Professional Documents
Culture Documents
Hasil Rancangan Drilling Ship Kelompok 4
Hasil Rancangan Drilling Ship Kelompok 4
Kelompok 4
Anggota :
- Edwin Bastian (1606883045)
- Irfan Setio Leksono (1606883644)
- Whisnu Febriansyah (1606882723)
- Muhammad Raihan Haidar (1606886204)
Owner Requirement :
Daerah Operasi = Laut Timor
Kapasitas = 125.000 bopd
Referensi :
Penentuan displacement
∆ = 𝐿𝐶 + 𝐷𝑊𝑇
LC = Gtopside + Ghull
DWT = PL + Consum + Crew + Acomm + Luggage
PL = Kapasitas Produksi (barrell) => (ton) dengan 1 barell = 159 liter.
2 1
∆= ∆ + ∆
3 3
2
∆ = 𝐺ℎ𝑢𝑙𝑙 + 𝐺𝑏𝑎𝑙𝑙𝑎𝑠𝑡
3
1
∆ = 𝐺𝑡𝑜𝑝𝑠𝑖𝑑𝑒 + 𝐺𝑒𝑞𝑢𝑖𝑝𝑚𝑒𝑛𝑡 + 𝐺𝑃𝐿
3
𝐺𝑏𝑎𝑙𝑙𝑎𝑠𝑡 = 10% 𝑃𝐿 (ton)
∆ = ∇𝑡𝑜𝑡𝑎𝑙 𝑥 𝛾𝑐
𝐹𝐶𝑊 = 𝐺𝑏𝑎𝑙𝑙𝑎𝑠𝑡
∑𝑀 = 0
𝐹. 𝑎 − 𝐺𝑏𝑎𝑙𝑙𝑎𝑠𝑡 . 𝑏 = 0
𝐹 .𝑎
𝐺𝑏𝑎𝑙𝑙𝑎𝑠𝑡 =
𝑏
𝑇𝑏𝑎𝑙𝑙𝑎𝑠𝑡 𝑇𝑡𝑜𝑝𝑠𝑖𝑑𝑒 𝑇𝑐𝑟𝑜𝑤𝑛
𝐽𝑎𝑟𝑎𝑘 𝑡𝑖𝑡𝑖𝑘 𝐵𝑒𝑟𝑎𝑡 = + +
2 2 3
∑ 𝐴𝑛 𝑖𝑛
𝐶𝑂𝐺 =
∑ 𝐴𝑛
∑𝑀
𝐶𝑂𝐺 =
∑𝐴
𝐿𝑢𝑎𝑠 𝑃𝑒𝑛𝑎𝑚𝑝𝑎𝑛𝑔 = 𝐴𝑏𝑎𝑙𝑙𝑎𝑠𝑡 + 𝐴𝑡𝑜𝑝𝑠𝑖𝑑𝑒 + 𝐴𝑐𝑟𝑜𝑤𝑛
̅̅̅̅ = 𝑀𝐺
𝑆𝑡𝑎𝑏𝑖𝑙𝑖𝑡𝑎𝑠 𝐵𝐿𝑃 =𝐺𝑍 ̅̅̅̅̅ 𝑠𝑖𝑛 𝜑
̅̅̅̅̅ 𝑠𝑖𝑛 𝜑 = 𝑀𝐾
𝑀𝐺 ̅̅̅̅ 𝑠𝑖𝑛 𝜑
̅̅̅̅̅ 𝑠𝑖𝑛 𝜑 − 𝐺𝐾
̅̅̅̅̅
𝑀𝐾 = ̅̅̅̅̅ ̅̅̅̅
𝑀𝐵 + 𝐵𝐾
̅̅̅̅̅ ̅̅̅̅) − ̅̅̅̅
̅̅̅̅̅ + 𝐵𝐾
𝑀𝐺 = (𝑀𝐵 𝐺𝐾
𝐼𝑡𝑜𝑡𝑎𝑙
̅̅̅̅̅
𝑀𝐵 =
∇
𝑆𝑡𝑎𝑏𝑖𝑙𝑖𝑡𝑎𝑠 = ∆ 𝑀𝐺 sin 𝜑 ≥ 𝑀𝑜𝑚𝑒𝑛𝑡 𝑃𝑒𝑛𝑔𝑔𝑎𝑛𝑔𝑔𝑢 (𝑀𝑝)
Rancangan :
DWT = PL + Consum + Crew + Acomm + Luggage
PL = 125000 (barrell) => (ton) dengan 1 barell = 159 liter.
PL = Kapasitas + Peralatan
Kapasitas = 125000 x 159 x 0,8 / 1000)
Peralatan = 50000 ton
PL = 65900 ton
Crew = 140 person x 75 / 1000
Crew = 10,5 ton
Consum = 140 person x 1 kg x 90 day / 1000
Consum = 12,6 ton
Acomm = 570 ton (CDB Corall Platform)
Luggage = 140 person x 20 kg / 1000
Luggage = 2,8 ton
DWT = 65900 + 10,5 + 12,6 + 570 + 2,8
DWT = 66495,9 ton
𝐷𝑊𝑇
Rules bangunan lepas pantai = 0,6 − 0,8
∆
3 ∆𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛
𝜆=√
∆𝑝𝑒𝑚𝑏𝑎𝑛𝑑𝑖𝑛𝑔
3 ∆𝑟𝑎𝑛𝑐𝑎𝑛𝑔𝑎𝑛
𝜆= √
∆𝑝𝑒𝑚𝑏𝑎𝑛𝑑𝑖𝑛𝑔
3 83119,375
𝜆= √
97500
𝜆 = 0,94
𝐾𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 = 0,083 𝑚3 /𝑠
𝑃 = 12 𝑏𝑎𝑟 = 1,2 𝑥 106 𝑃𝑎
Jumlah pompa pada Drilling Ship
𝑚3
𝐾𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 𝑑𝑟𝑖𝑙𝑙 0,1725 𝑠
= ≈ 2 𝑝𝑜𝑚𝑝𝑎
𝐾𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 𝑝𝑜𝑚𝑝𝑎 𝑚3
0,083 𝑠
Dibagi menjadi 2 sumur dengan 1 pompa cadangan setiap sumur sehingga dibutuhkan 4 pompa.
𝑃 (𝐷𝑎𝑦𝑎) = 𝑃𝑟𝑒𝑠𝑠𝑢𝑟𝑒 𝑥 𝑄(𝑓𝑙𝑜𝑤𝑟𝑎𝑡𝑒)
𝑆 = (1,025)(364,8)[(0,83)(67,2) + (1,7(19,2))]