Project Information:
Project Name: Tandur Project
Customer Name: Winsol Solar Field (Polepally ) Pvt. ltd
Peak Capacity: 61.38MWp
Reporting:
Raghavendra
Weather Report
Cloudy and raining happen afternoon
Today’s Activity:
Block#22: No drilling
due to pliable soil
condition
7 Boundary Wall DMSS/V 9.50 KM pole casting done. And 8.72 @22&21 Stopped as soil
eer panel done boundary condition is not
tejajee Block#21&22: 554 mts pole casting favourable for drilling
comp.
Decent
Surya 4 1
Bharat Singh 0 0
DMSS 63 6
Appoline
D K Electricals 9 1
Veer teja 0 3
Jeff 0 0
Decent 0
Photonz 0 6
KLR/Kandu 0 0
Teja cons 0 21
Ashok 0 0
Machinery used at site: