JRTPIC-FP-002 Rev.

CONTRACTOR INSPECTION CHECKLIST CHECKLIST NUMBER DATE APPROVED QR NUMBER

Fireproofing Material Receiving, Storage and Preservation


JRTPIC-FP-002 CIVIL
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Jazan Refinery & Terminal Project EPC-12 10-01055/0012 JGC-DEC


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

CONTRACTOR ITP NUMBER CONTRACTOR ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Material Receiving, Storage and Preservation Inspection

Proprietary FP system (Materials) was approved by Chief Fire


SAES-B-006,
Prevention Engineer:
A1 Para. 8.2.1
A) Qualifying documentation of fireproofing material was submitted
to Chief Fire Prevention Engineer for approval. (letter of approval)

Fireproofing materials desription conformed with the Manufacturer's data Manufacturer's


A2
sheets Technical Data

Material Data Sheet is available and checked regarding requirements:


SAES-B-006,
A) Ambients temperature, storage temperature are correct.
A3 Para. 8.2.3
B) Material storage, handling and preservation instructions are
available.

1. For Equipment (vessel skirts) - Galvanised welded wire mesh 50mm x


50mm with a wire diameter of 1.6mm.
2. For Structural Steel members (Columns, Beams, Bracing etc.) –
Manufacturer's
Galvanized welded wire mesh 50mm x 50mm with wire diameter of
A4 Recommendatio
1.4mm to 1.6mm
n
3. Galvanized tie wires - 1.2mm diameter
4. CD weld pins, 3mm dia. x 12-17mm
(structural steel members)

Top Coating paints are stored in well-ventilated buildings at storage SAES-H-001,


A5
temperatures as recommended in the Manufacturer's data sheet Para. 6.2

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-B-006 - Fireproofing for Plants
2- SAES-H-001 - Coating Selection and Application Requirements for Industrial Plants and Equipment
3-Manufacturer's Technical Data

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Rec. Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Perform Inspection Work / Rework May Proceed T&I Witnessed QC Rec. Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

Page 1 of 1
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Rec. Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1