Professional Documents
Culture Documents
TABLE OF CONTENTS
1 MANUFACTURER
3 COO
0 14-Aug-2018 DSW IAW HDO
4 CONFORMANCE TO PROJECT
4.1 APPLICABLE SPECIFICATIONS/ Accepted Accepted
DATA SHEET
4.2 APPLICABLE STANDARD/CODE Accepted Accepted
4.3 SCOPE OF SUPPLY/WORK Accepted Accepted
4.4 DESIGN COND.& PERFORMANCE Accepted Accepted
5 DELIVERY
5.1 POINT OF DELIVERY On Site On Site
5.2 DELIVERY SCHEDULE 3-5 days 3 days
1 General
2 Technical
2.2
Solvent based corrosion preventive compound.
1 General
2 Technical
2.2
Solvent based corrosion preventive compound.
1 General
2 Technical
2.2
Solvent based corrosion preventive compound.
1 General
2 Technical
2.2
Solvent based corrosion preventive compound.
1 General
1.1 Vendor Name Err:509 SENTOSA JAYA TEKNIK PROCESS SYSTEMINDO SUKSES ENGINEERING