Professional Documents
Culture Documents
Calculo Hvac Hosp. Andahuaylas
Calculo Hvac Hosp. Andahuaylas
Hospital De Andahuaylas
Prepared By:
Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0.350 No Yes
Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0.350 D
Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.350 1 33
Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 0.900 0.700 1 0.700
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 4
Check Figures
Total Building Supply Air (based on a 19° TD): 38,911 CFM
Total Building Vent. Air (85.87% of Supply): 33,413 CFM
Total Conditioned Air Space: 16,297 Sq.ft
Supply Air Per Unit Area: 2.3876 CFM/Sq.ft
Area Per Cooling Capacity: 140.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0071 Tons/Sq.ft
Heating Capacity Per Area: 91.09 Btuh/Sq.ft
Total Heating Required With Outside Air: 1,484,495 Btuh
Total Cooling Required With Outside Air: 115.68 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 5
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,004 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,004 CFM
Total Conditioned Air Space: 288 Sq.ft
Supply Air Per Unit Area: 3.4852 CFM/Sq.ft
Area Per Cooling Capacity: 85.2 Sq.ft/Ton
Cooling Capacity Per Area: 0.0117 Tons/Sq.ft
Heating Capacity Per Area: 139.10 Btuh/Sq.ft
Total Heating Required With Outside Air: 40,058 Btuh
Total Cooling Required With Outside Air: 3.38 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 7
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,038 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,038 CFM
Total Conditioned Air Space: 304 Sq.ft
Supply Air Per Unit Area: 3.4127 CFM/Sq.ft
Area Per Cooling Capacity: 87.1 Sq.ft/Ton
Cooling Capacity Per Area: 0.0115 Tons/Sq.ft
Heating Capacity Per Area: 137.26 Btuh/Sq.ft
Total Heating Required With Outside Air: 41,767 Btuh
Total Cooling Required With Outside Air: 3.49 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 9
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,158 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,158 CFM
Total Conditioned Air Space: 356 Sq.ft
Supply Air Per Unit Area: 3.2514 CFM/Sq.ft
Area Per Cooling Capacity: 91.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0109 Tons/Sq.ft
Heating Capacity Per Area: 130.56 Btuh/Sq.ft
Total Heating Required With Outside Air: 46,484 Btuh
Total Cooling Required With Outside Air: 3.87 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 11
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,158 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,158 CFM
Total Conditioned Air Space: 356 Sq.ft
Supply Air Per Unit Area: 3.2514 CFM/Sq.ft
Area Per Cooling Capacity: 91.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0109 Tons/Sq.ft
Heating Capacity Per Area: 130.56 Btuh/Sq.ft
Total Heating Required With Outside Air: 46,484 Btuh
Total Cooling Required With Outside Air: 3.87 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 13
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,158 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,158 CFM
Total Conditioned Air Space: 356 Sq.ft
Supply Air Per Unit Area: 3.2514 CFM/Sq.ft
Area Per Cooling Capacity: 91.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0109 Tons/Sq.ft
Heating Capacity Per Area: 130.56 Btuh/Sq.ft
Total Heating Required With Outside Air: 46,484 Btuh
Total Cooling Required With Outside Air: 3.87 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 15
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,135 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,135 CFM
Total Conditioned Air Space: 335 Sq.ft
Supply Air Per Unit Area: 3.3854 CFM/Sq.ft
Area Per Cooling Capacity: 88.2 Sq.ft/Ton
Cooling Capacity Per Area: 0.0113 Tons/Sq.ft
Heating Capacity Per Area: 134.66 Btuh/Sq.ft
Total Heating Required With Outside Air: 45,156 Btuh
Total Cooling Required With Outside Air: 3.80 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 17
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,837 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,837 CFM
Total Conditioned Air Space: 2,086 Sq.ft
Supply Air Per Unit Area: 1.8390 CFM/Sq.ft
Area Per Cooling Capacity: 164.2 Sq.ft/Ton
Cooling Capacity Per Area: 0.0061 Tons/Sq.ft
Heating Capacity Per Area: 82.84 Btuh/Sq.ft
Total Heating Required With Outside Air: 172,833 Btuh
Total Cooling Required With Outside Air: 12.71 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 19
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,824 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,824 CFM
Total Conditioned Air Space: 979 Sq.ft
Supply Air Per Unit Area: 2.8835 CFM/Sq.ft
Area Per Cooling Capacity: 104.4 Sq.ft/Ton
Cooling Capacity Per Area: 0.0096 Tons/Sq.ft
Heating Capacity Per Area: 114.48 Btuh/Sq.ft
Total Heating Required With Outside Air: 112,117 Btuh
Total Cooling Required With Outside Air: 9.38 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 21
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,499 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,499 CFM
Total Conditioned Air Space: 617 Sq.ft
Supply Air Per Unit Area: 2.4303 CFM/Sq.ft
Area Per Cooling Capacity: 126.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0079 Tons/Sq.ft
Heating Capacity Per Area: 107.83 Btuh/Sq.ft
Total Heating Required With Outside Air: 66,494 Btuh
Total Cooling Required With Outside Air: 4.86 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 23
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,621 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,621 CFM
Total Conditioned Air Space: 1,261 Sq.ft
Supply Air Per Unit Area: 2.0789 CFM/Sq.ft
Area Per Cooling Capacity: 147.7 Sq.ft/Ton
Cooling Capacity Per Area: 0.0068 Tons/Sq.ft
Heating Capacity Per Area: 95.39 Btuh/Sq.ft
Total Heating Required With Outside Air: 120,249 Btuh
Total Cooling Required With Outside Air: 8.53 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 25
4p_UCI NEONATAL
939 43,083 30,779 2,640 None None
12 (7 CAMAS)
12 2,115 2,089 0 0 0
3pm October
8,447 2.25 2.23 0 2,115 2,089
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,451 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,451 CFM
Total Conditioned Air Space: 1,048 Sq.ft
Supply Air Per Unit Area: 2.3394 CFM/Sq.ft
Area Per Cooling Capacity: 129.8 Sq.ft/Ton
Cooling Capacity Per Area: 0.0077 Tons/Sq.ft
Heating Capacity Per Area: 105.68 Btuh/Sq.ft
Total Heating Required With Outside Air: 110,709 Btuh
Total Cooling Required With Outside Air: 8.07 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 27
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,915 CFM
Total Air Handler Vent. Air (25.63% of Supply): 491 CFM
Total Conditioned Air Space: 545 Sq.ft
Supply Air Per Unit Area: 3.5121 CFM/Sq.ft
Area Per Cooling Capacity: 160.7 Sq.ft/Ton
Cooling Capacity Per Area: 0.0062 Tons/Sq.ft
Heating Capacity Per Area: 44.02 Btuh/Sq.ft
Total Heating Required With Outside Air: 24,007 Btuh
Total Cooling Required With Outside Air: 3.39 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 29
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,694 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,694 CFM
Total Conditioned Air Space: 479 Sq.ft
Supply Air Per Unit Area: 3.5350 CFM/Sq.ft
Area Per Cooling Capacity: 85.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0116 Tons/Sq.ft
Heating Capacity Per Area: 136.56 Btuh/Sq.ft
Total Heating Required With Outside Air: 65,428 Btuh
Total Cooling Required With Outside Air: 5.58 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 31
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,721 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,721 CFM
Total Conditioned Air Space: 1,542 Sq.ft
Supply Air Per Unit Area: 1.7650 CFM/Sq.ft
Area Per Cooling Capacity: 170.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0059 Tons/Sq.ft
Heating Capacity Per Area: 84.85 Btuh/Sq.ft
Total Heating Required With Outside Air: 130,803 Btuh
Total Cooling Required With Outside Air: 9.02 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 33
2P_LAB. PATOL.
163 10,926 9,763 660 None 100%
18 MOLEC.
3 594 560 0 0 0
7am December
1,468 3.64 3.43 0 594 560
2p_LABORAT.
264 14,062 11,798 880 None 100%
19 HISTOPAT.
4 764 676 0 0 0
4pm October
2,377 2.89 2.56 0 764 676
2p_TRABAJO
154 9,017 9,042 660 None 100%
21 MICROSC
3 490 518 0 0 0
3pm October
1,382 3.19 3.38 0 490 518
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2,847 CFM
Total Air Handler Vent. Air (100.00% of Supply): 2,847 CFM
Total Conditioned Air Space: 895 Sq.ft
Supply Air Per Unit Area: 3.1804 CFM/Sq.ft
Area Per Cooling Capacity: 94.0 Sq.ft/Ton
Cooling Capacity Per Area: 0.0106 Tons/Sq.ft
Heating Capacity Per Area: 137.39 Btuh/Sq.ft
Total Heating Required With Outside Air: 123,004 Btuh
Total Cooling Required With Outside Air: 9.52 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 35
2p_LABORATORIO
311 11,883 9,389 880 None None
23 INMUNOLOGÍA
4 613 639 0 0 0
3pm October
2,795 1.97 2.06 0 613 639
2p_LABORATORIO
503 21,826 14,386 1,100 None None
25 BIOQUÍMICA
5 1,125 980 0 0 0
3pm October
4,527 2.24 1.95 0 1,125 980
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,039 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,039 CFM
Total Conditioned Air Space: 1,393 Sq.ft
Supply Air Per Unit Area: 2.1815 CFM/Sq.ft
Area Per Cooling Capacity: 139.7 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft
Heating Capacity Per Area: 96.41 Btuh/Sq.ft
Total Heating Required With Outside Air: 134,303 Btuh
Total Cooling Required With Outside Air: 9.97 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 37
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,221 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,221 CFM
Total Conditioned Air Space: 564 Sq.ft
Supply Air Per Unit Area: 2.1670 CFM/Sq.ft
Area Per Cooling Capacity: 139.1 Sq.ft/Ton
Cooling Capacity Per Area: 0.0072 Tons/Sq.ft
Heating Capacity Per Area: 102.67 Btuh/Sq.ft
Total Heating Required With Outside Air: 57,872 Btuh
Total Cooling Required With Outside Air: 4.05 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Hospital De Andahuaylas
Hell Page 39
1p_OBSERV.
857 32,815 25,635 1,980 None 3.5/Hr
30 MUJERES
9 1,831 1,752 0 0 450
5pm December
7,710 2.14 2.04 0 0 476
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 5,593 CFM
Total Air Handler Vent. Air (27.16% of Supply): 1,519 CFM
Total Conditioned Air Space: 2,893 Sq.ft
Supply Air Per Unit Area: 1.9331 CFM/Sq.ft
Area Per Cooling Capacity: 279.6 Sq.ft/Ton
Cooling Capacity Per Area: 0.0036 Tons/Sq.ft
Heating Capacity Per Area: 34.65 Btuh/Sq.ft
Total Heating Required With Outside Air: 100,245 Btuh
Total Cooling Required With Outside Air: 10.35 Tons