BID DOCUMENTS
Item B. WIRING LAYOUT FROM PC2 LVSG TO YA CE DISTRIBUTION PANEL 460V (See attached Drawings/Diagram)
Supply and installation of Cold-End Distribution panel, power cables, cable tray, conduits, fittings, supports and bracket from PC2 to YA CE
VENTILATION DISTRIBUTION PANEL.
Specifications :
1. Distribution Panel Board: NEMA 12, Free Standing, Metal sheet enclosure gage#14 – 1 unit
2. For Circuit Breakers:
Main CB rating: 1200AT/1200AF, 65KAIC,3P,460V,60Hz – 1 unit
Branch CB rating: 300AT/400AF,50KAIC,3P,460V,60Hz – 2 units
Branch CB rating : 400AT/400AT,50KAIC,3P,460V,60Hz – 2 units
3. Cable tray, Ladder type w/cover, GI gauge #14 - 16 lnghts
Dim : 400mm X 150mm X 2400mm
Hot dipped Galvanized , with expanded metal wire mesh at the bottom
4. USE FEEDER SIZE:
4.01 3 sets of 3x1C-185 mm sq. PVC Insulated Wire, approved SMC standard - 1494 mtrs
4.02 1C-95 mm sq. PVC Insulated Wire, approved SMC standard - 166 mtrs
4.03 Support /bracket, fittings and connector - 1 lot
Item C. WIRING LAYOUT FROM YA CE VENTILATION DISTRIBUTION PANEL TO CE BLOWER RM PANEL (EXISTING) 460V
(See attached Drawings/Diagram)
Supply and installation of power cables, cable tray, conduits, fittings, supports and bracket from YA CE VENTILATION DISTRIBUTION PANEL
to CE BLOWER RM PANEL
Specifications :
1.0 Cable tray, Ladder type w/cover, GI gauge #14 – 30 lngths
Dim : 400mm X 150mm X 2400mm
Hot dipped Galvanized ,with expanded metal wire mesh at the bottom
1.01 Support /bracket, fittings and connector - 1 lot
Item D. WIRING LAYOUT FROM YA CE VENTILATION DISTRIBUTION PANEL TO CE BLOWER RM PANEL (ADDITIONAL) 460V
(See attached Drawings/Diagram)
Supply and installation of power cables, cable tray, conduits, fittings, supports and bracket from YA CE VENTILATION DISTRIBUTION PANEL
to ADDITIONAL CE BLOWER RM PANEL
Specifications :
1.0 Cable tray, Ladder type w/cover, GI gauge #14 - 62 lnghts
Item E. WIRING LAYOUT FROM YA CE VENTILATION DISTRIBUTION PANEL TO EXHAUST BLOWER PANEL 1 460V
(See attached Drawings/Diagram)
Supply and installation of power cables, cable tray, conduits, fittings, supports and bracket from YA CE VENTILATION DISTRIBUTION PANEL
to EXHAUST BLOWER PANEL 1
Specifications :
1.0 Cable tray, Ladder type w/cover, GI gauge #14 - 8 lnghts
Dim : 400mm X 150mm X 2400mm
Hot dipped Galvanized ,with expanded metal wire mesh at the bottom
1.01 Support /bracket, fittings and connector -1lot
2.0 USE FEEDER SIZE:
2.01 3x1C-120 mm sq. PVC Insulated Wire, approved SMC standard - 45 mtrs
2.02 1C-50 mm sq. PVC Insulated Wire, approved SMC standard - 15 mtrs.
Item F. WIRING LAYOUT FROM YA CE VENTILATION DISTRIBUTION PANEL TO EXHAUST BLOWER PANEL 2 460V
(See attached Drawings/Diagram)
Supply and installation of power cables, cable tray, conduits, fittings, supports and bracket from YA CE VENTILATION DISTRIBUTION PANEL
to EXHAUST BLOWER PANEL 2
Specifications :
1.0 Cable tray, Ladder type w/cover, GI gauge #14 – 8 lnghts
Dim : 400mm X 150mm X 2400mm
Hot dipped Galvanized ,with expanded metal wire mesh at the bottom
1.01 Support /bracket, fittings and connector -1lot
2.0 USE FEEDER SIZE:
2.01 3x1C-120 mm sq. PVC Insulated Wire, approved SMC standard - 45 mtrs
2.02 1C-50 mm sq. PVC Insulated Wire, approved SMC standard – 15 mtrs
Item I. Contractor shall submit all manuals, drawings/As-built plan as work constructed prior to
applying for a Completion Certificate.
NOTE: There should be a full time, competent Licensed Electrical Engineer or Supervisor assigned in this particular project.
PROJECT SCHEDULE
Start:
Duration: 90 days
1. The contractor must provide a Licensed Electrical Engineer or Supervisor to manage the electrical task for this particular project.
2. The contractor’s Electrical Engineer will directly coordinate with the assigned end user in the implementation of this project.
3. The contractor’s Electrical Engineer will supervise his people to the mobilization, installation, implementation, testing and the final commissioning of
each project.
5. Contractor should submit detailed work schedule in the form of Bar Graph (Gantt Chart) indicating weekly and monthly projected percentage of
accomplishments
7. Contractor should submit detailed Weekly and Monthly Material Delivery Schedule
8. Contractor will be responsible for handling, safekeeping and storage of their equipment, tools and materials.
9. Contractor shall be responsible for the prompt removal of rubbish, disused shoring & etc. during the progress of works.
10. Any person found pilfering, destroying, stealing any of SMYAC’s property shall be turned over to Security Office and contractor will be penalized
accordingly.
11. Contractor will be penalized accordingly, for every calendar day delay of the project.
12. Contractor shall work 24 hours, if necessary to complete the works within the specified period . All Works shall be subject to SMYAC rules covering
security and safety.
13. Contractors shall provide SMYAC with all necessary drawings, operating/maintenance manuals, brochures, charts & etc. that contain information
vital for the operation and maintenance.
NOTE TO BIDDERS
2. Bidders should offer electrical brands and products (wires, breakers, pipes, utilities, etc.) approved by the San Miguel Corp.
1. The contractor shall be involved until the final commissioning of the project.
2. Electrical Works Labor/Services and Delivered equipment/products Warranty provision: One year warranty
3. Acceptance of work shall be certified by SMYAC