PEKERJAAN TIMBUNAN DAN GAL

Rata-Rata
NO STA Timbunan Galian
Timbunan
1 1 + 550.0
0.000
2 1 + 600.0 1.697
0.849
3 1 + 650.0 21.193
0.000
4 1 + 700.0 2.597
0.000
5 1 + 750.0 13.710
0.261
6 1 + 800.0 0.522 0.873
0.261
7 1 + 850.0 17.971
0.000
8 1 + 900.0 16.083
0.000
9 1 + 950.0 13.372
0.000
10 2 + 0.0 20.110
0.000
11 2 + 50.0

TOTAL

VOLUME JALAN

Panjang volume total vol


No Lapisan
(m) (m)3 (m)3
1 Sub Base 500 1.156 580 10.35
2 Base A 500 0.5792 289.6 7.7

lapon Sub Base cm pada daerah pelebaran kiri kanan sj = 1m x 2 (kika) =

No Lapisan Panjang Lebar Volume


(M) (M) (M)2
1 Lapis Resa 500 3.54 1770
0.66
Untuk 1 Liter Lapis Resap Pengikat 0,66 =
1168.2
2 Laston Lapis Aus (AC-WC) (gradasi halus/kasar)
500 3.54 1770
BUNAN DAN GALIAN

Rata-Rata
Jarak V. Timbunan V. Galian NO
Galian
1
0.000 50 0.000 0.000
2
10.597 50 42.428 529.835
3
11.895 50 0.000 594.768
4
8.154 50 0.000 407.683
5
7.291 50 13.058 364.570
6
9.422 50 13.058 471.093
7
17.027 50 0.000 851.350
8
14.728 50 0.000 736.385
9
16.741 50 0.000 837.063
10
10.055 50 0.000 502.755
11

500 68.543 5295.500 TOTAL

2 5.175
3.85
7.08 3.54

kanan sj = 1m x 2 (kika) = 2 m
PEKERJAAN DRAINASE

Rata-Rata
Rata-Rata
STA Mortar Galian Jarak V. Mortar
Mortal Galian
1 + 550.0
0.000 0.000 50 0.000
1 + 600.0
0.000 0.250 50 0.000
1 + 650.0 0.500
0.180 0.500 50 9.000
1 + 700.0 0.360 0.500
0.360 0.500 50 18.000
1 + 750.0 0.360 0.500
0.360 0.375 50 18.000
1 + 800.0 0.360 0.250
0.360 0.375 50 18.000
1 + 850.0 0.360 0.500
0.180 0.500 50 9.000
1 + 900.0 0.500
0.000 0.500 50 0.000
1 + 950.0 0.500
0.000 0.500 50 0.000
2 + 0.0 0.500
0.000 0.375 50 0.000
2 + 50.0 0.250

500 72.000
V. Galian

0.000

12.500

25.000

25.000

18.750

18.750

25.000

25.000

25.000

18.750

193.750
PEKERJAAN DRAINASE

Rata-Rata
NO STA Mortar Galian
Mortal
1 1 + 550.0
0.000
2 1 + 600.0
0.000
3 1 + 650.0 0.500
0.180
4 1 + 700.0 0.360 0.500
0.360
5 1 + 750.0 0.360 0.500
0.360
6 1 + 800.0 0.360 0.250
0.360
7 1 + 850.0 0.360 0.500
0.180
8 1 + 900.0 0.500
0.000
9 1 + 950.0 0.500
0.000
10 2 + 0.0 0.500
0.000
11 2 + 50.0 0.250

TOTAL
AN DRAINASE

Rata-Rata
Jarak V. Mortar V. Galian
Galian

0.000 50 0.000 0.000

0.250 50 0.000 12.500

0.500 50 9.000 25.000

0.500 50 18.000 25.000

0.375 50 18.000 18.750

0.375 50 18.000 18.750

0.500 50 9.000 25.000

0.500 50 0.000 25.000

0.500 50 0.000 25.000

0.375 50 0.000 18.750

500 72.000 193.750


VOLUME JALAN

Panjang volume total vol


No Lapisan
(m) (m)3 (m)3
1 Sub Base (Sirtu) 500 1.156 580 10.35 2
2 Base A 500 0.5792 289.6 7.7
7.08

lapon Sub Base cm pada daerah pelebaran kiri kanan sj = 1m

No Lapisan Panjang Lebar Volume


(M) (M) (M)2
1 Lapis Resap Pengikat 500 3.54 1770
0.66
Untuk 1 Liter Lapis Resap Pengikat 0,66 =
1168.2
2 Laston Lapis Aus (AC-WC) (gradasi halus/kasar)
500 3.54 1770
5.175
3.85
3.54

ah pelebaran kiri kanan sj = 1m x 2 (kika) = 2 m


ANALISA BIAYA S
INFLASI
1.459206
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI
ALAT ALAT ALAT JAM

UMUR KERJA HARGA


ALAT 1 TAHUN ALAT

(HP) - (Tahun) (Tahun) (Jam) (Rp.)


No. JENIS PERALATAN KODE
ALAT

HP Cp B A W B
1 2 2a 3 4 5 6 7 8

1. ASPHALT MIXING PLANT E01 150.0 60.0 T/Jam 4,894,833,567 10.0 1,500.0 4,894,833,567
2. ASPHALT FINISHER E02 50.0 10.0 Ton 3,442,777,676 6.0 2,000.0 3,442,777,676
3. ASPHALT SPRAYER E03 15.0 200.0 Liter 135,837,487 5.0 2,000.0 135,837,487
4 COMPRESSOR 4000-6500 L\M E05 80.0 - - 150,000,000 5.0 2,000.0 150,000,000
5 CONCRETE MIXER 0.3-0.6 M3 E06 15.0 350.0 Liter 15,000,000 4.0 2,000.0 15,000,000
6 DUMP TRUCK 3-4 M3 E08 100.0 5.0 Ton 502,754,835 5.0 2,000.0 502,754,835
7 EXCAVATOR 80-140 HP E10 80.0 1.0 M3 750,000,000 5.0 2,000.0 2,047,073,798
8 GENERATOR SET E12 175.0 20.0 KVA 323,199,537 5.0 2,000.0 323,199,537
9 MOTOR GRADER >100 HP E13 150.0 - - 2,489,684,350 5.0 2,000.0 2,489,684,350
10 WHEEL LOADER 1.0-1.6 M3 E15 105.0 1.5 M3 2,282,210,654 5.0 2,000.0 2,282,210,654
11 TANDEM ROLLER 6-8 T. E17 50.0 8.0 Ton 1,866,477,326 5.0 2,000.0 1,866,477,326
12 TIRE ROLLER 8-10 T. E18 60.0 10.0 Ton 1,200,000,000 5.0 1,800.0 1,200,000,000
13 VIBRATORY ROLLER 5-8 T. E19 75.0 6.0 Ton 1,434,549,249 4.0 2,000.0 1,434,549,249
14 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 300,000,000 5.0 2,000.0 300,000,000
KETERANGAN : 1. Tingkat Suku Bunga = 14.00
2. Upah Operator / Sopir / Mekanik = 17,607
3. Upah Pembantu Operator/Sopir/Mekanik = 19,886
4. Harga Bahan Bakar Bensin = 8,145
5. Harga Bahan Bakar Solar = 9,014
6. Minyak Pelumas = 25,010
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA
SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN

ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK


MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA
MODAL
(Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) - (Rp.)
f1 x HP x
i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.0625 (g1 x B') 0.125 (g1 x B')
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----- s/d -----------
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.0875 W 0.175 W
Harga Olie
C D e1 e2 E f1 f2 F g1 G g1 G
9 10 11 12 13 14 15 16 17 18 17 18

489,483,357 0.19171 563,043.52 6,526.44 569,569.97 0.1250 0.0100 4,749,583.50 0.0000 0.00 0.1250 407,902.80
344,277,768 0.25716 398,401.24 3,442.78 401,844.02 0.1250 0.0100 68,842.50 0.0000 0.00 0.1250 215,173.60
13,583,749 0.29128 17,805.25 135.84 17,941.09 0.1250 0.0100 20,652.75 0.0000 0.00 0.1250 8,489.84
15,000,000 0.29128 19,661.64 150.00 19,811.64 0.1250 0.0100 110,148.00 0.0000 0.00 0.1250 9,375.00
1,500,000 0.34320 2,316.63 15.00 2,331.63 0.1250 0.0100 20,652.75 0.0000 0.00 0.1250 937.50
50,275,484 0.29128 65,899.90 502.75 66,402.65 0.1250 0.0100 137,685.00 0.0000 0.00 0.1250 31,422.18
75,000,000 0.29128 287,216.32 2,047.07 289,263.40 0.1250 0.0100 110,148.00 0.0000 0.00 0.1250 127,942.11
32,319,954 0.29128 42,364.22 323.20 42,687.42 0.1250 0.0100 240,948.75 0.0000 0.00 0.1250 20,199.97
248,968,435 0.29128 326,341.84 2,489.68 328,831.52 0.1250 0.0100 206,527.50 0.0000 0.00 0.1250 155,605.27
228,221,065 0.29128 299,146.69 2,282.21 301,428.90 0.1250 0.0100 144,569.25 0.0000 0.00 0.1250 142,638.17
186,647,733 0.29128 244,653.36 1,866.48 246,519.84 0.1250 0.0100 68,842.50 0.0000 0.00 0.1250 116,654.83
120,000,000 0.29128 174,770.13 1,333.33 176,103.46 0.1250 0.0100 82,611.00 0.0000 0.00 0.1250 83,333.33
143,454,925 0.34320 221,554.87 1,434.55 222,989.42 0.1250 0.0100 103,263.75 0.0000 0.00 0.1250 89,659.33
30,000,000 0.29128 39,323.28 300.00 39,623.28 0.1250 0.0100 137,685.00 0.0000 0.00 0.1250 18,750.00
% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
a Pekerjaan
r : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
RJA TOTAL
UPAH TOTAL BIAYA

OPERATOR PEMBANTU BIAYA SEWA ALAT


/ SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA
(Rp.) (Rp.) (Rp.) (Rp.) KET.
1 Orang 1 Orang
Per Per
Jam Kerja Jam Kerja F+G+H+I E+J
= =
Rp17,607.1 Rp19,885.7
H I J K L
19 20 21 22 23

17,607.14 59,657.14 5,234,750.58 5,804,320.55 Alat baru


17,607.14 19,885.71 321,508.96 723,352.98 Alat baru
17,607.14 19,885.71 66,635.45 84,576.54 Alat baru
17,607.14 19,885.71 157,015.86 176,827.50 Alat baru
17,607.14 19,885.71 59,083.11 61,414.74 Alat baru
17,607.14 19,885.71 206,600.03 273,002.68 Alat baru
17,607.14 19,885.71 275,582.97 564,846.37 Alat baru
17,607.14 19,885.71 298,641.58 341,329.00 Alat baru
17,607.14 19,885.71 399,625.63 728,457.15 Alat baru
17,607.14 19,885.71 324,700.27 626,129.17 Alat baru
17,607.14 19,885.71 222,990.19 469,510.03 Alat baru
17,607.14 19,885.71 203,437.19 379,540.65 Alat baru
17,607.14 19,885.71 230,415.94 453,405.36 Alat baru
17,607.14 19,885.71 193,927.86 233,551.14 Alat baru
HARGA DASAR SATUAN UPAH

No. URAIAN KODE SATUAN

1. Pekerja (L01) Jam


2. Tukang (L02) Jam
3. Mandor (L03) Jam
4. Operator (L04) Jam
5. Pembantu Operator (L05) Jam
6. Sopir / Driver (L06) Jam
7. Pembantu Sopir / Driver (L07) Jam
8. Mekanik (L08) Jam
9. Pembantu Mekanik (L09) Jam
10. Kepala Tukang (L10) Jam

DAFTAR
HARGA DASAR SATUAN BAHAN

No. URAIAN KODE SATUAN

1 Aspal M10 KG
2 Kerosen / Minyak Tanah M11 LITER
3 Semen / PC (50kg) M12 Zak
4 Semen / PC (kg) M12 Kg
5 Bahan Agr.Base Kelas A M26 M3
6 Bahan Agr.Base Kelas B M27 M3
7 Agregat Pecah Mesin 0-5 M91 M3
8 Agregat Pecah Mesin 5-10 M92 M3
9 Bensin M20 Ltr
10 Solar M21 Ltr
11 Anti Stripping Agent M66 Ltr
AR SATUAN UPAH
HARGA
SATUAN KETERANGAN
( Rp.) 7 1.45

15,535.71 108,750.00 /hari


20,714.29 145,000.00 /hari
22,785.71 159,500.00 /hari
22,785.71 159,500.00 /hari
17,607.14 123,250.00 /hari
31,071.43 217,500.00 /hari
17,607.14 123,250.00 /hari
25,685.71 179,800.00 /hari
19,885.71 139,200.00 /hari
21,128.57 147,900.00 /hari

AFTAR
R SATUAN BAHAN
HARGA
SATUAN KETERANGAN
( Rp.)

15,881.85 Base Camp 1.45


13,332.75 Base Camp
102,243.85 Base Camp
2,965.07 Base Camp
356,888.66 Base Camp
293,251.87 Base Camp
37,700.00 Base Camp
28,275.00 Base Camp
8,145.00 Base Camp
9,014.00 Base Camp
41,180.00 Base Camp
Perhitungan Kebutuhan Alat untuk Mobi
No Nama Alat Kode Jadwal Pekerjaan Kuantitas Sat
No Item Pekerjaan Alat bulan Hari Kerja Jam Kerja Pekerjaan
per hari total

1 2 3 4 5 6=4x5 7

1 Asphalt Mixing Plant E01


6.3(5a) 0.081 5.08 7 35.54 1770 Ton
2 Asphalt Finisher E02
6.3(5a) 0.055 3.474 7 24.317 1770 Ton
5 Concrete Mixer E06
2.2 0.072 4.544 7 31.807 72 M3
7 Compressor E05
6.1(1)(a) 0.001 0.035 7 0.243375 1168.2 liter
9 Dump Truck E08
2.1 0.044 2.779 7 19.450 193.75 M3
3.1(1) 0.233 14.710 7 102.969 5295.5 M3
3.2.1 0.004 0.242 7 1.695 68.5425 M3
5.1(1) 0.082 5.194 7 36.357 289.6 M3
5.1.3 0.159 10.026 7 70.18 580 M3
6.3(5)a 1.484 93.504 7 654.531 1770 Ton
10 Excavator E10
2.1 0.005 0.285 7 1.997 193.75 M3
3.1(1) 0.130 8.167 7 57.170 5295.5 M3
3.2.1 0.002 0.106 7 0.740 68.5425 M3
12 Generator Set E12
6.3(5)a 0.081 5.077 7 35.542 1770 Ton
13 Motor Grader E13
3.2.1
3.3(1) 0.001
#DIV/0! 0.037
#DIV/0! 7 0.256
#DIV/0! 68.5425 M3
5.1(1)
5.1(2) 0.003
#DIV/0! 0.176
#DIV/0! 7 1.234
#DIV/0! 289.6 M3
5.1.3
9.8 0.004
#DIV/0! 0.265
#DIV/0! 7 1.853
#DIV/0! 580 M3
14 Pneumatic Tyre Roller E18
6.3(5)a 0.023 1.467 7 10.270 1770 Ton

15 Tandem Roller E17


5.1.(1) 0.009 0.554 7 3.877 289.6 M3
5.1.3 0.005 0.333 7 2.329 580 M3
6.3(5)a 0.054 3.420 7 23.937 1770 Ton
16 Vibrator Roller E19
3.2.1 0.001 0.041 7 0.287 68.5425 M3
3.2(2)
5.1(1) #DIV/0! #DIV/0! #DIV/0!
17 Water Tank E23
3.2.1 0.001 0.069 7 0.482 68.5425 M3
5.1(1) 0.009 0.582 7 4.071 289.6 M3
5.1.3 0.018 1.165 7 8.153 580 M3
18 Wheel Loader E15
5.1(1) 0.005 0.293 7 2.052 289.6 M3
5.1(2)
5.1.3 0.009 0.587 7 4.111 580 M3
6.3(5)a
6.3(6) 0.038
#DIV/0! 2.420
#DIV/0! 7 16.941
#DIV/0! 1770 Ton
20 Asp. Distributor E41
6.1(1)(a) 0.001 0.035 7 0.243 1168.2 Liter
Alat untuk Mobilisasi
Target Peralatan Yang Diperlukan
Produksi koefisien alat jumlah alat jumlah minimal kebut. di
Tiap Jam per item per item alat lapangan

8=7:6 9 10=8x9 11 12 13

1.000 1.000 1.000


49.800 0.0201 1.000
1.000 1.000 1.000
72.788 0.0137 1.000
1.000 1.000 1.000
2.264 0.4418 1.000
1.000 1.000 1.000
4800 0.0002 1.000
7.000 7.000 7.000
9.961 0.1004 1.000
51.428 0.1361 7.000
40.429 0.0742 3.000
7.965 0.5022 4.000
8.264 0.4840 4.000
2.704 0.3698 1.000
3.000 1.000 1.000
97.039 0.0103 1.000
92.628 0.0108 1.000
92.628 0.0108 1.000
1.000 1.000 1.000
49.800 0.0201 1.000
3.000 1.000 1.000
267.429
#DIV/0! 0.0037 1.000
#DIV/0!
234.771
#DIV/0! 0.0043 1.000
#DIV/0!
313.029
#DIV/0! 0.0032 1.000
#DIV/0!
1.000 1.000 1.000
172.341 0.0058 1.000

3.000 1.000 1.000


74.700 0.0134 1.000
249.000 0.0040 1.000
73.943 0.0135 1.000
1.000 1.000 1.000
239.040 0.0042 1.000
#DIV/0! #DIV/0!
3.000 1.000 1.000
142.286 0.0070 1.000
71.143 0.0141 1.000
71.143 0.0141 1.000
1.000 1.000 1.000
141.100 0.0071 1.000
2.000 1.000 1.000
141.100 0.0071 1.000
104.478
#DIV/0! 0.0096 1.000
#DIV/0!
1.000 1.000 1.000
4800.000 0.0002 1.000
DAFTAR KUANTITAS DAN HARG
SPESIFIKASI 2015

Satker / PKK : ..............................


No. Paket Kontrak : ..............................
Nama Paket PERENCANAAN TEKNIS JALAN
Prov/Kab/ Kodya KEC. BANGKINANG - KAB. KAMPAR

No. Mata Uraian


Pembayaran

a b

DIVISI 1. UMUM
1.2 Mobilisasi dan Demobilisasi

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Peker

DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air
2.2 Pasangan Batu dengan Mortar

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

DIVISI 3. PEKERJAAN TANAH


3.1.1 Galian Biasa
3.2.1 Timbunan Biasa

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

DIVISI 5. PERKERASAN BERBUTIR


5.1.1 Lapis Pondasi Agregat Kelas A (15 cm)
5.1.3
5.2,1 S
Lapis Pondasi Agregat Kelas C

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

DIVISI 6. PERKERASAN ASPAL


6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair
6.3(5a)
6.3(5b) (AC-WC) (gradasi
Laston Lapis Aus Modifikasi (AC-WChalus/kasar)
Mod) (gradasi halus/kasar)

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa
NTITAS DAN HARGA
FIKASI 2015

Satuan Perkiraan Harga Jumlah


Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
c d e f = (d x e)

Ls 1.00 322,357,409.13 322,357,409.13

ulasi Perkiraan Harga Pekerjaan) 322,357,409.13

M3 193.75 39,217.17 7,598,326.79


M 3
72.00 889,799.54 64,065,567.09

si Perkiraan Harga Pekerjaan) 71,663,893.88

M3 5,295.50 50,581.22 267,852,866.55


M3 68.54 206,703.59 14,167,981.00

si Perkiraan Harga Pekerjaan) 282,020,847.55

M3 289.60 694,966.74 201,262,369.10


M3 580.00- 591,208.58 342,900,977.42-

si Perkiraan Harga Pekerjaan) 544,163,346.52

Liter 1,168.20 18,253.18 21,323,360.34


Ton 1,770.00- 3,815,396.72 6,753,252,198.56

si Perkiraan Harga Pekerjaan) 6,774,575,558.90


7,994,781,055.98
Satuan Jumlah % Thd.
No. Mata Uraian
Harga-Harga Total Biaya Minggu Ke-1 Minggu Ke-2 Minggu Ke-3

(Rupiah) (%) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3

1.2 Mobilisasi LS 322,357,409.13 4.03 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06

2.1 Galian untuk Selokan Drainase dan Saluran Air M3 7,598,326.79 0.10 0.10

2.2 Pasangan Batu dan Mortal M3 64,065,567.09 0.80 0.40 0.40

3.1.1 Galian Biasa M3 267,852,866.55 3.35 0.48 0.48 0.48 0.48 0.48 0.48 0.48

3.2.1 Timbunan Biasa M3 14,167,981.00 0.18 0.06 0.06 0.06

5.1.3 Lapis Pondasi Agregat Kelas S M3 342,900,977.42 4.29 0.61 0.61 0.61 0.61

5.1.1 Lapis Pondasi Agregat Kelas A (15 cm) M3 201,262,369.10 2.52

6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 21,323,360.34 0.27

6.3(5a) Laston Lapis Aus (AC-WC) (gradasi halus/kasar) Ton 6,753,252,198.56 84.47

TOTAL 7,994,781,055.98 100.00 0.06 0.06 0.06 0.06 0.54 0.54 0.64 1.00 1.00 0.60 0.54 0.68 0.68 0.68 0.68

0.06 0.13 0.19 0.26 0.80 1.34 1.98 2.98 3.98 4.59 5.13 5.80 6.48 7.16 7.83

63
TIME SCHEDULE

DURASI

Minggu Ke-3 Minggu Ke-4 Minggu Ke-5 Minggu Ke-6 Minggu Ke-7 Minggu Ke-8

4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4

0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06

0.61 0.61 0.61

0.42 0.42 0.42 0.42 0.42 0.42

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88

1.10 1.10 1.10 2.37 2.37 2.37 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95

8.93 10.03 11.12 13.49 15.86 18.22 20.17 22.12 24.06 26.01 27.96 29.91 31.85 33.80 35.75 37.69 39.64 41.59 43.54 45.48 47.43 49.38 51.32 53.27 55.22 57.16 59.11 61.06 63.01 64.95 66.90

51
Minggu Ke-8 Minggu Ke-9 Minggu Ke-10

5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3

0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88

1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95 1.95

68.85 70.79 72.74 74.69 76.64 78.58 80.53 82.48 84.42 86.37 88.32 90.26 92.21 94.16 96.11 98.05 100.00