Before Starting
Check to ensure that the kit you are going to use fits the cable.

Refer to the kit label and the title of the installation instruction.

Components or work steps may have been improved since you last installed this product.

Carefully read and follow the steps in the installation instruction.

om
General Instructions

.c
Use a propane (preferred) or butane gas torch.

Adjust the torch to obtain a soft blue flame with a yellow tip.

Pencil-like blue flames should be avoided.

ifa
Keep the torch aimed in the shrink direction to preheat the material.
fa
Keep the flame moving continuously to avoid scorching the material.

Clean and degrease all parts that will come into contact with adhesive.
ng

If a solvent is used follow the manufacturer's handling instructions.

Tubing should be cut smoothly with a sharp knife leaving no jagged edges.

Start shrinking the tubing at the position recommended in the instruction.


la

Ensure that the tubing is shrunk smoothly all round before continuing along the cable.
.k

Tubing should be smooth and wrinkle free with inner components clearly defined.
w
w
w

The information contained in these installation instructions is intended to describe the correct method of installation for this
product. However, Raychem has no control over the field conditions which influence product installation. It is the user's
responsibility to determine the suitability of the installation method in the user's field conditions.
Raychem's only obligations are those in Raychem's standard Conditions of Sale for this product and in no case will Raychem
be liable for any other incidental, indirect or consequential damages arising from the use or misuse of the products.

EPP 0275 8/92 P. 2/6


Cable Klangfaifa
PreparationRong-Ngan Tel: 02-994-4585-6 084-700-5991

,
,,,
A Cable with wire shield

Table 1
K
Max. system L L K
voltage indoor outdoor
[kV] [mm] [mm]
7,2 150 200 according
12/17.5 230 300 to depth of
24 270 350 connector barrel
36 370 500 hole + 5 mm

om
Clean 100

.c
A1 2017/1

Cut the cable to the required length.

ifa
Remove the oversheath to the
dimension L + K (Table 1). Clean and
degrease the end of the oversheath
for about 100 mm.
fa
ng

Wrap one layer of sealant tape (red) Thoroughly remove the core screen to Remove the release paper and wrap
with a small overlap and slight tension within 40 mm of the oversheath cut. the void filling strip (yellow) around the
around the end of the oversheath for The surface of the insulation should end of the core screen.
60 mm. be free from all traces of conductive Cover 20 mm of the core screen and
Bend the shielding wires back onto material. continue onto the insulation for
la

the oversheath. Avoid crossing the Smooth out any irregularities. 10 mm.
individual wires. Fix the wires with a Note: Do not nick the insulation. Stretch the strip to half of its original
wire binder 60 mm from the end of the width to achieve a fine, thin edge onto
.k

oversheath. Gather the shielding the insulation.


wires together to form an earth lead.
w

A2 A3 A4
60
w

10

20
w

60
40

1042/1 1046 1057/1

EPP 0275 8/92 P. 3/6


,
Klangfaifa Rong-Ngan Tel: 02-994-4585-6 084-700-5991

B Cable with metal tape shield

Table 2
Max. system
voltage
L
indoor
L
outdoor
K
,, K

[kV] [mm] [mm]


7,2 150 200 according
12/17.5 230 300 to depth of
24 270 350 connector barrel
36 370 500 hole + 5 mm
L

om
20

Clean 100

.c
B1 1069/2

Cut the cable to the required length.

ifa
Remove the oversheath to the
dimension L + K (Table 2). Clean
and degrease the end of the
oversheath for about 100 mm.
Remove the metal tape shield to
fa
within 20 mm of the oversheath cut.
ng

Wrap one layer of sealant tape (red) Thoroughly remove the core screen to Remove the releae paper and wrap
with a small overlap and slight tension within 40 mm of the oversheath cut. the void filling strip (yellow) around the
round the end of the oversheath for The surface of the insulation should end of the tape shield. Cover 5 mm of
60 mm. Bind and solder tack an earth be free from all traces of conductive the tape shield and continue along the
lead to the metal tape shield (or attach material.
la

core screen onto the insulation for


the earth lead by any other equivalent Smooth out any irregularities. 10 mm. Stretch the strip to half of its
method). Fill the earth lead with Note: Do not nick the insulation. original width to achieve a fine, thin
solder to form a 30 mm moisture block edge onto the insulation.
.k

20 mm from the oversheath end.


Fix the earth braid with a second wire
binder 60 mm from the end of the
oversheath.
w

B2 B3 B4
60 10
w

20
w

, ,
5
,,
,,,

60 30 40

1071/1 2003/1 1070

EPP 0275 8/92 P. 4/6


Klangfaifa Rong-Ngan Tel: 02-994-4585-6 084-700-5991
Completion of Termination

om
.c
5 2010/2 6 2132/1 7 1047/3

Place the stress control tubing (black) Cut back the insulation according to Wrap the red sealant tape around the

ifa
over the core and position it so that it dimension K = depth of cable lug barrel of the cable lug.
is level with the oversheath cut. barrel hole + 5 mm. Stretch the tape to half of its width and
Shrink the tubing down starting at the Install the cable lug. apply with half overlap.
bottom and working towards the core Clean and degrease the insulation Note: Use the remaining sealant (red)
end. and the lug. to fill any remaining gap between the
fa
core insulation and the cable lug.
ng

Remove the release paper from the Cut the tubing back onto the cable lug For indoor terminations above 17.5 kV
tubing (red). barrel if necessary. and all outdoor terminations shrink the
Place the tubing with the sealant Note: For cross sections above skirts into place at the positions shown
coated end downwards over the core, 120mm2. Postheat the palm of the in the drawing on the next page.
la

level with the wire binder. cable lug until a bead of sealant
Shrink the tubing down starting at the appears around the top of the tubing.
oversheath end, working towards the Indoor termination up to 17.5 kV
.k

cable lug. completed.


Allow the termination to cool before
applying any mechanical strain.
w

8 9 10
1
w
w

1050/2 1052/5 1053/1

EPP 0275 8/92 P. 5/6


Klangfaifa Rong-Ngan Tel: 02-994-4585-6 084-700-5991

om
.c
fa
ai
ngf
la
.k
w
w
w

You might also like