Professional Documents
Culture Documents
October 8, 2016
EXECUTIVE SUMMARIES
Highlights of Inspection
Conclusions
1. FRP CAN of HWP-2A is still feasible for operation until next Shut Down Turn
Around (SDTA) or at least 4 years. Further estimation of remaining service life will
be reported in the final report
2. It is advised to conduct minor touch-up on surface delamination in baffle and local
surface mark at the wall of FRP CAN of HWP-2A (low risk area)
INSPECTION METHOD
Several minor findings were observed at low risk area (around 2 m elevation from the bottom
of FRP CAN of HWP-2A)
a. Some surface delamination of FRP in corner part of baffle at the bottom of FRP CAN
of HWP-2A (Fig. 1).
Figure 1. Surface delamination was observed in baffle at the bottom of FRP CAN of HWP-2A.
Figure 2. Local surface mark was observed. Minor touch-up using resin and chopped fiber is advised.
Figure 3. Non-flat surface was occurred in low risk area. No action is needed
Figure 6. Representative UT results at low risk area at various elevation and section (a and b) and high
risk area (c)