Enter Your House Built Up Area in Sq ft in Red

Enter Your S.No.


S. Percentage For a 1000 sq ft
No.
Item of work
of total work house House Area
in
Sq ft
Construction
Rate per Sq ft
800 1,000 2,000

1 Excavation in 3% 24,000 48,000 1


2 ordinary
Foundation soil and 5% 40,000 80,000 2
3 Construction upto 5% 40,000 80,000 3
4 plinth
Superstructure in 25% 200,000 400,000 4
5 brickwork
Roofing including 17% 136,000 272,000 5
6 waterproofing
Flooring 6% 48,000 96,000 6
7 Wood work i.e. 13% 104,000 208,000 7
8 Joinery,
Internal doors and
finishes 6% 48,000 96,000
9 External finishes 3% 24,000 48,000
10 Water supply 4% 32,000 64,000
11 Sanitary work 8% 64,000 128,000
12 Electrification 5% 40,000 80,000
13 Total 100% 800,000 1,600,000
rea in Sq ft in Red Color Cell
Approx Approx
Requirement Unit of
Quantity Qyt for Qyt for
of Materia measurement
sq ft sq ft

Area of Construction in Sq ft 1000 2,000

Cement Bags/sqft 0.4 400 800


Sand (cu ft) Cut/sqft 1.81 1,810 3,620
Aggregate (cu
Cut/sqft 1.14 1140 2280
ft)
Bricks Nos/Sqft 34 34000 68000
Size Stone Nos/Sq ft 11 11000 22000
Steel Kg/Sqft 2.1 2100 4200
Wood CuF/Sqft 0.077 77 154