Problems Encountered:
The problem for this week was that some of the team members were not able to connect with
aims, objectives and technologies used for this project. As the project manager, I gave solution
for this was to conduct the workshop for everyone about the self-driving AI vehicle.
Problems encountered:
Problem for this week is that during the designing of the car there was problem we have tackled
that was the design layout of the car was looking not good. Where in the design layout exterior
of the car was looking too much with components on it like lidar system, radar system, and many
hardware components. As project manager, I have found the solution of it. The solution was to
have hardware in embedded into car as much as possible. There are some hardware components
that needs to be in exterior of the car.
Problem encountered:
This week problem was while the unpacking the question was, we don’t have enough space if we
unpack the all the equipment’s. So, as project manager I gave the solution that we first unpack
the stuffs that we needed to start then we unpack other stuffs as per we go ahead in the
assembling the car and hardware components.
Problem encountered:
This week problem is that our one robotic arm malfunction due to technical reasons on the
assembly line of the car. So, as we have tackle the problem the solution come out is to do the
manual work until the robotic arm got repaired and without loss of time we have completed the
task.
Problem encountered:
This time problem is there two choices ahead of us which to continue the project as per plan or to
develop another set of AI neural network that can learn the human driving while he is willing
driving the and that AI system can implement to improve more in driving a car. With have made
decision to make another set of neural networks and extended the developments another two
weeks with approval of the stakeholders.
Problem encountered:
This week problem was were test drive level 0 because we can’t drive on road directly. As
project manager, I have given solution to have level 0 test drive on the empty road.
Problem encountered:
This week the problem was that other company was not agreeing on terms and condition our
where they want to take control on the modifications of the software. As project manager, I have
discussed with the companies and take out middle way which was to collaborate while we have
modification of the software.