24,000 PER SQM. 26,000 PER SQM. 30,000 PER SQM.

Basic Finish Conservative Finish Elegant Finish

Doors Doors Doors


Main - Solid Door Main - Solid Door Main - Solid Door
Bedrooms - Flush Door Bedrooms - Flush Door Bedrooms - Solid Door
Toilet & Bath - Flush Door Toilet & Bath - Flush Door Toilet & Bath - Solid Door

Windows Windows Windows


Analok Aluminum Finish Analok Aluminum Finish Laminated Wood Aluminum Finish
Steel Grilles Steel Grilles

Floors Floors Floors


Ceramic Tile Finish Ceramic Tile Finish Granite Tile Finish

Stairs Stairs Stairs


Non-skid Tile Finish Solid Wood Steps Solid Wood Steps

Railings Railings Railings


Steel Tubular Railing Glass Railing Glass Railing
Wood Handrail Wood Handrail Stailess Steel Handrail

Carport Carport Carport


Concrete Finish Concrete & Pebble Finish Ceramic Tile & Pebble Finish

Kitchen Counter Top Kitchen Counter Top Kitchen Counter Top


Ceramic Tile Finish Synthetic Granite Synthetic Granite

Kitchen Cabinets Kitchen Cabinets Kitchen Cabinets


Painted Finish Painted & Laminated Finish Painted & Laminated Finish

Lighting Fixtures Lighting Fixtures Lighting Fixtures


Led Pinlights Led Pinlights Led Pinlights
Accent Lights
Pendant Lights

Bathroom Fixtures Bathroom Fixtures Bathroom Fixtures


Telephone Shower Rain Shower Rain Shower
Wall-hung Lavatory Vessel Type Lavatory Vessel Type Lavatory
Flush-type Water Closet Flush-type Water Closet Dual Flush-type Water Closet
Vanity Mirrors Vanity Mirrors
Alum. Frame Glass Shower Partition

Room Closets Room Closets


Painted Finish Laminated Finish
Building Permit Requirements Building Permit Requirements
Building Permit Fees Building Permit Fees
Temporary Water Connection Temporary Water Connection
Temporary Electric Connection Temporary Electric Connection
Construction Bond Construction Bond

Landscaping