Professional Documents
Culture Documents
Create a production order. (considering a material which do not have any valid routing)
After maintaining required details for order header, system asks you to maintain “ref. operation set” or
“change selection”
Selecting reference operation set button gives following window, where users can maintain already
created Group for reference operation set.
Selecting change selection button gives following window where users can select correct explosion date
of the routing of the material selected.
If routing / reference operation set is not selected, system will not allow order creation and exit the
transaction.
Please check the working of system and update if we can move this change to production client.