There is a need to use the available There are occasions when last minute
resources effectively. It is helpful in prioritization of existing orders due to
bringing down various costs of external pressure takes place. These changes
production. in priority are often decided by sufficiently
high level of management.
g) Timely Delivered
If there is good production planning and h) Design Changes
control, there will be timely production and Design changes are issued by R & D and the
the finished product will be rushed to the engineering department. This will necessarily
market in time. This also ensures the better force production planning control change the
relationship with the customers. input materials and process.
i) Rejection and Replacement
3. FACTORS AFFECTING PRODUCTION There are occasions when sub-assemblies or
finished goods are rejected during stage or
PLANNING AND CONTROL
final inspection. Production planning and
control must cater for contingent plans to
a) Use of Computers take care of rework without affecting
Modern factories are using office automation scheduled quality.
equipment like PC, punch cards etc. It helps
accurate computation of required of men and
4. FUNCTIONS OF PRODUCTION PLANNING
machine.
AND CONTROL
b) Seasonal Variations
Demand of certain products is affected by
Production Planning Functions:-
seasons, for instance umbrellas and raincoats
during the monsoons and outputs. Production
planning and control must take such changes a) Estimating
into consideration while planning and control Estimating involves deciding the quantity of
activities of inputs and outputs. products to be produced and cost involved in
it on the basis of sales forecast. Estimating
c) Test Marketing
manpower, machine capacity and materials
In an aggressive marketing strategy new
required to meet the planned production
products are to be test marketed in order targets are the key activities before budgeting
to know the trends. This is a short- cycle for resources.
operation, intermittent in nature and often b) Routing
upsets regular production. Routing means, determination of path or
d) After Sales Service route on which manufacturing operations will
This has become an important parameter for travel, establishing the sequence of
success. In after sales services, many items operations to be followed in manufacturing a
are returned for repair. These are unscheduled particular product. This route path is
work and also overload the production line. determined in advance. Routing information
e) Losses due to Unpredictable Factors is provided by product or process engineering
Losses occur due to accidents, fire and theft function and it is useful to prepare machine
of production inputs, mainly materials and loading charts and schedules.
components. These are unpredictable. c) Scheduling
Shortage of input due to such factors upset Scheduling involves fixing priorities for each
the planned production schedule in time and job and determines the starting time and
quantity. finishing time for each operation, the starting
f) Losses due to Predictable Factors dates and finishing dates for each part, sub
There are losses of inputs, due to natural d assembly and final assembly. Scheduling
engineering phenomena like production lays down a time table for production,
losses and changes in consumption of indicating the total time required for the
materials and occurrence of defectives. manufacture of a product and also the time
g) Production of Order required for carrying out the operation for
each part on each machine or equipment.
www.ijsret.org
International Journal of Scientific Research Engineering & Technology (IJSRET), ISSN 2278 – 0882
321
Volume 3, Issue 3, June 2014
5. CONCLUSION