Department of Buqget and Management
Department of Health
Department of Public Works and Highways
DBM-DOH-DPWH
JOINT CIRCULAR NO. _1 __
August 2 ,2013
SUBJECT '. Guidelines on' the >Implementation of the Health Facilities Enhancement
Program
.'
under the FYZO]3'Budgetof the . Department of.. Public W,'orks and
. :. '.' - .. ' - .. ' ' .
Highways
1.0 .' purpose'
1.1 To prescribe the guidelines on the release and implementation ofHFEPper Special
ProVisiol1 No.5 "Health Fatiliti~s Enhance~ent Program" und~rthe '2013 Btidget
, ,ofthe Departr.nent qf pubncWQrk~ and'Highways (DPWH)for,the Health Facilities
, • Enh~ncemE!OtProgra'm(Hf~p}ofthe'[)epart~'~~tofHe~ith(~OH). :' '
1.2: ":,19. c1efinethe rQles; and res,ponsibilitiesof the agencies concerned during the
programtmplementation andcor.npletlon.
. . .. . . ..
3.0 GeneralGuidelines
3.3 The amount for the purchase of equipment shall be released to the DOH - Office
of the Secretary which shall undertake the appropriate public bidding thereof, and
may do so by bulk, to ensure cost-efficiency.
3.4 The amount allotted for the civil works component of the Program, which covers
the preparation of the architectural and engineering designs, construction of
RHUs, BHUs, District/Provincial hospitals, health care facilities, and repair and
upgrading of existing ones, shall be released to the DPWH while
construction/repair/upgrading of Retained Hospital and procurement of
equipments for the said facilities shall be released to DOH.
3.5 DPWH may be allowed to charge the Engineering and Administrative Overhead
(EAO) expenses cited in the special provisions of the General Appropriation Act, FY
2013. DPWH will only charge two percent (2%) of the EAO with the remaining one
percent (1%) shared with the DOH.
4.0 Responsibilities
4.1.1.2 Where there are no other private health care facilities that can
provide affordable health care.
4.1.2 Provide DPWH with the list of approved infrastructure projects with project
description, allocation and exact location of the projects.
.(.
4.1.4 Assist DPWH in the preparation of the Schematic Plans which will be the
bases for the preparation of Detailed Architectural and Engineering Plans,
Scope of Works, Technical Specification, Detailed Cost Estimates and other
bidding documents.
4.1.5 Organize coordination meeting with the recipient LGUs and DPWH to
determine and finalize project special equipment needs and the
conceptualized design.
4.1.6 Submit a joint DOH-DPWH request to the DBM for the release of
SARO/NCA.
4.1.9 Organize and conduct regular meetings with DPWH to monitor the
progress of the projects.
4.1.11 Inspect the completed facilities prior to acceptance to ensure that the
foregoing standard specifications are complied with.
4.1.14 Post the list of Health Facilities in the agency's website with detailed
costing and status of project implementation.
4.2.1 Conduct ocular inspection based on the submitted HFEP list of the DOH by
Regional Offices/District Engineering Offices.
4.2.6 Coordinate with DOH on the status of the project and issues that may arise
concerning its implementation.
4.2.7 Report to DBM the status of funds allocated for the project through
submission of quarterly physical and financial report of operations.
4.2.9 Turn-over of the completed health facilities to DOH upon the latter's
issuance of the Certificate of Acceptance.
4.3.1 Approve the special budget request (SBR) submitted by DOH to DPWH and
facilitate the release of SARO/NCA directly to DPWH-Central Office and
subsequently sub-allotted to DPWH District Engineering Offices (DEOs). In
the case of ARMM allocation, release shall be made directly to ARMM-
Office of the Regional Governor.
5.1 All releases, transfer of funds, payment/ reimbursements and preparation of books
of accounts made pursuant to this Joint Circular shall be subject to pertinent laws,
government budgeting/accounting and auditing rules and regulations.
5.2 Issues arising from the implementation of this Joint Circular shall be resolved
jointly by DBM, DOH and DPWH.
6.0 Effectivity
Department of Public Works and Highways
Office of the Secretary
This Joint Circular shall take effect immediately. 11\ 1111111111111\ 1111111111 \ 1\ 1111111
OUT3$49571
. CZrtl.--
ENRIQUE T. ONA, MD R GELIO L. SINGSON
Depa~~alth
t
Secretary Secretary
Departmentof PublicWorksanw
~~ii!!!II:a~_~J'
FLORENCIO B. ABAD
Secretary
Department of Budget and Management