KSI PEMBAGI SUSU KAPUR UNTUK SPLITTER BOX PGM-MC1C06105 D
KSI DEFEKATOR 2 KAPASITAS 2,5 M3 PGM-MC1C07101 D
SI DEFEKATOR & SULFITASI TOWER PGM-MC1C07102 D
I DEFEKATOR DAN SULFITASI TOWER PGM-MC1C07103 D
M DAN SESUDAH INSTALASI DEFEKATOR & SULFITASI TOWER PGM-MC1C07104 D
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PGM-MC1C06201 DS
PGM-MC1C07201 DS

NDASI DAN STRUKTUR BAJA DEFEKATOR 1 & 2 PGM-CV1C06301 C

RPGM-PM-BAPP-003-002-003

KSI SEPARATOR SULFITASI TOWER PGM-MC1C08102 D


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-002-004

SI DEFEKATOR & SULFITASI TOWER PGM-MC1C07102 D


I DEFEKATOR DAN SULFITASI TOWER PGM-MC1C07103 D
M DAN SESUDAH INSTALASI DEFEKATOR & SULFITASI TOWER PGM-MC1C07104 D
KSI SULFITASI TOWER PGM-MC1C08101 D
KSI ACTUATOR PENJATAH KAPUR PGM-MC1C08103 D

PGM-MC1C08201 DS

RPGM-PM-BAPP-003-002-005

ROTARY SULFUR BURNER PGM-CV1C32101 D


UKSI ROTARY SULFUR BURNER PGM-MC1C32101 D

ROTARY SULFUR BURNER PGM-MC1C32201 DS

RUKTUR DAN PONDASI ROTARY SULFUR BURNER PGM-CV1C32301 C

RPGM-PM-BAPP-003-002-006
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

SCREW SULFUR HOOPER PGM-CV1C38101 D


KSI SCREW CONVEYOR SULFUR PGM-MC1C32103 D
UKSI SULFUR HOPPER PGM-MC1C32102
EMENT SITEM GAS SULFUR PGM-MC1C32104

RPGM-PM-BAPP-003-002-007

TANGKI SUBLIMATOR PGM-CV1C37101 D


PGM-MC1C38101 D

NDASI TANGKI SUBLIMATOR PGM-CV1C37301 C

RPGM-PM-BAPP-003-002-008

POMPA NIRA MENTAH TERSULFITASI PGM-CV1C33101 D


KSI SULFITED JUICE PUMP PGM-MC1C33101 D

SULFITED JUICE PUMP PGM-MC1C33201 DS

NDASI POMPA NIRA MENTAH TERSULFITASI PGM-CV1C33301 C


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-002-010

TANGKI NIRA TERSULFITASI PGM-CV1C36101 D


KSI TANGKI NIRA MENTAH TERSULFITASI PGM-MC1C36101 D

RPGM-PM-BAPP-003-003-001

PGM-CV1C09101 D
ASI ATAP CLARIFIER PGM-CV1C09102 D
KSI CLARIFIER KAPASITAS 225 M3 / JAM PGM-MC1C09101 D
R KAPASITAS 225 M3 / JAM PGM-MC1C09102 D
KSI CLARIFIER STATION PGM-MC1C09103 D
LARIFIER KAPASITAS 225 M3 PER JAM PGM-MC1C09104 D
PGM-MC1C09105 D

PGM-MC1C09201 DS

NDASI DAN STRUCTURE BAJA CLARIFIER PGM-CV1C09301 C

RPGM-PM-BAPP-003-003-002
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-003-003

KSI TANGKI FLOKULAN PGM-MC1C11101 D

PGM-MC1C11201 DS

RPGM-PM-BAPP-003-003-004

PGM-CV1C10101 D
PGM-MC1C10101 D
PGM-MC1C10102 D

PGM-MC1C10201 DS

RUKTUR DAN PONDASI FLASH TANK PGM-CV1C10301 C


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-003-005

KSI CLEAR JUICE SCREEN PGM-MC1C15101 D

PGM-MC1C15201 DS

RPGM-PM-BAPP-003-003-006

POMPA NIRA KOTOR PGM-CV1C14101 D


UKSI POMPA NIRA KOTOR PGM-MC1C14101 D

NDASI POMPA NIRA KOTOR PGM-CV1C14301 C

RPGM-PM-BAPP-003-003-007

TANGKI NIRA KOTOR PGM-CV1C13101 D


KSI TANGKI NIRA KOTOR UNTUK CLARIFIER PGM-MC1C13101 D

KI NIRA KOTOR UNTUK CLARIFIER PGM-MC1C13201 DS

NDASI TANGKI NIRA KOTOR PGM-CV1C13301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-003-009

POMPA NIRA JERNIH PGM-CV1C17101 D


KSI POMPA NIRA JERNIH PGM-MC1C17101 D

POMPA NIRA JERNIH PGM-MC1C17201 DS

NDASI POMPA NIRA JERNIH PGM-CV1C17301 C

RPGM-PM-BAPP-003-003-011

TANGKI NIRA JERNIH PGM-CV1C16101 D


KSI TANGKI NIRA JERNIH 4 M3 PGM-MC1C16101 D

PGM-MC1C16201 DS

NDASI TANGKI NIRA JERNIH PGM-CV1C16301 C

RPGM-PM-BAPP-003-004-001

ROTARY VACUUM FILTER DAN AUXILIARY PGM-CV1C20101 D


KSI ROTARY VACUUM FILTER PGM-MC1C18101 D
SI ROTARY VACUUM FILTER PGM-MC1C18102 D
EMENT ROTARY VACUUM FILTER PGM-MC1C18103 D
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

ROTARY VACUUM FILTER PGM-MC1C18104 D


PANEL RVF STATION PGM-EL1C18102 D
KSI PANEL ROTARY VACUUM FILTER PGM-EL1C18101 D

PGM-MC1C18201 DS

NDASI ROTARY VACUUM FILTER DAN AUXULARY PGM-CV1C20301 C

TION FOR ROTARY VACUUM FILTER PGM-COMM-MAN-003-001

RPGM-PM-BAPP-003-004-003

KSI BAGACILLO FAN PGM-MC1C21101 D

PGM-MC1C21201 DS
CILLO SCREEN DAN HOOPER PGM-MC1C20201 DS

RPGM-PM-BAPP-003-004-004

UKSI MUD FEED MIXER RVF PGM-MC1C22101 D

FEED MIXER ROTARY VACUUM FILTER PGM-MC1C22201 DS

RPGM-PM-BAPP-003-004-005
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

UKSI MUD RECIRCULATION PUMP PGM-MC1C23101 D


TANGKI NIRA KOTOR PGM-CV1C13101 D
POMPA NIRA KOTOR PGM-CV1C14101 D

RECIRCULATING PUMP PGM-MC1C23201 DS

NDASI POMPA NIRA KOTOR PGM-CV1C14301 C

RPGM-PM-BAPP-003-004-007

PGM-CV1C24101 D
KSI POMPA HOT WATER UNTUK VACUUM FILTER PGM-MC1C24101 D

A HOT WATER UNTUK VACUUM FILTER PGM-MC1C24201 DS

NDASI HOT WATER PUMP PGM-CV1C24301 C

RPGM-PM-BAPP-003-004-009

TANGKI AIR SIRAMAN PGM-CV1C25101


KSI TANGKI AIR SIRAMAN RVF PGM-MC1C25101

PGM-MC1C25201

NDASI TANGKI AIR SIRAMAN PGM-CV1C25301

RPGM-PM-BAPP-003-004-010
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

KSI TANGKI JATUHAN CONDENSOR RVF PGM-MC1C19102 D

PASITAS SALURAN AIR JATUHAN PGM-PS0G02301 C

RPGM-PM-BAPP-003-004-011

KSI CAKE BELT CONVEYOR RVF PGM-MC1C26101

CAKE BELT CONVEYOR RVF PGM-MC1C26201

RPGM-PM-BAPP-003-004-012

POMPA INJEKSI RVF PGM-CV1C18101-1


KSI POMPA INJEKSI RVF PGM-MC1C28101

PGM-MC1C28201

NDASI POMPA INJEKSI RVF PGM-CV1C18201-1

RPGM-PM-BAPP-003-004-014

POMPA VACUUM RVF PGM-CV1C18101-2


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

KSI VACUUM PUMP RVF PGM-MC1C40101

NDASI POMPA VACUUM RVF PGM-CV1C18201-2

RPGM-PM-BAPP-003-004-016

PGM-CV1C29101
PGM-MC1C29101

PGM-MC1C29201

PGM-CV1C29301

RPGM-PM-BAPP-003-004-017

POMPA FILTRAT RVF PGM-CV1C30101-1


UKSI POMPA FILTRAT PGM-MC1C39101

NDASI POMPA FILTRATE RVF PGM-CV1C30201-1

RPGM-PM-BAPP-003-004-021

KSI TANGKI FILTRAT PGM-MC1C30101


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PGM-MC1C30201

RPGM-PM-BAPP-003-004-022

KSI BAROMETRIC CONDENSOR ROTARY VACUUM FILTER PGM-MC1C19101


ASI ATAP BAROMETER CONDENSOR RVF PGM-CV1C09103

METRIC CONDENSOR PGM-MC1C19201

RPGM-PM-BAPP-003-004-023

RPGM-PM-BAPP-003-004-024

KSI BAGASSE CYCLONE RVF PGM-MC1C37101


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-004-025

CAKE STORAGE BIN PGM-CV1C27101


TAP CAKE HOPPER RVF PGM-CV1C09101-1
KSI CAKE STORAGE BIN RVF PGM-MC1C27101
PGM-MC1C27102

CAKE STORAGE BIN RVF PGM-MC1C27201

RUKTUR DAN PONDASI CAKE STORAGE BIN PGM-CV1C27301

RPGM-PM-BAPP-003-005-001

RPGM-PM-BAPP-003-006-001

MASS FLOWMETER PGM-MC1C02201


ralatan Instrument Juice Flowmeter (Juice smoothing) PGM-IC1C02201
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-003-006-002

OR UNTUK PH METER NIRA TERDEFEKASI PGM-MC1C34201


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
V Stasiun Penguapan

II.1V.1 Evaporator 1A
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PAVEMENT STASIUN PENGUAPAN
GAMBAR PENINGGIAN ATAP EVAPORATOR
GAMBAR PONDASI EVAPORATOR
ARRANGEMENT PIPING VAPOUR EVAPORATOR
PIPING ISOMETRIC OUTLET CONDENSATE EVAPORATOR
ISOMETRIK UAP EVAPORATOR
GAMBAR KONSTRUKSI KNEE VALVE EVAPORATOR
DETAIL CALANDRIA EVAPORATOR LP. 2000 M2
PIPING ISOMETRIC VAPOUR EVAPORATOR
ARRANGEMENT VAPOUR PIPING EVAPORATOR
STRUCTURE STAGING EVAPORATOR
ARR. STAGING EVAPORATOR LP. 2000 M2
GENERAL ARRANGEMENT EVAPORATOR
PROCESS & INSTRUMENTATION DIAGRAM EVAPORATION STATION
CONTROL PHILOSOPHY STASIUN PENGUAPAN

Data Sheet
Data Sheet Evaporator

Detail Calculation
PERHITUNGAN PONDASI DAN STRUCTUR BAJA EVAPORATOR
Perhitungan Pondasi Pompa Condensate U/ Evaporator
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
MDR
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.2 Evaporator 1B
As Built Drawing [GA, Detail, dll
Data Sheet
Detail Calculation
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.3 Evaporator 2
As Built Drawing [GA, Detail, dll
Data Sheet
Detail Calculation
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
V Stasiun Penguapan

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.4 Condensate Receiver Evaporator Pump A-F
As Built Drawing [GA, Detail, dll
Gambar Pondasi Kondensate U - Evaporator
PANEL LISTRIK POMPA KONDENSATE EVAPORATOR 1B,2B,3B
GAMBAR KONSTRUKSI POMPA KONDENSAT EVAPORATOR
GAMBAR KONSTRUKSI PANEL STASIUN PENGUAPAN # 1
GAMBAR KONSTRUKSI PANEL STASIUN PENGUAPAN # 2
Data Sheet
MANUAL INSTRUCTION OF CONDENSATE PUMP ( NEW BOILER )
DATA SHEET CONDENSATE PUMP UNTUK BOILER BARU
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.5 Condensate Receiver Evaporator Tank 1 - 3
As Built Drawing [GA, Detail, dll
BUFFER CONDENSATE TANK EVAPORATOR CAP. 2 M3

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.6 Pompa Injeksi Evaporator
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA INJEKSI EVAPORATOR
GAMBAR KONSTRKSI POMPA INJEKSI EVAPORATOR
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
V Stasiun Penguapan

DATA SPESIFIKASI POMPA INJEKSI EVAPORATOR

Detail Calculation
PERHITUNGAN PONDASI POMPA INJEKSI EVAPORATOR
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.7 Pure Condensate tank
As Built Drawing [GA, Detail, dll
GAMBAR KONTRUKSI PURE CONDENSATE TANK CAP. 40 M3
LAY OUT SWEET & PURE CONDENSATE TANK
DETAIL STAGING PURE DAN SWEET CONDENSATE TANK
GAMBAR PONDASI TANGKI CONDENSATE
GAMBAR KONSTRUKSI TANGKI CONDENSAT 50 M3
GAMBAR PONDASI PURE & SWEET CONDENSATE TANK
Data Sheet
DATA SHEET TANGKI PURE CONDENSATE

Detail Calculation
PERHITUNGAN PONDASI PURE & SWEET CONDENSATE TANK

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.8 Sweet Condensate tank
As Built Drawing [GA, Detail, dll
Gambar Konstruksi Sweet Condensate
LAY OUT SWEET & PURE CONDENSATE TANK
DETAIL STAGING PURE DAN SWEET CONDENSATE TANK

Data Sheet
DATA SHEET TANGKI SWEET CONDENSATE

Detail Calculation
PERHITUNGAN PONDASI PURE & SWEET CONDENSATE TANK

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
V Stasiun Penguapan

Spare Parts List for 2 Years Operation


Spare Parts Catalogue
II.1V.9 Condensor Evaporator
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CONDENSOR EVAPORATOR
DETAIL STAGING PERFORATED CONDENSOR EVAPORATOR
GAMBAR KONSTRUKSI PERFORATED CONDERSOR EVAPORATOR

Data Sheet
DATA SHEET PERFORATED CONDENSOR EVAPORATOR

Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI CONDENSOR EVAPORATO

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.10 Pompa Nira Kental
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA NIRA KENTAL
GAMBAR KONSTRUKSI POMPA NIRA KENTAL
Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.1V.11 Tangki Nira Kental
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI NIRA KENTAL
GAMBAR KONTRUKSI TANGKI NIRA KENTAL 4 M3

Data Sheet
DATA SPESIFIKASI POMPA NIRA KENTAL
DATA SHEET TANGKI NIRA KENTAL
Detail Calculation
PERHITUNGAN PONDASI POMPA NIRA KENTAL
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
V Stasiun Penguapan

PERHITUNGAN PONDASI TANGKI NIRA KENTAL


Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-004-001-001

PGM-CV2D01104
PGM-CV1D01102
PGM-CV1D01101
G VAPOUR EVAPORATOR PGM-MC1E00104
TLET CONDENSATE EVAPORATOR PGM-MC1D10102
PGM-MC1D01108
KNEE VALVE EVAPORATOR PGM-MC1D01107
APORATOR LP. 2000 M2 PGM-MC1D01106
PGM-MC1D01105
UR PIPING EVAPORATOR PGM-MC1D01104
PGM-MC1D01103
PGM-MC1D01102
PGM-MC1D01101
NTATION DIAGRAM EVAPORATION STATION PGM-PS1000102-3
PGM-PS1D00201

PGM-MC1D01201

NDASI DAN STRUCTUR BAJA EVAPORATOR PGM-CV1D01301


si Pompa Condensate U/ Evaporator PGM-CV1D07301

RPGM-PM-BAPP-004-001-002

RPGM-PM-BAPP-004-001-003
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-004-001-004

PGM-CV1D07101
MPA KONDENSATE EVAPORATOR 1B,2B,3B PGM-EL1D07101
KSI POMPA KONDENSAT EVAPORATOR PGM-MC1D10101
KSI PANEL STASIUN PENGUAPAN # 1 PGM-EL1D00101
KSI PANEL STASIUN PENGUAPAN # 2 PGM-EL1D00102

TION OF CONDENSATE PUMP ( NEW BOILER ) PGM-MC2A06302


ENSATE PUMP UNTUK BOILER BARU PGM-MC2A06202

RPGM-PM-BAPP-004-001-006

ATE TANK EVAPORATOR CAP. 2 M3 PGM-MC1D06103

RPGM-PM-BAPP-004-001-013

MPA INJEKSI EVAPORATOR PGM-CV1D03101


OMPA INJEKSI EVAPORATOR PGM-MC1D03101
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

POMPA INJEKSI EVAPORATOR PGM-MC1D03201

NDASI POMPA INJEKSI EVAPORATOR PGM-CV1D03301

RPGM-PM-BAPP-004-001-015

KSI PURE CONDENSATE TANK CAP. 40 M3 PGM-MC1D06101


PURE CONDENSATE TANK PGM-MC1D06105
URE DAN SWEET CONDENSATE TANK PGM-MC1D06102
TANGKI CONDENSATE PGM-CV2A07101
KSI TANGKI CONDENSAT 50 M3 PGM-MC2A06101
PURE & SWEET CONDENSATE TANK PGM-CV1D06101

PGM-MC1D06201

NDASI PURE & SWEET CONDENSATE TANK PGM-CV1D06301

RPGM-PM-BAPP-004-001-016

PGM-MC1D08101
PURE CONDENSATE TANK PGM-MC1D06105
URE DAN SWEET CONDENSATE TANK PGM-MC1D06102

KI SWEET CONDENSATE PGM-MC1D08201

NDASI PURE & SWEET CONDENSATE TANK PGM-CV1D06301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-004-001-017

NDENSOR EVAPORATOR PGM-CV1D02101


ORATED CONDENSOR EVAPORATOR PGM-MC1D02102
PERFORATED CONDERSOR EVAPORATOR PGM-MC1D02101

ORATED CONDENSOR EVAPORATOR PGM-MC1D02201

RUKTUR DAN PONDASI CONDENSOR EVAPORATOR PGM-CV1D02301

RPGM-PM-BAPP-004-002-001

POMPA NIRA KENTAL PGM-CV1D05101


KSI POMPA NIRA KENTAL PGM-MC1D05101

RPGM-PM-BAPP-004-002-003

TANGKI NIRA KENTAL PGM-CV1D04101


KSI TANGKI NIRA KENTAL 4 M3 PGM-MC1D04101

POMPA NIRA KENTAL PGM-MC1D05201


PGM-MC1D04201

NDASI POMPA NIRA KENTAL PGM-CV1D05301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

NDASI TANGKI NIRA KENTAL PGM-CV1D04301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

II.V.1 Vacuum pan A


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PAVEMENT STASIUN MASAKAN
GAMBAR FOUNDASI VACUUM PAN A
GAMBAR KONSTRUKSI VALVE DISCHARGE HIDROLIK VACUUM PAN
DETAIL PIPING BAHAN OLAHAN VACUUM PAN A
DETAIL CALANDRIA OF VACUUM PAN A
GENERAL ARRANGEMENT OF VACUUM PAN A SYSTEM
General Arrangement Vacuum Pan A
STRUCTURE VACUUM PAN A-C
General Arrangement Vacuum Pan
GAMBAR PONDASI POMPA KONDENSATE VACUUM PAN
GAMBAR KONSTRUKSI PANEL STASIUN MASAKAN
Data Sheet
DATA SHEET VACUUM PAN A
DATA SPESIFIKASI POMPA KONDENSAT VACUUM PAN
Detail Calculation
PERHITUNGAN PONDASI POMPA KONDENSATE u / VACUUM PAN
PERHITUNGAN PONDASI VACUUM PAN A
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.2 Pompa Injeksi Vacuum Pan A C D
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR DINDING SEKAT PIT INJEKSI VACUUM PAN
GAMBAR PONDASI POMPA INJEKSI VACUUM PAN
GAMBAR KONSTRUKSI POMPA INJEKSI VACUUM PAN
GAMBAR RELOKASI SALURAN AIR INJEKSI
Data Sheet
DATA SPESIFIKASI POMPA INJEKSI VACUUM PAN
CONTROL PHILOSOPHY POMPA INJEKSI VACUUM PAN DAN STASIUN
Detail Calculation
PERHITUNGAN PONDASI POMPA INJEKSI VACUUM PAN

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.3 Palung Pendingin A
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI PALUNG PENDINGIN A
GAMBAR KONTRUKSI PALUNG PENDINGIN A CAP.50 M3
GAMBAR KONTRUKSI SISTEM PALUNG PENDINGIN A
DETAIL PALUNG PENDINGIN A

Data Sheet
DATA SHEET PALUNG PENDINGIN A

Detail Calculation
PERHITUNGAN PONDASI PALUNG PENDINGIN A

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.4 Pompa Rota A
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA ROTA A,C,&D
GAMBAR KONSTRUKSI POMPA ROTA A, C, D
Data Sheet
DATA SHEET POMPA ROTA A, C, D

Detail Calculation
PERHITUNGAN PONDASI POMPA ROTA A,C&D

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.5 Jet Condensor A
Engineering Drawing
As Built Drawing [GA, Detail, dll
DETAIL LAYOUT JET CONDENSOR VACUUM PAN A
PLAN LAYOUT POMPA VACUUM PAN A, C, & D SISTEM JET CONDENS
GAMBAR PONDASI JET CONDENSOR BATCH PAN A
GAMBAR KONSTRUKSI JET KONDENSOR ( BATCH PAN A )
Data Sheet
DATA SPESIFIKASI JET KONDENSOR ( BATCH PAN A )
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI JET CONDENSOR BATH P

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.6 Vacuum pan C
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI & STRUKTUR VACUUM PAN C
GAMBAR KONSTRUKSI VALVE DISCHARGE HIDROLIK VACUUM PAN
PLAN STAGING VACUUM PAN C
GENERAL ARRANGEMENT STAGING VACUUM PAN C
DETAIL CALANDRIA OF VACUUM PAN C
GENERAL ARRANGEMENT OF VACUUM PAN C
STRUCTURE VACUUM PAN A-C
GENERAL LAYOUT VACUUM PAN C & D BARU
General Arrangement Vacuum Pan
GAMBAR PONDASI POMPA KONDENSATE VACUUM PAN
Data Sheet
Data Sheet VacuuM PAN C
DATA SPESIFIKASI POMPA KONDENSAT VACUUM PAN
Detail Calculation
PERHITUNGAN PONDASI & STRUKTUR VACUUM PAN C
PERHITUNGAN PONDASI POMPA KONDENSATE u / VACUUM PAN
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.7 Pompa Rota C
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA ROTA A,C,&D
GAMBAR KONSTRUKSI POMPA ROTA A, C, D
Data Sheet
DATA SHEET POMPA ROTA A, C, D

Detail Calculation
PERHITUNGAN PONDASI POMPA ROTA A,C&D

Quality Assurance Plan


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Fabrication or Erection Procedure


IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.8 Jet Condensor C
Engineering Drawing
As Built Drawing [GA, Detail, dll
DETAIL LAYOUT JET CONDENSOR VACUUM PAN C
PLAN LAYOUT POMPA VACUUM PAN A, C, & D SISTEM JET CONDENS
GAMBAR SALURAN AIR JATUHAN JET CONDENSOR C
GAMBAR JET CONDENSOR BATCH PAN C
GAMBAR KONSTRUKSI JET KONDENSOR ( BATCH PAN C )
Data Sheet
DATA SPESIFIKASI JET KONDENSOR ( BATCH PAN C )

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.9 Vacuum pan D
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI VACUUM PAN D
GAMBAR KONSTRUKSI VALVE DISCHARGE HIDROLIK VACUUM PAN
DETAIL CALANDRIA OF VACUUM PAN D
General Arrangement Vacuum Pan D
GENERAL LAYOUT VACUUM PAN C & D BARU
General Arrangement Vacuum Pan
GAMBAR PONDASI POMPA KONDENSATE VACUUM PAN
Data Sheet
DATA SPESIFIKASI POMPA KONDENSAT VACUUM PAN
DATA SHEET VACUUM PAN D
Detail Calculation
PERHITUNGAN PONDASI POMPA KONDENSATE u / VACUUM PAN
Perhitungan Pondasi Vacuum Pan D
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Spare Parts Catalogue


II.V.10 Palung Pendingin D
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI PALUNG PENDINGIN D
DETAIL PALUNG PENDINGIN D CAP. 50 M3
GAMBAR KONSTRUKSI PALUNG PENDINGIN D CAP. 50 M3
DETAIL LAYOUT PALUNG PENDINGN D 50 M3
Data Sheet
DATA SHEET PALUNG PENDINGIN D

Detail Calculation
PERHITUNGAN PONDASI PALUNG PENDINGIN D

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.11 Pompa Rota D
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA ROTA A,C,&D
GAMBAR KONSTRUKSI POMPA ROTA A, C, D
Data Sheet
DATA SHEET POMPA ROTA A, C, D

Detail Calculation
PERHITUNGAN PONDASI POMPA ROTA A,C&D

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.12 Jet Condensor D
Engineering Drawing
As Built Drawing [GA, Detail, dll
DETAIL LAYOUT JET CONDENSOR VACUUM PAN D
PLAN LAYOUT POMPA VACUUM PAN A, C, & D SISTEM JET CONDENS
GAMBAR KONSTRUKSI JET KONDENSOR ( BATCH PAN D )
Data Sheet
DATA SPESIFIKASI JET KONDENSOR ( BATCH PAN D )
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.13 Condensate Pump A B
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation
PERHITUNGAN PONDASI CONDENSATE PUMP ( PU - 56A/B )

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.14 Tangki Condensate
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI TANGKI CONDENSATE DARI VACUUM PAN
GAMBAR KONSTRUKSI POMPA KONDENSAT VACUUM PAN
Data Sheet
DATA SHEET TANGKI CONDENSATE VACUUM PAN

Detail Calculation
PERHITUNGAN PONDASI TANGKI CONDENSATE

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Pompa Remelter C D
II.V.15
Tangki Remelter
Engineering Drawing
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

As Built Drawing [GA, Detail, dll


PONDASI POMPA REMELTER C/D
GAMBAR PONDASI TANGKI REMELTER
PANEL LISTRIK POMPA REMELTER 1 & 2, AGIATOR REMELTER C-D
GAMBAR PIPING POMPA REMELTER
GAMBAR KONSTRUKSI POMPA REMELTER
Gambar Dimensional Remelter C/D

Data Sheet
DATA SHEET REMELTER C - D
DATA SHEET POMPA REMELTER C-D
Detail Calculation
Perhitungan Pondasi Pompa Remelter
Perhitungan Pondasi Remelter
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
High Grade Centrifuge SHS 1
II.V.16
Control room
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI HGF
GAMBAR KONTROL ROOM HGF
GAMBAR STAGING HIGH GRADE CENTRIFUGE
GAMBAR KONSTRUKSI DISTRIBUTOR MIXER HGF
STEEL STAGING HIGH GRADE CENTRIFUGE KB1250
ARRANGEMENT OF BASE PLATE & TIE PLATE HGF ( HIGH GRADE C
GENERAL LAYOUT HIGH GRADE CENTRIFUGE CAP. 1250 KG /CYCLE
GAMBAR KONSTRUKSI HIGH GRADE CENTRIFUGE A
PROCESS & INSTRUMENTATION DIAGRAM CRYSTALLITATION STAT
PROCESS & INSTRUMENTATION DIAGRAM HIGH GRADE CENTRIFU
Data Sheet
MANUAL INSTRUCTION FOR HIGH GRADE CENTRIFUGE

Detail Calculation
PERHITUNGAN PONDASI HGF

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

II.V.17 Screw Distributor Gula SHS


Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Peti Stroop
II.V.18
Peti Klare
Engineering Drawing
As Built Drawing [GA, Detail, dll
Layout Tangki Stroop A
GAMBAR DIMENSIONAL TANGKI STROOP A
GAMBAR KONSTRUKSI PETI SIRUP A & CLARE D
Data Sheet
Data Sheet Tangki Stroop A
DATA SHEET PETI SIRUP A DAN KLARE D
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.19 Tanki Tetes
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI TETES
Gambar Konstruksi Tangki Tetes Kapasitas 3000 Ton
DETAIL SHEEL & BOTTOM TANGKI TETES
DETAIL RANGKA ATAP TANGKI TETES
DETAIL VENTILASI TANGKI TETES
Layout Tangki Tetes Kapasitas 3000 Ton
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VI Stasiun Masakan

Data Sheet
DATA SHEET TANGKI TETES

Detail Calculation
PERHITUNGAN PONDASI TANGKI TETES KAPASITAS 3000 TON

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.V.20 Pompa Klare
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-005-001-001

NT STASIUN MASAKAN PGM-CV2D01103


PGM-CV1E01101
KSI VALVE DISCHARGE HIDROLIK VACUUM PAN A PGM-MC1E10101
HAN OLAHAN VACUUM PAN A PGM-MC1E01105
A OF VACUUM PAN A PGM-MC1E01103
EMENT OF VACUUM PAN A SYSTEM PGM-MC1E01102
PGM-MC1E01101
PGM-MC1E00103
PGM-MC1E00101
POMPA KONDENSATE VACUUM PAN PGM-CV1E08101
KSI PANEL STASIUN MASAKAN PGM-EL1E00101

PGM-MC1E01201
POMPA KONDENSAT VACUUM PAN PGM-MC1D07201

NDASI POMPA KONDENSATE u / VACUUM PAN PGM-CV1E08301


NDASI VACUUM PAN A PGM-CV1E01301

RPGM-PM-BAPP-005-001-002

SEKAT PIT INJEKSI VACUUM PAN PGM-CV1E23101


POMPA INJEKSI VACUUM PAN PGM-CV1E09101
KSI POMPA INJEKSI VACUUM PAN PGM-MC1E09101
I SALURAN AIR INJEKSI PGM-CV1E03102

POMPA INJEKSI VACUUM PAN PGM-MC1E09201


OPHY POMPA INJEKSI VACUUM PAN DAN STASIUN PENGEMASAN PGM-PS1E00201

NDASI POMPA INJEKSI VACUUM PAN PGM-CV1E09301

RPGM-PM-BAPP-005-001-003
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PALUNG PENDINGIN A PGM-CV1E14101


KSI PALUNG PENDINGIN A CAP.50 M3 PGM-MC1E14101
KSI SISTEM PALUNG PENDINGIN A PGM-MC1E14102
PGM-MC1E14103

PGM-MC1E14201

NDASI PALUNG PENDINGIN A PGM-CV1E14301

RPGM-PM-BAPP-005-001-004

POMPA ROTA A,C,&D PGM-CV1E16101


KSI POMPA ROTA A, C, D PGM-MC1E16101

PGM-MC1E16201

NDASI POMPA ROTA A,C&D PGM-CV1E16301

RPGM-PM-BAPP-005-001-005

T CONDENSOR VACUUM PAN A PGM-MC1E04102


MPA VACUUM PAN A, C, & D SISTEM JET CONDENSOR PGM-MC1E09102
JET CONDENSOR BATCH PAN A PGM-CV1E04101
KSI JET KONDENSOR ( BATCH PAN A ) PGM-MC1E04101

JET KONDENSOR ( BATCH PAN A ) PGM-MC1E04201


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RUKTUR DAN PONDASI JET CONDENSOR BATH PAN A PGM-CV2E04301

RPGM-PM-BAPP-005-002-001

& STRUKTUR VACUUM PAN C PGM-CV1E02101


KSI VALVE DISCHARGE HIDROLIK VACUUM PAN C PGM-MC1E11101
PGM-MC1E03103
EMENT STAGING VACUUM PAN C PGM-MC1E03102
A OF VACUUM PAN C PGM-MC1E02103
EMENT OF VACUUM PAN C PGM-MC1E02101
PGM-MC1E00103
VACUUM PAN C & D BARU PGM-MC1E02102
PGM-MC1E00101
POMPA KONDENSATE VACUUM PAN PGM-CV1E08101

PGM-MC1E02201
POMPA KONDENSAT VACUUM PAN PGM-MC1D07201

NDASI & STRUKTUR VACUUM PAN C PGM-CV1E02301


NDASI POMPA KONDENSATE u / VACUUM PAN PGM-CV1E08301

RPGM-PM-BAPP-005-002-003

POMPA ROTA A,C,&D PGM-CV1E16101


KSI POMPA ROTA A, C, D PGM-MC1E16101

PGM-MC1E16201

NDASI POMPA ROTA A,C&D PGM-CV1E16301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-005-002-004

T CONDENSOR VACUUM PAN C PGM-MC1E05102


MPA VACUUM PAN A, C, & D SISTEM JET CONDENSOR PGM-MC1E09102
AIR JATUHAN JET CONDENSOR C PGM-CV1E05101-3
DENSOR BATCH PAN C PGM-CV1E05101
KSI JET KONDENSOR ( BATCH PAN C ) PGM-MC1E05101

JET KONDENSOR ( BATCH PAN C ) PGM-MC1E05201

RPGM-PM-BAPP-005-003-001

PGM-CV1E03101
KSI VALVE DISCHARGE HIDROLIK VACUUM PAN D PGM-MC1E12101
A OF VACUUM PAN D PGM-MC1E03104
PGM-MC1E03101
VACUUM PAN C & D BARU PGM-MC1E02102
PGM-MC1E00101
POMPA KONDENSATE VACUUM PAN PGM-CV1E08101

POMPA KONDENSAT VACUUM PAN PGM-MC1D07201


PGM-MC1E03201

NDASI POMPA KONDENSATE u / VACUUM PAN PGM-CV1E08301


PGM-CV1E03301
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-005-003-003

PALUNG PENDINGIN D PGM-CV1E15101


ENDINGIN D CAP. 50 M3 PGM-MC1E15103
KSI PALUNG PENDINGIN D CAP. 50 M3 PGM-MC1E15101
LUNG PENDINGN D 50 M3 PGM-MC1E15102

PGM-MC1E15201

NDASI PALUNG PENDINGIN D PGM-CV1E15301

RPGM-PM-BAPP-005-003-004

POMPA ROTA A,C,&D PGM-CV1E16101


KSI POMPA ROTA A, C, D PGM-MC1E16101

PGM-MC1E16201

NDASI POMPA ROTA A,C&D PGM-CV1E16301

RPGM-PM-BAPP-005-003-005

T CONDENSOR VACUUM PAN D PGM-MC1E06102


MPA VACUUM PAN A, C, & D SISTEM JET CONDENSOR PGM-MC1E09102
KSI JET KONDENSOR ( BATCH PAN D ) PGM-MC1E06101

JET KONDENSOR ( BATCH PAN D ) PGM-MC1E06201


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-005-004-001

NDASI CONDENSATE PUMP ( PU - 56A/B ) PGM-CV2C05301

RPGM-PM-BAPP-005-004-002

KSI TANGKI CONDENSATE DARI VACUUM PAN PGM-MC1E07101


KSI POMPA KONDENSAT VACUUM PAN PGM-MC1D07101

KI CONDENSATE VACUUM PAN PGM-MC1E07201

NDASI TANGKI CONDENSATE PGM-CV2A07301

RPGM-PM-BAPP-002-009-001
RPGM-PM-BAPP-002-009-001
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PGM-CV1E18101
PGM-CV1E19101
MPA REMELTER 1 & 2, AGIATOR REMELTER C-D PGM-EL1E00102
PGM-MC1E19102
PGM-MC1E18101
PGM-MC1E19101

PGM-MC1E19201
PGM-MC1E18201

PGM-CV1E18301
PGM-CV1E19301

RPGM-PM-BAPP-005-006-001

PGM-CV1E20101
PGM-CV1E20101-1
HIGH GRADE CENTRIFUGE PGM-MC1E20107
KSI DISTRIBUTOR MIXER HGF PGM-MC1E20106
GH GRADE CENTRIFUGE KB1250 PGM-MC1E20105
F BASE PLATE & TIE PLATE HGF ( HIGH GRADE CENTRIFUGE ) PGM-MC1E20104
HIGH GRADE CENTRIFUGE CAP. 1250 KG /CYCLE PGM-MC1E20103
KSI HIGH GRADE CENTRIFUGE A PGM-MC1E20101
UMENTATION DIAGRAM CRYSTALLITATION STATION PGM-PS1000102-4
UMENTATION DIAGRAM HIGH GRADE CENTRIFUGAL AND DRYING PGM-PS1000102-5

TION FOR HIGH GRADE CENTRIFUGE PGM-COMM-MAN-005-001

PGM-CV1E20301
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-005-006-002

RPGM-PM-BAPP-005-007-001

PGM-MC1E21102
ONAL TANGKI STROOP A PGM-MC1E21101
KSI PETI SIRUP A & CLARE D PGM-MC1E13101

PGM-MC1E21201
SIRUP A DAN KLARE D PGM-MC1E13201

RPGM-PM-BAPP-005-008-001

PGM-CV1E22101
Tangki Tetes Kapasitas 3000 Ton PGM-MC1E22101
OTTOM TANGKI TETES PGM-MC1E22101-1
PGM-MC1E22101-2
PGM-MC1E22101-3
s Kapasitas 3000 Ton PGM-MC1E22102
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PGM-MC1E22201

NDASI TANGKI TETES KAPASITAS 3000 TON PGM-CV1E22301


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VII Stasiun Pengemasan

II.VI.1 Belt conveyor 1


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI BELT CONVEYOR
GAMBAR KONSTRUKSI BELT CONVEYOR CHECK SCALE
GAMBAR KONSTRUKSI BELT CONVEYOR SETELAH TIMBANGAN GU
GAMBAR STAGING SISTEM BELT CONVEYOR KE SUGAR DRYER
GAMBAR KONSTRUKSI SISTEM BELT CONVEYOR KE SUGAR DRYER
GAMBAR KONSTRUKSI PANEL STASIUN PENGEMASAN
Data Sheet
DATA SHEET BELT CONVEYOR SETELAH TIMBANGAN GULA

Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI BELT CONVEYOR

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.2 Belt conveyor 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI BELT CONVEYOR
GAMBAR KONSTRUKSI BELT CONVEYOR CHECK SCALE
GAMBAR KONSTRUKSI BELT CONVEYOR SETELAH TIMBANGAN GU
GAMBAR STAGING SISTEM BELT CONVEYOR KE SUGAR DRYER
GAMBAR KONSTRUKSI SISTEM BELT CONVEYOR KE SUGAR DRYER

Data Sheet
DATA SHEET BELT CONVEYOR SETELAH TIMBANGAN GULA

Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI BELT CONVEYOR

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VII Stasiun Pengemasan

II.VI.3 Vibrating Screen


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI SUGAR VIBRATING SCREEN
GAMBAR KONSTRUKSI SUGAR SCREEN
Data Sheet
GAMBAR STRUKTUR AKSES SUGAR SCREEN

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.4 Bucket elevator
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI BUCKET ELEVATOR 2
GAMBAR KONSTRUKSI BUCKET ELEVATOR 1

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.5 Sugar Dryer
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI WATER PUMP SUGAR DRYER
GAMBAR PONDASI AIR HEATER SUGAR DRYER
GAMBAR PONDASI ID FAN SUGAR DRYER
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VII Stasiun Pengemasan

GAMBAR PONDASI FD FAN SUGAR DRYER


GAMBAR PONDASI FLUIDIZED BED SUGAR DRYER & COOLER
GAMBAR KONSTRUKSI FLUIDIZED BED SUGAR DRYER
Data Sheet
DATA SHEET FLUIDIZED BED SUGAR DRYER & COOLER

Detail Calculation
PERHITUNGAN PONDASI AIR HEATER SUGAR DRYER
PERHITUNGAN PONDASI WATER PUMP SUGAR DRYER
PERHITUNGAN PONDASI FLUIDIZED BED SUGAR DRYER & COOLER
INSTRUCTION MANUAL FOR FLUIDIZED BED SUGAR DRYER
MANUAL INSTRUCTION FOR FLUIDEIZED BED SUGAR DRYER
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.6 Ventury Tank
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Bag sugar conveyor 1
II.VI.7
Bag sugar conveyor 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KUNSTRUKSI BAG SUGAR CONVEYOR
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VII Stasiun Pengemasan

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.8 Sugar Bin
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR STAGING ATAP SUGAR BIN
GAMBAR PONDASI SUGAR BIN
GAMBAR KONSTRUKSI SISTEM SUGAR BIN
Data Sheet
DATA SPESIFIKASI SISTEM SUGAR BIN

Detail Calculation
PERHITUNGAN PONDASI DAN STRUKTUR BAJA SUGAR BIN
PERHITUNGAN SISTEM SUGAR BIN
Quality Assurance Plan
Fabrication or Erection Procedure
Installation Manual
Operation Manual
Maintenance Instruction Manual
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Timbangan Line 1
II.VI.9
Timbangan Line 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KUNSTRUKSI TIMBANGAN GULA
GAMBAR DIMENSIONAL TIMBANGAN GULA
GAMBAR KONSTRUKSI PIPA PRDS SYSTEM
Data Sheet
DATA SHEET TIMBANGAN GULA

Detail Calculation
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VII Stasiun Pengemasan

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Bag sewing 1
II.VI.10
Bag sewing 2
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI PORTABLE BAG SEWING MACHINE
GAMBAR KONSTRUKSI SISTEM PENGEMASAN PRODUCT
Data Sheet
DATA SHEET PORTABLE BAG SEWING MACHINE
DATA SHEET BAG SEWING MACHINE
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VI.11 Control Room Pengemasan
Engineering Drawing
As Built Drawing [GA, Detail, dll

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-001-001

PGM-CV1F02101-3
KSI BELT CONVEYOR CHECK SCALE PGM-MC1F05101
KSI BELT CONVEYOR SETELAH TIMBANGAN GULA PGM-MC1F04103
SISTEM BELT CONVEYOR KE SUGAR DRYER PGM-MC1F01103
KSI SISTEM BELT CONVEYOR KE SUGAR DRYER PGM-MC1F01102
KSI PANEL STASIUN PENGEMASAN PGM-EL1F00101

CONVEYOR SETELAH TIMBANGAN GULA PGM-MC1F08201

RUKTUR DAN PONDASI BELT CONVEYOR PGM-CV1F02301-3

RPGM-PM-BAPP-006-001-002

PGM-CV1F02101-3
KSI BELT CONVEYOR CHECK SCALE PGM-MC1F05101
KSI BELT CONVEYOR SETELAH TIMBANGAN GULA PGM-MC1F04103
SISTEM BELT CONVEYOR KE SUGAR DRYER PGM-MC1F01103
KSI SISTEM BELT CONVEYOR KE SUGAR DRYER PGM-MC1F01102

CONVEYOR SETELAH TIMBANGAN GULA PGM-MC1F08201

RUKTUR DAN PONDASI BELT CONVEYOR PGM-CV1F02301-3


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-002-001

SUGAR VIBRATING SCREEN PGM-CV2F03101-2


KSI SUGAR SCREEN PGM-MC1F11101

R AKSES SUGAR SCREEN PGM-CV2F03102

RPGM-PM-BAPP-006-003-001

KSI BUCKET ELEVATOR 2 PGM-MC1F12102


KSI BUCKET ELEVATOR 1 PGM-MC1F12101

RPGM-PM-BAPP-006-004-001

WATER PUMP SUGAR DRYER PGM-CV1F01103


AIR HEATER SUGAR DRYER PGM-CV1F01102
ID FAN SUGAR DRYER PGM-CV1F07101
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

FD FAN SUGAR DRYER PGM-CV1F06101


FLUIDIZED BED SUGAR DRYER & COOLER PGM-CV1F01101
KSI FLUIDIZED BED SUGAR DRYER PGM-MC1F01101

DIZED BED SUGAR DRYER & COOLER PGM-MC1F01201

NDASI AIR HEATER SUGAR DRYER PGM-CV1F01302


NDASI WATER PUMP SUGAR DRYER PGM-CV1F01303
NDASI FLUIDIZED BED SUGAR DRYER & COOLER PGM-CV1F01301
NUAL FOR FLUIDIZED BED SUGAR DRYER PGM-MC1F01301
TION FOR FLUIDEIZED BED SUGAR DRYER PGM-COMM-MAN-006-001

RPGM-PM-BAPP-006-004-002

RPGM-PM-BAPP-006-005-001

UKSI BAG SUGAR CONVEYOR PGM-MC1F09101


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-006-001

PGM-CV1F02101
PGM-CV1F03101
KSI SISTEM SUGAR BIN PGM-MC1F03101

PGM-MC1F03201

NDASI DAN STRUKTUR BAJA SUGAR BIN PGM-CV1F03301


PGM-MC1F03301

RPGM-PM-BAPP-006-007-001

UKSI TIMBANGAN GULA PGM-MC1F04102


ONAL TIMBANGAN GULA PGM-MC1F04101
KSI PIPA PRDS SYSTEM PGM-MC2A02102

PGM-MC1F04201
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-006-007-002

KSI PORTABLE BAG SEWING MACHINE PGM-MC1F07101


KSI SISTEM PENGEMASAN PRODUCT PGM-MC1F02101

ABLE BAG SEWING MACHINE PGM-MC1F07201


PGM-MC1F06201

RPGM-PM-BAPP-006-007-003
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

II.VII.1 Pompa Spray Pond 1/2


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR MODIFIKASI BANGUNAN POMPA SPRAY POND
GAMBAR PONDASI POMPA SPRAY POND
GAMBAR KONSTRUKSI PANEL SPRAY POND
PLAN LAYOUT POMPA SPRAY POND BARAT
GAMBAR KONSTRUKSI POMPA SPRAY POND
LAYOUT SPRAY POND SYSTEM
PIPING & INSTRUMENT DIAGRAM SPRAY POND SYSTEM

Data Sheet
Data Retrofit Spray Pond

Detail Calculation
PERHITUNGAN DESAIN SPRAY POND DAN KEBUTUHAN POMPA SPR
PERHITUNGAN PONDASI POMPA SPRAY POND

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.2 Pompa Spray Pond 4
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR MODIFIKASI BANGUNAN POMPA SPRAY POND
GAMBAR PONDASI POMPA SPRAY POND
GAMBAR KONSTRUKSI PANEL SPRAY POND
PLAN LAYOUT POMPA SPRAY POND BARAT
GAMBAR KONSTRUKSI POMPA SPRAY POND
LAYOUT SPRAY POND SYSTEM
PIPING & INSTRUMENT DIAGRAM SPRAY POND SYSTEM

Data Sheet
DATA SPESIFIKASI POMPA SPRAY POND
Data Retrofit Spray Pond

Detail Calculation
PERHITUNGAN DESAIN SPRAY POND DAN KEBUTUHAN POMPA SPR
PERHITUNGAN PONDASI POMPA SPRAY POND
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue

II.VII.3 Cooling Tower Fan A B


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 1
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 2
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 3
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 4
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 5
GAMBAR PLATFORM MAINTENANCE AREA UTILITY 6
GENERAL ARRANGEMENT COOLING TOWER
GENERAL ARRANGEMENT COOLING TOWER
GAMBAR STRUKTUR PIPE SUPPORT ( ST 002 - 003 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 004 - 006 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 007 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 008 - 010 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 011 - 013 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 014 - 016 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 017 - 020 - 028 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 019A - 019B - 024A-024B )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 029 - 030 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 031 - 038 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 039 - 042 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 043 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 050 - 052 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 053 - 054 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 055 - 059 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 060 - 062 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 063 - 065,077-079,080-08
GAMBAR STRUKTUR PIPE SUPPORT ( ST 066 - 068 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 069 - 070 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 072 - 076 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST082-084 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST085 )
GAMBAR STRUKTUR PIPE SUPPORT ( ST 091 )
GAMBAR STRUKTUR PIPE SUPPORT (PS)
GAMBAR PONDASI PIPE 36 " SUPPORT
PIPING & INSTRUMENT DIAGRAM RAW WATER SUPPLY
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

PIPING & INSTRUMENT DIAGRAM COOLING WATER SUPPLY DAN CO


GAMBAR PONDASI COOLING TOWER PUMP
Data Sheet
DATA SHEET COOLING TOWER
PERFORMANCE DATA CURVE COOLING TOWER
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.4 Cooling Water Pump A B
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI COOLING WATER
GAMBAR KONSTRUKSI PIPA COOLING WATER SUPPLY
GAMBAR KUNSTRUKSI PIPA COOLING WATER RETURN
GAMBAR KONSTRUKSI POMPA COOLING WATER
Data Sheet
DATA SHEET COOLING WATER PUMP
MANUAL INSTRUCTION OF COOLING WATER PUMP

Detail Calculation
PERHITUNGAN PONDASI COOLING WATER PUMP

Quality Assurance Plan


Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.5 Demin Water Pump A B
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI DEMIN WATER PUMP
GAMBAR KONSTRUKSI POMPA AIR DEMIN
PIPING & INSTRUMENT DIAGRAM DEMINERALIZED WATER SUPPLY
GAMBAR KONSTRUKSI PIPA DEMINERALIZED WATER SYSTEM
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

DATA SHEET DEMIN PUMP

Detail Calculation
PERHITUNGAN PONDASI COOLING TOWER
PERHITUNGAN PONDASI DEMIN WATER PUMP

Quality Assurance Plan


Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.6 Demin Tank
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI TANGKI DEMIN
GAMBAR KONSTRUKSI TANGKI DEMIN 50 M3

Data Sheet
DATA SHEET TANGKI DEMIN

Detail Calculation
PERHITUNGAN PONDASI TANGKI DEMIN

Quality Assurance Plan


Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.7 Condensate Pump A B
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI CONDENSATE PUMP ( PU - 56 A B )
PIPING & INSTRUMENT DIAGRAM CONDENSATE WATER SUPPLY
GAMBAR KONSTRUKSI POMPA CONDENSATE UNTUK BOILER BARU
GAMBAR KONSTRUKSI PIPA CONDENSATE WATER SYSTEM
Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

Detail Calculation

Quality Assurance Plan


Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.8 CTT Pump A B
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI POMPA CTT ( P - 63 A-B )

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.9 Condensate Treatment Tank
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR KONSTRUKSI PIPA CONDENSATE TREATMENT TANK
GAMBAR RETROFIT TANGKI KONDENSAT 600 M3

Data Sheet
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
Air Compressor A B
II.VII.10
Shelter Instrument Air
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI INSTRUMENT AIR SHELTER
GAMBAR STRUKTUR INSTRUMENT AIR SHELTER

Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VII.11 WTP Plan System
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR OPERATOR ROOM WTP
GAMBAR WTP SHELTER
GENERAL ARRANGEMENT REVERSE OSMOSIS WTP
GENERAL ARRANGEMENT RESERVOIR WTP
GENERAL ARRANGEMENT MULTIMEDIA FILTEER WTP
GENERAL ARRANGEMENT MICRON FILTER WTP
GENERAL ARRANGEMENT FRESH WATER PUMP WTP
GENERAL ARRANGEMENT MB FEEDPUMP WTP
GENERAL ARRANGEMENT MB REGEN WATER PUMP WTP
GENERAL ARRANGEMENT RO FEED PUMP PUMP WTP
GENERAL ARRANGEMENT RO HIGH PRESSURE PUMP WTP
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun IPAL & Utility

PIPING & INSTRUMENT DIAGRAM WATER TREATMENT PLANT


PROCESS FLOW DIAGRAM WATER TREATMENT PLANT
GENERAL ARRANGEMENT MIXED BED POLISHER TANK
GENERAL ARRANGEMENT OIL - INJECTED SCREW COMPRESS
GENERAL ARRANGEMENT MODULAR HEATLESS DRYER NDL
GENERAL ARRANGEMENT AIR RECEIVER TANK 2000 L
GENERAL ARRANGEMENT COMPRESSOR AIR FILTER TYPE A
UTILITY ELECTRICAL CABLE SCHEDULE
ELECTRICAL & INSTRUMENT CABLE TRAY LAYOUT FOR UTIL
INTERCONNECTION DIAGRAM FOR UTILITY AREA
INSTRUMENT CABLE SCHEDULE OF UTILITY SYSTEM
GAMBAR PONDASI TANGKI AIR FILTER
GAMBAR NEUTRALIZATION PIT

Data Sheet
Data Spesifikasi Water Treatment Plant (Cation & Anion)
CONTROL PHILOSOPHY WATER TREATMENT PLANT
Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
MDR untuk WTP
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-007-001-001

ASI BANGUNAN POMPA SPRAY POND PGM-CV1G02102


POMPA SPRAY POND PGM-CV1G02101
KSI PANEL SPRAY POND PGM-EL1G01101
MPA SPRAY POND BARAT PGM-MC1G02102
KSI POMPA SPRAY POND PGM-MC1G02101
PGM-PS1G01102
MENT DIAGRAM SPRAY POND SYSTEM PGM-PS1G01101

PGM-MC1G01201

SAIN SPRAY POND DAN KEBUTUHAN POMPA SPRAY POND UNTUK KAPASITAS 4000 TCD
NDASI POMPA SPRAY POND

RPGM-PM-BAPP-007-001-002

ASI BANGUNAN POMPA SPRAY POND PGM-CV1G02102


POMPA SPRAY POND PGM-CV1G02101
KSI PANEL SPRAY POND PGM-EL1G01101
MPA SPRAY POND BARAT PGM-MC1G02102
KSI POMPA SPRAY POND PGM-MC1G02101
PGM-PS1G01102
MENT DIAGRAM SPRAY POND SYSTEM PGM-PS1G01101

POMPA SPRAY POND PGM-MC1G02201


PGM-MC1G01201

SAIN SPRAY POND DAN KEBUTUHAN POMPA SPRAY POND UNTUK KAPASITAS 4000 TCD
NDASI POMPA SPRAY POND
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-008-001-001

M MAINTENANCE AREA UTILITY 1 PGM-CV2C11101


M MAINTENANCE AREA UTILITY 2 PGM-CV2C11102
M MAINTENANCE AREA UTILITY 3 PGM-CV2C11103
M MAINTENANCE AREA UTILITY 4 PGM-CV2C11104
M MAINTENANCE AREA UTILITY 5 PGM-CV2C11105
M MAINTENANCE AREA UTILITY 6 PGM-CV2C11106
EMENT COOLING TOWER PGM-MC4A05106
EMENT COOLING TOWER PGM-MC4A03101
R PIPE SUPPORT ( ST 002 - 003 ) PGM-CV1G03101
R PIPE SUPPORT ( ST 004 - 006 ) PGM-CV1G03102
R PIPE SUPPORT ( ST 007 ) PGM-CV1G03103
R PIPE SUPPORT ( ST 008 - 010 ) PGM-CV1G03104
R PIPE SUPPORT ( ST 011 - 013 ) PGM-CV1G03104A
R PIPE SUPPORT ( ST 014 - 016 ) PGM-CV1G03104B
R PIPE SUPPORT ( ST 017 - 020 - 028 ) PGM-CV1G03105
R PIPE SUPPORT ( ST 019A - 019B - 024A-024B ) PGM-CV1G03105A
R PIPE SUPPORT ( ST 029 - 030 ) PGM-CV1G03105B
R PIPE SUPPORT ( ST 031 - 038 ) PGM-CV1G03105C
R PIPE SUPPORT ( ST 039 - 042 ) PGM-CV1G03105D
R PIPE SUPPORT ( ST 043 ) PGM-CV1G03105E
R PIPE SUPPORT ( ST 050 - 052 ) PGM-CV1G03105F
R PIPE SUPPORT ( ST 053 - 054 ) PGM-CV1G03105G
R PIPE SUPPORT ( ST 055 - 059 ) PGM-CV1G03106
R PIPE SUPPORT ( ST 060 - 062 ) PGM-CV1G03106A
R PIPE SUPPORT ( ST 063 - 065,077-079,080-081 ) PGM-CV1G03107
R PIPE SUPPORT ( ST 066 - 068 ) PGM-CV1G03107A
R PIPE SUPPORT ( ST 069 - 070 ) PGM-CV1G03107B
R PIPE SUPPORT ( ST 072 - 076 ) PGM-CV1G03107C
R PIPE SUPPORT ( ST082-084 ) PGM-CV1G03107D
R PIPE SUPPORT ( ST085 ) PGM-CV1G03107E
R PIPE SUPPORT ( ST 091 ) PGM-CV1G03107F
R PIPE SUPPORT (PS) PGM-CV1G03110
PGM-CV1G03109
MENT DIAGRAM RAW WATER SUPPLY PGM-PS4G02102
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

MENT DIAGRAM COOLING WATER SUPPLY DAN COOLING WATER RETURN PGM-PS4G03101
COOLING TOWER PUMP PGM-CV2C02101

PGM-MC4A03201
TA CURVE COOLING TOWER PGM-MC4A03202

RPGM-PM-BAPP-008-001-003

PGM-CV2C01101
KSI PIPA COOLING WATER SUPPLY PGM-MC2B00105
UKSI PIPA COOLING WATER RETURN PGM-MC2B00104
KSI POMPA COOLING WATER PGM-MC4A01101

PGM-MC4A01201
TION OF COOLING WATER PUMP PGM-MC4A02301

NDASI COOLING WATER PUMP PGM-CV2C02301

RPGM-PM-BAPP-008-002-001

DEMIN WATER PUMP PGM-CV2C04101


KSI POMPA AIR DEMIN PGM-MC2A05102
MENT DIAGRAM DEMINERALIZED WATER SUPPLY PGM-PS4G02101
KSI PIPA DEMINERALIZED WATER SYSTEM PGM-MC2A05103
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

PGM-MC2A05203

NDASI COOLING TOWER PGM-CV2C01301


NDASI DEMIN WATER PUMP PGM-CV2C04301

RPGM-PM-BAPP-008-002-002

PGM-CV2A05101
KSI TANGKI DEMIN 50 M3 PGM-MC2A05101

PGM-MC2A05201

NDASI TANGKI DEMIN PGM-CV2A05301

RPGM-PM-BAPP-008-003-001

CONDENSATE PUMP ( PU - 56 A B ) PGM-CV2C05101


MENT DIAGRAM CONDENSATE WATER SUPPLY PGM-PS4G01101
KSI POMPA CONDENSATE UNTUK BOILER BARU PGM-MC2A06102
KSI PIPA CONDENSATE WATER SYSTEM PGM-MC2A06104
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-008-004-001

POMPA CTT ( P - 63 A-B ) PGM-CV2C10101

RPGM-PM-BAPP-008-004-002

KSI PIPA CONDENSATE TREATMENT TANK PGM-MC2A06103


T TANGKI KONDENSAT 600 M3 PGM-MC3D01101
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-008-005-001

INSTRUMENT AIR SHELTER PGM-CV2C09101


R INSTRUMENT AIR SHELTER PGM-CV2C09101A

RPGM-PM-BAPP-009-001-001

PGM-CV2C07101
PGM-CV2C06101
EMENT REVERSE OSMOSIS WTP PGM-MC4A05110
EMENT RESERVOIR WTP PGM-MC4A05109
EMENT MULTIMEDIA FILTEER WTP PGM-MC4A05108
EMENT MICRON FILTER WTP PGM-MC4A05107
EMENT FRESH WATER PUMP WTP PGM-MC4A05105
EMENT MB FEEDPUMP WTP PGM-MC4A05104
EMENT MB REGEN WATER PUMP WTP PGM-MC4A05103
EMENT RO FEED PUMP PUMP WTP PGM-MC4A05102
EMENT RO HIGH PRESSURE PUMP WTP PGM-MC4A05101
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

MENT DIAGRAM WATER TREATMENT PLANT PGM-PS4H01101


AGRAM WATER TREATMENT PLANT PGM-PS4H01102
NGEMENT MIXED BED POLISHER TANK PGM-MC2A04101
NGEMENT OIL - INJECTED SCREW COMPRESSORS MARK MSS - 22 PGM-MC4A04101
NGEMENT MODULAR HEATLESS DRYER NDL-110-ES PGM-MC4A04102
NGEMENT AIR RECEIVER TANK 2000 L PGM-MC4A04103
NGEMENT COMPRESSOR AIR FILTER TYPE ADHX-058 PGM-MC4A04104
ICAL CABLE SCHEDULE PGM-EL0A01101
NSTRUMENT CABLE TRAY LAYOUT FOR UTILITY AREA PGM-EL4Z01101
ON DIAGRAM FOR UTILITY AREA PGM-EL4Z06101
BLE SCHEDULE OF UTILITY SYSTEM PGM-IC0A01201
SI TANGKI AIR FILTER PGM-CV2C08101
PGM-CV2C12101

ater Treatment Plant (Cation & Anion) PGM-MC2A04201


OPHY WATER TREATMENT PLANT PGM-PS4H01201
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun STG

II.VIII.1 Steam Turbine Generator Siemens


Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI STEAM TURBIN GENERATOR ( KANIS )
STEAM TURBINE AUXILIARY EQUIPMENT FOUNDATION
GAMBAR STRUKTUR PIPE SUPPORT ( STEAM TURBINE OUTLET )
GAMBAR PONDASI STEAM TURBIN GENERATOR
PLAN LOKASI STG KANIS
ISOMETRIC DRAWING OF STEAM TURBINE AUXILIARY PIPING
PIPING & INSTRUMENT DIAGRAM INSTRUMENT AIR SYSTEM FOR B
ROTOR ARRANGEMENT
FIELD INSTRUMENT LIST
CABLE SCHEDULE & INTER CONNECTION DETAILS FOR INSTRUME
OPERATIONAL WRITE UP OF SEPARATOR CONTROLLER
DISTRIBUTED CONTROL SYSTEM I/O LIST
DRAWING FOR INSTRUMENTS
GA & WIRING DETAILS OF JUNCTION BOXES
I & C OVERVIEW COMPACT TCS T3000
LOGICS TURBINE GENERATOR PROTECTION AND AUXILIARY DRIVE
GAMBAR PONDASI SUILINCER STEAM TURBINE

Data Sheet
SYSTEM WRITE - UP FOR STEAM TURBINE
STANDARD AND OPERATION PROCEDURE TURBINE START UP
OPERATION AND MAINTENANCE MANUAL FOR INDUTRIAL STEAM
DATA SHEET STEAM TURBINE
GENERATOR CURVES
OUTLINE DRAWING OF A.C.GENERATOR
SINGLE LINE DIAGRAM OF TURBINE AND AUXILIARIES
Detail Calculation
PERHITUNGAN PONDASI STEAM TURBINE GENERATOR ( KANIS )
PERHITUNGAN PONDASI STEAM TURBINE GENERATOR
Quality Assurance Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VIII.2 Lube Oil System
Engineering Drawing
As Built Drawing [GA, Detail, dll
GENERAL ARRANGEMENT OF LUBE OIL UNIT
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun STG

PROCESS AND INSTRUMENTATION DIAGRAM OF LUBE OIL SYSTEM


PROCESS AND INSTRUMENTATION DIAGRAM OF STEAM PATH SYST
PROCESS AND INSTRUMENTATION DIAGRAM OF GLAND STEAM CO
PIPING & INSTRUMENT DIAGRAM PURIFICATION STATION
PROCESS AND INSTRUMENTATION DIAGRAM OF PROTECTION SYST
PIPING & INSTRUMENT DIAGRAM STEAM PATH SYSTEM
GAMBAR KONSTRUKSI PIPA STEAM PATH SYSTEM (OUTLET TURBI
GAMBAR KUNSTRUKSI PIPA STEAM PATCH SYSTEM
TG HALL LAYOUT
GENERAL ARRANGEMENT OF OIL PURIFICATION UNIT,1000 LPH M
FLUSING OIL CIRCUIT FOR LUBE OIL SUPPLY LINE
OUTLINE DIMENSIONAL DRAWING DC ELECTRICAL OIL PUMP MOT
TERMINAL BOX ARRANGEMENT DC ELECTRICAL OIL PUMP MOTOR
TG DECK FOUNDATION PLAN
TG HALL PIPING LAYOUT PLAN
GA & WIRING DIAGRAM OF CONTROL PANEL FOR OIL PURIFICATIO
GAMBAR PONDASI GSC DAN COMBINED LOS MODULE
GAMBAR STRUCTURE PLATFORM GSC
Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
MDR untuk Lube Oil
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VIII.3 Control Room STG
Engineering Drawing
As Built Drawing [GA, Detail, dll
GENERAL ARRANGEMENT OF BATTERY UPST300 VRLA 108 V ( 54 C
AUX TERMINAL BOX WDG RTDS,CTDS,ETDS,ATDS
AUX TERMINAL BOX MAIN SPACE HEATER
AUX TERMINAL BOX EXP.FIELD,SPACE HEATER & SLIP RING
AUX TERMINAL BOX WATER LEAGKAGE DETECTOR
AUX TERMINAL BOX EXP.FIELD RTD
AUX TERMINAL BOX NEUTRAL CT'S
GA FOR MAIN TERMINAL BOX OF A.C.GEN.
GENERAL ARRANGEMENT AND SCHEMATIC DIAGRAM FOR LA,SC,P
GENERAL ARRANGEMENT AND SCHEMATIC DIAGRAM FOR NGR PA
GENERAL ARRANGEMENT AND SCHEMATIC FOR RELEY, METERING
GENERAL ARRANGEMENT AND SCHEMATIC DIAGRAM FOR LOCAL
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun STG

GENERAL ARRANGEMENT OF BATTERY CHARGER WITH DCDB & D


LINE DIAGRAM OF BATTERY CHARGER WITH DCBD & DC MOTOR (
GENERAL ARRANGEMENT FOR TG MCC PANEL
SCHEMATIC AND LINE DIAGRAM FOR TG MCC PANEL
BILL OF MATERIAL FOR TG MCC PANEL
GAMBAR STUKTUR MODIFIKASI BANGUNAN STASIUN LISTRIK
Data Sheet

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VIII.4 Trafo
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR ADDITIONAL STRUCTURE PLATFORM TRANSFORMER & P
GAMBAR PONDASI TRANSFORMER
ARRANGEMENT STAGING TRANSFORMER DAN PANEL
GENERAL ARRANGEMENT LAYOUT TRANSFORMER 3 X 3150 Kva
GAMBAR KONSTRUKSI TRANSFORMER 3150 Kva ( TRAFINDO )

Data Sheet
DATA SHEET TRANSFORMER

Detail Calculation
PERHITUNGAN STRUKTUR DAN PONDASI TRANSFORMER

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
MDR untuk Trafo
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VIII.5 MV Switchgear
Engineering Drawing
As Built Drawing [GA, Detail, dll
GA.DATA SHEET & SINGLE LINE DIAGRAM FOR MV SWITCHGEAR
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
VIII Stasiun STG

Data Sheet
6.3 kV SWITCHGEAR SCEMATIC, INTERCONNECTION DRAWING AN

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.VIII.6 Diesel Engine Generator
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI DIESEL EMERGENCY GENERATOR

Data Sheet
DATASHEET DIESEL ENGINE GENERATOR

Detail Calculation

Quality Assurance Plan


Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-011-001-001

STEAM TURBIN GENERATOR ( KANIS ) PGM-CV2B02101


UXILIARY EQUIPMENT FOUNDATION PGM-CV2B01102
R PIPE SUPPORT ( STEAM TURBINE OUTLET ) PGM-CV1G03108
STEAM TURBIN GENERATOR PGM-CV2B01101
PGM-MC2C00100
NG OF STEAM TURBINE AUXILIARY PIPING PGM-MC2B01115
MENT DIAGRAM INSTRUMENT AIR SYSTEM FOR BOILER AND STEAM TURBIN PGM-PS4A01101
PGM-MC2B01107
PGM-IC2B01201
& INTER CONNECTION DETAILS FOR INSTRUMENT CABLES PGM-IC2B01202
ITE UP OF SEPARATOR CONTROLLER PGM-IC2B01301
TROL SYSTEM I/O LIST PGM-IC2B01302
PGM-IC2B01101
AILS OF JUNCTION BOXES PGM-IC2B01102
PGM-IC2B01103
ENERATOR PROTECTION AND AUXILIARY DRIVES CLOSE LOOP PGM-IC2B01104
SUILINCER STEAM TURBINE PGM-CV1G03108A

P FOR STEAM TURBINE PGM-IC2B01303


PERATION PROCEDURE TURBINE START UP PGM-EL2B01302
MAINTENANCE MANUAL FOR INDUTRIAL STEAM TURBINE PGM-MC2B01307
PGM-MC2B01201
PGM-EL2B01102
G OF A.C.GENERATOR PGM-EL2B01104
RAM OF TURBINE AND AUXILIARIES PGM-EL2B01107

NDASI STEAM TURBINE GENERATOR ( KANIS ) PGM-CV2B02301


NDASI STEAM TURBINE GENERATOR PGM-CV2B01301

RPGM-PM-BAPP-011-001-002

EMENT OF LUBE OIL UNIT PGM-MC2B01111


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

TRUMENTATION DIAGRAM OF LUBE OIL SYSTEM PGM-PS2B00101-3


TRUMENTATION DIAGRAM OF STEAM PATH SYSTEM PGM-PS2B00101-1
TRUMENTATION DIAGRAM OF GLAND STEAM CONDENSOR PGM-PS2B00101-2
MENT DIAGRAM PURIFICATION STATION PGM-PS1000102-2
TRUMENTATION DIAGRAM OF PROTECTION SYSTEM PGM-PS2B00101-4
MENT DIAGRAM STEAM PATH SYSTEM PGM-PS2A00102
KSI PIPA STEAM PATH SYSTEM (OUTLET TURBINE) PGM-MC2B01101
UKSI PIPA STEAM PATCH SYSTEM PGM-MC2B01102
PGM-MC2B01104
EMENT OF OIL PURIFICATION UNIT,1000 LPH MAB 103+INDIRECT WATER H PGM-MC2B01105
UIT FOR LUBE OIL SUPPLY LINE PGM-MC2B01106
ONAL DRAWING DC ELECTRICAL OIL PUMP MOTOR 2.2 Kw, 110 V, 1500 RPM PGM-MC2B01108
RANGEMENT DC ELECTRICAL OIL PUMP MOTOR 2.2 Kw, 110 V, 1500 RPM PGM-MC2B01109
PGM-MC2B01110
PGM-MC2B01114
RAM OF CONTROL PANEL FOR OIL PURIFICATION SYSTEM MAB 103+12 KW PGM-EL2B01105
GSC DAN COMBINED LOS MODULE PGM-CV1C01102
PGM-CV1C01103

RPGM-PM-BAPP-011-001-003

EMENT OF BATTERY UPST300 VRLA 108 V ( 54 CELLS ) PGM-MC2B01112


X WDG RTDS,CTDS,ETDS,ATDS PGM-EL2B01101-1
X MAIN SPACE HEATER PGM-EL2B01101-2
X EXP.FIELD,SPACE HEATER & SLIP RING PGM-EL2B01101-3
X WATER LEAGKAGE DETECTOR PGM-EL2B01101-4
PGM-EL2B01101-5
PGM-EL2B01101-6
MINAL BOX OF A.C.GEN. PGM-EL2B01103
EMENT AND SCHEMATIC DIAGRAM FOR LA,SC,PT & CT PANEL PGM-EL2B01106
EMENT AND SCHEMATIC DIAGRAM FOR NGR PANEL PGM-EL2B01108
EMENT AND SCHEMATIC FOR RELEY, METERING AND SYNCHRONIZING PANE PGM-EL2B01109
EMENT AND SCHEMATIC DIAGRAM FOR LOCAL PUSH BUTTON STATION PGM-EL2B01113
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

EMENT OF BATTERY CHARGER WITH DCDB & DC MOTOR ( EOP ) STARTER P PGM-EL2B01114
BATTERY CHARGER WITH DCBD & DC MOTOR ( EOP ) STARTER PANEL PGM-EL2B01115
EMENT FOR TG MCC PANEL PGM-EL2B01117
INE DIAGRAM FOR TG MCC PANEL PGM-EL2B01118
FOR TG MCC PANEL PGM-EL2B01119
MODIFIKASI BANGUNAN STASIUN LISTRIK PGM-CV2B02102

RPGM-PM-BAPP-012-001-001

NAL STRUCTURE PLATFORM TRANSFORMER & PANEL PGM-CV2B03103


PGM-CV2B03102
AGING TRANSFORMER DAN PANEL PGM-MC2B03103
EMENT LAYOUT TRANSFORMER 3 X 3150 Kva PGM-MC2B03102
KSI TRANSFORMER 3150 Kva ( TRAFINDO ) PGM-MC2B03101

PGM-MC2B03201

RUKTUR DAN PONDASI TRANSFORMER PGM-CV2B03302

RPGM-PM-BAPP-012-002-001

SINGLE LINE DIAGRAM FOR MV SWITCHGEAR PGM-EL4A01101


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

R SCEMATIC, INTERCONNECTION DRAWING AND LIST OF COMPONENT PGM-EL4A01102

RPGM-PM-BAPP-012-003-001

DIESEL EMERGENCY GENERATOR PGM-CV2B03101

L ENGINE GENERATOR PGM-MC2000201


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IX Stasiun Boiler

II.X.1 Boiler Steel Structure


Engineering Drawing
As Built Drawing [GA, Detail, dll
LAPORAN HASIL PENYELIDKAN TANAH SPT
Laporan Hasil Penyelidikan Tanah
FOUNDATION LOAD FOR BOILER STRUCTURE
GAMBAR PONDASI BOILER ( PILLING LAYOUT & FOUNDATION PLAN
GAMBAR PONDASI BOILER ( BASE PLATE LAYOUT )
GAMBAR PONDASI BOILER ( DETAIL PONDASI & SECTION )
GAMBAR PONDASI BOILER ( DETAIL PONDASI SECTION & MEMBER
GAMBAR PONDASI BOILER ( LAYOUT & DETAIL PONDASI TANGGA )
DETAIL OF COLUMNS
TRENCH LAYOUT FOR BOILER AREA
GAMBAR STEEL STRUCTURE BOILER
PLAN LAYOUT BOILER
BOILER AUXILIARY EQUIPMENT FOUNDATION DETAILS
GENERAL ARRANGEMENT LAYOUT BOILER & AUXILIARIES
PLAN SINGLE LINE DIAGRAM
GROUNDING SYSTEM LAYOUT

Data Sheet

Detail Calculation
PERHITUNGAN PONDASI BOILER
Quality Assurance Plan
Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.X.2 Boiler Auxiliary
Engineering Drawing
As Built Drawing [GA, Detail, dll
FOUNDATION & LOAD DATA DETAILS FOR FLY ASH STORAGE ( BAK
FOUNDATION DETAILS FOR FD, SA, ID, BFP & LADDER & SCRAP CHU
BOILER AUXILIARY EQUIPMENT FOUNDATION LOAD DETAILS AT +
FOUNDATION BOLTS DETAIL FOR BOILER AUXILIARIES
GAMBAR PONDASI ESP
GAMBAR PONDASI CHIMNEY
GAMBAR PONDASI INDUCTED DRAFT FAN
GAMBAR PONDASI SECONDARY AIR FAN
FOUNDATION DETAILS FOR HP, LP, & SUBMERGE BELT CONVEYOR
GAMBAR PONDASI FLY ASH SILO
GAMBAR PONDASI HP, LP, SUBMERGE BELY DAN DUCT SUPPORT
GAMBAR PONDASI SCRAB CHUTE BOILER
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IX Stasiun Boiler

GAMBAR PONDASI AIR COMPRESSOR BOILER


GAMBAR STRUKTUR COMPRESSOR SHELTER
GAMBAR PONDASI AIR RECEIVER BOILER TANK
GAMBAR PONDASI CABLE TREY RACK
GAMBAR RELOKASI SALURAN BAK ABU EKSISTING
GAMBAR PONDASI FORCED DRAFT FAN
FOUNDATION LOAD DATA FOR CHIMNEY
FOUNDATION BOLT FOR CHIMNEY
GENERAL ARRANGEMENT OF INDUCED DRAFT FAN
GENERAL ARRANGEMENT OF SECONDARY AIR FAN
GENERAL ARRANGEMENT OF FORCED DRAFT FAN
GENERAL ARRANGEMENT OF BOILER FEED PUMP
FOUNDATION LOAD DETAIL FOR ESP
PIPING LAYOUT FOR ASH CONVEYING SYSTEM
FOUNDATION DETAILS FOR FLOOR INSERT PLATE, CONVEYING AIR
GENERAL ARRANGEMENT OF SUBMERGED BELT CONVEYOR
GENERAL ARRANGEMENT OF AIR COOLED SCREW COMPRESSOR A
GENERAL ARRANGEMENT OF HP DOSING SYSTEM
GENERAL ARRANGEMENT OF LP DOSING SYSTEM
Gambar Konstruksi Ash Handling
P & ID FOR BOILER FEED PUMP SYSTEMS
P & ID FOR STEAM FEED WATER SYSTEMS
P & ID FOR L.P DOSING SYSTEMS
P & ID FOR H.P DOSING SYSTEMS
P & ID FOR FLY ASH HANDLING SYSTEM
PROCESS AND INSTRUMENT DRAWING OF AIR COOLED SCREW CO
SINGLE LINE DIAGRAM OF ESP
POWER & CONTROL CABLE SCHEDULE BOILER EQUIPMENT & ESP
TECHNICAL SPECIFICATION, LEGEND DETAILS,AND INDEX OF ESP
GENERAL ARRANGEMENT FOR ESP MCC PANEL
SINGLE LINE DIAGRAM FOR ESP MCC PANEL
SCHEMATIC WIRING DIAGRAM FOR ESP MCC PANEL
DETAIL OF MARSHALLING CHAMBER FOR ESP
BILL OF MATERIAL FOR ESP PANEL
LIGHTING LAYOUT OF BOILER AND ESP
Data Sheet
GENERAL ARRANGEMENT OF ESP
TECHNICAL SPECIFICATION FOR DENSE PHASE ASH HANDLING SY
QUALITY ASSURANCE PLAN - ESP
ELECTRICAL LOAD LIST OF BOILER AND AUXILIARY
Detail Calculation
PERHITUNGAN PONDASI BOILER FEED PUMP
PERHITUNGAN PONDASI FORCED DRAFT FAN
PERHITUNGAN PONDASI ESP
PERHITUNGAN PONDASI CHIMNEY
PERHITUNGAN PONDASI INDUCTED DRAFT FAN
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IX Stasiun Boiler

PERHITUNGAN PONDASI SECONDARY AIR FAN


PERHITUNGAN PONDASI FLY ASH SILO
PERHITUNGAN PONDASI SUPPORT DUCTING, LP & HP HEATER AND
PERHITUNGAN PONDASI SCRAB CHUTE BOILER
PERHITUNGAN PONDASI AIR COMPRESSOR BOILER
Quality Assurance Plan
Inspection & Test Plan
INSPECTION & TEST PLAN FOR INSTALLATION BOILER AND AUXIL
INSPECTION & TEST PLAN FOR INSTALLATION STEEL STACK
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
MDR Boiler Auxiliary
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.X.3 Boiler Proper
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR PONDASI BOILER FEED PUMP
GAMBAR PONDASI BLOWDOWN TANK BOILER
TERMINAL POINT DRAWING
INPUT SKETCH FOR DENSE PHASE SYSTEM
GENERAL ARRANGEMENT OF CONTINUOS ASH DISCHARGE STOKE
QUALITY CONTROL PLAN BOILER FEED PUMP
ISOMETRIC VIEW FOR SATURATED STEAM PIPING
ISOMETRIC VIEW FOR LHS WATER WALL RISING
ISOMETRIC VIEW FOR ECONOMIZER OUTLET TO STEAM DRUM INL
ISOMETRIC VIEW FOR ATTEMPERATOR PIPING
ISOMETRIC VIEW FOR ECONOMIZER INLET PIPING
ISOMETRIC VIEW FOR MAIN STEAM PIPING
ISOMETRIC FOR RIGHT SIDE DOWNCOMER PIPING
ISOMETRIC FOR LEFT SIDE DOWNCOMER PIPING
ARRANGEMENT & DETAILS OF COMMON DRAIN HEADER
ARRANGEMENT & DETAILS OF SUPERHEATER DRAIN HEADER
GENERAL WELDING DETAIL FOR BEAM, STUB, SHARP EDGES FOR P
EXPANSION INDICATORS
DETAILS DRAWING OF CHEQUERED PLATE
DETAILS DRAWING OF STANDART GRATING
DETAILS DRAWING OF LADDER
FIELD WELD SCHEDULE OF PRESSURE PARTS ASSEMBLY
P & ID FOR AIR & FLUE GAS SYSTEMS
P & ID FOR DAERATOR SYSTEMS
P & ID FOR SOOT BLOWER STEAM SYSTEMS
P & ID FOR FUEL FEEDING SYSTEMS
P & ID FOR COMMON BLOWDOWN SYSTEM
P & ID FOR COOLING WATER & SAMPLE COOLER SYSTEMS
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IX Stasiun Boiler

EARTHING AND LIGTING PROTECTION LAYOUT


DETAIL OF MARSHALLING CHAMBER FOR BOILER
LIGHTING SYSTEM FOR BOILER CONTROL ROOM
SOOT BLOWER INTERLOCKS
Data Sheet
Data Sheet Boiler
WARNA PAINTING PERALATAN BOILER
CHEMICAL AND LUBRICANT REQUIREMENT FOR TRAVELLING GRA
Detail Calculation
PERHITUNGAN PONDASI BLOWDOWN TANK
Quality Assurance Plan
QUALITY ASSURANCE PLAN - FANS
LIST OF FEEDERS
Inspection & Test Plan
INSPECTION AND TEST PLAN HEADERS
INSPECTION AND TEST PLAN BOILER TUBES,COILS AND PANELS
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
II.X.4 Boiler Control Room
Engineering Drawing
As Built Drawing [GA, Detail, dll
GAMBAR STRUKTUR CONTROL ROOM BOILER
GAMBAR ARSITEK CONTROL ROOM BOILER
SINGLE LINE DIAGRAM OF BOILER
ELECTRICAL EQUIPMENT & CABLE ROUTING LAYOUT
TECHNICAL SPECIFICATION, LEGEND DETAILS,AND INDEX OF BOIL
GENERAL ARRANGEMENT FOR BOILER MCC PANEL
SINGLE LINE DIAGRAM FOR BOILER MCC PANEL
SCHEMATIC WIRING DIAGRAM FOR BOILER MCC PANEL
INSTRUMENT LIST
PLC SYSTEM CONFIGURATION
GENERAL ARRANGEMENT OF PLC SYSTEM
PLC PANEL POWER DISTRIBUTION
BOILER INTERLOCK
GROUNDING & LIGHTING PROTECTION SYSTEM FOR BOILER CONT
Data Sheet
Detail Calculation
Quality Assurance Plan
Inspection & Test Plan
Fabrication or Erection Procedure
IOM
Manufacture Data Record or MC per equipment
348-COM-PGMJ-X-2018 Joint Inspection Steam Flushing Steam Blow
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
NO BOOK VOLUME DESKRIPSI
IX Stasiun Boiler

isgec semua
Spare Parts List for 2 Years Operation
Spare Parts Catalogue
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

RPGM-PM-BAPP-010-001-001

ENYELIDKAN TANAH SPT PGM-CV0O00202 D


PGM-CV0O00201 D
D FOR BOILER STRUCTURE PGM-CV2A01101 D
BOILER ( PILLING LAYOUT & FOUNDATION PLAN ) PGM-CV2A01102-1 D
BOILER ( BASE PLATE LAYOUT ) PGM-CV2A01102-2 D
BOILER ( DETAIL PONDASI & SECTION ) PGM-CV2A01102-3 D
BOILER ( DETAIL PONDASI SECTION & MEMBER SCHEDULE ) PGM-CV2A01102-4 D
BOILER ( LAYOUT & DETAIL PONDASI TANGGA ) PGM-CV2A01102-5 D
PGM-CV2A01108 D
PGM-CV2A01103 D
PGM-CV2A01104 D
PGM-MC2A00101 D
EQUIPMENT FOUNDATION DETAILS PGM-MC2A01112 D
EMENT LAYOUT BOILER & AUXILIARIES PGM-MC2A01101 D
PGM-EL0000100
PGM-EL0Z02101

PGM-CV2A01301 C

RPGM-PM-BAPP-010-001-002

AD DATA DETAILS FOR FLY ASH STORAGE ( BAK PENAMPUNG ABU ) PGM-CV2A01105 D
AILS FOR FD, SA, ID, BFP & LADDER & SCRAP CHUTE PGM-CV2A01106 D
EQUIPMENT FOUNDATION LOAD DETAILS AT +000 L PGM-CV2A01107 D
TS DETAIL FOR BOILER AUXILIARIES PGM-CV2A01109 D
PGM-CV2A02101 D
PGM-CV2A06101 D
INDUCTED DRAFT FAN PGM-CV2A09101 D
SECONDARY AIR FAN PGM-CV2A11101 D
AILS FOR HP, LP, & SUBMERGE BELT CONVEYOR PGM-CV2A12101 D
PGM-CV2A13101 D
HP, LP, SUBMERGE BELY DAN DUCT SUPPORT PGM-CV2A14101 D
SCRAB CHUTE BOILER PGM-CV2A15101 D
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

AIR COMPRESSOR BOILER PGM-CV2A18101 D


R COMPRESSOR SHELTER PGM-CV2A18102 D
AIR RECEIVER BOILER TANK PGM-CV2A21101 D
PGM-CV2A22101 D
I SALURAN BAK ABU EKSISTING PGM-CV2A23101 D
FORCED DRAFT FAN PGM-CV2A10101 D
D DATA FOR CHIMNEY PGM-MC2A01102 D
PGM-MC2A01103 D
EMENT OF INDUCED DRAFT FAN PGM-MC2A01108 D
EMENT OF SECONDARY AIR FAN PGM-MC2A01109 D
EMENT OF FORCED DRAFT FAN PGM-MC2A01110 D
EMENT OF BOILER FEED PUMP PGM-MC2A01111 D
PGM-MC2A01113 D
R ASH CONVEYING SYSTEM PGM-MC2A01114 D
AILS FOR FLOOR INSERT PLATE, CONVEYING AIR RECEIVER & AIR COMPRESS PGM-MC2A01115 D
EMENT OF SUBMERGED BELT CONVEYOR PGM-MC2A01116 D
EMENT OF AIR COOLED SCREW COMPRESSOR AND RECEIVER TANK ASH HA PGM-MC2A01169 D
EMENT OF HP DOSING SYSTEM PGM-MC2A01130 D
EMENT OF LP DOSING SYSTEM PGM-MC2A01131 D
PGM-MC2A03102 D
FEED PUMP SYSTEMS PGM-PS2000102-2 D
FEED WATER SYSTEMS PGM-PS2000102-3 D
PGM-PS2000102-9 D
PGM-PS2000102-10 D
H HANDLING SYSTEM PGM-PS2000103 D
TRUMENT DRAWING OF AIR COOLED SCREW COMPRESSOR PGM-PS2000104 D
PGM-EL2A01102 D
L CABLE SCHEDULE BOILER EQUIPMENT & ESP PGM-EL2A01104 D
FICATION, LEGEND DETAILS,AND INDEX OF ESP MCC PANEL PGM-EL2A01107-1 D
EMENT FOR ESP MCC PANEL PGM-EL2A01107-2 D
RAM FOR ESP MCC PANEL PGM-EL2A01107-3 D
G DIAGRAM FOR ESP MCC PANEL PGM-EL2A01107-4 D
ALLING CHAMBER FOR ESP PGM-EL2A01107-5 D
PGM-EL2A01107-6 D
OF BOILER AND ESP PGM-EL2A01108 D

PGM-MC2A01104 DS
FICATION FOR DENSE PHASE ASH HANDLING SYSTEM PGM-MC2A01206 DS
PGM-MC2A01207 DS
LIST OF BOILER AND AUXILIARY PGM-EL2A01301 DS

NDASI BOILER FEED PUMP PGM-CV2A08301 C


NDASI FORCED DRAFT FAN PGM-CV2A10301 C
PGM-CV2A02301 C
PGM-CV2A06301 C
NDASI INDUCTED DRAFT FAN PGM-CV2A09301 C
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

NDASI SECONDARY AIR FAN PGM-CV2A11301 C


NDASI FLY ASH SILO PGM-CV2A13301 C
NDASI SUPPORT DUCTING, LP & HP HEATER AND BELT CONVEYOR PGM-CV2A14301 C
NDASI SCRAB CHUTE BOILER PGM-CV2A15301 C
NDASI AIR COMPRESSOR BOILER PGM-CV2A18301 C

T PLAN FOR INSTALLATION BOILER AND AUXILIARY PGM-QC-PRC-100-014


T PLAN FOR INSTALLATION STEEL STACK PGM-QC-PRC-100-015

RPGM-PM-BAPP-010-001-003

BOILER FEED PUMP PGM-CV2A08101 D


BLOWDOWN TANK BOILER PGM-CV2A16101 D
PGM-MC2A01105 D
R DENSE PHASE SYSTEM PGM-MC2A01106 D
EMENT OF CONTINUOS ASH DISCHARGE STOKER PGM-MC2A01107 D
L PLAN BOILER FEED PUMP PGM-MC2A01305 D
FOR SATURATED STEAM PIPING PGM-MC2A01117-1 D
FOR LHS WATER WALL RISING PGM-MC2A01117-2 D
FOR ECONOMIZER OUTLET TO STEAM DRUM INLET PIPING PGM-MC2A01117-3 D
FOR ATTEMPERATOR PIPING PGM-MC2A01117-4 D
FOR ECONOMIZER INLET PIPING PGM-MC2A01117-5 D
FOR MAIN STEAM PIPING PGM-MC2A01117-6 D
GHT SIDE DOWNCOMER PIPING PGM-MC2A01117-7 D
EFT SIDE DOWNCOMER PIPING PGM-MC2A01117-8 D
DETAILS OF COMMON DRAIN HEADER PGM-MC2A01117-9 D
DETAILS OF SUPERHEATER DRAIN HEADER PGM-MC2A01117-10 D
G DETAIL FOR BEAM, STUB, SHARP EDGES FOR PLATED BEAMS PGM-MC2A01125 D
PGM-MC2A01129 D
G OF CHEQUERED PLATE PGM-MC2A01132 D
G OF STANDART GRATING PGM-MC2A01133 D
PGM-MC2A01160 D
DULE OF PRESSURE PARTS ASSEMBLY PGM-MC2A01208 D
PGM-PS2000102-4 D
PGM-PS2000102-5 D
LOWER STEAM SYSTEMS PGM-PS2000102-6 D
PGM-PS2000102-7 D
ON BLOWDOWN SYSTEM PGM-PS2000102-8 D
G WATER & SAMPLE COOLER SYSTEMS PGM-PS2000102-11 D
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN

GTING PROTECTION LAYOUT PGM-EL2A01105 D


ALLING CHAMBER FOR BOILER PGM-EL2A01106-5 D
FOR BOILER CONTROL ROOM PGM-EL2A05101 D
PGM-IC2A01103 D

PGM-MC2A01201 DS
PERALATAN BOILER PGM-MC2A01202 DS
BRICANT REQUIREMENT FOR TRAVELLING GRATE BOILER PGM-MC2A01203 DS

NDASI BLOWDOWN TANK PGM-CV2A16301 C

PGM-MC2A01205
PGM-EL2B01202

TEST PLAN HEADERS PGM-MC2A01311


TEST PLAN BOILER TUBES,COILS AND PANELS PGM-MC2A01312

RPGM-PM-BAPP-010-001-004

R CONTROL ROOM BOILER PGM-CV2A20101 D


CONTROL ROOM BOILER PGM-CV2A20102 D
PGM-EL2A01101 D
PMENT & CABLE ROUTING LAYOUT PGM-EL2A01103 D
FICATION, LEGEND DETAILS,AND INDEX OF BOILER MCC PANEL PGM-EL2A01106-1 D
EMENT FOR BOILER MCC PANEL PGM-EL2A01106-2 D
RAM FOR BOILER MCC PANEL PGM-EL2A01106-3 D
G DIAGRAM FOR BOILER MCC PANEL PGM-EL2A01106-4 D
PGM-IC2A01203 D
PGM-IC2A01102-1 D
EMENT OF PLC SYSTEM PGM-IC2A01102-2 D
PGM-IC2A01102-3 D
PGM-IC2A01104 D
HTING PROTECTION SYSTEM FOR BOILER CONTROL ROOM PGM-EL0A06101

018 Joint Inspection Steam Flushing Steam Blowing of Boiler


EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah
DOKUMEN AKHIR

DAFTAR ISI
DESKRIPSI NO. DOKUMEN
EPCC Revitalisasi PG Mojo
Sragen - Jawa Tengah

DOKUMEN AKHIR

LIST OF FINAL ODNER


NO. VOLUME DESCRIPETION ORIGINAL ODNER COPY ODNER TOTAL REMARK
1 I MDR
2 II Stasiun Pendahuluan & Penerimaan Tebu
3 III Stasiun Gilingan
4 IV Stasiun Pemurnian
5 V Stasiun Penguapan
6 VI Stasiun Masakan, Pendinginan, dan Putaran
7 VII Stasiun Pengeringan dan Pengemasan
8 VIII IPAL & Utility
9 IX Stasiun Boiler
10 X Stasiun Pembangkit Listrik

TOTAL FOLDER 0 0 0
No Nama Vendor PERALATAN STASIUN
1 Aji Instrumen
2 CV Mega Jaya Abadi
3 CV Arif Budiman
4 CV Citra Mandiri Persada BOILER AUXILIARY BOILER
5 CV Mitra Energy WTP IPAL & UTILITY
6 CV Sentosa Jaya Teknik
7 PT ABB HDHS GILINGAN
8 PT Alpha Omega Pemurnian
9 PT Arita Prima
10 PT Citra Airin Abadi
11 PT Empower
12 PT Enka
13 PT Five Cail HDHS GILINGAN
14 PT Heksa Aditama
15 PT Insoclay Aditama
16 ISGEC lube oil STG
17 PT Jotun
18 PT Lugata Karya Teknik
19 MAXIMA dan SIEMAS
20 MAXIMA
21 PT Mesindo Teninesia
22 PT. Metsa Control Panel Cooling Tower Fan IPAL & UTILITY
23 Cooling Water Pump
24 PT. Mitra Galperti
25 PT.Ometraco Condensate Pump AB MASAKAN
26 PT.Prima Indah Lestari Cable Power Dan Utility
27 PT. Proses systemindo Sukses Enginer
28 PT. Ragasindo
29 PT. SAS
30 PT. SBM Cable Tray
31 PT. SHA Solo
32 PT. Siemens
33 PT. Sinar Surya Timur Teknik
34 PT. Taneko DEG
35 PT. Thysenkrup HGF MASAKAN
36 PT. Tugu Beton Semesta
37 PT. Union Metal
38 VUB
39 PT.WDM Mill
40 foxsub
41 PT. Krisna Dwi Mitra
42 PT. Rajawali
43 PT. Sutrado
44 PT. Trafindo Trafo STG
45 PT. Trisula
46 PT. Truwater Cooling Tower IPAL & UTILITY
47 PT. Agung Jaya Engineering
NOMOR MDR *yang general gausah
*semua stasiun ada

all area
I Document Engineering
I.1 PFD
I.2 PID
I.3 Calculation Sheet
I.4 Data Sheet
I.5 As Build Drawing
I.5.1 Civil
I.5.2 Mechanical
I.5.3 Piping
I.5.4 Electrical
I.5.5 Instrument

II Document Construction
II.1 Erection Methode
II.2 MDR & Procedure dan ITP
II.3 Inspection Report
II.3.1 Civil
II.3.2 Mechanical
II.3.3 Piping
II.3.4 Electrical
II.3.5 Instrument
II.4 Punchlist

III Commissioning dan Peerformance Test Support


III.1 IOM
III.2 Commissioning Support
III.3 Performance Test Report

IV Berita Acara & Sertifikat


IV.1 BAPP
IV.2 MC

You might also like