Professional Documents
Culture Documents
inShare
Tweet
How do we do?
To create finished products you must enter a Reference Material in the system. From this, the
system copies the material master data. The reference material must have the same base unit of
measure and master grid as the Configurable Material.
These are the ways to call this function:
You can call the FERT generator directly when creating or changing a sales order.
You can call the FERT generator manually from the SAP application menu under Logistics ->
Sales and Distribution -> AFS Variant Configuration -> Call FERT Generator.
Using a T-Code : /N/AFS/FGEN
How it Works?
As soon as you have valuated a material using the configuration, the system checks whether
there is already a finished product for this valuation. If not, the system automatically calls the FERT
generator. The FERT generator creates the finished product. The following are assigned to the finished
product:
User Exits :
User Exit J_4AVFGN
As part of the FERT generator functions, the AFS System provides a user exit J_4AVFGN. You can use it
to meet the requirements of your specific business processes. The system executes the user exit after the
FERT generator has created the new finished product and assigned it the configured BOM and routing.
Pricing
When creating the new finished product via the FERT generator, the system cannot copy price conditions
from the reference material or the configurable material.
There are two ways of having the system automatically create price conditions for the new finished
product, however:
You can use user exit J_4AVFGN to create your own condition records for your new finished products.
You can store a price material for the reference material in the master data view of the sales org 2.
When copying the master data of the reference material to the new finished product, the system can also
copy this price material. If you created conditions for this price material, the new finished material gets the
same conditions.