Professional Documents
Culture Documents
Appendix II Table-1
Mapping Department
Projects (2006, 2007)
App II T-1-1
PROJECTS FOR FY 2006
Physical Target
Aurora
Quezon 888,660 hectares
II. Spatial Data Infrastructure Development 2,948
A. Information System Geodetic Network 3 systems
Development & Maintenance Information System (GNIS)
Component of PRS92
We-based Document
Tracking System
Tides and Current Data
Conversion System
B. Database Management Aurora and Quezon 1 ENR dataase/metadata
1 manual
C. Geographic Information 2 centers
Services
2.c.1. Component 1 (ISD) One-stop-shop Geomatics 2 centers
Training Center
2.c.2 Component 2 (IEC) 2006 Annual Report 1 set
NAMRIA Newsletter (2)
Infomapper
Newscoop
GIS Link
PROJECTS FOR FY 2007
Physical Target Budget w/in the
Program/Activities and Projects
Coverage NEP (in
(PAPs) 2006
thousand pesos)
I. Mapping, Geodesy, and Land Resource Management
A. Topographic Base Mapping
A.1 Large scale base mapping Compilation: 21 map sheets 1,959
(1:10,000) Pangasinan
Enhancement 14 map sheets 771
CALABAR 2 (10 map
sheets)
Batangas (4 map sheets
App II T-1-2
PROJECTS FOR FY 2006
Physical Target
Region 3 2 map sheets
Region 4a 8 map sheets
Region 4b 10 map sheets
Region 6 49 map sheets
CAR 25 map sheets
NCR 3 map sheets
C. Administrative Mapping 692
1.c.1 Provincial Mapping Cartographic Enhancement: 7 provincial maps
Cebu
Aurora
Dinagat Island
App II T-1-3
Appendix II Table-2
Position Description
New position
Division Name Position Name name (if any) Ratio Responsibility
Cuts metal plate to press sizes, clean surface of plate with
25% desensitizing chemicals;
Costs plate with light sensitive chemcials, expose; develop and
Photo 20% make ready for offset printing;
Reprography & Printing
lithographic Tech 15% Mixes lithographic working solutions;
Division
I
15% Retouches imperfection on figures na dline on plate;
10% Assists in printing of blue and white prints;
10% Maintain lithographic equipment
Cuts metal plate to press sizes, clean surface of plate with
25% desensitizing chemicals;
10% Inspect reproductibles for imperfection before point down;
Reprography & Printing Photographic Coats plates with light sensitive chemicals, expose, develop and
Division Technician II 20% make ready for offset printing;
15% Mixes lithographic working solutions;
20% Retouches imperfection on figures and line on plates;
10% Hand Correct lithographic plates;
15% Installs plate on plate cylinder and prepare same for operation;
15% Checks load in feeder and makes preliminary setting;
10% Adjusts dumping system;
Studies plate for registrations, color, non-printing areas on faults
10% and dents;
Reprography & Printing Printing Machine Makes correction for registration and proper fountian solution
Division Operator II 10% distribution;
10% Mkes final registration adjustments;
10% Mixes ink to produce desired color of varied color jobs;
10% Operates machine, gives instructions to Press Operator I;
5% Submits daily time and work perfomance report to supervisor
5% Does such other duties as maybe assigned by Chef of Division
Studies assignments, inspects lthogrpahy plates for imperfecions
20% and gives instructions on methods and procedures to be followed;
Supervises adjustments and presetting of dampening and ink
rollers. Check blanket and plate cylinder clearances before printing
15% a proof copy.
Checks samples of reproduced copies and submits them to the
Reprography & Printing Printing Machine 15% Supervising Offset Press Operator for approval.
Division Operator III Checks conditions of press before and after operation ot detect
15% malfunctioning of parts.
15% Suppervises the mixing of ink and checks final color;
10% Reports to supervisor out-of-order presses and materials needed;
5% Operates machine to perform most difficult printing job works;
5% Submits time and work performance report to supervisor.
Supervises work of mechanics and offset press operators in
25% operation and maintenance of machinery and accessories;
Recommends to the Chief of Division processes or technical
25% changes which may improve operation of the presses;
Reprography & Printing Printing Machine 20% Supervises press operation for quality production;
Division Operator IV Prepares and submits report regarding the activities of the
10% personnel directly under him;
Enforces discipline among subordinates and recommends proper
10% action to superiors; and
10% Rates efficiency of personnel under his direct.
Helps in the photographic reproduction of charts, maps and official
30% publications.
20% Helps in developing and fixing photographic films.
Litho 20% Takes pictures of employees and other official pictures.
Reprography & Printing
Photoengraving Photographer II
Division 10% Cleans and oils photographic equipments
Cameraman I
Helps in the preparation of photographic solutions in processing
10% photographic films.
Keeps record of incoming and outgoing work orders and report
10% and accomplished to supervisor.
App II T-2-1
New position
Division Name Position Name name (if any) Ratio Responsibility
Under general supervision, develops and processes either wet or
dry negatives or regular line work, half tone, color half tone in
straight process or double-tone, intensity or reduce color
50% negatives.
Litho
Reprography & Printing 20% Mix photographic solutions for wet and dry processing
Photoengraving Photographer III
Division
Cameraman II 10% Make settings and adjustment on the camera.
make duplicate copies of negatives and positives by contact
10% printing, an d
Deliver finished jobs, negatives, positives or photo prints to the
10% supervisor.
Operates phototype machine to print type style and sizes as
50% required.
Make print of types on with or stripping film or on resin coated
Reprography & Printing Senior Phototype 20% paper.
Photographer III
Division Operator 10% Receives type orders and study specific requirement.
10% Coordinate with other units regarding their type needs.
10% Store or keep file of all type order characters for future reference.
Assist in all photographic processes which involves enlarging or
30% reducing the size of a chart, map or any manuscript;
Operate a contact printer to produce duplicate copies an dof
30% negatives or positives of a chart or maps or manuscript.
Reprography & Printing Offset Camera Operate an automatic film processor in processing exposed films
Photographer III
Division Technician 30% from the camera or contact printer.
Prepare photographic chemicals appropriate to a certain type of
5% photographic emulsion.
5% Maintain good housekeeping in the darkroom and equipment.
Produce enlarged or reduced reproducibles or photographs as
40% may be required
Produce small-size copies of reproducibles and photographs by
30% contact process
10% Inspect and evaluate photographability of manuscripts.
Reprography & Printing Photographic
Photographer III Prepare processing chemicals as may be appropriate for each
Division Color Processor
10% type of photographic material;
Inspect produced reporducibles or photographs for flaws,
imperfections, density of images and for dimensional
5% requirements;
5% Maintain good housekeeping and maintenance of equipment.
Operate process camera in the photographic reproduction of
30% nautical charts, maps, thematic maps, etc.
Produce reduced same size or enlarge photo repuroduction of
30% maps, charts, etc. to specified dimension, densities and materials;
Senior Offset
Reprography & Printing 15% Print duplicate copies of reproducibles as may be required.
Camera Photographer IV
Division Execute preventive maintenance of process camera to minimize
Technician
10% breakdown;
10% Produce color separation negatives/positives;
Charge in the specification of all photographic materials for
5% procurement.
25% Assist in the supervision of personnel in the Reprography Section.
Check negatives produced by Camera Section as to sharpness of
20% lines and clearness of details.
Give instructions on work methods and procedures relative to work
Supervising
Reprography & Printing 20% assigned.
Photolithographic Photographer IV
Division Prepare work order for type impressions for correction of charts
Technician
15% and maps;
Review completed work for quality, workmanship and compliance
15% to specifications of work orders.
5% Submit periodic reports.
Supervise the execution of functions and activities of the Printing
25% Section
Give instructions on the most economical and productive use of
25% printing supplies and materials.
Reprography & Printing Printing Control Printing Quality Charge with the scheduling of printing orders and priorities for the
Division Supervisor Control Officer II 20% optimum utilization of equipment;
Control and set standards in the purpose of materials and supplies
15% and
Coordinates with other unites regarding their reproduction works
15% requirement;
Reprography & Printing Photographic Produce enlarged or reduced reproducibles or photographs as
Division Color Processor 40% may be required.
App II T-2-2
New position
Division Name Position Name name (if any) Ratio Responsibility
Produce same-size copies of reproducibles and photographs by
30% contact process.
Inspect and evaluate photographability of manuscripts,
10% compilations, photographs, etc., for photographic reproduction.
Prepare processing chemicals as may be appropriate for each
10% type of phogoraphic materials;
Inspect producred reproducibles or photographs for flaws,
imperfections, density of imanges and for dimensional
5% requirements.
5% Maintain good housekeeping and maintenance of equipment.
Applies corrections o n charts, map reproducibles from correction
30% proofs prepared by Chart an dMap Production Division.
Checks reproducibles produced by the Photography Section, as to
sharpness of lines, and clearness of details before turning over to
other retouchers for minor retouching of weak lines, details and
20% pinholes.
Prepares work order for type impressions necessary for
Sr. Photo Photographic
Reprography & Printing cmpilation/corrrections of charts and maps, forms, cerrtificates and
Lithographic Color Processor
Division 15% other office publications.
Layout Man III
Prepares color separation negatives by strip mask or by
20% opaqueing.
Prepare manuscripts for photography work and makes final lay-out
of forms and other publications and also prepares dummies for
10% same in correct page sequence.
Assists Chief Section in supervising other retouchers in the
5% performance of delicate assignments.
Plans, directs and supervises the working the Reprography
25% Section.
Responsible for layouting, stripping, color separation and blue and
20% white printing.
Reprography & Printing Offset Press Printing Press Review incoming work orders and give special instructions
Division Supervisor Supervisor 20% required for the performance of the work.
15% Institute training programme for personnel.
Make studies on reprographic techniques and recommend work
15% procedures for the efficient performance of the unit.
5% Submit periodic reports
Supervise the execution of functions and activities of the Printing
25% Section;
Give instructions on the most economical and productive use of
25% printing supplies and materials.
Reprography & Printing Printing Quality Charge with the scheduling of printing orders and priorities for the
Division Control Officer II 20% optimum utilization of equipment.
Control and set standards in the purchase of materials and
15% supplies.
Coordinates with other units regarding their reproduction works
15% requirement.
Assists the Chief of Division in supervising all reproduction work,
including photographic processing, production of color separation
25% reproducibles, plate making and printing.
Coordinates the reprography and printing work of the different
25% sections/units of the division.
Production Sets up quality control system to ensure that production work are
Chief Production
Reprography & Printing Planning & 20% within standards.
Planning and
Division Control Officer Review production flow and recommend/effect changes which
Control
IV would result in the effective and efficient performance of the
10% division.
Supervises the preventive maintenance of all
10% equipments/machineries in the division to minimize down time.
Plans the work schedules for maximum performance and
10% utilization of equipments.
Assists the Chief of Division in supervising all reproduction work,
including photographic processing, production of color separation
25% reproducibles, plate making and printing.
Coordinates the reprography and printing work of the different
25% sections/units of the division.
Sets up quality control system to ensure that production work are
Production
Reprography & Printing 20% within standards.
Planning and
Division Review production flow and recommend/effect changes which
Control Officer IV
would result in the effective and efficient performance of the
10% division.
Supervises the preventive maintenance of all
10% equipments/machineries in the division to minize down time.
Plans the work schedules for maximum performance and
10% utilization of equipments.
App II T-2-3
New position
Division Name Position Name name (if any) Ratio Responsibility
Plans, directs and supervise the functions and activities of the
25% division.
Supervise all reproduction work, including photographic
processing products of color separation reproducible; plate making
20% and printing.
Coorinate with other units of the agency regarding their
15% reproduction work requirements.
Reprography & Printing Review existing work methodology an dinstrumentation with the
Engineer V
Division purpose of updating technology for the efficient performance of the
10% division.
Plans the most economical and reproductive operation of the
10% divisions and establish policies to effectuate such plans.
Supervise the specialized photographic reproduction of
10% mult-colored topogrpahic, thematic maps and nautical charts.
10% Plans work schedules for the optimum utilization of equipment.
Plan, directs and supervise the functiuons and activities of the
25% division.
Supervise all reproduction work, including photographic
prodessing products of color separation reproducibles; plate
20% making and printing.
Coordinate with other units of the agency regarding their
Chef 15% reproduction work requirements.
Cartography Division Cartographic Engineer V Review existing work methodlogy and instrumentation owith the
Engineer prupose of updating technology for the efficient perfomance of the
10% division.
Plans the most economical and reproductive operation of the
10% divisions and establish policies to effectuate such plans.
Supervise the specialized photographic reproduction ofo
10% mult-colored topographic, thematic maps and nautical charts.
10% Plans work schedules for the optimum utilizations of equipment.
Plans, directs and supervises the working the Reprography
25% Section.
Responsible for layouting, stripping, color separation and blue and
20% white printing.
Reprography & Printing Offset Press Printing Press Review incoming work orders and give special instructions
Division Supervisor Supervisor 20% required for the performance of the work.
15% Institute training programme for personnel
Make studies on reprographic techniques and recommend work
15% procedures for the efficent performance of the unit.
5% Submit periodic reports.
Junior Renders photogrammetric work in the production of orthophoto
Photogrammetry Division Photogrammetric 60% and conventional line maps and managing of computer programs.
Engineer 40% Perfoms preparatory work for aerial triangulation.
45% Executes aerial triangulation in photogrammetric instruments
Photogrammetric Undertakes the production of orthophoto maps and conventional
Photogrammetry Division
Engineer 45% line maps in photogrammetric instruments.
10% Checks and maintans photogrammetric equipment.
30% Prepare and execute aerial triangulation and adjustements
Undertake the production and recording of digital terrain model
20% data for orthohpoto mapping projects.
Senior
Undertake the production of orthophoto negative an d/or
Photogrammetry Division Photogrammetric
20% compilation of line maps.
Engineer
Responsible for the proper care and maintenance of
20% photogrammetric instruments assigned.
10% Performs such other duties as may be assigned.
Supervising Assists in the planning and execution of all photogrammetric works
Photogrammetry Division Engineer IV Photogrammetric to which his section os concerned, ie a) aerial triangulation, b)
Engineer 30% orthophoto and photo mosaic production, c) line map production
Provides suitable training program for the advancement fo
15% subordinates;
Undertake periodic inspection of the photogrammetric instruments
to ensure that standard policy on care and maintenance of the
10% instruments are followed by operations.
Plans and prepares daily workloads of his section and
10% assignments of subordinates.
Assist in the function and enforcement of standards and
10% specifications in photogrammetric work.
Assists in the formulation and conduct of research programs to
10% improve work operations.
Supervise production of orthophoto maps and conventional line
10% maps in photogrammetric instrument;
App II T-2-4
New position
Division Name Position Name name (if any) Ratio Responsibility
5% Performs such other duties that may be assigned.
15% Exercise general supervision in the photogrammetry division.
Responsible for the implemetnation of standard operating
10% procedures, directives and orders issued by higher authorities.
Formulate technical advice on staff training requirements,
equipments, performance and maintenance and advancement of
10% division personnel.
Evaluate production procedures and specifications and propose
Chief 10% better alternatives.
Photogrammetry Division Photogrammetric Engineer V 10% Submit periodic reports an proposals.
Division
10% Represent the division in all staff meetings.
Prepares feasibility studies on special projects and work contracts,
10% Memoranda of Agreement as may be required.
Supervise the production of Orthophoto maps and conventional
10% line maps in photogrammetric instrument.
10% Check accuracy of results in Aerial triangulation adjustments.
5% Perform such other duties as may be assigned.
Operates all photographic laboratory equipment processes films
Photogrammetric 70% and produce photo prints;
Laboratory Responsible for the maintenance of the photographic laboratory
Photogrammetry Division Laboratory
Technician II 15% equipment.
Technician
15% Do the photographic works as maybe required.
25% Performs routine jobs like lettering, sketching and tracing.
Makes enlargements or reductions of source materials by use of
25% pantograph.
Cartographic Maintains records of incoming and outgoing survey sheets in the
Cartography Division
aide II 25% Section.
20% Maintains and keeps in order map files in the Section.
5% Performs other duties as maybe assigned to him from time to time.
Compiles and prepares working drawing for topographic and
25% thematic maps.
25% Inks map manuscripts on mylar, herculene or other base materials.
Scribes and prepares open window negative of topographic and
25% thematic maps for color separations;
Cartography Division Cartographer I Prepares orders for type impressions needed in map
10% constructions.
5% Applies corrections on positive map reproducibles;
Prepares layout and marginal information of topographic and
5% thematic maps;
5% Performs other duties as maybe assigned to him from time to time.
Under general supervision, instruction and assigns work to a group
25% of cartographers coordinating collective functions with other group.
Reviews their individual work clearly for vlidity and accuracy of the
25% technical details involved.
15% Participates in their regular work of the group.
Inks, plans topographic sheets, charts and plan, translating
surveys data into scaled charts and plans or verifying the technical
Cartography Division Cartographer II
10% details of the job prior to final tracing work to be done on them.
Receives assignment, work schedule and general instructions
from a supervising cartographer and reports to him periodically the
10% accomplishment of the working group.
Devises better cartographic symbols for better and economical
10% methods of presentation of geodetic, topographic data on maps.
5% Performs other duties that may be assigned to her.
Under general supervision, guide and instructs lower level
cartographers in the compilation and construction of topographic
25% and thematic maps and other related publications.
Makes a general review of finished compilations before
25% submission to higher supervisors.
Devises better cartographic symbols or better methods of
Supervising 15% presentation of details on topographic and thematic maps.
Cartography Division Cartographer III
Cartographer
15% Prepares map layout and design including marginal information.
Inks, scribes and prepares open window negatives of topographic
10% and thematic maps for color separation.
Prepares correction proofs and names standards for topographic
5% and thematic maps.
5% Performs other duties as maybe assigned to him from time to time.
App II T-2-5
New position
Division Name Position Name name (if any) Ratio Responsibility
Assists in the planning and programming of work assignments,
25% schedules and work loads among the personnel in the Section.
Prepares and designs layout and marginal information for
25% topographic and thematic maps.
Head Gathers and complies data needed and participate in the
Cartography Division Cartographer IV 25% construction of topographic and thematic maps.
Cartographer
Computes projection data and constructs projects lines used in
10% different types of maps.
10% Prepares correction proofs and name standards for maps.
5% Performs other duties as maybe assigned from time to time.
Assists in planning and programming of work assignments,
25% schedules and work loads among the personnel in the Section.
Gathers and compiles data and statistics needed in the design and
constrictions of topographic and thematic maps and other related
25% publications.
Performs computations in the design of maps and analyzes and
15% submits solutions to simple technical problems.
Cartographic Engages in layouting, plotting and construction of maps and
Cartography Division Engineer II submits periodic reports of accomplishments to Immediate
Engineer
10% Supervisor.
Participates in directed researches and investigations along
definite lines of study concerning proposed cartographic
10% engineering projects.
Prepares correction proofs and names standards for topographic
10% and thematic maps.
5% Performs other duties as maybe assigned to him from time to time.
Supervises the compilation, studies, evaluation and translation of
survey data prior to the construction of topographic and thematic
maps in accordance with established procedures standards and
40% specifications.
Receives work assignments, schedules and accepts general
instructions from the Supervising Cartographic Engineer and
20% submits to him periodically on the accomplishment of the group.
Senior Coordinates with other sections/units on the production of
Cartography Division Cartographic Engineer III 10% topographic maps, thematic maps and other related publications.
Engineer 10% Prepares and designs map layout and marginal information.
Participates in directed researches and investigations along
definite lines of study concerning proposed cartographic
10% engineering projects.
Studies and devises new work procedures and methods for
5% application in the units.
Performs other duties a s may be assigned to him from time to
5% time.
Under general direction, supervises and implements the technical
and administrative functions of the section engaged in specialized
25% cartographic engineering work.
Guides, instructs and directs cartographers in plotting topographic
field data and assumes responsibility for the accuracy and
25% correctness of the same.
Analyzes and reviews technical reports regarding plotting an
delineating topographic features and prepares memoranda on the
Supervising
15% same for the Chief of the Division.
Cartography Division Cartographic Engineer IV
Plans, work schedules and directs implementations of the various
Engineer
10% tasks assigned to the Section.
Initiates the production and revision of topographic thematic maps
10% and other related publications.
Conducts researches, studies and investigations on the feasibility
of proposed cartographic engineering projects and renders
10% decisions on minor problems affecting the unit.
Studies and devises new work procedures and methods for
5% application in the unit.
Reprography and Plans, directs and supervise the functions and activities of the
Engineer V
Printing Division 25% division.
Supervise all reproduction work, including photographic
processing products of color separation reproducibles, plate
20% making and printing and printing.
Coordinate with other units of the agency regarding their
15% reproduction work requirements.
Review existing work methodology and instrumentation with the
purpose of updating technology for the efficient performance of the
10% division.
Plans the most economical and reproductive operation of the
10% divisions and establish policies to effectuate such plans.
App II T-2-6
New position
Division Name Position Name name (if any) Ratio Responsibility
Supervise the specialized photographic reproduction of
10% multi-colored topographic, thematic maps and nautical charts.
10% Plans work schedules for the optimum utilization of equipment.
Supervises the typing of correspondence, records and other
60% relevant documents and paper or stencil;
20% Supervises filling out of form letters and routine endorsements;
Secretary I Supervises sorting and recording of incoming and outgoing
10% correspondence and other documents;
Supervises the maintenance and indexing of correspondence,
10% records and other documents.
Supervises and participates in the work of a clerical staff
performing tasks of varied levels of activity in providing
50% administrative services;
15% Carries out administrative policies and decides on routine matters;
Administrative Assigns work to clerical pool and reviews report, forms and
Assistant II 15% records prepared by circulars;
10% Prepares memoranda and circulars;
Performs other duties as may be assigned from time to time and
act on routine/.delegated matters in the absence of the immediate
10% officer.
Source: Personnel Management Section, NAMRIA
App II T-2-7
Appendix II Table-3
GIS Database
App II T-3-1
3648 IV Tanjay Cebu Region 7 completed All Layers
Completed
3649 I Argao Cebu Region 7 completed All Layers
Completed
3649 II Dalaguete Cebu Region 7 completed All Layers
Completed
3849 III Manjuyod Cebu Region 7 completed All Layers
Completed
3849 IV Tayasan Cebu Region 7 completed All Layers
Completed
3850 I Pinamungahan Cebu Region 7 completed All Layers
Completed
3850 II Dumanjog Cebu Region 7 completed All Layers
Completed
3651 IV Murcia Negros Region 6 completed All Layers
Occidental Completed
3852 III Bacolod Region 6 completed All Layers
Completed
3852 IV Victorias Region 6 completed All Layers
Completed
3660 I Mt Isarog Naga City Region 5 completed All Layers
Completed
3660 IV Naga City Naga City Region 5 completed All LAYERS
Completed
3661 II Tinambac Naga City Region 5 completed All Layers
Completed
3661 III Libmanan Naga City Region 5 completed All Layers
Completed
3750 I Cebu City Cebu Region 7 completed All Layers
Completed
3750 III Carcar Cebu Region 7 completed All Layers
Completed
3750 IV Pardo Cebu Region 7 completed All Layers
Completed
3751 I Balamban Cebu Region 7 completed All Layers
Completed
3751 II Buanoy Cebu Region 7 completed All Layers
Completed
3751 III San Carlos Cebu Region 7 completed All Layers
Completed
3752 I Maravilla Cebu Region 7 completed All Layers
Completed
3732 II Tuburan Cebu Region 7 completed All Layers
Completed
3753 I Madridejos Cebu Region 7 completed All Layers
Completed
3753 II Sta. Fe Cebu Region 7 completed All Layers
Completed
3759 I Bacacay Legaspi Region 5 completed All LAYERS
Completed
3759 II Manito Albay Region 5 completed All Layers
Completed
3759 III Legaspi City Legaspi Region 5 completed All Layers
Completed
3845 I Alubijid Region 10 completed All Layers
Completed
3822 II Tudela Cebu Region 7 completed All Layers
Completed
3851 III Liloan Cebu Region 7 completed All Layers
Completed
App II T-3-2
3851 IV Danao Cebu Region 7 completed All Layers
Completed
3852 III Catmon Cebu Region 7 completed All Layers
Completed
3652 IV Tabogon Cebu Region 7 completed All Layers
Completed
3853 III Bogo Cebu Region 7 completed All Layers
Completed
3853 IV Daanbantayan Cebu Region 7 completed All Layers
Completed
3854 III Guintacan Island Cebu Region 7 completed All Layers
Completed
3952 III Pilar Cebu Region 7 completed All Layers
Completed
4041 III Kidapawan North Cotabato Region 12 completed All Layers
Completed
4140 IV Kaputian Region 11 completed All Layers
Completed
4141 III Davao Region 11 completed All Layers
Completed
4141 IV Bunawan Region 11 completed All Layers
Completed
6973 I Palaul Region 3 completed All Layers
Completed
6974 I Sta. Cruz Region 3 on-going Road, River
6974 II Masinloc Region 3 on-going Road, River
7071 I Marivelea Bataan Region 3 on-going Road River
7072 I Olongapo Zambales Region 3 completed All Layers
Completed
7072 II Bagac Pampanga Region 3 on-going Road
7072 IV San Antonio Region 3 on-going Road
7073 I O'donnelte Region 3 completed All Layers
Completed
7073 II Mt Pinalubo Regon 3 on-going Road
7073 III San Narciso Region 3 on-going Road
7074 I San Carlos Region 3 on-going Road, River
7074 II Camiling Tarlac Region 3 on-going Road
7074 III Mt Lamat Region 3 on-going Road, River
7074 IV Bugallon Region 3 on-going Road, River
7075 II Dagupan City Region 1 completed All Layers
Completed
7171 IV Corregidor Island Cavite Region 3 on-going Road
7172 I Malolos Bulacan Region 3 on-going Road
7172 II Manila Metro Manila NCR on-going Road
7172 III Orion Bataan Region 3 on-going Road
7172 IV Guagua Pampanga Region 3 on-going Road, River
7173 I Cabanatuan Nueva Ecija Region 3 on-going Road
7173 II San Miguel Bulacan Regon 3 on-going Road, River
7173 III Angeles Pampanga Region 3 on-going Road, River
7173 IV Tarlac Tarlac Region 3 on-going Road
7174 I San Jose Region 3 on-going Road, River
7174 II Mutos Region 3 completed All Layers
Completed
7174 III Gerona Region 3 on-going Road
7174 IV Cuyapo Region 3 on-going Road, River
7175 II San Nicolas Region 3 on-going Road
7272 I Mt Irid Region 3 on-going Road
7272 IV Angat Bulacan Region 3 on-going Road, River
7273 I Gabaldon Region 3 on-going Road
7273 II Ulalikan Point Region 3 on-going Road, River
App II T-3-3
7273 III Sibul Island Region 3 on-going Road, River
7273 IV General Tinio Region 3 on-going Road, River
7274 I Maria Aurora Aurora Region 3 on-going Road
7274 II Ligaya Region 3 on-going Road
7274 Ill Palayan City Region 3 on-going Road, River
7274 IV Pantabangan Region 3 on-going Road, River
7275 III Burgos Region 3 on-going Road
7374 III San Luis Region 3 on-going Road, River
7374 IV Baler Aurora Region 3 on-going Road, River
73751 I Virgoneza Region 3 on-going Road
7375 II Dinalongan Region 3 completed All Layers
Completed
7375 III Nagtipunan Region 3 on-going Road
7475 III Calabgan Region 3 on-going Road
7476 III Mt. Dos Region 3 on-going Road, River
Hermanos
3548 I Bais Sugar Region 7 on-going
Central
3548 II Basang Region 7 completed
3548 III Bayawan Region 7 completed All Layers
Completed
3548 IV Bagotbotan Region 7 on-going
3549 I Negros Region on-going
Occidental
Agricultural
School
3549 II Bagtic on-going
3650 III Guihulngan on-going
3651 II Vallehermosa Region 7 on-going
3651 111 La Carlota Region 7 completed All Layers
Completed
3749 II Balilihan Region 7 on-going
3750 II Inabanga Region 7 completed All Layers
Completed
3759 IV Ligao Legaspi Region 5 completed All Layers
Completed
3845 II Manticao Region 10 completed All Layers
Completed
3849 I Batuanan Region 7 completed All Layers
Completed
3849 II Anda Region 7 completed All Layers
Completed
3849 IV Cambangay Sur Region 7 completed All Layers
Completed
3850 III Talibon Region 7 on-going
3850 IV Mahanay Island Region 7 completed All Layers
Completed
3945 I Claveria Region 10 on-going
3945 II Tankulan Region 10 on-going
3945 III Cagayan de Oro Misamis Region 10 completed All Layers
Oriental Completed
3945 IV EI Salvador Misamis Region 10 completed All Layers
Oriental Completed
4038 II Lun Grande completed All Layers
Completed
4038 III Dadiangas completed All Layers
Completed
7073 V Botolan Region 3 completed All Layers
Completed
App II T-3-4
Appendix II Table-4
Prescribed Rates for
NAMRIA Services
SERVICES PRICE
Production of Aerial Photographs
Paper print 10” x 10” 250.00
2x Enlargement 22” x 22” 1,800.00
3x Enlargement 32” x 32” 2,400.00
4x Enlargement 42” x 42” 3,200.00
Diapositive Print 10” x 10” 550.00
Production of SAR Mosaic
Scale 1:100, 000 25” x 29” 2,000.00
Scale 1:50,000 37” x 37” 3,800.00
Production of SAR Strip
Scale 1:100, 000 10” x 42” 800.00
Scale 1:50,000 17” x 42” 1,700.00
Certification of Nautical Distance
First 25 nautical miles 180.00
Every succeeding Nm 25.00
Processed tidal hourly heights, monthly per station 240.00
Processed mean hourly tidal current Velocity including current ellipse, 720.00
per station
Processed times and heights of high and low waters including lunitidal 240.00
interval heights, per station, per month
Monthly and Annual mean sea level and other tidal datum planes per 240.00
tide station
Tide Reducers per station, per month 240.00
Highest and lowest tide observed per tide station 120.00
Tidal extremes, per tide, station, per year 300.00
Certification of tidal benchmarks per tide station 120.00
Certification of geodetic station data, per station 360.00
Processed serial casts data (CTD, BT/XBT, dissolved oxygen,
phosphate, nitrate, silica, pH, sound velocity, etc., per inshore/ offshore
oceanographic station
A combination of 3 parameters or less 360.00
A combination of 4 to 6 parameters 540.00
A combination of 6 or more parameters 720.00
Processed serial cast oceanographic CTD, BT/XBT data (sound
velocity dissolved oxygen, phosphate, nitrate temperature, salinity,
conductivity)/ month/Tide station observation
A combination of 3 parameters or less 200.00
A combination of 4 to 6 parameters 300.00
A combination of 6 or more parameters 450.00
GPS Raw Data, per day observation, per station 660.00
Baseline processing of GPS data
Single frequency receive (L1)per station 360.00
Dual frequency receiver (L1/L2)per 480.00
GPS survey network adjustment
Single frequency receive (L1)per station 480.00
Single frequency receive (L1)per station 600.00
Evaluation of GPS survey data
Single frequency receive (L1)per station 1,200 .00
Dual frequency receiver (L1/L2)per 1,440.00
Certification of Trimble GPS receivers
Per receiver:
App II T-4-1
With CGSD providing operator 3,600.00
Client performing the observations 1,800.00
Raw magnetic observation data, per day
Processed magnetic observation data, per day 4,200.00
Gravity Station Data, per station 2,400.00
Authentication Land Classification, per map/document 360.00
Printing of Satellite Raw data A0 size 440.00
Photo laboratory – Slide to print 300.00
3R (31/2” x 5”) 25.00
5R (5” x 7”) 3,000.00
8R (8” x 10”) 405.00
11R (11” x 14”) 817.00
16” x 20” 1,762.00
20” x 24” 2,542.00
Policy and Procedures on Evaluation & Certification
Application Fee 500.00
Evaluation & Processing Fee per sq.cm. 0.20
Light Detail 1,000.00
Medium Detail 2,000.00
Heavy Detail 4,000.00
Certification Fee 200.00
Final Review 150.00
Administrative Maps
National Maps
Map 25 85.00
Map 104 (B&W) 85.00
Map 150 300.00
Map 200 (B&W) 120.00
Map 201 120.00
Regional Maps 195.00
Other Regions 195.00
Region IV (4 sheets) 195.00
Provincial Maps 195.00
Topographic Maps 120.00
Land Cover Maps 120.00
Metro Manila Maps 120.00
Land Use Maps 120.00
Land Condition Maps 120.00
Planimetric Maps 120.00
Nautical Charts
Black and White 350.00
Colored 400.00
Land Classification Maps PHP180 for the first 8sq.ft,
plus, Php30 per sq.ft, of map
sheet of fraction thereof.
JAFTA Maps 100.00
Preliminary Map Data (PMD) 50.00
Communal Forest (CnF) 50.00
Predicted Tide and Current Table 400.00
Philippine Coast Pilot Book 3,000.00
Topographic Maps (digital)
Scale 1:5,000 per sheet 9,000.00
Scale 1:10,000 per sheet 9,000.00
Scale 1:50,000 per sheet 6,000.00
Scale 1:250,000 per sheet 6,000.00
Thematic Maps (Scale 1:50,000) 15’x15’
Land Cover 1,100.00
App II T-4-2
Slope 1,100.00
Soil/Geologic 1,100.00
Road Network 1,100.00
River Network 1,100.00
Administrative Boundary 1,100.00
LC Points (Corners) 1,100.00
Land Use/Forest Cover – JAFTA 3,000.00
Nautical Charts 6,000.00
Inset (less than 50% of sheet coverage) 3,600.00
Hydrographic Sheet
Single Beam 9,000.00
Multi Beam (100% Floor Coverage) 12,000.00
Hard copy (old data) 1,200.00
Hard copy (new data) 2,500.00
Rectified and enhanced satellite image, 15’x15
Using Landsat 7 data
Foreign Distributor 4,860.00
Local Distributor 6,750.00
Using Landsat TM data
Foreign Distributor 16,100.00
Local Distributor 22,400.00
Using Landsat SPOT XS data
Local Distributor 28,500.00
Land Cover Map w/o field verification, 15’x15’
Using Landsat 7 data
Foreign Distributor 8,360.00
Local Distributor 10,250.00
Using Landsat 7 data
Foreign Distributor 21,600.00
Local Distributor 25,900.00
Using Landsat SPOT XS data
Local Distributor 32,000.00
Land Cover Map w/ field verification, 15’x15’
Using Landsat 7 data
Foreign Distributor
Luzon 27,000.00
Visayas 38,400.00
Mindanao 43,240.00
Local Distributor
Luzon 28,900.00
Visayas 40,300.00
Mindanao 45,100.00
Using Landsat TM data
Foreign Distributor
Luzon 40,250.00
Visayas 51,650.00
Mindanao 56,450.00
Local Distributor
Luzon 44,540.00
Visayas 55,940.00
Mindanao 60,740.00
Using Landsat SPOT XS data
Local Distributor
Luzon 50,680.00
Visayas 62,080.00
Mindanao 66,880.00
App II T-4-3
App II T-5-1
SPOT 5 ACQUIRED AS OF 21 DECEMBER 2007 (LEVEL 1A)
App II T-5-2
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Full Scene 5m Panchromatic 2006 12-Jan-06
16 303 320 Full Scene 10 m Multi-Spectral 2006 28-Feb-06
Full Scene 2.5 m Panchromatic 2006 28-Feb-06
17 303 323 1/4 Scene 10 m Multi-Spectral 2005 21-Nov-05
1/4 Scene 5m Panchromatic 2005 21-Nov-05
18 304 313 1/4 Scene 10 m Multi-Spectral 2007 21-Jan-07
1/4 Scene 2.5 m Panchromatic 2007 21-Jan-07
19 304 313 Half Scene 10 m Multi-Spectral 2003 16-Feb-03
Half Scene 2.5 m Panchromatic 2003 16-Feb-03
20 304 314 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
21 304 314 Full Scene 10 m Multi-Spectral 2006 20-Nov-06
Full Scene 2.5 m Panchromatic 2006 20-Nov-06
22 304 315 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
23 304 316 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
24 304 316 Half Scene 10 m Multi-Spectral 2007 17-Feb-07
Half Scene 2.5 m Panchromatic 2007 17-Feb-07
25 304 317 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
26 304 317 Half Scene 10 m Multi-Spectral 2007 17-Feb-07
Half Scene 2.5 m Panchromatic 2007 17-Feb-07
27 304 318 Full Scene 10 m Multi-Spectral 2005 19-May-05
Full Scene 5m Panchromatic 2005 19-May-05
28 304 319 Full Scene 10 m Multi-Spectral 2005 3-Feb-05
Full Scene 5m Panchromatic 2005 3-Feb-05
29 304 320 Full Scene 10 m Multi-Spectral 2004 19-Dec-04
Full Scene 2.5 m Panchromatic 2004 19-Dec-04
30 304 321 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
31 304 322 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
App II T-5-3
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
32 304 322 Full Scene 10 m Multi-Spectral 2006 13-Sep-06
Full Scene 2.5 m Panchromatic 2006 13-Sep-06
33 304 323 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
34 304 323 Half Scene 10 m Multi-Spectral 2006 16-Mar-06
Half Scene 2.5 m Panchromatic 2006 16-Mar-06
35 304 324 Full Scene 10 m Multi-Spectral 2005 24-Feb-05
Full Scene 5m Panchromatic 2005 24-Feb-05
36 305 315 Full Scene 10 m Multi-Spectral 2002 15-Nov-02
Full Scene 2.5 m Panchromatic 2002 15-Nov-02
37 305 316 Full Scene 10 m Multi-Spectral 2002 15-Nov-02
Full Scene 2.5 m Panchromatic 2002 15-Nov-02
38 305 316 Half Scene 10 m Multi-Spectral 2007 31-Mar-07
Half Scene 2.5 m Panchromatic 2007 31-Mar-07
39 305 317 Full Scene 10 m Multi-Spectral 2006 1-Mar-06
Full Scene 5m Panchromatic 2006 1-Mar-06
40 305 317 Half Scene 10 m Multi-Spectral 2007 31-Mar-07
Half Scene 2.5 m Panchromatic 2007 31-Mar-07
41 305 318 Full Scene 10 m Multi-Spectral 2006 1-Mar-06
Full Scene 5m Panchromatic 2006 1-Mar-06
42 305 320 Full Scene 10 m Multi-Spectral 2005 13-Jun-05
Full Scene 5m Panchromatic 2005 13-Jun-05
43 305 322 Full Scene 10 m Multi-Spectral 2004 23-Dec-04
Full Scene 5m Panchromatic 2004 23-Dec-04
44 305 323 Half Scene 10 m Multi-Spectral 2005 24-May-05
Half Scene 5m Panchromatic 2005 24-May-05
45 305 323 Full Scene 10 m Multi-Spectral 2004 23-Dec-04
Full Scene 2.5 m Panchromatic 2004 23-Dec-04
46 305 325 Full Scene 10 m Multi-Spectral 2006 7-Jan-06
Full Scene 2.5 m Panchromatic 2006 7-Jan-06
47 306 320 Full Scene 10 m Multi-Spectral 2006 7-Jun-06
App II T-5-4
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Full Scene 2.5 m Panchromatic 2006 7-Jun-06
48 306 322 Full Scene 10 m Multi-Spectral 2006 22-Mar-06
Full Scene 2.5 m Panchromatic 2006 22-Mar-06
49 306 323 Half Scene 10 m Multi-Spectral 2006 12-Jan-06
Half Scene 2.5 m Panchromatic 2006 12-Jan-06
50 306 325 Half Scene 10 m Multi-Spectral 2006 12-Jan-06
Half Scene 2.5 m Panchromatic 2006 12-Jan-06
51 307 321 Full Scene 10 m Multi-Spectral 2004 18-Oct-04
Full Scene 5m Panchromatic 2004 18-Oct-04
52 307 322 Full Scene 10 m Multi-Spectral 2004 18-Oct-04
Full Scene 5m Panchromatic 2004 18-Oct-04
53 307 326 1/8 Scene 10 m Multi-Spectral 2007 15-Dec-07
1/8 Scene 2.5 m Panchromatic 2007 15-Dec-07
54 308 322 Full Scene 10 m Multi-Spectral 2004 22-Aug-04
Full Scene 5m Panchromatic 2004 22-Aug-04
55 308 322 Half Scene 10 m Multi-Spectral 2004 23-Oct-04
Half Scene 5m Panchromatic 2004 23-Oct-04
56 308 323 Half Scene 10 m Multi-Spectral 2004 23-Oct-04
Half Scene 2.5 m Panchromatic 2004 23-Oct-04
57 308 325 1/4 Scene 10 m Multi-Spectral 2003 10-Mar-03
1/4 Scene 2.5 m Panchromatic 2003 10-Mar-03
58 308 326 Full Scene 10 m Multi-Spectral 2006 8-May-06
Full Scene 2.5 m Panchromatic 2006 8-May-06
59 308 328 Full Scene 10 m Multi-Spectral 2006 8-May-06
Full Scene 2.5 m Panchromatic 2006 8-May-06
60 308 328 Full Scene 10 m Multi-Spectral 2006 1-Apr-06
Full Scene 2.5 m Panchromatic 2006 1-Apr-06
61 309 322 Full Scene 10 m Multi-Spectral 2005 2-Apr-05
Full Scene 2.5 m Panchromatic 2005 2-Apr-05
62 309 323 Full Scene 10 m Multi-Spectral 2004 7-Nov-04
Full Scene 2.5 m Panchromatic 2004 7-Nov-04
63 309 324 Half Scene 10 m Multi-Spectral 2002 25-Oct-02
App II T-5-5
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Half Scene 5m Panchromatic 2002 25-Oct-02
64 309 325 1/4 Scene 10 m Multi-Spectral 2004 7-Nov-04
1/4 Scene 2.5 m Panchromatic 2004 7-Nov-04
65 309 326 1/4 Scene 10 m Multi-Spectral 2005 20-Feb-05
1/4 Scene 2.5 m Panchromatic 2005 20-Feb-05
65 309 329 Half Scne 10 m Multi-Spectral 2006 27-Nov-06
Half Scne 2.5 m Panchromatic 2006 27-Nov-06
66 309 329 Full Scene 10 m Multi-Spectral 2006 11-Dec-06
Full Scene 2.5 m Panchromatic 2006 11-Dec-06
67 309 331 Full Scene 10 m Multi-Spectral 2006 11-Dec-06
Full Scene 2.5 m Panchromatic 2006 12-Dec-06
68 310 331 Full Scene 10 m Multi-Spectral 2006 22-Dec-06
Full Scene 2.5 m Panchromatic 2006 23-Dec-06
69 310 322 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 5m Panchromatic 2006 3-May-06
70 310 323 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
71 310 324 Full Scene 10 m Multi-Spectral 2004 6-Jul-04
Full Scene 5m Panchromatic 2004 6-Jul-04
72 310 325 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
73 310 326 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
74 310 334 Full Scene 10 m Multi-Spectral 2006 23-Dec-06
Full Scene 2.5 Panchromatic 2006 23-Dec-06
75 310 335 Full Scene 10 m Multi-Spectral 2006 23-Dec-06
Full Scene 2.5 Panchromatic 2006 23-Dec-06
76 310 336 Full Scene 10 m Multi-Spectral 2005 26-Sep-05
Full Scene 2.5 Panchromatic 2005 26-Sep-05
77 310 336 Half Scene 10 m Multi-Spectral 2006 12-Dec-06
Half Scene 2.5 Panchromatic 2006 12-Dec-06
78 310 328 Full Scene 10 m Multi-Spectral 2006 3-May-06
App II T-5-6
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Full Scene 2.5 m Panchromatic 2006 3-May-06
Quarter
79 310 328 10 m Multi-Spectral 2003 27-Feb-03
Scene
Quarter
2.5 m Panchromatic 2003 27-Feb-03
Scene
80 310 328 Full Scene 10 m Multi-Spectral 2003 27-Feb-03
Full Scene 2.5 m Panchromatic 2003 27-Feb-03
Quarter
81 310 332 10 m Multi-Spectral 2006 7-Dec-06
Scene
Quarter
2.5 m Panchromatic 2006 7-Dec-06
Scene
82 311 322 Half Scene 10 m Multi-Spectral 2006 29-May-06
Half Scene 5m Panchromatic 2006 29-May-06
83 311 324 Half Scene 10 m Multi-Spectral 2006 29-May-06
Half Scene 2.5 m Panchromatic 2006 29-May-06
84 311 326 Full Scene 10 m Multi-Spectral 2006 2-Apr-06
Full Scene 2.5 m Panchromatic 2006 2-Apr-06
85 311 328 Full Scene 10 m Multi-Spectral 2007 17-Jan-07
Full Scene 2.5 m Panchromatic 2007 17-Jan-07
86 311 329 Full Scene 10 m Multi-Spectral 2007 17-Jan-07
Full Scene 2.5 m Panchromatic 2007 17-Jan-07
87 311 330 Full Scene 10 m Multi-Spectral 2006 22-Apr-06
Full Scene 2.5 m Panchromatic 2006 22-Apr-06
88 311 331 Full Scene 10 m Multi-Spectral 2006 22-Apr-06
Full Scene 2.5 m Panchromatic 2006 22-Apr-06
89 311 333 Full Scene 10 m Multi-Spectral 2004 12-Sep-04
Full Scene 2.5 m Panchromatic 2004 12-Sep-04
90 311 333/9 Full Scene 10 m Multi-Spectral 2004 12-Sep-04
Full Scene 2.5 m Panchromatic 2004 12-Sep-04
91 311 335 Full Scene 10 m Multi-Spectral 2006 19-Jan-06
Full Scene 2.5 m Panchromatic 2006 20-Jan-06
92 312 325 Full Scene 10 m Multi-Spectral 2003 11-Jun-03
App II T-5-7
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
App II T-5-8
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Half Scene 2.5 m Panchromatic 2006 15-Aug-06
109 314 326 Full Scene 10 m Multi-Spectral 2006 19-May-06
Full Scene 2.5 m Panchromatic 2006 19-May-06
110 314 327 Full Scene 10 m Multi-Spectral 2003 1-Jun-03
App II T-5-9
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Full Scene 2.5 m Panchromatic 2003 1-Jun-03
125 315 333 Full Scene 10 m Multi-Spectral 2003 13-Jan-03
Full Scene 2.5 m Panchromatic 2003 13-Jan-03
126 315 334 Full Scene 10 m Multi-Spectral 2006 22-Dec-06
Full Scene 2.5 m Panchromatic 2006 22-Dec-06
127 315 335 Full Scene 10 m Multi-Spectral 2006 2-Apr-06
Full Scene 2.5 m Panchromatic 2006 2-Apr-06
128 315 336 Full Scene 10 m Multi-Spectral 2005 14-Feb-05
Full Scene 2.5 m Panchromatic 2005 14-Feb-05
129 315 337 Full Scene 10 m Multi-Spectral 2005 14-Feb-05
Full Scene 2.5 m Panchromatic 2005 14-Feb-05
130 315 338 Full Scene 10 m Multi-Spectral 2006 9-Jan-06
Full Scene 2.5 m Panchromatic 2006 9-Jan-06
131 316 330 Half Scene 2.5 m Multi-Spectral 2003 2-Jun-03
Half Scene 10 m Panchromatic 2003 2-Jun-03
132 316 331 Full Scene 10 m Multi-Spectral 2003 2-Jun-03
Full Scene 2.5 m Panchromatic 2003 2-Jun-03
133 316 331 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
134 316 332 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 10-Oct-04
135 316 333 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
136 316 334 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
137 316 335 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
138 316 336 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
139 316 337 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
140 317 332 Half Scene 10 m Multi-Spectral 2003 18-Jun-03
App II T-5-10
Rosolu YEAR DATE
No. SCENE TYPE
-tion ACQUIRED ACQUIRED
K J
Half Scene 2.5 m Panchromatic 2003 18-Jun-03
141 317 332 Full Scene 10 m Multi-Spectral 2004 27-Jul-04
Full Scene 2.5 m Panchromatic 2004 27-Jul-04
142 317 333 Full Scene 10 m Multi-Spectral 2003 18-Jun-03
Full Scene 2.5 m Panchromatic 2003 18-Jun-03
143 317 334 Half Scene 10 m Multi-Spectral 2007 26-Mar-07
Half Scene 2.5 m Panchromatic 2007 26-Mar-07
144 317 334 Full Scene 10 m Multi-Spectral 2007 26-Mar-07
Full Scene 2.5 m Panchromatic 2007 26-Mar-07
145 317 336 Full Scene 10 m Multi-Spectral 2003 12-Feb-03
Full Scene 2.5 m Panchromatic 2003 12-Feb-03
146 317 337 Full Scene 10 m Multi-Spectral 2006 7-Mar-06
Full Scene 2.5 m Panchromatic 2006 7-Mar-06
147 317 338 Full Scene 10 m Multi-Spectral 2003 12-Feb-03
Full Scene 2.5 m Panchromatic 2003 12-Feb-03
148 318 334 Half Scene 10 m Multi-Spectral 2003 25-Sep-03
Half Scene 2.5 m Panchromatic 2003 25-Sep-03
149 318 335 Full Scene 10 m Multi-Spectral 2006 15-Aug-06
Full Scene 2.5 m Panchromatic 2006 15-Aug-06
150 318 336 Full Scene 10 m Multi-Spectral 2003 2-Jan-03
Full Scene 2.5 m Panchromatic 2003 2-Jan-03
151 318 337 Half Scene 10 m Multi-Spectral 2003 25-Sep-03
Half Scene 5m Panchromatic 2003 25-Sep-03
SPOT 5 ACQUIRED AS OF 21 DECEMBER 2007 (LEVEL 1A)
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
1 301 313 1/2 Scene 10 m Multi-Spectral 2006 26-Dec-06
1/2 Scene 2.5 m Panchromatic 2006 26-Dec-06
2 301 314 Full Scene 10 m Multi-Spectral 2003 12-Oct-03
Full Scene 2.5 m Panchromatic 2003 14-Oct-03
3 301 315 Half Scene 10 m Multi-Spectral 2006 11-May-06
App II T-5-11
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
Half Scene 2.5 m Panchromatic 2006 11-May-06
4 301 317 Full Scene 10 m Multi-Spectral 2005 13-Feb-05
Full Scene 2.5 m Panchromatic 2005 13-Feb-05
5 301 318 Full Scene 10 m Multi-Spectral 2005 13-Feb-05
Full Scene 2.5 m Panchromatic 2005 13-Feb-05
6 302 313 Half Scene 10 m Multi-Spectral 2003 17-Jul-03
2 copies
Half Scene 5m Panchromatic 2003 17-Jul-03
7 302 313 Full Scene 10 m Multi-Spectral 2006 25-Nov-06
Full Scene 2.5 m Panchromatic 2006 25-Nov-06
8 302 314 Full Scene 10 m Multi-Spectral 2003 17-Feb-03
Full Scene 2.5 m Panchromatic 2003 17-Feb-03
9 302 315 Full Scene 10 m Multi-Spectral 2006 6-Jun-06
Full Scene 2.5 m Panchromatic 2006 6-Jun-06
10 302 316 Full Scene 10 m Multi-Spectral 2006 6-Jun-06
Full Scene 2.5 m Panchromatic 2006 6-Jun-06
11 302 317 Full Scene 10 m Multi-Spectral 2006 6-Jun-06
Full Scene 2.5 m Panchromatic 2006 6-Jun-06
12 303 313 Half Scene 10 m Multi-Spectral 2003 13-Jul-03
Half Scene 2.5 m Panchromatic 2003 13-Jul-03
13 303 314 Full Scene 10 m Multi-Spectral 2003 13-Jul-03
Full Scene 2.5 m Panchromatic 2003 13-Jul-03
14 303 316 Full Scene 10 m Multi-Spectral 2006 25-Jan-00
Full Scene 5m Panchromatic 2006 18-Jan-06
15 303 317 Full Scene 10 m Multi-Spectral 2006 12-Jan-06
Full Scene 5m Panchromatic 2006 12-Jan-06
16 303 320 Full Scene 10 m Multi-Spectral 2006 28-Feb-06
Full Scene 2.5 m Panchromatic 2006 28-Feb-06
17 303 323 1/4 Scene 10 m Multi-Spectral 2005 21-Nov-05
1/4 Scene 5m Panchromatic 2005 21-Nov-05
18 304 313 1/4 Scene 10 m Multi-Spectral 2007 21-Jan-07
1/4 Scene 2.5 m Panchromatic 2007 21-Jan-07
App II T-5-12
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
19 304 313 Half Scene 10 m Multi-Spectral 2003 16-Feb-03
Half Scene 2.5 m Panchromatic 2003 16-Feb-03
20 304 314 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
21 304 314 Full Scene 10 m Multi-Spectral 2006 20-Nov-06
Full Scene 2.5 m Panchromatic 2006 20-Nov-06
22 304 315 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
23 304 316 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
24 304 316 Half Scene 10 m Multi-Spectral 2007 17-Feb-07
Half Scene 2.5 m Panchromatic 2007 17-Feb-07
25 304 317 Full Scene 10 m Multi-Spectral 2003 16-Feb-03
Full Scene 2.5 m Panchromatic 2003 16-Feb-03
26 304 317 Half Scene 10 m Multi-Spectral 2007 17-Feb-07
Half Scene 2.5 m Panchromatic 2007 17-Feb-07
27 304 318 Full Scene 10 m Multi-Spectral 2005 19-May-05
Full Scene 5m Panchromatic 2005 19-May-05
28 304 319 Full Scene 10 m Multi-Spectral 2005 3-Feb-05
Full Scene 5m Panchromatic 2005 3-Feb-05
29 304 320 Full Scene 10 m Multi-Spectral 2004 19-Dec-04
Full Scene 2.5 m Panchromatic 2004 19-Dec-04
30 304 321 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
31 304 322 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
32 304 322 Full Scene 10 m Multi-Spectral 2006 13-Sep-06
Full Scene 2.5 m Panchromatic 2006 13-Sep-06
33 304 323 Full Scene 10 m Multi-Spectral 2003 27-Jan-03
Full Scene 2.5 m Panchromatic 2003 27-Jan-03
34 304 323 Half Scene 10 m Multi-Spectral 2006 16-Mar-06
Half Scene 2.5 m Panchromatic 2006 16-Mar-06
App II T-5-13
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
35 304 324 Full Scene 10 m Multi-Spectral 2005 24-Feb-05
Full Scene 5m Panchromatic 2005 24-Feb-05
36 305 315 Full Scene 10 m Multi-Spectral 2002 15-Nov-02
Full Scene 2.5 m Panchromatic 2002 15-Nov-02
37 305 316 Full Scene 10 m Multi-Spectral 2002 15-Nov-02
Full Scene 2.5 m Panchromatic 2002 15-Nov-02
38 305 316 Half Scene 10 m Multi-Spectral 2007 31-Mar-07
Half Scene 2.5 m Panchromatic 2007 31-Mar-07
39 305 317 Full Scene 10 m Multi-Spectral 2006 1-Mar-06
Full Scene 5m Panchromatic 2006 1-Mar-06
40 305 317 Half Scene 10 m Multi-Spectral 2007 31-Mar-07
Half Scene 2.5 m Panchromatic 2007 31-Mar-07
41 305 318 Full Scene 10 m Multi-Spectral 2006 1-Mar-06
Full Scene 5m Panchromatic 2006 1-Mar-06
42 305 320 Full Scene 10 m Multi-Spectral 2005 13-Jun-05
Full Scene 5m Panchromatic 2005 13-Jun-05
43 305 322 Full Scene 10 m Multi-Spectral 2004 23-Dec-04
Full Scene 5m Panchromatic 2004 23-Dec-04
44 305 323 Half Scene 10 m Multi-Spectral 2005 24-May-05
Half Scene 5m Panchromatic 2005 24-May-05
45 305 323 Full Scene 10 m Multi-Spectral 2004 23-Dec-04
Full Scene 2.5 m Panchromatic 2004 23-Dec-04
46 305 325 Full Scene 10 m Multi-Spectral 2006 7-Jan-06
Full Scene 2.5 m Panchromatic 2006 7-Jan-06
47 306 320 Full Scene 10 m Multi-Spectral 2006 7-Jun-06
Full Scene 2.5 m Panchromatic 2006 7-Jun-06
48 306 322 Full Scene 10 m Multi-Spectral 2006 22-Mar-06
Full Scene 2.5 m Panchromatic 2006 22-Mar-06
49 306 323 Half Scene 10 m Multi-Spectral 2006 12-Jan-06
Half Scene 2.5 m Panchromatic 2006 12-Jan-06
50 306 325 Half Scene 10 m Multi-Spectral 2006 12-Jan-06
Half Scene 2.5 m Panchromatic 2006 12-Jan-06
App II T-5-14
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
51 307 321 Full Scene 10 m Multi-Spectral 2004 18-Oct-04
Full Scene 5m Panchromatic 2004 18-Oct-04
52 307 322 Full Scene 10 m Multi-Spectral 2004 18-Oct-04
Full Scene 5m Panchromatic 2004 18-Oct-04
53 307 326 1/8 Scene 10 m Multi-Spectral 2007 15-Dec-07
1/8 Scene 2.5 m Panchromatic 2007 15-Dec-07
54 308 322 Full Scene 10 m Multi-Spectral 2004 22-Aug-04
Full Scene 5m Panchromatic 2004 22-Aug-04
55 308 322 Half Scene 10 m Multi-Spectral 2004 23-Oct-04
Half Scene 5m Panchromatic 2004 23-Oct-04
56 308 323 Half Scene 10 m Multi-Spectral 2004 23-Oct-04
Half Scene 2.5 m Panchromatic 2004 23-Oct-04
57 308 325 1/4 Scene 10 m Multi-Spectral 2003 10-Mar-03
1/4 Scene 2.5 m Panchromatic 2003 10-Mar-03
58 308 326 Full Scene 10 m Multi-Spectral 2006 8-May-06
Full Scene 2.5 m Panchromatic 2006 8-May-06
59 308 328 Full Scene 10 m Multi-Spectral 2006 8-May-06
Full Scene 2.5 m Panchromatic 2006 8-May-06
60 308 328 Full Scene 10 m Multi-Spectral 2006 1-Apr-06
Full Scene 2.5 m Panchromatic 2006 1-Apr-06
61 309 322 Full Scene 10 m Multi-Spectral 2005 2-Apr-05
Full Scene 2.5 m Panchromatic 2005 2-Apr-05
62 309 323 Full Scene 10 m Multi-Spectral 2004 7-Nov-04
Full Scene 2.5 m Panchromatic 2004 7-Nov-04
63 309 324 Half Scene 10 m Multi-Spectral 2002 25-Oct-02
Half Scene 5m Panchromatic 2002 25-Oct-02
64 309 325 1/4 Scene 10 m Multi-Spectral 2004 7-Nov-04
1/4 Scene 2.5 m Panchromatic 2004 7-Nov-04
65 309 326 1/4 Scene 10 m Multi-Spectral 2005 20-Feb-05
1/4 Scene 2.5 m Panchromatic 2005 20-Feb-05
65 309 329 Half Scne 10 m Multi-Spectral 2006 27-Nov-06
Half Scne 2.5 m Panchromatic 2006 27-Nov-06
App II T-5-15
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
66 309 329 Full Scene 10 m Multi-Spectral 2006 11-Dec-06
Full Scene 2.5 m Panchromatic 2006 11-Dec-06
67 309 331 Full Scene 10 m Multi-Spectral 2006 11-Dec-06
Full Scene 2.5 m Panchromatic 2006 12-Dec-06
68 310 331 Full Scene 10 m Multi-Spectral 2006 22-Dec-06
Full Scene 2.5 m Panchromatic 2006 23-Dec-06
69 310 322 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 5m Panchromatic 2006 3-May-06
70 310 323 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
71 310 324 Full Scene 10 m Multi-Spectral 2004 6-Jul-04
Full Scene 5m Panchromatic 2004 6-Jul-04
72 310 325 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
73 310 326 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
74 310 334 Full Scene 10 m Multi-Spectral 2006 23-Dec-06
Full Scene 2.5 Panchromatic 2006 23-Dec-06
75 310 335 Full Scene 10 m Multi-Spectral 2006 23-Dec-06
Full Scene 2.5 Panchromatic 2006 23-Dec-06
76 310 336 Full Scene 10 m Multi-Spectral 2005 26-Sep-05
Full Scene 2.5 Panchromatic 2005 26-Sep-05
77 310 336 Half Scene 10 m Multi-Spectral 2006 12-Dec-06
Half Scene 2.5 Panchromatic 2006 12-Dec-06
78 310 328 Full Scene 10 m Multi-Spectral 2006 3-May-06
Full Scene 2.5 m Panchromatic 2006 3-May-06
Quarter
79 310 328 10 m Multi-Spectral 2003 27-Feb-03
Scene
Quarter
2.5 m Panchromatic 2003 27-Feb-03
Scene
80 310 328 Full Scene 10 m Multi-Spectral 2003 27-Feb-03
Full Scene 2.5 m Panchromatic 2003 27-Feb-03
App II T-5-16
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
Quarter
81 310 332 10 m Multi-Spectral 2006 7-Dec-06
Scene
Quarter
2.5 m Panchromatic 2006 7-Dec-06
Scene
82 311 322 Half Scene 10 m Multi-Spectral 2006 29-May-06
Half Scene 5m Panchromatic 2006 29-May-06
83 311 324 Half Scene 10 m Multi-Spectral 2006 29-May-06
Half Scene 2.5 m Panchromatic 2006 29-May-06
84 311 326 Full Scene 10 m Multi-Spectral 2006 2-Apr-06
Full Scene 2.5 m Panchromatic 2006 2-Apr-06
85 311 328 Full Scene 10 m Multi-Spectral 2007 17-Jan-07
Full Scene 2.5 m Panchromatic 2007 17-Jan-07
86 311 329 Full Scene 10 m Multi-Spectral 2007 17-Jan-07
Full Scene 2.5 m Panchromatic 2007 17-Jan-07
87 311 330 Full Scene 10 m Multi-Spectral 2006 22-Apr-06
Full Scene 2.5 m Panchromatic 2006 22-Apr-06
88 311 331 Full Scene 10 m Multi-Spectral 2006 22-Apr-06
Full Scene 2.5 m Panchromatic 2006 22-Apr-06
89 311 333 Full Scene 10 m Multi-Spectral 2004 12-Sep-04
Full Scene 2.5 Panchromatic 2004 12-Sep-04
90 311 333/9 Full Scene 10 m Multi-Spectral 2004 12-Sep-04
Full Scene 2.5 Panchromatic 2004 12-Sep-04
91 311 335 Full Scene 10 m Multi-Spectral 2006 19-Jan-06
Full Scene 2.5 Panchromatic 2006 20-Jan-06
92 312 325 Full Scene 10 m Multi-Spectral 2003 11-Jun-03
App II T-5-17
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
96 312 328 Half Scene 10 m Multi-Spectral 2003 29-Aug-03
App II T-5-18
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
112 314 328 Full Scene 10 m Multi-Spectral 2004 2-Sep-04
Full Scene 2.5 m Panchromatic 2004 2-Sep-04
113 314 329 Full Scene 10 m Multi-Spectral 2003 1-Jun-03
App II T-5-19
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
128 315 336 Full Scene 10 m Multi-Spectral 2005 14-Feb-05
Full Scene 2.5 m Panchromatic 2005 14-Feb-05
129 315 337 Full Scene 10 m Multi-Spectral 2005 14-Feb-05
Full Scene 2.5 m Panchromatic 2005 14-Feb-05
130 315 338 Full Scene 10 m Multi-Spectral 2006 9-Jan-06
Full Scene 2.5 m Panchromatic 2006 9-Jan-06
131 316 330 Half Scene 2.5 m Multi-Spectral 2003 2-Jun-03
Half Scene 10 m Panchromatic 2003 2-Jun-03
132 316 331 Full Scene 10 m Multi-Spectral 2003 2-Jun-03
Full Scene 2.5 m Panchromatic 2003 2-Jun-03
133 316 331 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
134 316 332 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 10-Oct-04
135 316 333 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
136 316 334 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
137 316 335 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
138 316 336 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
139 316 337 Full Scene 10 m Multi-Spectral 2004 19-Oct-04
Full Scene 2.5 m Panchromatic 2004 19-Oct-04
140 317 332 Half Scene 10 m Multi-Spectral 2003 18-Jun-03
Half Scene 2.5 m Panchromatic 2003 18-Jun-03
141 317 332 Full Scene 10 m Multi-Spectral 2004 27-Jul-04
Full Scene 2.5 m Panchromatic 2004 27-Jul-04
142 317 333 Full Scene 10 m Multi-Spectral 2003 18-Jun-03
Full Scene 2.5 m Panchromatic 2003 18-Jun-03
143 317 334 Half Scene 10 m Multi-Spectral 2007 26-Mar-07
Half Scene 2.5 m Panchromatic 2007 26-Mar-07
App II T-5-20
Rosolu- YEAR DATE
No. SCENE TYPE
tion ACQUIRED ACQUIRED
K J
144 317 334 Full Scene 10 m Multi-Spectral 2007 26-Mar-07
Full Scene 2.5 m Panchromatic 2007 26-Mar-07
145 317 336 Full Scene 10 m Multi-Spectral 2003 12-Feb-03
Full Scene 2.5 m Panchromatic 2003 12-Feb-03
146 317 337 Full Scene 10 m Multi-Spectral 2006 7-Mar-06
Full Scene 2.5 m Panchromatic 2006 7-Mar-06
147 317 338 Full Scene 10 m Multi-Spectral 2003 12-Feb-03
Full Scene 2.5 m Panchromatic 2003 12-Feb-03
148 318 334 Half Scene 10 m Multi-Spectral 2003 25-Sep-03
Half Scene 2.5 m Panchromatic 2003 25-Sep-03
149 318 335 Full Scene 10 m Multi-Spectral 2006 15-Aug-06
Full Scene 2.5 m Panchromatic 2006 15-Aug-06
150 318 336 Full Scene 10 m Multi-Spectral 2003 2-Jan-03
Full Scene 2.5 m Panchromatic 2003 2-Jan-03
151 318 337 Half Scene 10 m Multi-Spectral 2003 25-Sep-03
Half Scene 5m Panchromatic 2003 25-Sep-03
App II T-5-21
Appendix II Table-6
Free Software
OPERATING LICENSE
SOFTWARE DEVELOPER VER. MODE FORMAT SUPPORTED
SYSTEM TYPE
ARC- ESRI 9.2 WINDOWS VIEWER FREE- BMP, TIFF, PNG, JPG, GIF
EXPLORER WARE
ORBIT Orbit 4.2 WINDOWS VIEWER FREE- MrSID, ECW, OMI
EXPLORER GeoSpatial WARE
Technologies
TatukGIS TatukGIS 1.9 MS Windows VIEWER FREE- Raster
Viewer 95, 98, ME, NT, WARE TIFF/GeoTIFF, ECW/ECWP, MrSID,
2000, XP, 2003 JPEG2000, JPEG, IMG, BMP, BIL/SPOT,
PNG, CADRG, CIB
Vector
SHP, E00, MIF/MID, TAB, DXF, DGN,
TIGER, GML, KML, VPF, GDF, DLG,
SDTS, GPX, Geomedia
DTM formats
ESRI ASCII GRID, Surfer ASCII Grid
(DSAA), FLOAT GRID, BT, DTED, and
ADF
Georeferenced Images
GeoTIFF, World File, and TAB based
Geomatica PCI 10 Windows 2000/ VIEWER FREE- SPANS
Viewer Geomatics XP/ WARE Arc Info .bil
Server 2000/ E00
Server2003 SHP
TIF
.dxf
ERDAS
Laser-Scan
MapInfo
NTF
USGS DEM
USGS DLG
and about 100 more formats!
ERDAS Leica 2.1 Windows NT / VIEWER FREE- ERDAS IMAGINE .IMG, TIFF (including
ViewFinder Geosystem 2000 / XP. WARE TIFF World, GeoTIFF, compressed and
tiled variants)and Lizardtech MrSID image
files, including 16-bit and floating point
data types.
AccuGlobe Digital Data 2007 Windows 98, INPUT/ FREE- Raster
Desktop 2007 Technologies, ME, NT4 EDIT WARE MrSID, TIF and JPG ,ECW raster layers,
Inc (Service Pack 6 JPEG 2000 layers, PNG layers
& IE6), 2000 Vector
(Service Pack ESRI Shapefile and MapInfo tables
2+), XP, 2003,
GRASS GIS GRASS 6.2.2 GNU/Linux, INPUT/ Open Raster
Mac OS EDIT Source r.in.ascii GRASS ASCII r.in.bin BIL, GMT
X/Darwin, binary les, LANDSAT TM5 r.in.gdal
Microsoft ARC/INFO ASCII/Binary GRID, BIL,
Windows ERDAS (LAN, IMG), USGS DOQ, JPEG,
(native using SAR CEOS, EOSAT, GeoTIFF,
MinGW or with PPM/PNM, SDTS DEM, GIF, PNG (see
full UNIX also http://www.gdal.org/formats_list.html)
support via Vector
Cygwin), Sun v.in.ogr SHAPE le, UK.NTF, SDTS,
Solaris TIGER, S57, MapInfo-File,DGN, VRT,
(SPARC/Intel), AVCBin, REC, Memory, GML, ODBC(see
Silicon Graphics also:
Irix, HP-UX, http://www.gdal.org/ogr/ogr_formats.html)
DEC-Alpha, v.in.ascii GRASS ASCIIv.in.e00
App II T-6-1
OPERATING LICENSE
SOFTWARE DEVELOPER VER. MODE FORMAT SUPPORTED
SYSTEM TYPE
AIX, BSD, ArcInfo-E00-formatv.in.db Create vectors
iPAQ/Linux and from database with x|y[|z] coordinates
other UNIX
compliant
platforms.
GRASS runs on
both 32 and 64
bit systems with
large files (2GB)
supported by
many key
modules.
QGIS Quantum GIS 9 MacOS X, INPUT/ Open Raster
Windows, EDIT Source o Arc/Info Binary Grid o Arc/Info ASCII
GNU/Linux and Grid o GRASS Raster o GeoTIFF o
other Unices Spatial Data Transfer Standard Grids (with
some limitations) o USGS ASCII DEM o
Erdas Imagine
Vector(QGIS uses OGR)
Shapefiles, MapInfo layers, and ArcInfo
coverages.
App II T-6-2
Appendix II Table-7
Free Software
(Functionalities)
App II T-7-1
Software Name Provider Features/Capabilities
All formats supported natively, with no importing of data to any internal format
Open data in many different formats in the same project, with no need for format
conversion
Open image map data from a remote server using the WMS or ECWP protocols.
Open vector map data in one of the supported SQL server formats from a remote server.
Open most ESRI ArcView®, ArcExplorer®, or MapInfo Professional® projects as well as
TatukGIS project files
Zoom in/out, pan
User defined scale for viewing/printing
Create new TatukGIS project files
Very fast with huge data sets (handles SHP files up to 2 gigabytes!)
R-tree spatial indexing
Layer control to add, remove, and reorder layers in a project
Alter the appearance (colors, styles, fills, outlines, symbols, transparency, etc.) of vector
layers
Use CGM, WMF, and TrueType symbols to represent points, lines, polygon fills and
perimeters
Manipulate pixel layers, including transparency, histogram, brightness, color enhancing,
etc.
Render custom thematic maps based on vector attribute information, including
colored-gradient value themes
TatukGIS Viewer TatukGIS Present data as bar and pie charts
Spatial queries (using a point, line, circle, rectangle, polygon, and custom clipboard layer)
Attribute queries using SQL query builder
Measurement of distances, areas, and perimeters
Import data collected with a GPS device by opening as a GPX layer
Custom render label appearances and positions, multi-field labeling
URL Hotlink for automatic linking objects to any document referenced with a valid URL
(web page, file, even mailto)
Map hints to automatically display information about any feature under the cursor
Data table to present attribute data in table form
Print and print preview, print to PDF file
Copy visible extent of all layers to Windows clipboard using the EMF meta format
Export any map view to image files: TIFF/GeoTIFF (w/ LZW), JPEG, PNG, BMP,
PixelStore
Mosaic multiple already georeferenced images into a single exported image file
Very small footprint - program is only approx. 2.5 Mb (excluding the 5 Mb of tutorials/help
files with images)
The Viewer includes the "Internet Server Wizard" to easily set up a simple ASP.
NET project for web publishing with the TatukGIS Internet Server.
Program user interface is customizable to the following languages: English, German,
Spanish, Portuguese, French, Italian, Greek,
Swedish, Polish, Czech, Russian, Ukrainian, Japanese, Hungarian, and Thai.
App II T-7-2
Software Name Provider Features/Capabilities
Add data via the wizard. A simple GUI that walks you through data import procedures.
Cursor control reveals the geographic coordinates of your cursor
Contrast settings enable you to adjust image display parameters
Toggle from map view to area view is useful
Display of filenames intreelist is handy
Display of map projects enables you to add a number of files for convenient display of
your project area
Directly read from Oracle 10g Spatial and GeoRaster databases - open, view, select,
and enhance any number of layers from an Oracle 10g database
Generic Database (GDB) technology - directly read data from an extensive list of
supported file formats
Modern interface - including a fully georeferenced file based viewer.
Multiple image display - view any number of images, any depth ( 8 -, 16 -, and 32 - bit),
any size, and any resolution.
Data inspection tools - fast roam and zoom and new overview window.
Image enhancement tools - improve the way your data is displayed.
Geomatica Viewer PCI Geomatics Image analysis tools - RGB mapping, numeric values display, and histograms.
Attribute table display - view and query the attributes associated with your data.
HTML online help - modern online help that's easy-to-use.
Works with a variety of data, including imagery, vector, and ancillary.
Allows the viewing, enhancing, and examination of remotely sensed imagery such as
LANDSAT, SPOT,
RADARSAT, IKONOS, ERS-1, NOAA AVHRR, and aerial photography.
Users can employ FreeView to integrate GIS data with imagery and view the associated
attribute data.
Key features and benefits include a fully georeferenced file-based viewer with modern
graphical user interface (GUI)
and the ability to view any number of images at any bit depth, at any size, and in any
resolution.
The ability to directly access a large number of image and GIS formats through PCI
Geomatics' GDB (Generic Database) technology, powerful vector support, tools for fast
image roaming and magnification, enhancements, numeric value display, and attributes
table display.
Initial display speed has been vastly improved. In some instances images may display an
order of
magnitude faster than in previous versions of ViewFinder®.
Military Grid Reference System (MGRS) coordinate display in the Inquire Cursor dialog.
Brightness and Contrast thumbwheels have been added for quick and easy image
enhancement.
Copy the contents of the Main View to the Windows clipboard.
Data is then easily available for pasting into any application which uses the clipboard.
Image information can be displayed, such as the number of rows, columns and bands,
layer statistics, projection parameters, etc.
Extended library of US and international projection systems for reprojecting to and from.
ERDAS Extended range of raster formats are supported, including JPEG (JFIF), ERMapper .ers
Leica Geosystem
ViewFinder and generic binary BIL, BIP and BSQ formats.
Filter files on all raster formats to see all supported images in a directory.
Quickly swap between non-stretched and 2 Standard Deviation modes of displaying the
images.
If an image has been pre-processed to stretch its data across the entire data range, then
you may not want to have displayed it with the “Automatically Stretch Contrast” display
option on and wish to swap to no stretch without redisplaying the image.
App II T-7-3
Software Name Provider Features/Capabilities
Standard GIS functions such as pan, zoom and identify
Thematic mapping using interval and value themes
Feature labeling using label themes
Printing and plotting layout designer
Powerful charting wizard
Map legend allowing full control over layer order and symbolization
Basic geometry and attribute editing capability (Requires the Basic Editor plug-in, also
included)
Attribute query builder
User defined map annotations, both text and shapes
Hyperlink other documents to map features
Powerful buffering tools
GPS (Requires the GPS plug-in)
Real-time projection (both vector and raster)
Support for ECW raster layers
Support for JPEG 2000 layers
Support for PNG layers
Legend grouping - will support groups within groups
Dynamically show and hide whole or partial themes via legend
Edit multiple layers at the same time
No longer restricted to editing a single feature
Can modify attribute information in either identification window and attribute table
Incorporates a structure editor
AccuGlobe Digital Data Supports Undo/Redo
Desktop 2007 Technologies, Inc Can update X,Y attribute columns for point layers
Copy & Paste multiple attributes
Can dynamically add/remove fields while in edit mode
Sorting in attribute table
Reorder attribute column names
No longer restricted to a single attribute table
Enhanced calculation capabilities
Enhanced statistical evaluation
Multiple map support
Hotspots
Dockable components
Identification window shows differences between current and previously identified feature
Attribute data types are differentiated in attribute table & identification window
Built in script capability
Built in vector layer checker
Spatial index supports null geometries
Anti-alias support
Cropping of features to ensure that labels are visible when zoomed in
Managed spatial and attribute indexes
Enhanced database relates
Spatial Relate
Merge multiple layers into one
Halo effect for label themes
Integrate remote data with Web Mapping Service (WMS)
App II T-7-4
Software Name Provider Features/Capabilities
System and Libraries:
DBMI/SQL parser: Add missing TIME support
DBF driver: Add missing SQL TIME support; fix semicolon problem
Sqlite driver: Add missing 'date' support; transactions to speed up 'execute'; don't crash
with SQLITE_NULL
QGIS-GRASS DB bug: Fixes QGIS bug #448
geodetic datum: Enable geodetic datum for Krovak, fixed Slovakia Datum
(hermannskogel)
libgis: Backport false easting/northing test
Graphical User Interface:
GIS.m GUI: Backport various enhancements, including: clickable layer buttons; more
robust error handling;main window cosmetics;
fix the lwidth bug; various typos; browsing for EPSG file not updating path to it fixed;
browsing for new location path fixed
GUI menus: Remove non-functional font setting entries; other assorted fixes
GUI startup: Backport Michael Barton's new EPSG code search tool
Modules/Scripts:
scripts: Backport various fixes; remove all Bashisms from Bourne scripts
d.labels: Backport fixes for rotated labels
d.vect: Nodes are displayed in topo mode
d.vect.thematic: Remove Bashisms
g.mremove: Fixed to work correctly from the GIS.m GUI
nviz: compilation fix for MacOSX
ps.map: Fix landscape mode. Fix map scaling when map projection is not measured in
meters
r.contour: Fix segmentation fault
r.distance: Allow null distance for area in area
r.flow: 3D length fix; 64bit segfault fix
GRASS GIS GRASS r.in.bin: Honour the -s flag for 2-byte and 4-byte data
r.in.wms: Fix a number of teething problems; remove bashisms
r.median: fix broken internal r.stats call
r.profile: Allow data from stdin, exit with error if coordinate request is outside the current
region settings (was reporting bogus data)
r.proj bilinear: Fix inverted interpolation expression
r.reclass.area: Don't leave the clump file behind, label support added
r.tileset: Fix break due to platform specific units parsing; Requires Bash
v.build.polylines: Build polylines out of a closed boundaries, remove doubled vertices at
each node
v.clean snap tool: Remove doubled vertices
v.db.addtable: fixed error treatment when wrong SQL types were defined
v.dissolve: Dissolve common boundaries by attribute; fix for DBMI error if input map is
specified with @mapset
v.in.ascii: Skip over blank lines without error, improve robustness
v.in.gns: fixed format incompatibility with current GNS format
v.in.gpsbabel: Attribute and point import fixed for tracks and routes; works with Mac
OSX
v.in.region: Add additional vertex if necessary to ensure line segments don't exceed 180
degrees longitude and
wrap the wrong way around the world
v.lidar.*: Various fixes backported
v.lrs.*: fixes backported + new documentation
v.report: Backport fixes for RT bug #4459 and Wald bug #301
v.segment: Make the side_offset instruction functional
v.to.db: Repair the compactness formula parentheses to match actual formula
v.type: Wrap with a script so all combinations are allowed from the GUI menus
v.what: Allow multiple input coordinates
App II T-7-5
Software Name Provider Features/Capabilities
Support for spatially enabled PostgreSQL tables using PostGIS
Support for ESRI shapefiles and other vector formats support by the OGR library
MapInfo files
GRASS integration, including view, edit, and analysis
On the fly projection of vector layers
Map composer
Identify features
Display attribute table
Select features
Label features
Persistent selections
Save and restore projects
Support for raster formats supported by the GDAL library
Change vector symbology (single, graduated, unique value, and continuous)
SVG markers symbology (single, unique value, and graduated)
Display raster data such as digital elevation models, aerial photography or landsat
QGIS Quantum GIS imagery
Change raster symbology (grayscale, pseudocolor and multiband RGB)
Export to Mapserver map file
Digitizing support
Map overview
Plugins
Improved vector and attribute editing
Improved measure tools with area measuring
Attribute searching
New legend structure
Refactoring of API to allow the use of QGIS libraries in mapping applications
Improved MapServer export tool
Vector layer transparency and antialiasing
GRASS support in all platforms
Enhanced GRASS support and toolbox commands
Enhanced vector editing, including copy, cut, paste, snapping and vertex editing
Shapefile/OGR layer editing
App II T-7-6
Appendix II Table-8
List of New Control Points
������� ��� ��� �������� � ��� �� ��������� �� ������ �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ������
������ ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ��
������ ��� ��� �������� � ��� �� ��������� �� ������� �� �� �������� � ��� � �������� �� ���� ����������� ���������� ����������� ���������� ��
������ ��� ��� �������� � ��� �� ��������� �� ������� �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ��
������ ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ��� ����������� ���������� ����������� ���������� �����������
������� ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� ������� �� ����� ����������� ���������� ����������� ���������� ������������
������ ��� ��� ������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ��
������ ��� ��� �������� � ��� ��� ������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ��������������������������
������ ��� ��� �������� � ��� ��� �������� �� ����� �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �������������
������ ��� ��� �������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �������
������ ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ������
������ ��� ��� �������� � ��� �� ��������� �� ������� �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� �����
������ ��� ��� �������� � ��� ��� ��������� �� ����� �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ��������������
������ ��� �� �������� � ��� ��� �������� �� ������ �� � �������� � ��� �� ������� �� ����� ����������� ���������� ����������� ���������� �����������
App II T-8-1
������ ��� �� �������� � ��� ��� ��������� �� ������� �� � ������� � ��� �� �������� �� ������ ����������� ���������� ����������� ���������� ������
������ ��� �� �������� � ��� ��� ��������� �� ������ �� � ������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ��������
������ ��� �� �������� � ��� ��� ��������� �� ������ �� � �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ������
������ ��� �� ������� � ��� �� ��������� �� ������� �� � ������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ����������������������
������ ��� ��� �������� � ��� ��� ��������� �� ������� �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �����������������������������
������ ��� ��� �������� � ��� �� ��������� �� ������� �� �� �������� � ��� � ������� �� ����� ����������� ���������� ����������� ���������� �����������
������ ��� ��� �������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� ������� �� ����� ����������� ���������� ����������� ���������� ��������
������ ��� ��� �������� � ��� �� ��������� �� ������� �� �� ������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ����������������
������ ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ������
������� ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �����������������
������ ��� ��� �������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� �������� �� ��� ����������� ���������� ����������� ���������� ������
�����������������������
������� ��� ��� �������� � ��� �� ��������� �� ������� �� �� �������� � ��� � �������� �� ������ ����������� ���������� ����������� ����������
��������
������ ��� ��� ������� � ��� ��� ������� �� ������ �� �� �������� � ��� �� ������� �� ����� ����������� ���������� ����������� ���������� �����������������
������ ��� ��� �������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ��
App II T-8
������ ������ ������ ������
�������� �������������
���������� ����������
��������� ���������� ��������� ���������� �������� ������� �������� �������
������� �������
������� ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ��
������� ��� ��� �������� � ��� ��� �������� �� ������ �� �� ������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ��
������ ��� ��� �������� � ��� ��� �������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ���������������
������ ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ���� ����������� ���������� ����������� ���������� ����������������
������ ��� ��� �������� � ��� �� ��������� �� ������ �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ����������������������
������ ��� ��� �������� � ��� �� ��������� �� ������ �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ����������������������������
������ ��� ��� �������� � ��� ��� �������� �� ������� �� �� �������� � ��� �� �������� �� ������ ����������� ���������� ����������� ���������� ������������
������ ��� �� �������� � ��� ��� ��������� �� ������� �� � ������� � ��� �� �������� �� ������ ����������� ���������� ����������� ���������� ��
������ ��� �� �������� � ��� ��� ��������� �� ������ �� � �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �������
������ ��� ��� ������� � ��� ��� �������� �� ������ �� �� ������� � ��� �� ������� �� ���� ����������� ���������� ����������� ���������� ������
������� ��� ��� �������� � ��� ��� ��������� �� ������� �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� �������
������� ��� �� �������� � ��� �� ��������� �� ������ �� � �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ��
������� ��� ��� �������� � ��� ��� ��������� �� ������ �� �� �������� � ��� �� �������� �� ����� ����������� ���������� ����������� ���������� ������������������
App II T-8-2
������� ��� ��� �������� � ��� �� ��������� �� ������ �� �� �������� � ��� � �������� �� ����� ����������� ���������� ����������� ���������� ���������
����� ��� ��� ������� � ��� ��� ��������� �� ������� �� �� ������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� �� �������� � ��� ��� ��������� �� ������� �� � �������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� �� �������� � ��� �� ��������� �� ������� �� � �������� � ��� � �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� ��� �������� � ��� ��� ��������� �� ������ �� �� ������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� ��� �������� � ��� ��� ��������� �� ������� �� �� �������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� �� �������� � ��� �� ��������� �� ������� �� � �������� � ��� � �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� ��� �������� � ��� ��� ��������� �� ������� �� �� �������� � ��� �� ������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� �� ������� � ��� ��� ��������� �� ������� �� � �������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
����� ��� ��� �������� � ��� ��� ��������� �� ������� �� �� �������� � ��� �� �������� �� �� ����������� ���������� ����������� ���������� ��
App II T-8
Appendix II Table-9
List of Height and UTM
Coordinates of
Benchmarks and New
Spot Height Points
App II T-9-1
ELEVA ELEVA ELEVA
STATION EASTING NORTHING STATION EASTING NORTHING STATION EASTING NORTHING
-TION -TION -TION
PA-137-P 238495.78 1650503.21 8.10 RM- 10 283503.96 1643646.80 36.21 RM-136 264950.98 1682720.69 11.34
PA-138-P 237741.76 1650013.23 3.30 RM- 11 284148.99 1644440.79 46.34 RM-136 264950.98 1682720.69 11.34
PA-139-P 236908.74 1649469.25 4.23 RM- 12 284919.02 1645043.77 50.38 RM-137 264217.93 1681399.70 8.23
PA-53A-P 236908.74 1649469.25 5.11 RM- 13 285762.05 1645843.75 68.99 RM-137 264217.93 1681399.70 8.23
PA-140-P 236010.71 1648894.27 5.10 RM- 14 286280.07 1646576.74 75.38 RM-138 263522.87 1679594.71 7.37
PA-141-P 235335.69 1648429.29 5.65 RM- 15 287435.12 1647875.72 71.76 RM-138 263522.87 1679594.71 7.37
PA-142-P 235036.69 1648276.30 6.58 RM- 16 288326.14 1648189.69 64.76 RM-139 263187.84 1678769.71 7.59
PA-143-P 234405.67 1647872.31 8.54 RM- 17 288875.17 1648908.68 60.77 RM-139 263187.84 1678769.71 7.59
PA-144-P 233861.65 1647518.33 8.23 RM- 18 288481.17 1649154.70 59.05 RM-140 261653.81 1677988.75 15.63
PA-145-P 233163.63 1647069.34 7.42 RM- 20 287782.20 1650530.73 40.45 RM-140 261653.81 1677988.75 15.63
PA-58A-P 232692.62 1646760.35 8.12 RM- 21 287875.23 1651355.73 36.88 RM-141 260706.77 1677143.77 7.33
PA-146-P 231643.59 1646093.38 8.77 RM- 22 287160.26 1652689.77 32.56 RM-141 260706.77 1677143.77 7.33
BA-1A-P 230822.57 1645558.40 7.57 RM- 23 287608.28 1653067.76 34.77 RM-142 259882.73 1675833.78 8.03
BA-167-P 229948.54 1644998.42 6.91 RM- 24 288497.29 1653089.73 36.34 RM-142 259882.73 1675833.78 8.03
BA-4A-P 228791.51 1644258.45 8.25 RM- 25 289062.28 1652675.71 33.74 RM-143 260540.71 1675013.76 8.37
BA-5-P 228270.50 1643923.46 6.75 RM- 26 289785.29 1652739.69 40.37 RM-143 260540.71 1675013.76 8.37
ZA-5A-P 210995.33 1643504.98 26.53 RM- 27 289984.32 1653738.69 40.40 RM-144 260795.67 1673719.74 5.81
ZA-6A-P 210102.32 1643344.01 10.79 RM- 28 291008.36 1654757.67 52.13 RM-144 260795.67 1673719.74 5.81
ZA-9A-P 207292.27 1642438.08 3.86 RM- 29 291594.39 1655740.66 71.92 RM-145 260814.64 1672833.73 5.64
ZA-10A-P 206961.26 1642162.09 5.41 RM- 31 293240.50 1658821.64 162.64 RM-145 260814.64 1672833.73 5.64
ZA-11A-P 206076.21 1640947.11 5.00 RM- 32 293879.52 1659351.62 190.40 RM-146 260341.60 1671531.73 6.34
ZA-13A-P 205818.22 1641327.12 38.36 RM- 33 294497.56 1660458.61 205.35 RM-146 260341.60 1671531.73 6.34
ZA-16A-P 205884.28 1643275.13 3.24 RM- 34 295372.59 1661361.60 204.85 RM-147 259826.56 1670230.74 5.85
ZA-21A-P 202316.35 1646579.27 3.03 RM- 35 295480.63 1662611.60 237.19 RM-147 259826.56 1670230.74 5.85
ZA-22A-P 202353.37 1647190.28 1.83 RM- 36 295154.64 1663044.62 230.86 RM-148 259405.51 1668818.74 4.37
ZA-23A-P 202634.40 1648061.27 2.76 RM- 37 294316.64 1663305.64 155.06 RM-148 259405.51 1668818.74 4.37
ZA-25-P 202292.43 1649289.30 5.87 RM- 38 293303.66 1664169.68 87.22 RM-149 258856.48 1667840.75 5.06
ZA-26A-P 201820.46 1650247.32 47.36 RM- 39 292743.67 1664563.70 87.22 RM-149 258856.48 1667840.75 5.06
ZA-166A-P 212913.36 1643733.93 101.93 RM- 40 291628.67 1664881.74 115.91 RM-150 257504.46 1667651.79 4.90
ZA-167-P 211783.33 1643079.95 74.87 RM- 41 290600.66 1665013.77 124.76 RM-150 257504.46 1667651.79 4.90
ZA-168-P 209170.32 1643415.04 7.34 RM- 42 289703.65 1664996.80 75.18 RM-151 256606.44 1667325.81 5.12
ZA-169-P 208145.29 1642879.06 3.68 RM- 43 288456.66 1665385.84 80.40 RM-151 256606.44 1667325.81 5.12
ZA-170-P 205955.24 1641703.12 24.33 RM- 44 287364.63 1664913.87 66.51 RM-152 255845.43 1667180.83 10.28
ZA-172-P 202742.31 1644961.24 2.68 RM- 8A 282560.91 1642144.81 33.29 RM-152 255845.43 1667180.83 10.28
ZA-173-P 202356.33 1645760.26 2.76 RM- 95 285244.62 1665100.93 53.49 RM-153 254786.41 1666798.86 4.86
FB-1 227646.47 1643257.48 7.04 RM- 96 284282.63 1665599.96 47.16 RM-153 254786.41 1666798.86 4.86
FB-2 228135.45 1642407.45 6.89 RM- 97 282883.63 1666085.01 38.40 RM-154 253850.37 1665666.88 3.33
FB-3 228336.43 1641751.44 10.72 RM- 98 281409.65 1667089.06 19.36 RM-154 253850.37 1665666.88 3.33
FB-4 228847.40 1640573.42 22.01 RM- 99 280099.64 1667381.10 19.15 RM-155 252872.35 1665359.91 3.28
FB-5 229140.38 1639961.40 22.12 RM-100 278838.56 1667576.98 10.98 RM-155 252872.35 1665359.91 3.28
FB-6 229411.35 1638821.38 29.34 RM-101 278566.22 1668354.26 16.10 RM-156 251813.33 1664948.93 9.71
FB-7 229558.33 1637995.37 54.96 RM-102 278656.63 1669969.30 11.25 RM-156 251813.33 1664948.93 9.71
FB-8 229788.29 1636782.36 65.64 RM-103 278881.81 1671051.83 13.36 RM-157 250497.29 1664019.97 5.53
FB-9 229994.26 1635551.34 74.10 RM-104 279384.34 1671899.35 13.64 RM-157 250497.29 1664019.97 5.53
FB-10 230193.23 1634482.32 75.38 RM-105 280185.15 1673607.36 14.74 RM-A 275951.72 1637876.98 3.07
FB-11 231628.25 1634967.28 35.41 RM-106 281265.61 1674183.89 16.76 RM-B 276765.74 1638341.96 3.17
FB-13 233016.27 1635119.24 10.67 RM-107 281658.96 1674866.44 17.40
App II T-9-2
Appendix II Table-10
Equipment and Software
Used for Technology
Transfer
App II T-10-1
SOFTWARE/Equipment Media MANUAL
Extraction (NGATE)
Windows XP Installer: 1 CD
Professional
Microsoft Office Installer: 1 CD
Professional Edition Microsoft Office Outlook 2003: 1 CD
2003
Microsoft Office Installer: 1 CD
Small Business Edition Microsoft Office Outlook 2003: 1 CD
2003
HP Designjet 820 / 4500 Documentation: 1 CD
System Recovery: 1 DVD
HP Designjet 500 / 800 Series Printer: 1 CD
HP Designjet 800ps Macintosh Software: 1 CD
DELL 2007FP Color Driver & User Documentation: 1
Monitor CD
DELL 2007FP Flat Driver & User Documentation: 1
Panel Monitor CD
ASUS Server System Software: 1 CD
ELSA Driver & Tools: 1 CD
Color Reference Files 1 CD
Norton Anti-Virus 2007 Installer: 2 CDs (1 CD/set) 1. Norton Anti-Virus User
(2 sets) Guide (2 sets)
SERIAL
QTY UNIT ITEM / DESCRIPTION MODEL NO. PRODUCT NO.
NO.
1 Unit HP Designjet 4599 Scanner DK6CB4104 Q1277A
including standard
accessories
1 Unit Emerson Liebert PSA iton
1000VA
1 Unit HP Designjet 800ps Printer - MY718D30 C7780C
Plotter 66
1 Unit Asus NCSR5JH 5U (Intel Xeon
3.0 ghz, 2gb ECC Memory,
500gb 250gb x2 Sata hard
disk combo
CD-RW/DVD-ROM
10/100/1000 Gigabit
ethernet card card
keyboard/ opticalmouse
usb interface
2 Units Dell Ultra Sharp 2007FP 20"
(1680X 1000 Pixelss/DVI
VGA / 300 cd/ms
1 Unit Emerson Liebert PSA iton
1000VA
1 pc Stealth 3D Mouse S2-E Data 7020511 S2-E
Collection Hand Controller
1 pc ITE Power Supply HK-B520-A05 DTS050400UC-
P5-KH
App II T-10-2
SERIAL
QTY UNIT ITEM / DESCRIPTION MODEL NO. PRODUCT NO.
NO.
2 pcs Handwheels with Mounting
Plates
1 set Treadlite II, foot pedals
1 pc Foot Disk
1 pc ITE Power Supply S50226183
1 pc Power Cord
2 pcs Interface Unit
1 Unit Stereographic Monitor Zscreen NAC306017
2000i (with standard 085
accessories)
2 pcs Deluxe Circular Polarized
Eyewear with Brown
Casing
1 pc Clip-on Eyewear with Black
Casing
3 pcs Pin mini-DIN cables/adpaters
(7-Pin, 9 Pin, VESA to
BNC Stereo Connector)
1 pc Power Supply for Zscreen
Monitor
2 pcs Shim, UZS Universal with
roundover
1 Unit Dell Monitor CN-00C214-
46633-711-0
6RL
1 Unit Lenovo Keyboard 4321485 41A5039
1 Unit Lenovo CPU 41V9706
1 pc Asus Mouse
1 pc HP 1280 Deskjet Printer CN61N850Z
K
1 pc Emerson Liebert PSA iton
1000VA
1 Unit RICOH AFICIO-FX Photo
Copier
App II T-10-3
Appendix II Table-11
Comparison of Horizontal Errors
App II T-11-1
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� �������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
App II T-11
������������������������������ ������������������������������ ������������������������������ ���������������������������������
���������� ���������� ����������
������ ������������������� �������������������� �������������������� �����������������
���� ���� ����
������� ���� ���� ���� ����
����� ����� ����� ����� ����� ����� ����� ����� ������������ ������������ ������������
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ����� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
App II T-11-2
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ����� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ��������� ��������� ���������� ��������� ���������� ���� ���� ����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
��� ��������� ���������� ��������� ���������� ��������� ���������� ��������� ���������� ���� ���� �����
� � � � � � � � �������� ���� ���� �����
� � � � � � � � ����� ����� ����� �����
��������������������������
App II T-11
Appendix II Figure-1
INDEX OF
TOPOGRAPHIC MAPS
1:250,000
INDEX OF N
2501
TOPOGRAPHIC MAPS
1:250,000
2502
2503 2504
2505 2506
2507 2508
2509 2510
2555
App II F-0
Appendix II Figure-2
INDEX OF
TOPOGRAPHIC MAPS
SCALE 1:250,000
SERIES 711
338 2-I
338 2-II
INDEX OF
338 1-I
N
TOPOGRAPHIC MAPS
SCALE 1:50,000
337 9-II 347 9-III
327 7-III
327 7-I
327 7-II
337 7-IV
337 7-III
337 7-I
337 7-II
317 6-III 317 6-II 327 6-III 327 6-II 337 6-II 347 6-III
317 5-IV 317 5-I 327 5-IV 327 5-I 347 5-IV
317 5-III 317 5-II 327 5-III 327 5-II 337 5-III 337 5-II 347 5-III 347 5-II
307 4-II
317 4-IV
317 4-III
317 4-I
317 4-II
327 4-IV
327 4-III
327 4-I
327 4-II
337 4-IV
337 4-III
337 4-I
337 4-II
347 4-IV
347 4-III
347 4-I
347 4-II
307 3-II
317 3-IV
317 3-III
317 3-I
317 3-II
327 3-IV
327 3-III
327 3-I
327 3-II
337 3-IV
337 3-III
337 3-I
337 3-II
347 3-IV
347 3-III
NO DATA 307 2-I 317 2-IV 317 2-I 327 2-IV 327 2-I 337 2-IV 337 2-I 347 2-IV
307 1-I
317 2-III
317 1-IV
317 2-II
317 1-I
327 2-III
327 1-IV
327 2-II
327 1-I
337 2-III
337 1-IV
337 2-II
337 1-I
347 2-III
347 1-IV
347 2-II
347 1-I
307 1-II 317 1-III 317 1-II 327 1-III 327 1-II 337 1-III 337 1-II 347 1-III 347 1-II 357 1-III
307 0-I 317 0-IV 317 0-I 327 0-IV 327 0-I 337 0-IV 337 0-I 347 0-IV 347 0-I
307 0-II 317 0-III 317 0-II 327 0-III 327 0-II 337 0-III 337 0-II 347 0-III 347 0-II
306 9-I 316 9-IV 316 9-I 326 9-IV 326 9-I 336 9-IV 336 9-I 346 9-IV 346 9-I
296 9-II 306 9-III 306 9-II 316 9-III 316 9-II 326 9-III 326 9-II 336 9-III 336 9-II 346 9-III
296 8-IV 296 8-I 306 8-IV 306 8-I 316 8-IV 316 8-I 326 8-IV 326 8-I 336 8-IV 336 8-I 346 8-IV
296 8-III 296 8-II 306 8-III 306 8-II 316 8-III 316 8-II 326 8-III 326 8-II 336 8-III 336 8-II 346 8-III
296 7-I 306 7-IV 306 7-I 316 7-IV 316 7-I 326 7-IV 326 7-I 336 7-IV
296 7-II 306 7-III 306 7-II 316 7-III 316 7-II 326 7-III 326 7-II 336 7-III
296 6-I 306 6-IV 306 6-I 316 6-IV 316 6-I 326 6-IV 326 6-I 336 6-IV
296 6-II 306 6-III 306 6-II 316 6-III 316 6-II 326 6-III 326 6-II 336 6-III
296 5-I 306 5-IV 306 5-I 316 5-IV 316 5-I 326 5-IV 326 5-I 336 5-IV 336 5-I 346 5-IV
306 5-III 306 5-II 316 5-III 316 5-II 326 5-III 326 5-II 336 5-III 336 5-II 346 5-III
306 4-IV 306 4-I 316 4-IV 316 4-I 326 4-IV 326 4-I 336 4-IV 336 4-I 346 4-IV 346 4-I
306 4-III 306 4-II 316 4-III 316 4-II 326 4-III 326 4-II 336 4-III 336 4-II 346 4-III 346 4-II 356 4-II
306 3-IV 306 3-I 316 3-IV 316 3-I 326 3-IV 326 3-I 336 3-IV 336 3-I 346 3-IV 346 3-I 356 3-I
306 3-II 316 3-III 316 3-II 326 3-III 326 3-II 336 3-III 336 3-II 346 3-III 346 3-II 356 3-III 356 3-II 366 3-III
306 2-I 316 2-IV 316 2-I 326 2-IV 326 2-I 336 2-IV 336 2-I 346 2-IV 346 2-I 356 2-IV 356 2-I 366 2-IV 366 2-I 376 2-IV 376 2-I 386 2-IV 386 2-I
316 2-III 316 2-II 326 2-III 326 2-II 336 2-III 336 2-II 346 2-III 346 2-II 356 2-III 356 2-II 366 2-III 366 2-II 376 2-III 376 2-II 386 2-III 386 2-II
306 1-IV 306 1-I 316 1-IV 316 1-I 326 1-IV 326 1-I 336 1-IV 336 1-I 346 1-IV 346 1-I 356 1-IV 356 1-I 366 1-IV 366 1-I 376 1-IV 376 1-I 386 1-IV 386 1-I
306 1-III 306 1-II 316 1-III 316 1-II 326 1-III 326 1-II 336 1-III 336 1-II 346 1-III 346 1-II 356 1-III 356 1-II 366 1-III 366 1-II 376 1-III 376 1-II 386 1-III 386 1-II
306 0-IV 306 0-I 316 0-IV 316 0-I 326 0-IV 326 0-I 336 0-I 346 0-IV 346 0-I 356 0-IV 356 0-I 366 0-IV 366 0-I 376 0-IV 376 0-I 386 0-IV 386 0-I
306 0-II 316 0-III 316 0-II 326 0-III 326 0-II 336 0-II 346 0-III 346 0-II 356 0-III 356 0-II 366 0-III 366 0-II 376 0-III 376 0-II 386 0-III
305 9-I 315 9-IV 315 9-I 325 9-IV 325 9-I 335 9-IV 335 9-I 345 9-IV 345 9-I 355 9-IV 355 9-I 365 9-IV 365 9-I 375 9-IV 375 9-I 385 9-IV
315 9-III 315 9-II 325 9-III 325 9-II 335 9-III 335 9-II 345 9-III 355 9-III 355 9-II 365 9-III 365 9-II 375 9-III 375 9-II 385 9-III
315 8-IV 315 8-I 325 8-IV 325 8-I 335 8-IV 345 8-IV 355 8-I 365 8-IV 365 8-I 375 8-IV 375 8-I 385 8-IV
315 8-III 315 8-II 325 8-III 325 8-II 335 8-III 335 8-II 345 8-III 345 8-II 355 8-III 355 8-II 365 8-III 365 8-II 375 8-III 375 8-II 385 8-III 385 8-II 395 8-III 395 8-II 405 8-III 405 8-II
315 7-IV 315 7-I 325 7-IV 325 7-I 335 7-IV 335 7-I 345 7-IV 345 7-I 355 7-IV 365 7-IV 365 7-I 375 7-IV 375 7-I 385 7-IV 385 7-I 395 7-IV 395 7-I 405 7-IV 405 7-I
295 7-II 305 7-III 305 7-II 315 7-II 325 7-III 325 7-II 335 7-II 345 7-III 345 7-II 355 7-III 355 7-II 365 7-III 365 7-II 375 7-III 375 7-II 385 7-III 385 7-II 395 7-III 395 7-II 405 7-III 405 7-II
295 6-I 305 6-IV 305 6-I 315 6-I 325 6-IV 325 6-I 335 6-IV 335 6-I 345 6-IV 345 6-I 355 6-IV 355 6-I 365 6-IV 365 6-I 375 6-IV 375 6-I 385 6-IV 385 6-I 395 6-IV 395 6-I 405 6-IV 405 6-I 415 6-IV
295 6-II 305 6-III 305 6-II 315 6-II 325 6-III 325 6-II 335 6-III 335 6-II 345 6-III 355 6-III 355 6-II 365 6-III 365 6-II 375 6-III 375 6-II 385 6-III 385 6-II 395 6-III 395 6-II 405 6-III 405 6-II 415 6-III
295 5-I 305 5-IV 305 5-I 325 5-I 335 5-IV 335 5-I 345 5-IV 345 5-I 365 5-IV 365 5-I 375 5-IV 375 5-I 385 5-IV 385 5-I 395 5-IV 395 5-I 405 5-IV 405 5-I 415 5-IV
295 5-III 295 5-II 305 5-III 305 5-II 325 5-II 335 5-III 335 5-II 345 5-III 345 5-II 355 5-III 355 5-II 365 5-III 365 5-II 375 5-III 375 5-II 385 5-III 385 5-II 395 5-III 395 5-II 405 5-III 405 5-II 415 5-III
295 4-IV 295 4-I 305 4-IV 335 4-IV 335 4-I 345 4-IV 345 4-I 355 4-IV 355 4-I 365 4-IV 365 4-I 385 4-IV 385 4-I 395 4-IV 395 4-I 405 4-IV 405 4-I 415 4-IV
285 4-II 295 4-III 295 4-II 305 4-III 315 4-III 315 4-II 325 4-III 335 4-II 345 4-III 345 4-II 355 4-III 355 4-II 365 4-III 365 4-II 375 4-III 375 4-II 385 4-III 385 4-II 395 4-III 395 4-II 405 4-III 405 4-II 415 4-III
285 3-IV 285 3-I 295 3-IV 295 3-I 305 3-IV 305 3-I 315 3-IV 315 3-I 325 3-IV 335 3-I 345 3-IV 345 3-I 355 3-IV 355 3-I 365 3-IV 365 3-I 375 3-IV 375 3-I 385 3-IV 385 3-I 395 3-IV 395 3-I 405 3-IV 405 3-I 415 3-IV 415 3-I
285 3-III 285 3-II 295 3-III 295 3-II 305 3-II 315 3-III 315 3-II 325 3-III 345 3-III 345 3-II 355 3-III 355 3-II 365 3-III 365 3-II 375 3-III 375 3-II 385 3-III 385 3-II 395 3-III 395 3-II 405 3-III 405 3-II 415 3-III 415 3-II
285 2-IV 285 2-I 295 2-IV 295 2-I 315 2-IV 315 2-I 325 2-IV 335 2-I 345 2-IV 345 2-I 355 2-IV 355 2-I 365 2-IV 365 2-I 375 2-IV 375 2-I 385 2-IV 385 2-I 395 2-IV 395 2-I 405 2-IV 415 2-IV 415 2-I
285 2-III 285 2-II 295 2-III 295 2-II 305 2-III 305 2-II 315 2-III 315 2-II 325 2-III 335 2-II 345 2-III 345 2-II 355 2-III 355 2-II 365 2-III 365 2-II 375 2-III 375 2-II 385 2-III 385 2-II 395 2-III 395 2-II 405 2-III 415 2-III 415 2-II
285 1-IV 285 1-I 295 1-IV 295 1-I 305 1-IV 305 1-I 315 1-IV 315 1-I 325 1-IV 335 1-I 345 1-IV 345 1-I 355 1-IV 355 1-I 365 1-IV 365 1-I 375 1-IV 375 1-I 385 1-IV 385 1-I 395 1-IV 395 1-I 405 1-IV 415 1-IV 415 1-I
275 1-II 285 1-III 285 1-II 295 1-III 295 1-II 335 1-II 345 1-III 345 1-II 355 1-III 355 1-II 365 1-III 365 1-II 375 1-III 375 1-II 385 1-III 385 1-II 395 1-III 395 1-II 405 1-III 405 1-II 415 1-III
275 0-IV 275 0-I 285 0-IV 285 0-I 295 0-IV 295 0-I 335 0-I 345 0-IV 345 0-I 355 0-IV 355 0-I 365 0-IV 365 0-I 375 0-IV 375 0-I 385 0-IV 385 0-I 395 0-IV 395 0-I 405 0-IV 405 0-I 415 0-IV 425 0-IV
275 0-III 275 0-II 285 0-III 285 0-II 295 0-III 355 0-III 355 0-II 365 0-III 365 0-II 375 0-III 375 0-II 385 0-III 385 0-II 395 0-III 395 0-II 405 0-III 405 0-II 415 0-III 425 0-III
264 9-I 274 9-IV 274 9-I 284 9-IV 324 9-IV 324 9-I 344 9-I 354 9-IV 354 9-I 364 9-IV 364 9-I 374 9-IV 374 9-I 384 9-IV 384 9-I 394 9-IV 404 9-IV 404 9-I 414 9-IV 414 9-I 424 9-IV
264 9-III 264 9-II 274 9-III 274 9-II 284 9-III 324 9-III 324 9-II 344 9-II 354 9-III 354 9-II 364 9-III 364 9-II 374 9-III 374 9-II 384 9-III 384 9-II 394 9-III 404 9-III 404 9-II 414 9-III 414 9-II 424 9-III
264 8-IV 264 8-I 274 8-IV 274 8-I 324 8-IV 324 8-I 344 8-I 354 8-IV 354 8-I 364 8-IV 364 8-I 374 8-IV 374 8-I 384 8-IV 384 8-I 394 8-IV 404 8-I 414 8-IV 414 8-I 424 8-IV
254 8-III 254 8-II 264 8-III 264 8-II 274 8-III 314 8-II 354 8-III 354 8-II 364 8-III 364 8-II 374 8-III 374 8-II 394 8-III 394 8-II 404 8-II 414 8-III 414 8-II 424 8-III
254 7-IV 254 7-I 264 7-IV 264 7-I 274 7-IV 314 7-IV 314 7-I 354 7-IV 354 7-I 364 7-IV 364 7-I 374 7-IV 374 7-I 394 7-IV 394 7-I 404 7-IV 404 7-I 414 7-IV 414 7-I 424 7-IV 424 7-I
254 7-III 254 7-II 264 7-III 264 7-II 314 7-III 314 7-II 354 7-II 364 7-III 364 7-II 374 7-III 394 7-III 394 7-II 404 7-III 404 7-II 414 7-III 414 7-II 424 7-III 424 7-II
244 6-IV 244 6-I 254 6-IV 254 6-I 264 6-IV 294 6-I 304 6-IV 304 6-I 364 6-I 394 6-I 404 6-IV 404 6-I 414 6-IV 414 6-I 424 6-IV 424 6-I
244 6-III 244 6-II 254 6-III 254 6-II 264 6-III 294 6-II 304 6-III 304 6-II 364 6-III 364 6-II 374 6-III 374 6-II 384 6-II 394 6-III 394 6-II 404 6-III 404 6-II 414 6-III 414 6-II 424 6-III 424 6-II
244 5-IV 244 5-I 254 5-IV 254 5-I 294 5-I 304 5-I 364 5-IV 364 5-I 374 5-IV 374 5-I 384 5-I 394 5-IV 394 5-I 404 5-IV 404 5-I 414 5-IV 414 5-I 424 5-IV 424 5-I
244 5-III 244 5-II 254 5-III 254 5-II 354 5-II 364 5-III 364 5-II 374 5-III 374 5-II 384 5-III 384 5-II 394 5-III 394 5-II 404 5-III 404 5-II 414 5-III 414 5-II 424 5-III 424 5-II
234 4-I 244 4-IV 244 4-I 254 4-IV 254 4-I 344 4-I 354 4-IV 354 4-I 364 4-IV 364 4-I 374 4-IV 374 4-I 384 4-IV 384 4-I 394 4-IV 394 4-I 404 4-IV 404 4-I 414 4-IV 414 4-I 424 4-IV 424 4-I
234 4-II 244 4-III 244 4-II 344 4-II 354 4-III 354 4-II 364 4-III 364 4-II 374 4-III 374 4-II 384 4-III 384 4-II 394 4-III 394 4-II 404 4-III 404 4-II 414 4-III 414 4-II 424 4-III 424 4-II
234 3-I 244 3-IV 244 3-I 264 3-I 274 3-IV 344 3-IV 344 3-I 354 3-IV 354 3-I 364 3-IV 364 3-I 374 3-IV 374 3-I 384 3-IV 384 3-I 394 3-IV 394 3-I 404 3-IV 404 3-I 414 3-IV 414 3-I 424 3-IV 424 3-I
234 3-II 244 3-III 244 3-II 264 3-III 264 3-II 274 3-III 344 3-III 344 3-II 354 3-III 354 3-II 364 3-III 364 3-II 374 3-III 374 3-II 384 3-III 384 3-II 394 3-III 394 3-II 404 3-III 404 3-II 414 3-III 414 3-II 424 3-III 424 3-II 434 3-III
244 2-IV 244 2-I 264 2-IV 264 2-I 344 2-IV 344 2-I 354 2-IV 354 2-I 364 2-IV 364 2-I 374 2-IV 374 2-I 384 2-IV 384 2-I 394 2-IV 394 2-I 404 2-IV 404 2-I 414 2-IV 414 2-I 424 2-IV 424 2-I 434 2-IV
264 2-II 334 2-II 344 2-III 344 2-II 354 2-III 354 2-II 364 2-III 364 2-II 374 2-II 384 2-III 384 2-II 394 2-III 394 2-II 404 2-III 404 2-II 414 2-III 414 2-II 424 2-III 424 2-II 434 2-III
264 1-I 274 1-IV 334 1-I 344 1-IV 344 1-I 354 1-IV 354 1-I 364 1-IV 364 1-I 374 1-I 384 1-IV 384 1-I 394 1-IV 394 1-I 404 1-IV 404 1-I 414 1-IV 414 1-I 424 1-IV 424 1-I 434 1-IV
264 1-II 274 1-III 334 1-II 344 1-III 344 1-II 374 1-II 384 1-III 384 1-II 394 1-III 394 1-II 404 1-III 404 1-II 414 1-III 414 1-II 424 1-III 424 1-II 434 1-III
264 0-IV 264 0-I 274 0-IV 324 0-I 334 0-IV 334 0-I 344 0-IV 344 0-I 374 0-I 384 0-IV 384 0-I 394 0-IV 394 0-I 404 0-IV 404 0-I 414 0-IV 414 0-I 424 0-IV 424 0-I
264 0-III 264 0-II 274 0-III 324 0-II 334 0-III 334 0-II 344 0-III 344 0-II 374 0-II 384 0-III 384 0-II 394 0-III 394 0-II 404 0-III 404 0-II 414 0-III 414 0-II 424 0-III 424 0-II
263 9-IV 263 9-I 273 9-IV 323 9-I 333 9-IV 333 9-I 343 9-IV 343 9-I 383 9-IV 383 9-I 393 9-IV 393 9-I 403 9-IV 403 9-I 413 9-IV 423 9-IV 423 9-I
263 9-III 303 9-II 313 9-III 313 9-II 333 9-III 333 9-II 343 9-III 383 9-III 383 9-II 393 9-III 393 9-II 403 9-III 403 9-II 413 9-III 423 9-III
263 8-IV 263 8-I 303 8-I 313 8-IV 313 8-I 323 8-IV 323 8-I 333 8-IV 333 8-I 343 8-IV 383 8-IV 383 8-I 393 8-IV 393 8-I 403 8-IV 403 8-I 413 8-IV 423 8-IV
263 8-III 263 8-II 303 8-II 313 8-III 313 8-II 323 8-III 323 8-II 333 8-III 333 8-II 383 8-III 383 8-II 393 8-III 393 8-II 403 8-III 403 8-II 413 8-III
293 7-IV 293 7-I 303 7-IV 303 7-I 313 7-I 323 7-IV 323 7-I 333 7-IV 393 7-IV 393 7-I 403 7-IV 403 7-I 413 7-IV
293 7-III 293 7-II 303 7-III 303 7-II 313 7-III 313 7-II 323 7-III 323 7-II 333 7-III 393 7-III 393 7-II 403 7-III 403 7-II 413 7-III
303 6-IV 303 6-I 313 6-IV 313 6-I 323 6-IV 403 6-IV 403 6-I 413 6-IV
293 6-II 303 6-III 303 6-II 313 6-III 313 6-II 403 6-II
293 5-IV 293 5-I 303 5-IV 303 5-I 313 5-IV 313 5-I 403 5-I
293 5-III 293 5-II 303 5-III 303 5-II 313 5-III
283 4-IV 283 4-I 293 4-IV 293 4-I 303 4-IV
283 4-III 283 4-II 293 4-III 293 4-II 303 4-III
App II F-1
Appendix II Figure-3
INDEX OF
TOPOGRAPHIC MAP
SCALE 1:50,000
384- I
7
INDEX OF 384- I I
7
N
TOPOGRAPHIC MAP
383- I
7 483- I V
7
281- I
7 381- I V
7 381- I
7
281- I I
7 281- I I
7 381- I I
7 381- I I
7
280- I V
7 280- I
7 380- I
7
180- I I
7 180- I I
7 280- I I
7 280- I I
7 480- I I
7
NO DATA 079- I I
7
078- I
7
179- I I
7
178- I V
7
179- I I
7
178- I
7
279- I I
7
278- I V
7
279- I I
7
278- I
7
379- I I
7
378- I V
7
379- I I
7
378- I
7
479- I I
7
478- I V
7
479- I I
7
Series701 078- I I
7 178- I I
7 178- I I
7 278- I I
7 278- I I
7 378- I I
7 378- I I
7 478- I I
7
077- I
7 177- I V
7 177- I
7 277- I V
7 277- I
7 377- I V
7 377- I
7 477- I V
7 477- I
7
077- I I
7 177- I I
7 177- I I
7 277- I I
7 277- I I
7 377- I I
7 377- I I
7 477- I I
7 477- I I
7 577- I I
7
076- I
7 176- I V
7 176- I
7 276- I V
7 276- I
7 376- I V
7 376- I
7 476- I V
7 476- I
7
076- I I
7 176- I I
7 176- I I
7 276- I I
7 276- I I
7 376- I I
7 376- I I
7 476- I I
7 476- I I
7
975- I
6 075- I V
7 075- I
7 175- I V
7 175- I
7 275- I V
7 275- I
7 375- I V
7 375- I
7 475- I V
7
975- I I
6 975- I I
6 075- I I
7 075- I I
7 175- I I
7 175- I I
7 275- I I
7 275- I I
7 375- I I
7 375- I I
7 475- I I
7
974- I
6 074- I V
7 074- I
7 174- I V
7 174- I
7 274- I V
7 274- I
7 374- I V
7
974- I I
6 074- I I
7 074- I I
7 174- I I
7 174- I I
7 274- I I
7 274- I I
7 374- I I
7
973- I
6 073- I V
7 073- I
7 173- I V
7 173- I
7 273- I V
7 273- I
7 373- I V
7
073- I I
7 073- I I
7 173- I I
7 173- I I
7 273- I I
7 2
773- I I 373- I I
7 373- I I
7 473- I I
7
072- I V
7 072- I
7 172- I V
7 172- I
7 272- I V
7 272- I
7 372- I V
7 372- I
7 472- I V
7 472- I
7
072- I I
7 072- I I
7 172- I I
7 172- I I
7 272- I I
7 272- I I
7 372- I I
7 372- I I
7 472- I I
7 472- I I
7 572- I I
7
071- I
7 171- I V
7 171- I
7 271- I V
7 271- I
7 371- I V
7 371- I
7 471- I V
7 471- I
7 571- I V
7 571- I
7 671- I V
7
171- I I
7 171- I I
7 271- I I
7 271- I I
7 371- I I
7 371- I I
7 471- I I
7 471- I I
7 571- I I
7 571- I I
7 671- I I
7 671- I I
7 771- I I 771- I I 871- I I
7 871- I I
7
070- I V
7 070- I
7 170- I V
7 170- I
7 270- I V
7 270- I
7 370- I V
7 370- I
7 470- I V
7 470- I
7 570- I V
7 570- I
7 670- I V
7 670- I
7 770- I V 770- I 870- I V
7 870- I
7
070- I I
7 070- I I
7 170- I I
7 170- I I
7 270- I I
7 270- I I
7 370- I I
7 470- I I
7 470- I I
7 570- I I
7 570- I I
7 670- I I
7 670- I I
7 770- I I 770- I I 870- I I
7 870- I I
7
069- I
7 169- I V
7 169- I
7 269- I V
7 269- I
7 369- I
7 469- I V
7 469- I
7 569- I V
7 569- I
7 669- I V
7 669- I
7 769- I V 769- I 869- I V
7
169- I I
7 169- I I
7 269- I I
7 269- I I
7 369- I I
7 369- I I
7 469- I I
7 569- I I
7 7
569- I I 669- I I
7 669- I I
7 769- I I 769- I I 869- I I
7
168- I V
7 168- I
7 268- I V
7 268- I
7 368- I V
7 468- I V
7 568- I
7 668- I V
7 668- I
7 768- I V 768- I 868- I V
7
068- I I
7 168- I I
7 168- I I
7 268- I I
7 268- I I
7 368- I I
7 368- I I
7 468- I I
7 468- I I
7 568- I I
7 668- I I
7 668- I I
7 768- I I 768- I I 868- I I
7 868- I I
7 968- I I
7 968- I I
7 068- I I
8 068- I I
8
967- I
6 067- I V
7 067- I
7 167- I
7 267- I V
7 267- I
7 367- I
7 467- I V
7 467- I
7 567- I V
7 567- I
7 667- I V
7 667- I
7 767- I V 767- I 867- I V
7 867- I
7 967- I V
7 967- I
7 067- I V
8 067- I
8
967- I I
6 067- I I
7 067- I I
7 167- I I
7 267- I I
7 267- I I
7 367- I I
7 367- I I
7 467- I I
7 567- I I
7 567- I I
7 667- I I
7 667- I I
7 767- I I 767- I I 867- I I
7 867- I I
7 967- I I
7 967- I I
7 067- I I
8 067- I I
8 167- I I
8
966- I
6 066- I V
7 066- I
7 266- I
7 366- I V
7 366- I
7 466- I V
7 466- I
7 666- I V
7 666- I
7 766- I V 766- I 866- I V
7 866- I
7 966- I V
7 966- I
7 066- I V
8 066- I
8 166- I V
8
966- I I
6 966- I I
6 066- I I
7 366- I I
7 366- I I
7 466- I I
7 466- I I
7 566- I I
7 566- I I
7 666- I I
7 666- I I
7 866- I I
7 866- I I
7 966- I I
7 966- I I
7 066- I I
8 0
866- I I 166- I I
8
865- I
6 965- I V
6 965- I
6 065- I V
7 165- I V
7 165- I
7 265- I V
7 365- I
7 465- I V
7 465- I
7 565- I V
7 565- I
7 665- I V
7 665- I
7 765- I V 765- I 865- I V
7 865- I
7 965- I V
7 965- I
7 065- I V
8 065- I
8 165- I V
8
865- I I
6 865- I I
6 965- I I
6 965- I I
6 065- I I
7 165- I I
7 165- I I
7 265- I I
7 465- I I
7 465- I I
7 565- I I
7 565- I I
7 665- I I
7 665- I I
7 765- I I 765- I I 865- I I
7 865- I I
7 965- I I
7 965- I I
7 065- I I
8 065- I I
8 165- I I
8 165- I I
8
864- I V
6 864- I
6 964- I V
6 964- I
6 164- I V
7 164- I
7 264- I V
7 364- I
7 464- I V
7 464- I
7 564- I V
7 564- I
7 664- I V
7 664- I
7 764- I V 764- I 864- I V
7 864- I
7 964- I V
7 964- I
7 064- I V
8 164- I V
8 164- I
8
864- I I
6 864- I I
6 964- I I
6 964- I I
6 064- I I
7 064- I I
7 164- I I
7 1
764- I I 264- I I
7 364- I I
7 464- I I
7 464- I I
7 564- I I
7 564- I I
7 664- I I
7 664- I I
7 764- I I 764- I I 864- I I
7 864- I I
7 964- I I
7 964- I I
7 064- I I
8 164- I I
8 164- I I
8
763- I
6 863- I V
6 863- I
6 963- I V
6 963- I
6 363- I
7 463- I V
7 463- I
7 563- I V
7 563- I
7 663- I V
7 663- I
7 763- I V 763- I 863- I V
7 863- I
7 963- I V
7 963- I
7 063- I V
8 063- I
8 163- I V
8
763- I I
6 763- I I
6 863- I I
6 863- I I
6 963- I I
6 563- I I
7 563- I I
7 663- I I
7 663- I I
7 763- I I 763- I I 863- I I
7 863- I I
7 963- I I
7 963- I I
7 063- I I
8 063- I I
8 163- I I
8 263- I I
8
662- I 762- I V
6 6
762- I 862- I V
6 262- I V
7 262- I
7 462- I
7 562- I V
7 562- I
7 662- I V
7 662- I
7 762- I V 762- I 862- I V
7 862- I
7 962- I V
7 062- I V
8 062- I
8 162- I V
8 162- I
8 262- I V
8
561- I V
6 561- I
6 661- I V 661- I 761- I V
6 161- I
7 561- I V
7 561- I
7 661- I V
7 661- I
7 761- I V 761- I 961- I V
7 961- I
7 061- I
8 161- I V
8 161- I
8 261- I V
8
561- I I
6 561- I I
6 661- I I 661- I I 961- I I
6 161- I I
7 161- I I
7 561- I I
7 661- I I
7 661- I I
7 761- I I 961- I I
7 961- I I
7 061- I I
8 061- I I
8 161- I I
8 161- I I
8 261- I I
8 261- I I
8
460- I V
6 460- I
6 560- I V
6 560- I
6 660- I V 960- I
6 060- I V
7 060- I
7 660- I
7 960- I
7 060- I V
8 060- I
8 160- I V
8 160- I
8 260- I V
8 260- I
8
460- I I
6 460- I I
6 560- I I
6 560- I I
6 960- I I
6 060- I I
7 660- I I
7 660- I I
7 760- I I 760- I I 860- I I
7 960- I I
7 960- I I
7 060- I I
8 060- I I
8 160- I I
8 160- I I
8 260- I I
8 260- I I
8
459- I V
6 459- I
6 559- I V
6 559- I
6 559- I
7 659- I V
7 659- I
7 759- I V 759- I 859- I V
7 859- I
7 959- I V
7 959- I
7 059- I V
8 059- I
8 159- I V
8 159- I
8 259- I V
8 259- I
8
359- I I
6 459- I I
6 459- I I
6 859- I I
6 459- I I
7 559- I I
7 559- I I
7 659- I I
7 659- I I
7 759- I I 759- I I 859- I I
7 859- I I
7 959- I I
7 959- I I
7 059- I I
8 059- I I
8 8
159- I I 159- I I
8 259- I I
8 259- I I
8
358- I
6 458- I V
6 6
458- I 658- I 758- I V
6 458- I V
7 458- I
7 558- I V
7 558- I
7 658- I V
7 658- I
7 758- I V 758- I 858- I V
7 858- I
7 958- I V
7 958- I
7 058- I V
8 058- I
8 158- I V
8 158- I
8 258- I V
8 258- I
8
458- I I
6 458- I I
6 658- I I 658- I I 458- I I
7 458- I I
7 558- I I
7 558- I I
7 658- I I
7 658- I I
7 758- I I 758- I I 858- I I
7 858- I I
7 958- I I
7 958- I I
7 058- I I
8 058- I I
8 158- I I
8 158- I I
8 258- I I
8 258- I I
8 358- I I
8
657- I 357- I
7 457- I V
7 457- I
7 557- I V
7 557- I
7 657- I V
7 657- I
7 757- I 857- I V
7 857- I
7 957- I V
7 957- I
7 057- I V
8 057- I
8 157- I V
8 157- I
8 257- I V
8 257- I
8 357- I V
8
657- I I 757- I I
6 357- I I
7 457- I I
7 457- I I
7 757- I I 857- I I
7 857- I I
7 957- I I
7 957- I I
7 057- I I
8 057- I I
8 157- I I
8 157- I I
8 257- I I
8 257- I I
8 357- I I
8
655- I V 055- I
7 155- I V
7 155- I
7 355- I V
7 355- I
7 455- I V
7 855- I V
7 855- I
7 955- I V
7 955- I
7 055- I V
8 055- I
8 155- I V
8 255- I V
8
954- I V
6 954- I
6 054- I V
7 054- I
7 154- I
7 254- I V
7 254- I
7 354- I V
7 954- I V
7 954- I
7 054- I V
8 054- I
8 154- I V
8
054- I I
7 054- I I
7 154- I I
7 154- I I
7 254- I I
7 054- I I
8 054- I I
8 154- I I
8
953- I
6 053- I V
7 053- I
7 153- I V
7 153- I
7 053- I
8
953- I I
6 953- I I
6 053- I I
7 053- I I
7 153- I I
7
852- I V
6 852- I
6 952- I V
6 952- I
6 052- I V
7
852- I I
6 852- I I
6 952- I I
6
App II F-2
Appendix II Figure-4
INDEX OF
TOPOGRAPHIC MAP
SCALE 1:50,000
SERIES NTMS
3342- I
INDEX OF 3342- II
3341- I 3441- IV
N
TOPOGRAPHIC MAP
SCALE 1:50,000 3340- II 3440- III
Administrative Boundary 3036- I 3136- IV 3136- I 3236- IV 3236- I 3336- IV 3336- I 3436- IV
NO DATA 3036- II 3136- III 3136- II 3236- III 3236- II 3336- III 3336- II 3436- III
NTMS 3035- II 3135- III 3135- II 3235- III 3235- II 3335- III 3335- II 3435- III 3435- II 3535- III
3034- II 3134- III 3134- II 3234- III 3234- II 3334- III 3334- II 3434- III 3434- II
2933- I 3033- IV 3033- I 3133- IV 3133- I 3233- IV 3233- I 3333- IV 3333- I 3433- IV
2933- III 2933- II 3033- III 3033- II 3133- III 3133- II 3233- III 3233- II 3333- III 3333- II 3433- III
2932- II 3032- III 3032- II 3132- III 3132- II 3232- III 3232- II 3332- III
3031- III 3031- II 3131- III 3131- II 3231- III 3231- II 3331- III 3331- II 3431- III
3030- IV 3030- I 3130- IV 3130- I 3230- IV 3230- I 3330- IV 3330- I 3430- IV 3430- I
3030- III 3030- II 3130- III 3130- II 3230- III 3230- II 3330- III 3330- II 3430- III 3430- II 3530- II
3029- I 3129- IV 3129- I 3229- IV 3229- I 3329- IV 3329- I 3429- IV 3429- I 3529- IV 3529- I 3629- IV
3129- III 3129- II 3229- III 3229- II 3329- III 3329- II 3429- III 3429- II 3529- III 3529- II 3629- III 3629- II 3729- III 3729- II 3829- III 3829- II
3028- IV 3028- I 3128- IV 3128- I 3228- IV 3228- I 3328- IV 3328- I 3428- IV 3428- I 3528- IV 3528- I 3628- IV 3628- I 3728- IV 3728- I 3828- IV 3828- I
3028- III 3028- II 3128- III 3128- II 3228- III 3228- II 3328- II 3428- III 3428- II 3528- III 3528- II 3628- III 3628- II 3728- III 3728- II 3828- III 3828- II
3027- I 3127- IV 3127- I 3227- IV 3227- I 3327- I 3427- IV 3427- I 3527- IV 3527- I 3627- IV 3627- I 3727- IV 3727- I 3827- IV
3127- III 3127- II 3227- III 3227- II 3327- III 3327- II 3427- III 3527- III 3527- II 3627- III 3627- II 3727- III 3727- II 3827- III
3126- IV 3126- I 3226- IV 3226- I 3326- IV 3426- IV 3526- I 3626- IV 3626- I 3726- IV 3726- I 3826- IV
3026- II 3126- III 3126- II 3226- III 3226- II 3326- III 3326- II 3426- III 3426- II 3526- III 3626- III 3626- II 3726- III 3726- II 3826- III 3826- II 3926- III 3926- II 4026- III 4026- II
2925- I 3025- IV 3025- I 3125- I 3225- IV 3225- I 3325- I 3425- IV 3425- I 3525- IV 3525- I 3625- IV 3625- I 3725- IV 3725- I 3825- IV 3825- I 3925- IV 3925- I 4025- IV 4025- I
2925- II 3025- III 3025- II 3125- II 3225- III 3225- II 3325- III 3325- II 3425- III 3525- III 3525- II 3625- III 3625- II 3725- III 3725- II 3825- III 3825- II 3925- III 3925- II 4025- III 4025- II 4125- III
2924- I 3024- IV 3024- I 3224- I 3324- IV 3324- I 3424- IV 3424- I 3624- IV 3624- I 3724- IV 3724- I 3824- IV 3824- I 3924- IV 3924- I 4024- IV 4024- I 4124- IV
2924- III 2924- II 3024- III 3324- III 3324- II 3424- III 3424- II 3524- III 3524- II 3624- III 3624- II 3824- III 3824- II 3924- III 3924- II 4024- III 4024- II 4124- III
2823- I 2923- IV 2923- I 3023- IV 3123- IV 3123- I 3223- IV 3323- I 3423- IV 3423- I 3523- IV 3523- I 3623- IV 3623- I 3723- IV 3723- I 3823- IV 3823- I 3923- IV 3923- I 4023- IV 4023- I 4123- IV
2823- III 2823- II 2923- III 2923- II 3023- II 3123- III 3123- II 3223- III 3423- III 3423- II 3523- III 3523- II 3623- III 3623- II 3723- III 3723- II 3823- III 3823- II 3923- III 3923- II 4023- III 4023- II 4123- III 4123- II
2822- IV 2822- I 2922- IV 2922- I 3122- IV 3122- I 3222- IV 3322- I 3422- IV 3422- I 3522- IV 3522- I 3622- IV 3622- I 3722- IV 3722- I 3822- IV 3822- I 3922- IV 3922- I 4022- IV 4122- IV 4122- I
2822- III 2822- II 2922- III 2922- II 3022- III 3022- II 3122- III 3122- II 3222- III 3322- II 3422- III 3422- II 3522- III 3522- II 3622- III 3622- II 3722- III 3722- II 3822- III 3822- II 3922- III 3922- II 4022- III 4122- III 4122- II
2721- I 2821- IV 2821- I 2921- IV 2921- I 3321- I 3421- IV 3421- I 3521- IV 3521- I 3621- IV 3621- I 3721- IV 3721- I 3821- IV 3821- I 3921- IV 3921- I 4021- IV 4021- I 4121- IV
2721- III 2721- II 2821- III 2821- II 2921- III 3521- III 3521- II 3621- III 3621- II 3721- III 3721- II 3821- III 3821- II 3921- III 3921- II 4021- III 4021- II 4121- III 4221- III
2620- I 2720- IV 2720- I 2820- IV 3220- IV 3220- I 3420- I 3520- IV 3520- I 3620- IV 3620- I 3720- IV 3720- I 3820- IV 3820- I 3920- IV 4020- IV 4020- I 4120- IV 4120- I 4220- IV
2620- III 2620- II 2720- III 2720- II 3220- III 3220- II 3420- II 3520- III 3520- II 3620- III 3620- II 3720- III 3720- II 3820- III 3820- II 3920- III 4020- II 4120- III 4120- II 4220- III
2519- IV 2519- I 2619- IV 2619- I 2719- IV 3119- I 3519- IV 3519- I 3619- IV 3619- I 3719- IV 3719- I 3919- IV 3919- I 4019- I 4119- IV 4119- I 4219- IV
2519- III 2519- II 2619- III 2619- II 2919- II 3119- III 3119- II 3519- II 3619- III 3619- II 3719- III 3919- III 3919- II 4019- III 4019- II 4119- III 4119- II 4219- III 4219- II
2418- IV 2418- I 2518- IV 2518- I 2618- IV 2918- I 3018- IV 3018- I 3618- I 3918- I 4018- IV 4018- I 4118- IV 4118- I 4218- IV 4218- I
2418- III 2418- II 2518- III 2518- II 2918- II 3018- II 3618- III 3618- II 3718- III 3718- II 3818- II 3918- III 3918- II 4018- III 4018- II 4118- III 4118- II 4218- III 4218- II
2417- IV 2417- I 2517- IV 2517- I 3517- I 3617- IV 3617- I 3717- IV 3717- I 3817- IV 3817- I 3917- IV 3917- I 4017- IV 4017- I 4117- IV 4117- I 4217- IV 4217- I
2317- II 2417- III 2417- II 2817- II 3417- II 3517- III 3517- II 3617- III 3617- II 3717- III 3717- II 3817- III 3817- II 3917- III 3917- II 4017- III 4017- II 4117- III 4117- II 4217- III 4217- II
2316- I 2416- IV 2416- I 2616- I 2716- IV 3416- IV 3416- I 3516- IV 3516- I 3616- IV 3616- I 3716- IV 3716- I 3816- IV 3816- I 3916- IV 3916- I 4016- IV 4016- I 4116- IV 4116- I 4216- IV 4216- I
2416- III 2416- II 2616- III 2616- II 3416- III 3416- II 3516- III 3516- II 3616- III 3616- II 3716- III 3716- II 3816- III 3816- II 3916- III 3916- II 4016- III 4016- II 4116- III 4116- II 4216- III 4216- II 4316- III
2615- I 3315- I 3415- IV 3415- I 3515- IV 3515- I 3615- IV 3615- I 3715- I 3815- IV 3815- I 3915- IV 3915- I 4015- IV 4015- I 4115- IV 4115- I 4215- IV 4215- I 4315- IV
2615- II 2715- III 3315- II 3415- III 3415- II 3715- II 3815- III 3815- II 3915- III 3915- II 4015- III 4015- II 4115- III 4115- II 4215- III 4215- II 4315- III
2614- IV 2614- I 2714- IV 3214- I 3314- IV 3314- I 3414- IV 3414- I 3714- I 3814- IV 3814- I 3914- IV 3914- I 4014- IV 4014- I 4114- IV 4114- I 4214- IV 4214- I
2614- III 2614- II 2714- III 3214- II 3314- III 3314- II 3414- III 3414- II 3814- III 3814- II 3914- III 3914- II 4014- III 4014- II 4114- III 4214- III 4214- II
2613- IV 3013- I 3113- IV 3113- I 3313- IV 3313- I 3413- IV 3813- IV 3813- I 3913- IV 3913- I 4013- IV 4013- I 4113- IV 4213- IV
2613- III 2613- II 3013- II 3113- III 3113- II 3213- III 3213- II 3313- III 3313- II 3813- III 3813- II 3913- III 3913- II 4013- III 4013- II 4113- III
2912- IV 2912- I 3012- IV 3012- I 3112- I 3212- IV 3212- I 3312- IV 3912- IV 3912- I 4012- IV 4012- I 4112- IV
3012- III 3012- II 3112- III 3112- II 3212- III 4012- III 4012- II 4112- III
App II F-3
Appendix II Figure-5
INDEX OF
METRO MANILA
TOPOGRAPHIC MAP
SCALE 1:10,000
INDEX MAP OF
METRO MANILA TOPOGRAPHIC MAP
SCALE 1:10,000
3130-I-13 3130-I-14
3229-IV-16 3229-IV-17
App II F-4
Appendix II Figure-6
INDEX OF
TOPOGRAPHIC MAP
SCALE 1:5,000
23-II 3523-III 3523-II 3623-III 3623-II 3723-III 3723-II 3823-III 3823-II 3923-III 39
22-II 3522-III 3522-II 3622-III 3622-II 3722-III 3722-II 3822-III 3822-II 3922-III 39
352 2-II-14
421-I 3521-IV 3521-I 3621-IV 3621-I 3721-IV 3721-I 3821-IV 3821-I 3921-IV 39 372 1-I-18 372 1-I-19 372 1-I-20 382 1-IV-16
LEGEND
Administrative Boundary
39
INDEX OF 1:50,000
39
INDEX OF 1:5,000
39
3818-II 3918-III 39
416 I 3516 IV 3516 I 3616 IV 3616 I 3716 IV 3716 I 3816 IV 3816 I 3916 IV 39
App. II-6
App II F-5
Appendix II Figure-7
METRO MANILA INDEX OF
PLANIMETRIC, LAND USE,
LAND CONDITION MAPS
SCALE 1:10,000
3229-IV-16 3229-IV-17
LEGEND
Administrative Boundary
PLANIMETRIC MAPS
WITH LAND USE MAPS
WITH LAND USE AND LAND CONDITION MAPS
WITH LAND CONDITION MAPS
App II F-6
APPENDIX III DIAGNOSTIC OF CORPORATE CULTURE
English Version
フィリピン国 国土総合開発計画促進に関する地図政策支援行政整備調査
September 2006
JICA Study Team
Survey Questionnaire
Work place related questions: 60
One’s superior related questions : 19
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 2
1
Procedure of DCC
【Tasks by NAMRIA 】 【Tasks by JICA Study Team】
①Discussion with Target Divisions & Personnel ・Explained the Concepts and
for Diagnosis Implementation
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 3
Note)In this program besides for Degree of strategic vitality & Degree of organizational vitality、various departments,
& management‘s leadership judgement can be quantitatively pointed out。
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 4
2
DCC Vitality Index
1.Degree of strategic 2. Degree of
vitality organizational vitality
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 5
1 -1 1
-1 Average use Average increased
property, business, revenue
profit percentage
-1 -1
Note)Vertical line is degree of organizational vitality、 Note) Vertical line is degree of organizational vitality、
horizontal line is data from (1985 year~95 year) Ave. horizontal line is data from (1985 year~95 year)
use property, business, profit percentage. average increase revenue
(related to =0.30) (related to=0.36)
Source) JICA Study Team Business Climate Data Base Source) JICA Study Team Business Climate Data Base
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 6
3
Correlation of Degree of Strategic & Company’s Achievements(2)
「Degree of Strategic Vitality」& Achievements :Corresponding change in achievements is improving
1 -1 1
-1 Average used Average increased
property, business, revenue
& profit percentage
-1 -1
Note)Vertical line is degree of strategic vitality、 Note) Vertical line is degree of strategic vitality、
horizontal line is data from (1985 year~95 year) Ave. horizontal line is data from (1985 year~95 year)
use property, business, profit percentage. average increase revenue
(related to =0.67) (related to=0.62)
Source) JICA Study Team Business Climate Data Base Source) JICA Study Team Business Climate Data Base
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 7
Conservative
Control-Oriented Free-and-easy
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 8
4
Respondents’ Attribute
Questionnaire Attributes 1. Office of the Administrator
Questionnaire Attributes: Total Sample no. 727 employees. Distributed questionnaires amounted to 715. 2. Security and Intelligence Division
Returned samples: 642 (89.79%); Valid Samples: 625 (97.35%) 3. Administrative Division
4. Financial and Management Division
Position Gender
Administrative Staff 90 Male 430 5. Planning Division
Managerial Staff 30 Female 195
Technical Staff 359 TOTAL 625
Medical Staff 6 2. Coast and Geodetic Surveys Department
Maintenance Staff 36 Age Range
6. Office of the Director - Coast and Geodetic Surveys Department
Others 64 20 years old and below 3
No Answ er 40 21 to 30 years old 109 7. Hydrographic Survey Division
TOTAL 625 31 to 40 years old 147 8. Oceanographic Survey Division
41 to 50 years old 250
Departm ent 51 to 60 years old 97 9. Geodetic and GeoPhysics Division
Staff Services Department 64 61 years old and above 19 31. Survey Operations Division
Coast and Geodetic Surveys Department 253 TOTAL 625
Engineering Services Department 48 3. Engineering Services Department
Mapping Department 113 Educational Attainm ent 10. Office of the Director - Engineering Services Department
Remote Sensing and Resources Data Analysis Department 73 University graduate and higher 314
Information Management Department 74 Vocational graduate 231 11. Transportation Division
TOTAL 625 High School graduate 67 12. Computer Engineering Division
Elementary School graduate 1
Division Elementary School undergraduate 2 13. Instrumentation and Communication Division
Office of the Administrator 13 No answ er 10 14. Facilities Maintenance and Repair Division
Security and Intelligence Division 12 TOTAL 625
Administrative Division 17 4. Mapping Department
Financial and Management Division 14 Num ber of Years of Service in NAMRIA 15. Office of the Director - Mapping Department
St Planning Division 8 Less than 1 year 20
Office of the Director - Coast and Geodetic Surveys Department 16 1 year to less than 2 years 27 16. Photogrammetry Division
Hydrographic Survey Division 63 2 years to less than 3 years 20 17. Cartography Division
Oceanographic Survey Division 13 3 years to less than 4 years 30
Geodetic and GeoPhysics Division 19 4 years to less than 5 years 39 18. Reprography and Printing Division
CoSurvey Operations Division 147 5 years and more 489 19. Aerial and Spatial Surveys Division
5. Remote Sensing and Resources Data Analysis Department
Office of the Director - Engineering Services Department 8 TOTAL 625
Transportation Division 5
Computer Engineering Division 15 Num ber of Dependents 20. Office of the Director - Remote Sensing and Resources Data Analysis Department
Instrumentation and Communication Division 9 None 56
EnFacilities Maintenance and Repair Division 10 1 person 96 21. Land Resource Division
Office of the Director - Mapping Department 7 2 to 3 persons 319 22. Physiography and Aquatics Division
Photogrammetry Division 20 4 to 5 persons 98
Cartography Division 43 6 persons or more 56
23. Geographic Information Systems Application Division
Reprography and Printing Division 26 TOTAL 625 24. Land Classification Division
M Aerial and Spatial Surveys Division
Office of the Director - Remote Sensing and Resources Data Analysis Department
13
2 Overseas Training
25. National Remote Sensing Center
Land Resource Division 17 With overseas training 133 6. Information Management Department
Physiography and Aquatics Division 10 Without overseas training 492
Geographic Information Systems Application Division 12 TOTAL 625
26. Office of the Director - Information Management Department
ReLand Classification Division 31 27. Database Management Division
Office of the Director - Information Management Department
Database Management Division
2
25
28. System Development and Programming Division
System Development and Programming Division 14 29. Media Production Division
Media Production Division 15
30. Information Services Division
In Information Services Division 19
TOTAL 625
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 9
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 10
5
Overall Vitality by Department
Strategic 0.8
Vitality
0.7
Staff Services0.6
Remote Sensing &
Department
Resource Data
Analysis
0.5
Department
0.4
0.3 Information
Coast and NAMRIA Management
Geodetic Surveys Department
Department 0.2
Mapping
Department
Engineering 0.1
Services
Department
Organizational
0.0 Vitality
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
-0.1
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 11
z “Merit System”
From the characteristics of the adoption/promotion for the Government employee as shown below,
it is the general case that the “Merit System” of the Government employee’s organization scores a
low point. This is no exception in NAMRIA’s case..
▪ The adoption of personnel in the system applies where there is a vacant post. Lower level personnel moves to
a higher position.
▪ It is advantageous to have connections in the organization to be promoted to a post regardless of being hard
working (there might be cases that giving a bribe or special offering will be the promotional condition).
▪ Due to these background, the significance and the incentive to implement the individual performance
evaluation are weak. The motivation for “to get a better salary by changing job” may be the only solution.
z “Long-Term Outlook”
This reflects NAMRIA’s (weak) situation in the process of restructuring the administrative
organization at present. This index is low in departments that has no strategy in their daily work.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 12
6
General Keynote (2)
~”Strategic Vitality”~ Diagnosis in each Dept. (1)
Mapping Dept.
1. This Dept. ranked 2nd lowest Dept. in NAMRIA in terms of “Strategic Vitality”.
2. The vitality for “Discharge of Responsibility” is high, but for “Active reform” / “Improvement Campaigns” is lower
than in other Depts. The index for “Merit Orientation” is also low. With this situation, the following tendency can
be considered:
• Although the work given will be executed under his responsibility, the consciousness to absorb a new
technology or to improve the weakness of an old technology are lacking.
• Persons with ability, has confidence in his skill, has the aim to make use of it and possesses know-how of
the work is buried, and the person without any ability is treated well in the organization.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 14
7
General Keynote (2)
~”Strategic Vitality”~ Diagnosis in each Dept. (3)
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 15
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 16
8
General Keynote (3)
~”Organizational Vitality”~ Outlook for communication in the Organization
“Respect for Dialogue” and “Appropriation Regulation” are ranked below the
average of the organization in the Philippines and there is room for improvement.
z “Respect for Dialogue”
Opinions and suggestions submitted by the lower ranked staff are not accepted nor hear out. The
special executives may decide on everything (proper delegation of authority to the Depts. has not
been done).
z “Appropriation Regulation”
Proper Standards and Working Manuals have not been prepared to perform the works. Or, Carrier
Pass and Training Plan have not been prepared to encourage the human power.
“Delegation of Authority” and “Tolerance of Failure” are ranked average in the
Philippines. The environment on “Respect for the Individual” has been built
properly in the organization.
z “Respect for the Individual”
There is tendency to respect individuals. However, allowing for low score of index of “Merit
Orientation”, staff seem to misunderstand that “Respect for the Individual” that every staff are in
the same level and not to evaluate the individual ability. This tendency is the sense of values which
often meets even in the private sector in the Philippines. It is necessary to discuss the following
directions for improvement.
▪ Implementation of training regarding “Performance Management”.
▪ Introduction of individual performance management based on the performance of the Dept. or the Team
(though there are many problems to be solved).
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 17
9
Organizational Vitality by Department
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 19
10
Leadership by Department
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 21
11
Overall Vitality by Division
Strategic Vitality
1.1
Instrumentation and
1.0
Financial and Management Communication
Security and Intelligence Physiography and
0.9
Aquatics
Planning 0.8
Land Classification
Media Production
Cartography 0.7
Geographic Information
Photogrammetry Office of the Director -
Systems Application 0.6
CGSD
Geodetic and GeoPhysics 0.5 System Development and
Programming
0.4
Database Management
Office of the Administrator 0.3 Reprography
NAMRIA Oceanographic Survey
Hydrographic Survey
0.2
Administrative
0.1
Office of the Director - Organizational
Engineering Services Vitality
Survey Operations
0.0
-1.5 -1.3 -1.1 -0.9 -0.7 -0.5 -0.3 -0.1 0.1 0.3 0.5 0.7 0.9 1.1 1.3 1.5
Information Services
-0.3
Transportation
-0.4 Office of the Director -
RSRDAD
-0.5
Aerial and Spatial Surveys
-0.6
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 23
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 24
12
Organizational Vitality by Division
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 25
13
Leadership by Division
NAMRIA Office of the Administrator Security and Intelligence
Administrative Financial and Management Planning
Office of the Director - CGSD Hydrographic Survey Oceanographic Survey
Geodetic and GeoPhysics Office of the Director - Engineering Services Transportation
Computer Engineering Instrumentation and Communication Facilities Maintenance and Repair
Office of the Director - Mapping Photogrammetry Cartography
Reprography Aerial and Spatial Surveys Office of the Director - RSRDAD
Land Resource Physiography and Aquatics Geographic Information Systems Application
Land Classification Office of the Director - IM Database Management
System Development and Programming Media Production Information Services
Survey Operations
1.1
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
-0.8
-0.9
-1.0
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 27
General Keynote
z According to the order of Administration→Management→Technical post, vitality is
high and the degree of contribution is also high.
z Maintenance staff falls into those who do not understand what to do, makes vitality
down.
“Strategic Vitality”
z The Strategic Vitality of the Management in NAMRIA is high.
z The segment of [no reply] who cannot understand the scope of work is weak on self-
improvement consciousness, (“Strategic brains”, “Active Reform” and Improvement
Campaigns” are low) and are low vitality persons.
“Organizational Vitality”
z In circumstances that lack discussions and proper regulation, the management and
administrative staff are more strongly aware of the circumstances than technical staffs.
“Leadership”
z Leadership of the administrative staff as observed by the management staff, is rather
high. On the other hand, one of the management staff is observed to be lacking in
“Consideration” and “Power of Influence” by the technical post staff.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 28
14
Overall Vitality by Position
Strategic Vitality
0.6
0.5
Managerial Staff Administrative Staff
0.4
Technical Staff
0.3
NAMRIA
Others
0.2
No Answer
-0.1
-0.2
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 29
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
-0.8
Strategic Influence of Active Reform Discharge of Merit Orientation Imporvement Aspirations Definition Long-term
Thinking Management Responsibility Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 30
15
Organizational Vitality by Position
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 31
Leadership by Position
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
-0.8
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 32
16
Women and Men Analysis / One by one Analysis.
~Gender Issue~
General Keynote
z There are effective replies from 430 males and 195 females. The vitality of females is
overwhelmingly high.
“Strategic Vitality”
z Except for “Merit Orientation”, the vitality of females is high. However, this matter is
important because the female staff feel that they are not treated equally in “Merit
Orientation” with male staff. And there are circumstances that male staff has more
advantage on promotion and treatment.
z Introduction of a “Merit Orientation”, in which there is no difference between men and
women, would be an urgent matter for NAMRIA.
“Organizational Vitality”
z As in the reflection of the circumstances on the “Merit Orientation” mentioned above,
female staff has low recognition for “Delegation of Authority” and “Respect for
Dialogue”.
z The female staff have a much more higher circumstances recognition on “Tolerance
of Failure”. As for “Tolerance of Failure”, there exists a sense that failure by a male
would not be permissible, but that one of a female would be a bit permissible.
“Leadership”
z Although there is a question concerning immediate superior in the Dept., female staff
have a tendency to say that their leader would be excellent compared with the male
staff. It may be because of many male leaders in the Dept.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 33
Strategic Vitality
0.4
Female
0.3
NAMRIA
Male
0.2
0.1
Organizational
Vitality
0.0
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
-0.1
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 34
17
Strategic Vitality by Gender
NAMRIA
0.7
Male
0.6 Female
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 35
NAMRIA
Male
0.3
Female
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 36
18
Leadership by Gender
NAMRIA
Male
0.4 Female
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 37
General Keynote
z Most staff have obtained their jobs in their twenties and by their thirties, vitality goes
down because of mannerism and dissatisfaction in the organizational environment
where they are placed. After that, if some of them could get promotion to amanagerial
position, vitality increases. It is a general case that when most of them are aware of
the “Glass Ceiling”, vitality goes down. This composition would not be changed
regardless of the type of occupation.
“Strategic Vitality”
z The vitality of the twenties and thirties are lower than for the senior generations.
z “Merit Orientation” and “Long-term outlook” are conspicuous. This shows that they will
not cling on the job for a long time unless their performance are not admitted.
“Organizational Vitality”
z Except for the line of ”under twenties" the samples are 3 only, so no considering, the
trends are almost similar. It would be a matter of course that there is a high
“Tolerance of Failure” in the twenties who have not had things put in their hands.
“Leadership”
z The thirties who are ranked in the lowest of the “Strategic Vitality” show the most
severe way of thinking towards the leadership of their immediate bosses.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 38
19
Overall Vitality by Age
Strategic
0.4
Vitality
61 years old or
more 41 - 50 years old Organizational
0.3
NAMRIA Vitality
0.2
21 - 30 years old
31 - 40 years old
51 - 60 years old
0.1
0.0
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
-0.1
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 39
NAMRIA
20 years old or less
21 - 30 years old
0.8
31 - 40 years old
41 - 50 years old
0.7 51 - 60 years old
61 years old or more
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 40
20
Organizational Vitality by Age
NAMRIA
20 years old or less
21 - 30 years old
31 - 40 years old
0.4 41 - 50 years old
51 - 60 years old
61 years old or more
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 41
Leadership by Age
NAMRIA
20 years old or less
21 - 30 years old
31 - 40 years old
0.6 41 - 50 years old
51 - 60 years old
0.5 61 years old or more
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 42
21
On the educational background / One by one Analysis
General Keynotes
z Observing the properties of the respondents, University graduate=314,
Vocational School (college) graduate=231, High school graduate=67 and
Elementary graduate, Leaves elementary school before graduation and no
response are the total 12.
z No significant difference was found by observing the top 3 ranking
categories.
“Strategic Vitality”
z There is no significant difference by educational background.
“Organizational Vitality”
z There is no significant difference by educational background.
“Leadership”
z There is no significant difference by educational background.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 43
Strategic Vitality
0.5
Elementary
Undergraduate 0.4
High School
Vocational
0.3
Graduate NAMRIA Organizational
University/ College
0.2 Vitality
Graduate
0.1
0.0
-0.9 -0.8 -0.7 -0.6 -0.5 -0.4 -0.3 -0.2 -0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
-0.8
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 44
22
Strategic Vitality by Educational Attainment
NAMRIA University/ College Graduate
Vocational High School Graduate
1.0 Elementary Graduate Elementary Undergraduate
0.9 No answ er
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
-0.8
-0.9
-1.0
-1.1
-1.2
-1.3
-1.4
-1.5
-1.6
-1.7
-1.8
-1.9
-2.0
-2.1
-2.2
-2.3
-2.4
-2.5
-2.6
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 45
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
-0.7
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 46
23
Leadership by Educational Attainment
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
Consideration Presentation of Goals Power of Influence Mentorship Pressure to Achieve
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 47
General Keynotes
z Having a knack on the work in 3 years after entering NAMRIA, “Strategic Vitality”
decreases every year. At the same time, “Organizational Vitality” increases gradually
because of getting accustomed to the circumstances in the organization.
z It would be 4 years after entering NAMRIA that personnel will be assigned to certain
responsibilities at NAMRIA. After this, “Strategic Vitality” is going up and gradually
goes down when they get accustomed with the work.
“Strategic Vitality”
z “Strategic brains”, “Action reform” and “Definition” are so high for the staff working
less than a year. That would be proof that they had started the work eagerly with
passion in their roles. However, as time passes, this tendency is gone and the
recognition of environment in terms of “Influence of management concept” and the
“Discharge of responsibility” gets stronger.
z This tendency is generally common regardless of nationality. It can be understood
that a certain period (4 years) after entering to a Dept., one would ponder to the
traditional ways of an organization.
“Organizational Vitality”
z The fact that “Tolerance of Failure” goes down after 4 years has passed is because of
the reasons mentioned above.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 48
24
Overall Vitality by Years of Service in NAMRIA
Strategic Vitality
0.5
0.1
0.0
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
-0.1
2 - less than 3
-0.2
years
-0.3
-0.4
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 49
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
-0.6
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 50
25
Organizational Vitality by Years of Service in NAMRIA
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 51
General Keynotes
z The segment, without dependent shows clearly the low “Strategic Vitality”.
z When he gets dependent, “Strategic Vitality” goes up. At the same time,
“Organizational Vitality” tends to be restrained as the commitment to the organization
increases.
“Strategic Vitality”
z The class of “No dependant (56 persons)” shows low points for the “Merit orientation”
and the “Long-term outlook”. They are feeling that they would not stay in NAMRIA for
a long time since they are not properly evaluated.
z Although those who have more than 5 dependents (56 persons) recognizes the
environment on “Influence of Management Concept” and “Active Reform”, the point
for “Discharge of Responsibility” is low. They are feeling that their job-site is under
irresponsible circumstances (although there is an insincere appeal, nobody is
responsible for it).
“Organizational Vitality”
z It would be thought that the class of “No dependant (56 persons)” has a wide
influence in NAMRIA and has good communication skills (because of lightness?).
Due to the reason mentioned above, the index point for “Delegation of Authority”,
“Respect for the Individual” and “Tolerance of failure” are high.
z On the other hand, as there is no ”Appropriate regulation”, they seem to feel that their
performance is not evaluated properly.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 52
26
Overall Vitality by Leadership by Number of Dependents
5 or more
dependents 0.5
3 - 5 dependents Organizational
0.4 Vitality
1 dependent
0.3
NAMRIA
0.2
No dependents
2 - 3 dependents
0.1
0.0
-0.6 -0.5 -0.4 -0.3 -0.2 -0.1 0.0 0.1 0.2
-0.1
-0.2
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 53
NAMRIA None
1 person 2-3 persons
0.6 3-5 persons 5 or more persons
0.5
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 54
27
Organizational Vitality by Leadership by Number of
Dependents
NAMRIA None
1 person 2-3 persons
3-5 persons 5 or more persons
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
-0.5
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 55
General Keynotes
z 133 persons had experienced overseas training. Vitality is low compared to
persons who have not receive overseas training yet.
z There is room for improvement on treatment for the training participants.
“Strategic Vitality” / “Organizational Vitality”
z There seems to exist dissatisfaction from the trainees who have
experienced overseas training and are not given favorable treatment.
z The following dissatisfactions exist in such peoples:
▪ They think they are capable enough but are not evaluated properly.
▪ There are so many staff in their workplace who do not know what to do.
▪ NAMRIA does not have long–term vision.
▪ Sufficient discussions has not been executed in NAMRIA.
▪ NAMRIA is not generous towards failure.
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 56
28
Overall Vitality by Exposure to Overseas Training
Strategic Vitality
0.5
0.4
Haven't undergone
overseas trainning
0.3
NAMRIA
overseas trainning
0.1
Organizational
Vitality
0.0
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
-0.1
-0.2
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 57
NAMRIA
Have undergone overseas trainning
0.5 Haven't undergone overseas trainning
0.4
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
Strategic Influence of Active Reform Discharge of Merit Imporvement Aspirations Definition Long-term Education
Thinking Management Responsibility Orientation Campaigns Outlook
Concepts
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 58
29
Organizational Vitality by Exposure to Overseas Training
NAMRIA
Have undergone overseas trainning
Haven't undergone overseas trainning
0.3
0.2
0.1
0.0
-0.1
-0.2
-0.3
-0.4
Delegation of Authority Respect for Dialogue Appropriate Regulations Respect for the Individual Tolerance of Failure
The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines 59
30
Don’t write anything please.
Diagnosis of the
Organizational Culture
◇◇Questionnaire Survey Form◇◇
1
Part A. Your unit, etc.
This part concerns the unit to which you belong in the NAMRIA
organization. Circle only one response for each question.
※ Position(Class) Circle only one response
1. Administrative Staff
2. Managerial Staff
3. Technical Staff
4. Medical Staff
5. Maintenance Staff
6. Others
※ Assigned Division & Section. Circle one division & one corresponding section
2
STAFF SERVICES
1. Office of the Administrator
2. Security & Intelligence Division
3. Administrative Division
a. Personnel Management & Dev’t Section
b. Map Sales Office
c. Records Section
d. Dental Clinic
4. Financial & Mgmt. Division
a. Accounting Section
b. Internal Audit
c. Cash Section
5. Planning Division
COAST & GEODETIC SURVEYS DEPARTMENT
1. Office of the Director
2. Hydrographic Survey Division
a. Hydrographic Survey Division
b. Camera Unit
c. Printing Unit
3. Oceanographic Survey Division
4. Geodetic & GeoPhysics Division
ENGINEERING SERVICES DEPARTMENT
1. Office of the Director
2. Transport Division
3
3. Computer Engineering Division
4. Instrumentation & Communication Division
5. Facilities Maintenance & Repair Division
MAPPING DEPARTMENT
1. Office of the Director
2. Photogrammetry Division
a. Compilation Section
b. Analytical Section
c. Enhancement Section
d. DPW
3. Cartography Division
a. Administrative Map Section
b. National Series Section
c. Database Section
4. Reprography & Printing Division
a. Camera Unit
b. Plate Making Unit
c. Archives Unit
5. Aerial & Spatial Surveys Division
REMOTE SENSING & RESOURCE DATA ANALYSIS DEPARTMENT
1. Office of the Director
2. Land Resource Division
a. Research Section
3. Physiography & Aquatics Division
a. Mangrove Section
b. Physiography Section
4. Geographic Information Systems Application Division
a. Database and Archive Section
5. Land Classification Division
a. Mapping Section
b. Field Operation Section
c. Documentation & Data Processing Section
6. National Remote Sensing Center
INFORMATION MANAGEMENT DEPARTMENT
1. Office of the Director
2. Database Management Division
3. Systems Dev’t. & Programming Division
4. Media Production Division
5. Information Services Division
4
※ Educational Background Circle only one response
1. University graduate and above 4. Elementary School Graduate
2. Vocational/College Graduate 5. Elementary School Under graduate
3. High School Graduate
※ Have you been to overseas training so far? Circle only one response
1. Yes
2. No
5
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
Q2. Even petty matters have to be referred to the superior. (2) Yes 1 2 3 4 5 No
Q6. People are extremely busy and chronically tired. (6) Yes 1 2 3 4 5 No
You can decide things as you see fit, without having to worry
Q7. (7) Yes 1 2 3 4 5 No
about what other people think.
Q8. The level of profit is more important than the level of sales. (8) Yes 1 2 3 4 5 No
Q9. Ideas derived from client needs receive full attention. (9) Yes 1 2 3 4 5 No
6
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
You can disagree with the superior without any ill feelings or
Q20 (20) Yes 1 2 3 4 5 No
consequences.
Q24 Targets are too high, and the atmosphere is highly oppressive. (24) Yes 1 2 3 4 5 No
Q28 People think it is enough merely to do the job at hand. (28) Yes 1 2 3 4 5 No
7
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
Q43 Many people truly empathize with NAMRIA’s philosophy. (43) Yes 1 2 3 4 5 No
8
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
Q50 There is an attitude of giving new ideas a chance to work. (50) Yes 1 2 3 4 5 No
Q59 You want to continue working at your current workplace. (59) Yes 1 2 3 4 5 No
9
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
Q64 Attaches importance to the on-the-job attitude and outlook. (64) Yes 1 2 3 4 5 No
Q70 Puts the business results before all other considerations. (70) Yes 1 2 3 4 5 No
Q71 Has power of influence with other organizational units. (71) Yes 1 2 3 4 5 No
10
Disagree Completely
Disagree basically
Agree completely
Agree basically
Neutral
Question No. Question No.
11
APPENDIX IV PROJECT CYCLE MANAGEMENT
JICA STUDY FOR MAPPING POLICY
AND TOPOGRAPHIC MAPPING FOR
INTEGRATED NATIONAL
DEVELOPMENT PLAN IN THE
REPUBLIC OF THE PHILIPPINES
PCM WORKSHOP
COMPLETION REPORT
Submitted
by:
Attachments:
COMPLETION REPORT
1.0 Introduction
The three-year study is being conducted with the support of the Japan
International Cooperation Agency with the National Mapping and Resource
Identification Authority (NAMRIA) as the counterpart agency. The main
objective of the study is the formulation of an implementation plan for
NAMRIA to promote nationwide deployment of topographic mapping at a
scale of 1:50,000. One of the components of the study is the formulation of an
organizational development plan to enhance the capacity of NAMRIA to
undertake the task of updating the topographic maps. The capacity
assessment entails the conduct of the Diagnosis of Corporate Culture (DCC)
and the Project Cycle Management (PCM) Workshop.
The PCM Workshop was conducted to analyze the existing situation (in terms
of updating the topographic maps), identify the major problems of the
situation and to define the desirable and realistically achievable situation.
The workshop was held on 17 May 2006 at the Lecture Hall, NAMRIA Office,
Fort Bonifacio, Taguig City.
4.0 Participants
Department No of Participants
Coast and Geodetic Surveys Department 1
Engineering Services Department 3
Mapping Department 6
Remote Sensing & Resource Data Analysis Dept 4
Information Management Department 1
Capt. Jose Galo Isada, Jr., Manager of the Mapping Department was also
present. Observers included the representatives from the JICA Philippine
Office, the JICA Experts assigned in NAMRIA; and the members of the JICA
Study Team.
2
the logical relationships among them. The PCM method is
characterized by consistency (through the use of the PDM); logical
relationships (cause and effect and means-ends) and participatory
approach. One of the important steps of the PCM Method is
participatory planning that comprises of analysis stage (participation
analysis, problem analysis, objectives analysis and project selection or
alternatives analysis) and planing stage (formulation of project design
matrix and plan of operations).
She reiterated that for this workshop the participants would undergo
the problem and the objectives analysis; two of the critical steps in
participatory planning.
5.3.1 Preliminaries
3
5.3.2 Highlights
Each card was read to the participants before posting to the board.
Related cards were temporarily grouped into clusters. Each cluster
was then discussed and clarification was sought from the participants
regarding the ideas expressed in the card.
4
Institutional
mechanisms/arrangements not
yet in place
(d) Manpower
5
Limited number of skilled
manpower to update existing
topographic maps
*Map production, image processing, cartographic enhancement, digital photogrammetric, ground survey training,
upgrading on topographic map production
(e) Equipment
The ideas were written in the cards and were re-arranged into:
6
(f) Budget
It was explained that NEDA did not accept the proposal on National
Common Spatial Database (NCSD) that was submitted by NAMRIA
on the grounds that it is a non-economic project. This is despite the
contention of NAMRIA that for every dollar spent on data; four (4)
dollars went back to the economy. This is based on Australia's
experience. With this situation, funding for mapping activities is given
less priority.
7
Core Problem
It was agreed that the major causes of the core problem would be
stated as follows:
8
(4) Effects of the core problem
Economic development is
affected
5.4.1 Preliminaries
9
• New objectives that need to be added if these appear to be
relevant and necessary in order to achieve the stated
objective (s) at the next level.
The participants were divided into two (2) groups afterwards for this
workshop. Each group presented the outputs in the plenary.
10
(b.3) controlled and tolerable turn-over
• Scholarships promoted
11
(c) On sufficient appropriate equipment and sources of data
made available and maintained properly
Mr. Takano informed the group that the PCM workshop has enabled
the participants to:
12
JICA Study for Mapping Policy and Topographic Mapping for
Integrated National Development Plan
In the Republic of the Philippines
ATTENDANCE
1.0 Participants
13
Name Position Division/Department
Name Position
Name Division/Department
Takeshi Kanome
Mae Leyson
14
PROBLEM TREE Economic development is affected
Less priority
Collaboration Some topo Insufficient/ Insufficient Rapid Recruit- Unavaila- Insufficient Not upgraded Limited given by the
with other maps did not lack Training turnover of ment is bility of software/ software: acquisition government for
government meet the technical • Map skilled limited by software hardware • Topo map of aerial mapping
agencies for required Production production activities
knowledge personnel plantilla for data (high-end photographs
data sharing • Image • High-end
specifications/ on data positions processing computer) and satellite
Processing imageries
not firmly standards processing of radar for data imageries
• Cartographic processing
established and radar Enhancement imageries processing
imageries of optical • Cartographic
• Digital
Photogram- enhancement
imageries
metric
• Ground
survey
training
• Upgrading on
topo map
production
15
OBJECTIVES TREE Sound economic development
program
Decision making is
enhanced
Standards New Continuous Controlled Staffing Software for Digital Appropriate Sattelite
Collaboration Mapping
mapping training program and tolerable processing of photogra- equipment (DPW imageries
institutionalized adopted and pattern activities given
technology developed and turn-over of radar mmetric work and accessories) (remaining 50%)
followed implemented personnel rationalized imageries and upgraded and aerial priority by the
station and
acquired purchased software on photography government
software made
available cartographic purchased
enhancement
acquired
In-house Foreign Efficient Knowledge Incentive
training training recruitment on package
management developed
conducted courses
systems and
availed established implemented
Policies and Standards are Research and Magna carta on Personnel Scholarships
operational Sufficient
formulated and fund for Development S&T allowed by promoted
schemes with other approved for Program implemented in management to
government training NAMRIA work outside
implementation involving S &
agencies formulated secured T personnel NAMRIA
and adopted developed and
implemented
MOUs between
agencies signed and
made effective
16